I called Joe Davila from American, and the contractor who transplanted the Live Oak trees from the Spring Valley project will be coming out to check them to determine their condition. I spoke with Slade regarding soil for the planting beds, and we want to use native black clay topsoil with the EarthKind amendments of expanded shale and compost. These amendments should already be in the specifications. After some discussion, the consensus is to replace the water line ran to the grotto hose bibs with the specified copper material and to follow the specifications for future installations. Parks Operations Manager Town of Addison Office: 972-450-2863 Fax: 972-450-2834