Jack, Just a heads up that we are going to commence with construction on Spring Valley tomorrow. At that time the signal at Vitruvian Way and Spring Valley will be placed on red flash and stop signs will be erected. The signal will be disconnected and likely removed by the end of the week and the contractor will begin installing the Oncor duct bank on the north side of the roadway. I have attached a preliminary construction schedule from the contractor. We will do our best to keep you appraised of the progress and dates of possible driveway closures and traffic changes. If you have any questions, please let me know. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857