The connection to existing was made yesterday at Woodway, so the existing 8 inch main is now abandoned from the Oncor easement on the east end to Woodway on the west. Any hydrant that is not bagged is on and available for use in an emergency. All the new valves are on except the lateral at the main Springhaven entrance, which still needs to be pressure-tested and chlorinated (this hydrant should be bagged). All the valves on the existing 8 inch main will be abandoned in place, filled with concrete, and covered over with new pavement. The hydrant re-location at Glenwood did not happen yet, but it is operational at this time. David E. Wilde Town of Addison Public Works Inspector 972-450-2847 dwilde@addisontx.gov