Joel,
Just cc me on this kind of stuff please.
Thanks,
From: Joel Massey [mailto:jmassey@icon-engineers.com]
Sent: Tuesday, January 25, 2011 2:27 PM
To: Eric T. Little
Cc: Nick Jacob; Clay Barnett; Bruce Dunne
Subject: RE: VP - Ponte Ave. Bridge Sidewalk Grading
This was a discussion to determine if there was an issue. You would have been included if it was. TOA decided it was not.
Joel
From: Eric T. Little [mailto:ELittle@udr.com]
Sent: Tuesday, January 25, 2011 1:49 PM
To: Joel Massey
Cc: Nick Jacob; Clay Barnett; Bruce Dunne
Subject: RE: VP - Ponte Ave. Bridge Sidewalk Grading
I would just like to be included on any discussions about issues on the project I am supposed to be running.
Thanks,
From: Joel Massey [mailto:jmassey@icon-engineers.com]
Sent: Tuesday, January 25, 2011 1:34 PM
To: Eric T. Little
Cc: Nick Jacob; Clay Barnett; Bruce Dunne
Subject: RE: VP - Ponte Ave. Bridge Sidewalk Grading
Eric,
This was a bridge design discussion that, at the end, expanded to the separate park design work related to grading coordination at the four corners of the bridge.
The purpose of the original email was to get the Ponte Bridge designer to respond to sidewalk design slopes of less than 0.6% on the bridge. It was forwarded to the TOA after there
was little response and no resolution to the design issue. The TOA takes the position that it is too flat, but will monitor the construction to minimize the impact.
The bridge grading coordination is a separate item that we are still working on as described below.
Please let me know if you need further information.
Joel
From: Eric T. Little [mailto:ELittle@udr.com]
Sent: Tuesday, January 25, 2011 11:48 AM
To: Clay Barnett; Joel Massey
Cc: Nick Jacob
Subject: RE: VP - Ponte Ave. Bridge Sidewalk Grading
Hey,
Is there a reason neither Nick or I were copied on any of these emails?
From: Clay Barnett [mailto:cbarnett@addisontx.gov]
Sent: Tuesday, January 25, 2011 9:14 AM
To: 'wgeistweidt@kleinfelder.com'
Cc: Eric T. Little; Nick Jacob
Subject: FW: VP - Ponte Ave. Bridge Sidewalk Grading
Wade,
Please be aware of the flat slopes in the bridge approach slab on the southeast side of the Ponte Bridge. Also included is a summary of where Icon is on the grading revisions near the
bridge approach slabs.
If you have any questions, please let me know.
Thanks,
Clay Barnett, P.E.
Town Engineer
Town of Addison
16801 Westgrove Drive
Addison, TX 75001-2818
Office: (972) 450-2857
From: Joel Massey [mailto:jmassey@icon-engineers.com]
Sent: Monday, January 24, 2011 3:17 PM
To: Clay Barnett
Cc: Bruce Dunne
Subject: RE: VP - Ponte Ave. Bridge Sidewalk Grading
Clay,
Well maybe with Klienfelder watching this construction, the paver sidewalk ponding will be minimal.
The coordination of the bridge grades and the preferred parkway grading will result in revisions and/or adjustments at the top of the four stairs and two ramps. We have completed a
parkway grading concept plan for all four corners of the bridge and have reviewed it in person with KSS. They are reviewing the concept plan and will provide their input. After they
are finished, we will provide the proposed plan and park structure revisions and/ or adjustments. I believe that answers your question.
Joel
From: Clay Barnett [mailto:cbarnett@addisontx.gov]
Sent: Monday, January 24, 2011 3:00 PM
To: Joel Massey
Cc: Bruce Dunne
Subject: RE: VP - Ponte Ave. Bridge Sidewalk Grading
Joel,
I reviewed the information. I agree that there is a cross section of the sidewalk that is fairly flat. However, that is true of the street at this location as well and is generally
true of all streets near low and high points. Additionally, I believe that 0.5% slope is adequate to maintain drainage on a paved surface assuming that the contractor maintains this
slope. I will advise Kleinfelder of the flat slopes in these areas and ask them to keep watch to insure that we have positive drainage.
How is the examination of the elevations of the bridge approach section matching up with the park plans? I believe this was the issue that Bruce mentioned at the construction meeting
a few weeks back.
Thanks,
Clay Barnett, P.E.
Town Engineer
Town of Addison
16801 Westgrove Drive
Addison, TX 75001-2818
Office: (972) 450-2857
From: Joel Massey [mailto:jmassey@icon-engineers.com]
Sent: Wednesday, January 19, 2011 12:17 PM
To: Clay Barnett
Cc: Bruce Dunne
Subject: FW: VP - Ponte Ave. Bridge Sidewalk Grading
Clay,
In conjunction with the Ponte Ave. grading coordination with the bridge, I came across what I believe may be a bridge deck drainage issue. I sent the following email and attachment
to Halff a little over a week ago. The purpose of the email was to verify with the designer that the bridge deck east side sidewalk transitions provided adequate surface slope to drain.
I received a call from a staff member at Halff, I believe the next day, but I have not heard any resolution since then. I believe this is important because my translation of the sidewalk
transition information results in a surface slope of about 0.5%. I believe this slope will be too flat for the paver walkway to adequately drain.
Please follow-up with Halff to verify whether or not this is an issue.
Joel
From: Joel Massey
Sent: Monday, January 10, 2011 10:20 AM
To: 'Christiansen, Eric'
Cc: Bruce Dunne
Subject: VP - Ponte Ave. Bridge Sidewalk Grading
Eric,
I am working on the proposed grading coordination, at both ends of the Vitruvian Park Ponte Ave. bridge, with the four (4) adjacent buildings (existing, proposed & future), the Vitruvian
Park access and the Ponte Ave. roadway. I have one question to you concerning the “sidewalk slope transitions” at the southeast and southwest corners of the bridge. Using the sidewalk
slope transition stations and plan view slopes shown on your sheet S1-01 and the proposed roadway grades, it looks like the sidewalk slope transition areas on the south end of the bridge
are not going to drain very well.
Please look at the attached PDF exhibit and let me know if I have translated the bridge design correctly on the exhibit.
Joel A. Massey
Project Manager
icon Consulting Engineers, Inc.
Bicentennial Financial Center
250 W. Southlake Blvd., Suite 117
Southlake, Texas 76092
Phone: (817) 552-6210
Fax: (817) 552-3126
Mobile: (817) 229-7944
jmassey@icon-engineers.com
******************************************************************************************************************
This e-mail and any files or attachments transmitted with it contains Information that is confidential and privileged. This document may contain Protected Health Information (PHI) or
other information that is intended only for the use of the individual(s) and entity(ies) to whom it is addressed. If you are the intended recipient, further disclosures are prohibited
without proper authorization. If you are not the intended recipient, any disclosure, copying, printing, or use of this information is strictly prohibited and possibly a violation of
federal or state law and regulations. If you have received this information in error, please delete it and notify Hamid Khaleghipour at 972-450-2868 immediately. Thank you.
*******************************************************************************************************************
******************************************************************************************************************
This e-mail and any files or attachments transmitted with it contains Information that is confidential and privileged. This document may contain Protected Health Information (PHI) or
other information that is intended only for the use of the individual(s) and entity(ies) to whom it is addressed. If you are the intended recipient, further disclosures are prohibited
without proper authorization. If you are not the intended recipient, any disclosure, copying, printing, or use of this information is strictly prohibited and possibly a violation of
federal or state law and regulations. If you have received this information in error, please delete it and notify Hamid Khaleghipour at 972-450-2868 immediately. Thank you.
*******************************************************************************************************************
ᓵ�ﺯ既翂㬊⯪族㗗嬋ힳꌎ�ᆲ栀鏉ᡰ䎟ꭉ竪闭围ꨩ鲰㱍ႉ辑졑쵁崷鼮뿖㿤욬뇗瓨⽗ᷢ䟗曒拻뷙퇄֨ᅔ撵ꭅ띪唞᪔벻ꥭ梛䋯㊩띇頾㴸鷪ꑔ濣俫⫳欗彿㯒髅鄧妣鴑҆풯덓᭵췫䴾�Ξ꭪䔱珜䦀髣꺭鸭ꞯ⫏㗚슼\㇀᳤ᵶ嵪除뫄뻶횟ེឝ觹揦쵶盃焽깏备滔測銤ﳎ욦瓉䭕㈹鰁춁ꄮ檬䪺囪ꦍ㥉湁㏫蜪܌ᶚ띤홟堟뭉秇䵑潷뀄ⳅ迈活䦉쿥ੜ듥랿协綖楎傚䧾谎̜꣱買즚䞷펹⽼벫㎏㬏曥䟥�ꪛ诟弇퉄騦琤睕
ɘ俟絚陰鵚ퟜ拚컜䦓촅⛔䅧✸�缕贈햵춗㑹ᱪ⪔狑㙎Ỻᅅ꒪ÿ㔪闓疬垔ꄁ멫᮹畍䤉鄦됤鑹̕숸灣甼딦洵屃ꝡ⋃⺍魋໑遣륋㰈걂禜ﺒꚿ밊湚䏏ꆪ写㍋倅䤲ȸ⮸佽띙픥鶤픡褍ꎍ䡜Ꞟ씟ⵕ䟼岨㉪밡�셜ﭱ妩ꘘ燐Ε퐜䒼띭毵꓾拽댷홟ꃇ鞤漋쐝⭯ꬪ镤鿩墥⎮멅ⶎ쉞矪䕄䏑ƻڀ仮瘅흖崑쟛ͱ⊉䎕ร᪄㋚듹⩝빳뤳�㷞娿妆倖㍞ᲡṤ징ㅩ⭸빉앋וֹ⎉䄹Ȳ﨔듢⓾읿追狽贫ᮯ贓享誫蚶ት뭳ꍇẏ≨⡓熂ణဗ醌췵胖鍋㙯ᡤ鮏獞慅ꏽ
졛퉾ꅇ趯㘼泝䊜揝ﺴ⤝谏ぼ裑菍ܔ䴡尟鹗䟑跶⽯岸籙쫙괙逤�/縻魎竇쐅㥦ྕ硕݁⛰㾊殴ཹ㏚�黆锛奣鴬翄㕰邺便筊췌ㅭ묮願챇༽禵棍穨穴ꢮ銖텈⮫쬝臗ꢚꭣ峎칡퇎浼엡暙䥛訄蜶ഐ竀虦럱᪇⤯냝껛媏귡ﮋ↙傶끼㍋唰㭐窒蝔뽃늱꽆첳틞鬀뵿ꚻ갩╮ꖫ邿䡳忭黆鈛⤯�캣跭ꑮ흧仸㻼貌茌ᅪ쨈䆏ᗏ꿆뭆啫᪅၁⊗땁풓蘞ྛ㖇ꀫይ퇂⿇튔쩹眗꧖녢ﱍ耿ꗹ蟷⪦뙦䊚犇胮ꜝ珔l萀쏻捠돬癣秼ﵺ㪂翕ಳ湛付塀ꛕ蛰
ʴ⚟ꔐ㎶휙�玌ꯁ⮆ⴓﱒ켅윮빤仒᙮旒뢙ଲ롱㷾❩菸駡嚤튞ṩ먿滏弉殦螄�㙗ӂ궍ገ눴䔄ꀧ磜鳦✼쮬煵�㷐ڸą䙏䳏핻丬�쁏矬쌓彎둵㸌ὠ髧쵫繉㿍莘뽪㊐킣휜椁귡禍鈶밫藆喦壳ॵ붟囸㙬ៗ欗ᱩ칧�뿏㾥垭퍖ⁿ⑵摺㓳歋밺뽍�缎㦼潎뺈㜙猢灥໓鼄զ쁛鶺ꗮ艢�컜ዥ㧦䑖꣣ꭽ唧帗퐞늤˔䎹㲁ᤌ筘ꇣ귶樝䷶㜤�㷶归�蘘搰鲴䠫Ἁὧ푻ퟳ菞﵂粖뜘�ퟫ붯穱螗悭뫰虪髭ᓢ箎犛줇鏒�뤍錮甚⟉䊉꺻諫깪ﰢ
檭礮ꛩ棧ᇟⴼᠪ캞䥧猛똩酺凫쉋�軽嬫㊟仝嬘䚌踽깸䍋鷰ಥ䒲섒먡깐᳠ꀒ燲ⱕ⮼娚�ꕽ�橝孓趬⨠蓈軣ꮚ酛꿉썏쫼镒枛籾䖆敃䔩쩭눍ῠ굟伺䮷Ⱨ醄㷳麺⮝侄積ᅭ瘢ﱘ釆卦꼚溩ꖂᘞ췕듡畛礲桞䀢靕Ổ릆돾ﺈ쁟禎㯶︩䥢黁矎⾒춺८ꅟ㳍䥼캘롃㟃㊐탃힜簘笝筱딕釔荛鬑૭퓁㩆㪞䗖뻝穷�呯岈т苣縺갵흫붒ຒ굹䝏衏ᔞ⚎ⲉ䢥ﳜ뛈ϊ䝽虺蕯呚鱒ﮦ恥餾磳屳풴퍠뚥꺉➦䥬넲㥐�ᣝ⛧ٚ랬隖沋䶳齹벳ऒ䰒썵㠎嗯딚曯麃ꅫ
櫟⏼綪溝퐣漱锰쉂䠰秬囩纭楒뙢놷ֹ偎攋༁ﰉꬥ�嫚偹掮䢆垦鲍嵵胃멩蚇촵��酆錠ⷊꨔ㟦퀁껖튤闦揯擗菸ꋡ뻏盒䘮�뮃㌝㓏蠟᭞枭䄦첇蜞殞瓍㝆Ṿ립뚻榒鹡ꌨᲙ崅ῧ剫싫땺犬윻⯘鲯ꚤቺ༻沕穌꺝齶鿰彸ὠ面�綠碙뜃꧒﹪놦慬㮞컘濥⠲沀龎왟疱ி嬋ⶻ䴻ꚅ銺툠鰹砐㣉ჾ欽햞宴⇭止䎔�Ⱙᵎᴛ䕆휩꺬閤劂겕��螦넌ⵛ跼斌嚁鄴躣棒鏼访u퐓窎雗밭⇓愱﹉褩媣㊧㳜亮݉퀀趱㼫裈槔ṙ纨ࡑ걸差⒁癹鳀Ꞟ窯뾨
ﰘ怟뇘喵ﳉ蓫宄㇀欌㬞柕랹旔敨㦂ᱢ⌖ಧ꽴歜䝷墥奼緰濉灩䧋时缌辮�렛ڐ徴�豈ꡏ볦倿요䳧芘寮ꖏ捅䦯㝭ꦕ穄빠픰煊ꏦ鞯�훛먇蠟ᣞ쥕龵ÿ룇�窽퓻萷䊒웢睕曉㋻禮ᶯ풺灠䟊툇뒨迥㗗ꬑ굕ṙᅵ᐀⦼阌ㅷ差욊淘ﴫ떧㩶ꄾꩭ灩奞⒣༒妑遶윁쉏斾榊贤湭鮏孬黮調탗ฟ塣ർ䚧첮똂甋웻⦺鑔榥팚㎟縱缤ﷇﶏ潲⯦꾍활㥼깡ᑋ蚗텝唩훠ﱯᨠ괯﷏�靗슊痎⒥Ꟑ굹梀랾관ﱇᨠ괯﷏�㝗䑷㏲棍䪯ÿ΄
ᄍ뼀ﶿ㽪á緑置ÿ轚咩菮麑䕫坺⼚쾭﷽ÿ凫ÿ؈ウ缀奔緔Ꝋᱴ퍚뻽겛畅塲ꩄ㰙璌�ჾᜍÿꣵÿ΄ᄍ뼀ﶿ롪橡䫂굉鄃욜ꪙ婩앍䗊팼睃ങ�욌죙䧹藹כּ乷喓�伳瘔⣆殥ť퐛퍇툕ÿǂ甆ᅵ�ﻟﻡオ缀奔닕妧锤붬깿媥Ն觧厚霙폦�⠟弮茾겠畘栫㫼禚烌�꼇瞭뒯孏ﮯ혀ᄂ蔀ꅹ��ﻟ㞵덎海乿퓠㣲뗹䚛꫱锰ﱜ㚿윀ꭊ걳㛚玏㱨Ⓝ袺徹趗ﺙ�쉿킼篏ﮯ혆숀킺鲳翝�뗾팸몬罻鲐칤ﭞ퉝㙵鹮᯦륫驣鈩창ꠊᔄ䟍⭻㶛ࡊ旖
ⵙ랢�怹ꮇ智뎺㵂�﷽ÿ勫쉿킶왈ョ娀슭�훟ꢟ䝚ꐫ�덅隴땆춚ꯘꪭ볍鸓�Ⲱ蠇ヨ倀ꞅ㎶⒙ق㹈ÿ곰㿼矫ÿ뽿퓺蘟ÿÿ魚喧�嚖춱䮻ꙑ綋ﷲﮎ淏쮶⤈肎껵啗펹�ꙩ캖懦懱䊣썲꼙n蔀珰뾛ﷻÿꛖ쎷溱漪㤋㇋鎛嗺哲뭺ゥ̀臼䷆牪磒䢯햻е튺躡響똆衻駐恌㉡踳꠸趴䡯鞵뭃벹ኼラ猛億銂炎⟹ྎ쌏༏관㽍簋笺翞뗾畚뒺阮ÿ툭移讴ᦩ뜣㊈䥥⪾훒堫귮⬞滩酌ॄ籕껈꺆步ꇢ쒳ÿ櫽
泆붖Îÿ⦅혀᪭䮛찷쯑᛭ᗍ�잪а遦쇲㯆遢델虍朳�겵欺엚☫䤞鰛�剗ᐾ泸ᕿÿÿ叫硖ί缀꯵ष翹w㈀㵭⫎엓盖먖䙄朩ⵘ뚥䎼嗆㾛㒊䵫흖ퟷ麘鸥⟜᪑䢶Ḅ땫蕯᰾굮サ缀ÿ헺簛痋혀誫傟鉑㡖漻堘ﳚ뵃䓗쥲癧㈙潐恕瘆뢞䫇㲶東굧卩ⱇ뚗暶쁍ꕙ䂸ΰ踪뾧欽ᄚ蔀ﲁ�관ﱇ⼪缌ﭺ튪늚伋蹓욛瀺㓕䮖枹뎴㞼ᘎㄈᖎ곷껑獩難龎尻笁궪凎ᄹ튃ᗾ蘗봿ス缀ÿ퓺蘧筇ﯟÿÿꗖ罩⽟௲m开珗鷵丟痓㸽
껕⥞₯�鿈䐱㬹ල筍귢䬾ᒯ୍Ꝏ䑕쐖炧睆瑺ᗾ蘯붿サ缀ÿ퓺쎏罟︀▵䠉 ̄넺☞ⰷ㶳彩�쫊銘�态봪ꟾ筣�嫩콣鴥趤錬鯌踌苝˶辻哸ᠾﷷÿÿ嗫纸ᑒ愷ꝗ뿯헺檕煲ퟒ챿搹楹Ḹ첔靖毽ᅰ桛�ᄏ뼀ཪ淃$ᔀὗ柕ᇝ�㫣캅외嗤杫鷲灰휻㞲忂ㄍ딤⓱鿤_관䆠篝ﷇW剗㗃ଛ동擊㧹Ⓣ⭕棫↯爞꾌矱픾믰쿃떌᭓埡ᢇ娐鿷濺ÿ꧖অꟅꩱ䝲것ࠫೂ픎耢ퟜ㞷ῂᄌ꿷숇ఏ贎ス缀ÿ헺댟詧적괞꿀벡%∀齦㻆f
퀀撍쎛䠱ᬜ䇂瓣ﻹ횕嫩빭ꞑ捅뽫诊眻麜穎凕趃筍刚劋ᅯÙ