Dianne, As we discussed in the meeting, we are providing one photo electric controlled circuit to the bridge for street lighting and one photo electric / time clock controlled circuit to the bridge for accent lighting. This is the same for both Ponte Avenue or Bella Lane. You will need transformer(s) for the LED fixtures and light fixture circuit protection for all the fixtures at the bridge. Joel A. Massey Project Manager icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 229-7944 jmassey@icon-engineers.com From: Popken, Dianne [mailto:DPopken@Halff.com] Sent: Friday, July 30, 2010 6:56 PM To: Joel Massey Cc: Christiansen, Eric; Bruce Dunne; Barnett, Clay Subject: Lighting Circuit coordination Joel As a follow-up to our conversation after the coordination meeting 7-29-10, here are the circuit requirements for the Ponte Bridge: Streetlight circuit 4 Type A fixtures 10 Amps at 240V Accent light circuit Type D, F and on SA poles 15 Amps at 240V Accent light circuit LED Type E 10 Amps at 120V Please provide the three circuits listed above and the locations for connection. Dianne M. Popken, P.E. Vice President Halff Associates, Inc. 1201 N Bowser Road, Richardson, Texas 75081 214-346-6306 Cell 214-724-8150 Fax 214-739-0095 dpopken@halff.com