Robert, We inspected the removed concrete areas and confirmed the presence of a cold joint. Although the cold joint is present in the two panels on the north side that were removed, it was not apparent in the north face of the southern panels. Therefore, it is our conclusion that the removal of the northern two panels removed the bulk of the area that contained the cold joints and the south panels can be covered under the maintenance bond for the project. If you have any questions, please let me know. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 -----Original Message----- From: Robert Farrow [mailto:rfarrow@concretepaversystems.com] Sent: Friday, August 26, 2011 1:16 PM To: Clay Barnett; Jacob Nick; Massey Joel Cc: Hale Scott Subject: Vitruvian Guys the pavement has been torn out. Please go take a look at it. Thanks Robert Sent from my iPhone