David Freeman / Dave Foster: Part of the elevated MALSR change order is to install an access road that leads up to the station 10+00 light bars and to the new MALSR shelter location. I have attached an exhibit of the proposed changes. The typical section from the FAA standard detail shows an 8 inch P-209 on top of a compacted subgrade for a maintenance area access road. During the RSA grading project a chip seal was placed on the MALSR / Localizer access road. Do either one of you prefer the 8 inch P-209 or a typical section that matches the existing access road? Let me know as soon as possible to help process Change Order #3. If you have any questions just let me know. Thanks, Mitchell McAnally Project Engineer Office: 972-377-7480 Direct: 972-377-7480 E-mail: MRMcAnally@GarverUSA.com