Chad, The agreement stipulates that AT&T would contribute all of the materials and $35,000. UDR is going to pick up the tab for the remaining $52,000 to install the duct bank. I am not sure what extra you are referring to. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 -----Original Message----- From: COOPER, CHAD (ATTSWBT) [mailto:cc8956@att.com] Sent: Wednesday, May 11, 2011 1:48 PM To: Clay Barnett Subject: FW: Vitruvian Manhole Placement Clay, I need to discuss with you the difference in cost for the manhole, and the placement of this manhole at Brookhaven Club Dr. We are currently trying to close out the current project. One manhole placement has been deferred until a later time per changes we received 1/19/2011. We need to determine the amount of material and labor cost to subtract from the final contract. AT&T had already supplied the manhole and it needs to be returned, or credit given, as well as the labor that would have installed it. Chad Cooper AT&T Mgr. Engineering Design 972-234-7073