New RFI No. 18 As of 1-Jul-2010 3:17 PM CT Vitruvian Infrastructure Phase 1C Park 4010 Marsh Lane Addison, Texas 75001 Project Number: 1308C Status: Outstanding Subject Pergola/Trellis Reason Code None Question 1. S101 calls for the exposed structural steel to be galvanized. L1-01 calls for the pergola and trellis to be powder coated. Please clarify. 2. SP308 calls for embed base plates for the pergola. L9-14 calls for the base plates installed with anchor bolts. If powder coating, plates with anchor bolts is the preferred method. If the pergola and trellis do get a powder coat finish, there will have to be some design and fabrication methods developed so the items will fit in a powder coaters oven and so installation can be completed with bolt together connections. Proposed Solution Attached Files (none) Section: 5 - Metals Int. Tracking #: Days Elapsed: 0 From: Jennifer Haynes Originated: 1-Jul-2010 3:17 PM CT To: Nick Jacob (First Recipient) Requested By: 4-Jul-2010 2:52 PM CT Copy to: Joel Massey Eric Little Victor Lissiak III Robyn Jacobson Wade Geistweidt Clay Barnett Additional Info Proposed Solution Impact Critical Path? Yes Cost Change: None Time Change: None Discipline Code: Structural Drawing Numbers: Needs Drawing Change? N/A History (Chronological Order) No history to display. Final Response (Closing) This item is still open. No final response to display. .................................................................................. Copyright (c) 1999-2010, Systemates, Inc. View the User Agreement for legal restrictions and terms of use applicable to this site. Use of this site signifies your agreement to the terms of use specified in the User Agreement. Projectmates - The Capital Project Management Software