Meeting Minutes For "Construction Meetings" Meeting No. 5 As of 11-Aug-2010 2:16 PM CT Vitruvian Infrastructure Phase 1D Bridges 4010 Marsh Lane Addison, Texas 75001 Project Number: 1308D Published Date/Place 5-Aug-2010 8:30 AM CT at Construction Trailer Prepared By Eric Little Attendees Clay Barnett Eric Christiansen Derek Dodson Wade Geistweidt Andrew Harper Todd Henson Nick Jacob Eric Little Brad Rusk Dave Wilde Other Attendees tlamberth@udr.com Statement Next Meeting 12-Aug-2010 8:30 AM CT at Construction Trailer Old Business Topic 1.1 Pre-Con Questions Complete Meeting Date: 8-Jul-2010 10:00 AM CT Ponte Bridge 1)When will the Oncor manhole @ Abutment 1 be raised to future grade? -- NTC will work hand in hand with Austin B&R and raise manhole when it is needed. 2)How long is the existing box culvert staying in? Will it supporst construction equipment weight? -- Existing box culvert will stay in until Abutment 1 is complete. The box culvert supported the weight of a drilling rig. 3)When will the storm drain and manholes at the abutments be finished? -- coordinate with NTC as this is needed 4)What is Rebcon's scope of work, and what will need to be coordinated? -- Rebcon will be installing wiers, walkways, walls and ramps. Supply Austin B&R a copy of the park drawings. 5)When is the fill at the Abutment 2 header coming in? -- NTC will backfill as abutment is built 6)UGE penetration at Abutment 1, how will this be supported during excavation and construction? -- Supported by piers. 7)Future UGE at Abutment 2, will a location be provided to block out the wing and stem walls? -- Icon is reviewing and will provide location (consider deleting) Pedestrian Bridge 1)Which trees will be removed? -- Austin B&R to stake bridge for TOA review 2)With the existing trees, how will pedestrian bridge be installed with crane? -- Pending layout 3)Can Austin B&R access the west side of the pedestrian bridge through the apartment complex? -- Yes, public road. Only 6" paving with no lime subgrade so avoid heavy equipment. Bella Lane Bridge 1)What is the maximum load on the existing bridge? Can equipment cross it safely? -- Austin B&R to send load requirements 2)Who will cut out the channel at the interior bents? When will this take place? -- NTC will remove, timing TBA. Austin B&R needs by mid August. Schedule 1)NTC requests Austin B&R adds time for utilities -- Austin B&R shows 2 days in their schedule for utilities at Ponte, NTC will provide dates and durations. 2)Storm drain under Bella -- pending design by ICON. Austin B&R will pour around storm drain at interior bents. Status: In Progress Assigned To: (none) Due Date: - TBA - Meeting Date: 22-Jul-2010 9:00 AM CT Ponte Bridge 7)Future UGE at Abutment 2, will a location be provided to block out the wing and stem walls? -- Icon has deleted. Bella Lane Bridge 1)What is the maximum load on the existing bridge? Can equipment cross it safely? - UDR and the ToA have provided AB&R copies of the inspection reports for the bridge. AB&R to determine if their loads are ok to cross. Status: In Progress Assigned To: Todd Henson Due Date: 28-Jul-2010 12:00 AM CT NEW! Meeting Date: 5-Aug-2010 8:30 AM CT Closed. Status: Complete Assigned To: (none) Due Date: - TBA - Topic 1.2 Electrical Coordination In Progress -- Due Now Meeting Date: 22-Jul-2010 9:00 AM CT ToA to follow up with Halff and ICON. Status: In Progress Assigned To: Clay Barnett Eric Christiansen Bruce Dunne Due Date: 28-Jul-2010 12:00 PM CT Meeting Date: 29-Jul-2010 8:30 AM CT Meeting scheduled for Thursday afternoon at 1:30pm to discuss notes attached. Attachment: MN Update20100723 Lighting Design Coordination.pdf Status: In Progress Assigned To: Eric Christiansen Joel Massey Dianne Popken Due Date: - TBA - NEW! Meeting Date: 5-Aug-2010 8:30 AM CT Discussed conduit at Ponte, D1/D2 fixtures with camlock system and tethers. D5 fixtures at Bella and several other items. Attached are the updated meeting minutes from the Halff and Icon meeting. A follow up meeting is scheduled for Thursday, August 11th at 1:30pm. Attachment: MN Update20100805 Lighting Design Coordination.pdf Status: In Progress Assigned To: Eric Christiansen Joel Massey Dianne Popken Due Date: - TBA - Topic 2.3 SWPPP In Progress -- Due Now Meeting Date: 15-Jul-2010 9:00 AM CT ABR to submit their own NOI to TCEQ. UDR has turned over a copy of the existing SWPPP to ABR so their new SWPPP design will match. Status: In Progress Assigned To: Andrew Harper Todd Henson Due Date: - TBA - Meeting Date: 29-Jul-2010 8:30 AM CT ABR has submitted their NOI. SWPPP plan is at the ToA pending review and signature. Status: In Progress Assigned To: Clay Barnett Due Date: - TBA - NEW! Meeting Date: 5-Aug-2010 8:30 AM CT SWPPP is signed and complete. Status: Complete Assigned To: (none) Due Date: - TBA - Topic 2.4 RFIs In Progress -- Due Now Meeting Date: 22-Jul-2010 9:00 AM CT UDR has re-issued RFI on foreign steel and ToA has answered and closed. Discussed the following open RFIs #4 - Steel Arch Grounding - Closed #6 - Construction Joints - Closed #18 - Slab Drain Substitute - Pending answers from AB&R (drain outlet fitting 3" pvc) #23 - PMD Substitution - Closed #29 - Mass Concrete Placement - Halff reviewing Status: In Progress Assigned To: Eric Christiansen Todd Henson Due Date: - TBA - Meeting Date: 29-Jul-2010 8:30 AM CT #18 - Slab Drain Substitute - Pending answers from AB&R (drain outlet fitting 3" pvc) #29 - Mass Concrete Placement - ABR to reply. Status: In Progress Assigned To: Todd Henson Due Date: - TBA - NEW! Meeting Date: 5-Aug-2010 8:30 AM CT There are no open RFIs at this time. Status: In Progress Assigned To: (none) Due Date: - TBA - Topic 2.5 Submittals In Progress -- Due Now Meeting Date: 15-Jul-2010 9:00 AM CT Electrical submittal in. Halff has routed. Need to finalize design coordination between ICON and Halff. Status: In Progress Assigned To: Eric Christiansen Bruce Dunne Due Date: - TBA - Meeting Date: 29-Jul-2010 8:30 AM CT #2 - Electrical - pending results of park coordination. #6 - Pending ABR answer on Class F concrete Status: In Progress Assigned To: Eric Christiansen Andrew Harper Todd Henson Due Date: - TBA - NEW! Meeting Date: 5-Aug-2010 8:30 AM CT #2 - Electrical - pending results of park coordination. #6 - Pending ABR answer on Class F concrete #7 - Ped Bridge - Pending Halff Review #8 - Drilled Shaft CL C and SS - Close #10 - Structural Steel Arch Ponte - Pending Halff Comment on Resubmittal of General Notes Status: In Progress Assigned To: Eric Christiansen Todd Henson Amanda Lara Due Date: - TBA - Topic 2.6 Schedule Update In Progress -- Due Now Meeting Date: 29-Jul-2010 8:30 AM CT AB&R to re-run schedule with new dates and coordination efforts with NTC at Ponte bridge to remove 45 day lag. AB&R has begun demo of existing box culvert and creek fill in at abut #1 at Ponte. Pier drilling to begin Monday. Status: In Progress Assigned To: Derek Dodson Todd Henson Due Date: - TBA - NEW! Meeting Date: 5-Aug-2010 8:30 AM CT Schedule has be revised and no additional days will be required to coordinate between the park and the bridge at Ponte. Drilling for Ponte bridge shafts to begin Monday. Status: In Progress Assigned To: Todd Henson Due Date: - TBA - Topic 3.1 Corps of Engineers Issues In Progress -- Due Now Meeting Date: 22-Jul-2010 9:00 AM CT Discussed the upcoming items to be reviewed with the USACOE: - Addition of 2 low water crossings - Removal of concrete channel bottom prior to creekwall construction UDR stated that there will be several other items on this list for the park contract. Status: In Progress Assigned To: Bruce Dunne Brian LaFoy Eric Little Brad Rusk Due Date: - TBA - NEW! Meeting Date: 5-Aug-2010 8:30 AM CT Closed for bridges - no low water crossings will be allowed. Status: Complete Assigned To: (none) Due Date: - TBA - Topic 4.1 Power Lines at Bella Bridge In Progress -- Due Now Meeting Date: 29-Jul-2010 8:30 AM CT Need to discuss existing powerlines with Oncor at the Bella Bridge location. Are approx 12-15' from abut pier drilling operations. Need to know if they can be shut down or shelded. Status: In Progress Assigned To: Eric Little Due Date: - TBA - NEW! Meeting Date: 5-Aug-2010 8:30 AM CT Met with Oncor on site. Power line is within 10' of Bella bridge pier. Oncor will add disconnects at temp power pole location and manually shut power off and turn power on each day as needed. UDR to pay for this service (anticipated to be around $5k). Status: In Progress Assigned To: Eric Little Due Date: - TBA - New Business No new items to display. Addendum N/A .................................................................................. Copyright (c) 1999-2010, Systemates, Inc. View the User Agreement for legal restrictions and terms of use applicable to this site. Use of this site signifies your agreement to the terms of use specified in the User Agreement. Projectmates - The Capital Project Management Software 慷汬挠湯瑳畲瑣潩൮ഊ唊剄猠慴整⁤桴瑡琠敨敲眠汩敢猠癥牥污漠桴牥椠整獭漠桴獩氠獩⁴潦⁲桴⁥慰歲挠湯牴捡⹴਍਍਍瑓瑡獵›湉倠潲牧獥൳ഊ䄊獳杩敮⁤潔›਍牂捵⁥畄湮॥牂慩慌潆ॹ਍牅捩䰠瑩汴॥牂摡删獵५਍畄⁥慄整›‭䉔⁁‭†††††††††††਍਍䕎⅗ഠ䴊敥楴杮䐠瑡㩥਍ⴵ畁ⵧ〲〱㠠㌺‰䵁䌠ൔ ਍䌉潬敳⁤潦⁲牢摩敧⁳‭潮氠睯眠瑡牥挠潲獳湩獧眠汩敢愠汬睯摥മ匊慴畴㩳䌠浯汰瑥൥ഊ䄊獳杩敮⁤潔›渨湯⥥਍畄 ⁥慄整›‭䉔⁁‭†††††††††††਍ഉ吊灯捩㐠ㄮठ潐敷⁲楌敮⁳瑡䈠汥慬䈠楲杤॥湉倠潲牧獥⁳ⴭ䐠敵丠睯ठ†ഉ䴊敥楴杮䐠瑡㩥਍㤲䨭汵㈭㄰‰㨸〳䄠⁍呃਍ഠऊ敎摥琠楤捳獵⁳硥獩楴杮瀠睯牥楬敮⁳楷桴传据牯愠⁴桴⁥敂汬⁡牂摩敧氠捯瑡潩⹮䄠敲愠灰潲⁸㈱ㄭ✵映潲扡瑵瀠敩⁲牤汩楬杮漠数慲楴湯⹳਍਍敎摥琠湫睯椠⁦桴祥挠湡戠⁥桳瑵搠睯牯猠敨摬摥മഊഊ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䔊楲⁣楌瑴敬 ഉ䐊 敵䐠瑡㩥ⴠ吠䅂ⴠ†††††††††††ഠഊ上坅‡਍敍瑥湩⁧慄整ഺ㔊䄭杵㈭㄰‰㨸〳䄠⁍呃਍ഠऊ敍⁴楷桴传据牯漠楳整‮潐敷⁲楬敮椠⁳楷桴湩ㄠ✰漠⁦敂汬⁡牢摩敧瀠敩⹲传据牯眠汩摡⁤楤捳湯敮瑣⁳瑡琠浥⁰潰敷⁲潰敬氠捯瑡潩湡⁤慭畮污祬猠畨⁴潰敷⁲景⁦湡⁤畴湲瀠睯牥漠慥档搠祡愠⁳敮摥摥‮䑕⁒潴瀠祡映牯琠楨⁳敳癲捩⁥愨瑮捩灩瑡摥琠敢愠潲湵⁤㔤⥫മ匊慴畴㩳䤠牐杯敲獳਍਍獁楳湧摥吠㩯ഠ䔊楲⁣楌瑴敬 ഉ 䐊敵䐠瑡㩥ⴠ吠䅂ⴠ†††††††††††ഠഊ ഠ上睥䈠獵湩獥⁳ †ഉऊ਍潎渠睥椠整獭琠楤灳慬⹹਍਍਍਍摁敤摮浵ठ†਍ഉ上䄯ठ਍਍਍਍† ठ਍਍⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮⸮਍潃祰楲桧⁴挨
㤱㤹㈭㄰ⰰ匠獹整慭整ⱳ䤠据‮楖睥琠敨唠敳⁲杁敲浥湥⁴格瑴㩰⼯睷⹷牰橯捥浴瑡獥挮浯倯潲敪瑣慭整⽳潃敲唯敳䅲牧敥敭瑮汁⹬獡㹰†潦⁲敬慧敲瑳楲瑣潩獮愠摮琠牥獭漠 ⁦獵⁥灡汰捩扡敬琠桴獩猠瑩⹥ഠ唊敳漠⁦桴獩猠瑩⁥楳湧晩敩⁳潹牵愠牧敥敭瑮琠桴⁥整浲⁳景甠敳猠数楣楦摥椠桴⁥獕牥䄠牧敥敭瑮‮਍牐橯捥浴瑡獥ⴠ吠敨䌠灡瑩污倠潲敪瑣䴠湡条浥湥⁴潓瑦慷敲㰠瑨灴⼺眯睷瀮潲敪瑣慭整⹳潣㹭†਍਍