>> Leave comment << Response to RFI No. 21 As of 10-Aug-2010 11:51 AM CT Vitruvian Infrastructure Phase 1C Park 4010 Marsh Lane Addison, Texas 75001 Project Number: 1308C Status: Outstanding Overdue Subject Anemometer Conduit Reason Code None Question The plans call out for wind controls for the grotto fountain but show no location. Proposed Solution The anemometer needs to be as close to the feature as it can be. There is a 3/4"conduit running from a pull box near the recirculation irrigation control cabinet for a future 4" fill valve that runs to that location and is capped. It is recommended when the ditch is open to add another 3/4" conduit for the anemometer be added. Attached Files (none) Section: 2 - Sitework Int. Tracking #: Days Elapsed: 33 From: Jennifer Haynes Originated: 8-Jul-2010 2:00 PM CT To: Nick Jacob (First Recipient) Requested By: 11-Jul-2010 12:00 AM CT (Original 11-Jul-2010 1:53 PM CT) Copy to: Jerry West Joel Massey Eric Little Wade Geistweidt Clay Barnett Additional Info Proposed Solution Impact Critical Path? No Cost Change: None Time Change: None Discipline Code: Mechanical Drawing Numbers: Needs Drawing Change? Yes History (Chronological Order) Type Routed Billable n/a Memo Please advise. Attached Files (none) From: Nick Jacob Sent: 8-Jul-2010 2:25 PM CT To: Joel Massey Requested By: 11-Jul-2010 1:53 PM CT Copy to: (none) Type Response Billable n/a Memo The anemometer for the Grotto Waterfall will be located on the Grotto structure, on the park lake face of column A1. The vertical location will be the same as for the light fixture, SK2, on the park lake face of column A2. I will comment on the metals shop drawing submittal for an additional 1/2" rigid coupling (same as for the light fixtures) for the anemometer mounting. A new 3/4" conduit will be added to run from this column, around the amphitheater upper wall, along the west north park lighting conduit, across the creek with the other power & lighting conduits and south to the recirculation controls cabinet. Revised drawings indicating this will be issued this Friday or early next week along with bridge lighting coordination revisions and park lake water level control revisions. Attached Files (none) From: Joel Massey Sent: 10-Aug-2010 11:50 AM CT To: Nick Jacob Requested By: 11-Jul-2010 12:00 AM CT Copy to: Jerry West Joel Massey Eric Little Victor Lissiak III Robyn Jacobson Jennifer Haynes Wade Geistweidt Bruce Dunne Clay Barnett Final Response (Closing) This item is still open. No final response to display. .................................................................................. Copyright (c) 1999-2010, Systemates, Inc. View the User Agreement for legal restrictions and terms of use applicable to this site. Use of this site signifies your agreement to the terms of use specified in the User Agreement. Projectmates - The Capital Project Management Software