Here are some of the pictures we took this afternoon after the painter had power washed the Ponte arches. You can see where they have skips through out both arches. The arches were both wet from the rain while they were working. Thanks Wade Geistweidt Engineering Tech 2035 Central Circle Suite 110 McKinney, TX 75069 o| 972.562.4677 c| 469.576.9951 f | 972.542.4366 ________________________________ From: David T. Hernandez Sent: Thursday, April 21, 2011 3:32 PM To: Wade Geistweidt Subject: draft only-Ponte Ave Bridge 04-21-11