Good Afternoon, There have been no additions or changes to the list that I sent out yesterday. This will be considered the final list of things we will check during the walkthrough Thursday morning. Please let me know if you have any questions. Thank you, Michael Barbier, P.E. Civil Engineer HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214-217-6643 Fax 214-739-0095 www.halff.com From: Barbier, Michael Sent: Monday, July 11, 2011 11:20 AM To: 'Josh Hodsdon' Cc: 'Andrew Nord'; Cline, Nancy S.; Barnett, Clay; 'David Wilde' Subject: Spring Valley Walkthrough Good Moring, Below is a list of items that were discussed at our walkthrough that need to be completed to meet the July 15th deadline. Please let me know before 12:00 PM tomorrow if you have any additions or changes to the list. I will send out a revised list at that time if there are any changes. We will recheck these items with another walkthrough at 8:30 Thursday morning for final approval. 1. Striping- Install all proposed and remove all temporary/existing from Spring Valley within project limits 2. Concrete- Complete all sections (driveways, intersection, etc.) along Spring Valley, driveway half that was poured incorrectly should be redone 3. Pavers- All vehicular pavers at the Vitruvian intersection should be in place, ensure that pavers do not inhibit flow of drainage 4. Signs- All proposed signing should be in place and operational along Spring Valley, all unnecessary temporary signs removed 5. Backfill all medians along Spring Valley 6. All joints should be sealed and finished. Several joints at the Vitruvian intersection need to be redone 7. All median noses should match detail on sheet 22 which shows a 6" to 3" taper down (this item can be completed after the deadline but is still very critical) 8. All lanes (2-each direction) should be open on Spring Valley, Vitruvian must have 1 lane each direction 9. Vitruvian intersection can still be four way stop sign controlled 10. Short term one lane closures on Spring Valley will still be allowed to complete work in the medians Michael Barbier, P.E. Civil Engineer HALFF ASSOCIATES, INC. 1201 North Bowser Road Richardson, Texas 75081 Phone 214-217-6643 Fax 214-739-0095 www.halff.com