Scott, I wanted to discuss some details with you related to the installation of the electrical equipment vault and pad on the Bella Lane project. We have had various problems on previous Vitruvian Park projects and my intentions are to try to prevent any re-work on this project. I am willing to provide you any additional detailed information, exhibits, etc. to make sure the installation is correct the first time. All equipment in the Vitruvian Park project has been specifically located to prevent conflicts with future facilities and to provide the best look as the development is completed. Unfortunately, some of the equipment is very close to future facilities and must be constructed to very tight tolerances. On the Bella Lane project there are only a few items that will require close attention. You are getting very close to the installation of two of these items, the subsurface switchgear vault and the 6-way switchgear pad. The location, orientation and elevations of these items require close attention. The subsurface vault must be at the location indicated, parallel to the future back of curb and at the specific elevations shown on sheet 10 of the plans. This vault must be set on undisturbed soil with required bedding to prevent settlement in the future. The 6-way switchgear pad must be in the location, orientation and elevation as shown on sheet 36 of the plans. The switchgear pad must be set per note 31 on sheet 35 to prevent settlement in the future. Both of these items are also shown in the CAD files. The 6-way switchgear pad is in very close proximity to a future masonry wall. You MUST have all corners located for these items during the installation to prevent re-work later in the project. The other item that has been very problematic for us is the street lighting pole base locations and conduit routing. I will address this item with you more specifically in the future when you are closer to beginning the street light work. Please make sure we discuss this before any streetlight conduit and foundations begin. Please let me know if you would like to discuss or need any additional information. Joel A. Massey Project Manager icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 229-7944 jmassey@icon-engineers.com