Joel, It looks as though the depth of the manhole will be shallower than originally proposed (5 feet as opposed to 8 feet). We will be exposing the line this morning and I will provide you with the horizontal as well as vertical information. Thanks, Josh Hodsdon Project Manager North Texas Contracting, Inc. 4999 Keller Haslet Road Fort Worth, Texas 76248 M: 817.401.1913 O: 817.430.9500 F: 817.719.9440 E: josh@ntexcon.com From: Joel Massey [mailto:jmassey@icon-engineers.com] Sent: Friday, February 11, 2011 7:53 AM To: Josh Hodsdon Cc: Andy Nord; Clay Barnett; Nancy Cline; Romanowski, Mike; Bruce Dunne Subject: RE: RFI #8 Josh, The intent of the “Warning” note was to verify horizontally and vertically where the existing sanitary sewer line was located so that adjustments (east-west, north-south and vertical) could be made prior to the construction of the manhole in Vitruvian Way and to the east. I recommend that the existing sanitary sewer be located at the existing cleanout first. The new manhole locations can be shifted as needed. Extending a service lateral to intercept the existing line may add unwanted additional bends in the service line. Please let me know what you find. Joel A. Massey Project Manager icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 229-7944 jmassey@icon-engineers.com From: Josh Hodsdon [mailto:josh@ntexcon.com] Sent: Thursday, February 10, 2011 4:46 PM To: 'Nancy Cline'; 'Clay Barnett'; Joel Massey; 'Romanowski, Mike' Cc: 'Andy Nord' Subject: RFI #8 All, Please see RFI #8 attached. Cheers, Josh Hodsdon Project Manager North Texas Contracting, Inc. 4999 Keller Haslet Road Fort Worth, Texas 76248 M: 817.401.1913 O: 817.430.9500 F: 817.719.9440 E: josh@ntexcon.com