Jason, can you arrange if we could install the meter as they install there parts on Tuesday. We also want to be sure all is aligned correctly. Thank You Jerry Davis, Utilities Superintendent Town of Addison 972-661-1693 jdavis@addisontx.gov P Please consider the environment before printing this email. From: Clay Barnett Sent: Wednesday, August 04, 2010 4:19 PM To: Nancy Cline; Jerry Davis; Jason Sutton; David Wilde; Jose T Flores Subject: FW: Loos Pool - Domestic Water Vault Assembly Importance: High FYI… Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: David Baxter [mailto:DavidBaxter@RatcliffConstructors.com] Sent: Wednesday, August 04, 2010 3:32 PM To: Clay Barnett Cc: Jack Seay; Karl Prinz; Tom Diehl; EDWARD LEVINE; Chris Botto Subject: Loos Pool - Domestic Water Vault Assembly Importance: High Clay, The additional appurtenances for the 6" domestic water assembly at Loos Pool have been ordered and are scheduled to arrive on Monday (8/9/10). We plan to have the installation complete on Tuesday, and you should be able to schedule the meter to be installed on Tuesday afternoon. I will ask Tom Diehl to follow up with you or Dave Wilde to confirm this on Monday. Feel free to contact me with any questions. Thank you, David Baxter Ratcliff Constructors, LP 4200 Beltway Drive Addison, TX 75001 Office: (972) 432-9969 Fax: (972) 432-9943 Cell: (469) 531-9994