Michael, It might be worth having Seth look at his irrigation plan for the southwest corner of the intersection as the layout and or head design is not allowing for water to reach the center of that area. The borders are getting watered nicely, but in order to get the hydromulch to fully germinate the middle will need to be watered as well. Let me know if American may have installed the wrong heads as I will take that up with them directly. Thanks, Josh Hodsdon Project Manager North Texas Contracting, Inc. 4999 Keller Haslet Road Fort Worth, Texas 76248 M: 817.401.1913 O: 817.430.9500 F: 817.719.9440 E: josh@ntexcon.com