Joel As you are aware, Brian w/ Nathan D. Maier Consulting will be designing the upstream portion under the bridge and upstream of the park. Brian has requested permission to do a topographic survey upstream and I noticed on a set of drawings Bruce showed to UDR last week, that there were already some contours shown. One might conclude that ICON probably did some survey or had access to some survey documents in the area. Do you have any survey data from the area upstream of the Bella Bridge? Please call me if you have any questions. THANKS ! Kent Power, P.E. 210.889.8143 (Mobile) 210.525.0647 (Office) R.H. Shackelford, Inc. 1100 NW Loop 410, Suite 350 5057 Keller Springs Rd, Ste 300 15218 Isla Pinta Drive San Antonio, TX 78213 Addison, TX 75001 Corpus Christi, TX 78418 A Service Disabled Veteran Owned Small Business (SDVOSB)