This pricing was only for the far west lowering. From what I have been told, there are 2 asbestos lines that need to be lowered and one PVC line. The PVC line we will use one of the “Water line lowering” from the bid. I will try to make the meeting tomorrow. I know that you all are dying for my presence again…….it happens…….. Andy Nord Cell: 817.819.4117 Email: anord@ntexcon.com From: Barbier, Michael [mailto:mBarbier@Halff.com] Sent: Wednesday, May 18, 2011 10:23 AM To: Andrew Nord Cc: Cline, Nancy S.; Josh Hodsdon; Barnett, Clay; Romanowski, Mike Subject: RE: Addison - Water Line Lowering Andy, I have a few questions for you on this change order. First, Josh had mentioned that there will be a total of 3 water line lowerings on the 12" water line to work around the proposed storm laterals on the south side. Does this change order take into account all 3 sections or is this just for the far west lowering? Second, the original bid included an allowance of 10 water line lowering sections to be used for this purpose, none of which have been used so far. This item was not specific to the size of water line lowering that would be encountered since there was conflicting information on existing conditions. I understand that you bid the best case scenario that all lowerings would be 8" PVC and there is some additional cost of larger pipe and special fittings for the asbestos line. I believe there needs to be some compromise using multiple lowerings from the bid to take care of these 3 sections. We can discuss this and the other outstanding change order issues at the 10:30 meeting tomorrow if your are able to attend. Let me know if you have any questions. Michael Barbier, P.E. Civil Engineer HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214-217-6643 Fax 214-739-0095 www.halff.com From: Andrew Nord [mailto:anord@ntexcon.com] Sent: Wednesday, May 18, 2011 9:41 AM To: 'Josh Hodsdon'; Cline, Nancy S. Cc: Barnett, Clay; Barbier, Michael; zach@ntexcon.com Subject: Addison - Water Line Lowering Nancy Attached is the pricing for the 12” Asbestos Coated Water Line Lowering up on Spring Valley. Please let me know if you have any questions on this. I have attached to the change order the material pricing verification. Thanks Andy Andrew D. Nord North Texas Contracting | Estimator 4999 Keller Haslet Rd. Keller, TX 76248 Phone: 817.430.9500 Fax: 817.430.9207 Cell: 817.819.4117