Mike, Per your request, attached are the bid tabulations for the previous and current Vitruvian Way duct bank projects. Also, below is a tabulation of the AT&T duct banks lengths: 1. Connection to first manhole 107 LF 2. First manhole to second (last) manhole 326 LF 3. First manhole stub outs 45 LF left and 55 LF right 4. Second manhole stub outs 50 LF left and 75 LF right I am still not sure who the duct bank sub contractor will be. Please contact North Texas Contracting. Please let me know if you need any additional information. Joel A. Massey Project Manager icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas  76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 229-7944 jmassey@icon-engineers.com