Just a follow up to our conversation yesterday. In the meeting yesterday, it was brought up that no irrigation water source was shown or specified on the job. Discussion occurred and it was decided to have one of the subs for the school construction to price installation of a 2” tap with corp stop, copper tubing and angle curb stop that will accept either a 2” or an 1 ½” meter. The location of this tap will be the same as the building water (the large green space on the west side of the school between it and the west side driveway going to the parking lots). Dave and Clay, we are also going to have to tap a water line on the east side of the property to supply irrigation water to the trail and possibly to the larger open field areas on the north side of the school. Please let me know what kind of water lines are available (size and material). Thanks. Parks Operations Manager Town of Addison Office: 972-450-2863 Fax: 972-450-2834