But please be sure we are watering the plants and trees enough for them to get established. Nancy ----- Original Message ----- From: Clay Barnett To: 'Josh Hodsdon' Cc: Nancy Cline; 'Andy Nord' ; 'Barbier, Michael' Sent: Tue Aug 30 14:21:37 2011 Subject: FW: Concrete panels Josh, Slade is going to halt the watering on September 10th so that McMahon can repair the concrete areas that are noted in the punchlist. Please let me know if this works for you all. Also, Parks has requested that we revise the watering times on Spring Valley (see below). Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 -----Original Message----- From: Slade Strickland Sent: Tuesday, August 30, 2011 2:13 PM To: Clay Barnett Cc: Ron Lee; Nancy Cline Subject: RE: Concrete panels Yes we can do this. Clay is there any way American can change their watering times on SV road to water from 2-6am? I was over this morning and there was a lot of water on the street. Slade Strickland Director of Parks and Recreation O972.450.2869 C972.489.4426 sstrickland@addisontx.gov -----Original Message----- From: Clay Barnett Sent: Tuesday, August 30, 2011 1:11 PM To: Slade Strickland Cc: Nancy Cline; Ron Lee Subject: FW: Concrete panels Slade, Would it be possible to shut the irrigation systems off for part of the weekend of September 10 to allow North Texas to repair these areas? Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 -----Original Message----- From: Josh Hodsdon [mailto:josh@ntexcon.com] Sent: Friday, August 19, 2011 12:52 PM To: Clay Barnett; Nancy Cline; Michael Barbier Cc: andy@ntexcon.com Subject: Concrete panels Clay, We are going to run into the same problem without the cleaning of the entrance to the school this weekend as we have with the striping for the panel replacement in the intersection. I would like to coordinate a day to do both the concrete replacement and the striping so that we can shut down the irrigation systems and entrance only once. McMahon has agreed to pour back high early concrete to help out as well. I would like to add these two panels to the work outside of the incentive schedule due to the school schedule. Please let me know and we will start coordinating a day to perform this work. Thanks, Josh Sent from my iPhone