Eric, It was my understanding from David Hernandez of Kleinfelder that the painters felt they were done on the Ponte Arches. They move over to the Bella Lane arches about 1:45 PM. The welders and Austin crews were all working on the Bella Bridge and the painters crew left the site for the day around 2 PM. I will be off tomorrow however I am leaving the paint issues in the hands of Robert Boswell and David Hernandez. Roberts cell # is 512.426.3380 Davids cell # is 214.876.5558 Rick Hammerberg is the project manager for this site and his cell is 972.251.3876 Thanks Wade Geistweidt Engineering Tech 2035 Central Circle Suite 110 McKinney, TX 75069 o| 972.562.4677 c| 469.576.9951 f | 972.542.4366 ________________________________________ From: Christiansen, Eric [echristiansen@halff.com] Sent: Thursday, April 21, 2011 6:11 PM To: Wade Geistweidt; elittle@udr.com; pjacob@udr.com; Barnett, Clay; Lara, Amanda; Andrew Harper; Todd Henson; Derek Dodson Cc: David T. Hernandez; Rick Hammerberg; Robert Boswell Subject: RE: draft only-Ponte Ave Bridge 04-21-11 Wade, While some of the pictures are taken in shadow (or looking at the sun) and difficult to view, it is apparent that the sub still has some work to do to prepare the arches for painting. Do we know if they were planning to return and provide additional prep work or did they believe they were finished? Eric Eric S. Christiansen, P.E., SECB, LEED AP Senior Structural Engineer [cid:image001.gif@01CC004F.80B28020] HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214-346-6284 Fax 214-739-0095 Cell 972-955-2996 www.halff.com From: Wade Geistweidt [mailto:WGeistweidt@kleinfelder.com] Sent: Thursday, April 21, 2011 5:43 PM To: elittle@udr.com; Christiansen, Eric; pjacob@udr.com; Barnett, Clay; Lara, Amanda; Andrew Harper; Todd Henson; Derek Dodson Cc: David T. Hernandez; Rick Hammerberg; Robert Boswell Subject: FW: draft only-Ponte Ave Bridge 04-21-11 Here are some of the pictures we took this afternoon after the painter had power washed the Ponte arches. You can see where they have skips through out both arches. The arches were both wet from the rain while they were working. Thanks Wade Geistweidt Engineering Tech 2035 Central Circle Suite 110 McKinney, TX 75069 o| 972.562.4677 c| 469.576.9951 f | 972.542.4366 Error! Filename not specified. ________________________________ From: David T. Hernandez Sent: Thursday, April 21, 2011 3:32 PM To: Wade Geistweidt Subject: draft only-Ponte Ave Bridge 04-21-11