I have attached the irrigation plan and materials used for watering the infield areas in this project. If you could review these pdf’s tomorrow morning that would be great. As you heard in the field the lead time on the materials for the irrigation system is 2 weeks. If it’s alright with you all I would like to call around 1:00pm to discuss this plan and go over any concerns that you might have. Let me know if this time doesn’t work and we can work something out. Thanks, Mitchell McAnally Garver 972-377-7480 <> Frank, Updated Irrigation Plan with requested Bore Locations. Trunk Line will be 6" with Gun connections every 120 FT. Gun Radius is estimated at 130 Ft. Watering toward Runway will be by manually rotating 2 guns for periodic watering. Lateral Lines will be 3" with 18" sprinklers every 30 FT. All watering towards Taxiways will be with 3 Inch Laterals. All Irrigation Lines will be outside the reduced Runway Safety Area. We will still need to water shoulder sod with water trucks in scheduled closures. We are in discussion with the City and Fire Department on using 6" Valves. Bobby EAS The message is ready to be sent with the following file or link attachments: Addison Irrigation Plan 5-14-2011 Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check your e-mail security settings to determine how attachments are handled.