>> Leave comment << Response to RFI No. 46 As of 19-Nov-2010 3:26 PM CT Vitruvian Infrastructure Phase 1C Park 4010 Marsh Lane Addison, Texas 75001 Project Number: 1308C Status: Outstanding Overdue Subject Sidewalks Reason Code None Question 1. C603 shows sawed control joints for the sidewalk/paving. The landscape shows tooled joints. We think the tooled joints aren't deep enough for crack control on the 6" concrete. Can we disregard the tooled joints shown on the landscape drawings and use the sawed joints on the civil drawings? 2. The amphitheater doesn't show a sawcut pattern or layout. Since it's radial and half of it is visible and not covered in pavers is there a pattern you want to follow or do we just follow the 8' max spacing each way? Proposed Solution Attached Files (none) Section: 3 - Concrete Int. Tracking #: Days Elapsed: 3 From: Jennifer Haynes Originated: 16-Nov-2010 11:27 AM CT To: Nick Jacob (First Recipient) Requested By: 19-Nov-2010 12:00 AM CT (Original 19-Nov-2010 11:26 AM CT) Copy to: Junior Rojas Joel Massey Eric Little Robyn Jacobson Wade Geistweidt Mark Gaines Clay Barnett Additional Info Proposed Solution Impact Critical Path? Yes Cost Change: None Time Change: None Discipline Code: N/A Drawing Numbers: Needs Drawing Change? N/A History (Chronological Order) Type Routed Billable n/a Memo please review Attached Files (none) From: Nick Jacob Sent: 16-Nov-2010 3:55 PM CT To: Joel Massey Requested By: 19-Nov-2010 11:26 AM CT Copy to: Junior Rojas Robyn Jacobson Type Routed Billable n/a Memo Both KSS and UDR feel that the C603 drawing should override here. Please proceed with using sawed joints in the 6" walks/paving. KSS to provide a sawcut pattern for the amphitheater shortly. Attached Files (none) From: Eric Little Sent: 16-Nov-2010 4:33 PM CT To: Robyn Jacobson Requested By: 19-Nov-2010 11:26 AM CT Copy to: Joel Massey Nick Jacob Jennifer Haynes Wade Geistweidt Type Response Billable n/a Memo Revised drawings uploaded on 11/18/10 to address paving pattern (sheet L8-01). Also revised drawings to address details of drainage flume at Amphitheater (sheets L8-34 & L8-35). Attached Files (none) From: Junior Rojas Sent: 19-Nov-2010 3:26 PM CT To: Eric Little Requested By: 19-Nov-2010 12:00 AM CT Copy to: Joel Massey Eric Little Robyn Jacobson Nick Jacob Wade Geistweidt Mark Gaines Bruce Dunne Clay Barnett Final Response (Closing) This item is still open. No final response to display. .................................................................................. Copyright (c) 1999-2010, Systemates, Inc. View the User Agreement for legal restrictions and terms of use applicable to this site. Use of this site signifies your agreement to the terms of use specified in the User Agreement. Projectmates - The Capital Project Management Software