I have attached the plan revisions to relocate the MALSR power distribution panel from the original design location 80 feet off runway centerline to a new location inside the MALSR shelter. I have also included the revised voltage drop calculations for the MALSR. If you have any questions regarding these revisions just let me know. Thanks, Mitchell McAnally Project Engineer Office: 972-377-7480 Direct: 972-377-7480 E-mail: MRMcAnally@GarverUSA.com