Karen, I inquired today and was told by the contractor (Scott Hale, CPS Civil) that the Bella Lane electric service pedestal is ready, inspected and has a green tag. Go ahead with your planning construction date of 8/30/11 for transformer, secondary riser and pull the service. The address for the Bella Lane electric service is 14109 Bella Lane. I was also told we are ready for the meter. The address is on the pedestal. Please let us know what else needs to be completed to get the meter done. Joel A. Massey Project Manager icon Consulting Engineers, Inc. Bicentennial Financial Center 250 W. Southlake Blvd., Suite 117 Southlake, Texas 76092 Phone: (817) 552-6210 Fax: (817) 552-3126 Mobile: (817) 229-7944 jmassey@icon-engineers.com From: Karen.Eastman@oncor.com [mailto:Karen.Eastman@oncor.com] Sent: Tuesday, August 23, 2011 12:55 PM To: Joel Massey Subject: RE: Bella Ln. Streetlights transformer I have the date set for 8/30/11 for us to start construction. They should be able to install the transformer, the secondary riser and pull the service by then. Let me know if you think that is too soon. Thank You, Karen Eastman New Construction Manager Oncor Electric Delivery 200 North Ector Euless, Texas 76039 Office 817-355-7050 Fax 817-355-7090 From: Joel Massey [mailto:jmassey@icon-engineers.com] Sent: Tuesday, August 23, 2011 12:50 PM To: Eastman, Karen Subject: RE: Bella Ln. Streetlights transformer Karen, I noticed today that the Bella Lane Electric Service Pedestal has been installed. I am not saying it is ready for service, just that they are getting closer. Joel