Bruce, After further review, I would like to exclude the Bella Lane storm drain from the Halff work. We will handle the Bella Lane storm drain at the same time as the Ponte Ave. storm drain in the Vitruvian Park Phase 1C package. Joel From: Christiansen, Eric [mailto:echristiansen@halff.com] Sent: Saturday, April 24, 2010 10:36 PM To: Bruce Dunne Cc: Joel Massey; Barnett, Clay Subject: Vitruvian - Bella Lane Storm Profiles Bruce, The sheet that Icon is providing for the Bella Lane Storm Drain should be labeled as Sheet C1-01. We'd like to receive the sheet by the end of the day on Wednesday to incorporate it into our set. Thanks, Eric Eric S. Christiansen, P.E., SECB, LEED AP Senior Structural Engineer HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214-346-6284 Fax 214-739-0095 Cell 972-955-2996 www.halff.com