Lynn, Please move the plug valve on the 169’ hydrant lead to the tie-in at Westgrove. We have a detail for the hydrant with the bollards. Everything else looks good. I believe the only outstanding issues are the orifice design on the detention structure outlet and the pavement design. When do you anticipate submitting the final drawings? Also, do you know if the developer is working on the items required for a preconstruction meeting? This list along with the details can be found at the following website: http://www.addisontx.gov/Departments/public_works/News___Articles/Engineering.asp If you have any questions, please let me know. Thanks, Clay Barnett, P.E. Town Engineer Town of Addison 16801 Westgrove Drive Addison, TX 75001-2818 Office: (972) 450-2857 From: Lynn Kadleck [mailto:lkadleck@verizon.net] Sent: Tuesday, February 08, 2011 5:32 PM To: Clay Barnett Cc: Bill Leggett Subject: Million air Phase 2 Clay, Attached is a revised Utility & Storm Plan showing the fire line and fire hydrants on the east end of the building as discussed with you by Bill Leggett. Please review and let me know if this is acceptable. Contact me with any questions. Regards, L. Lynn Kadleck, PE, RPLS Kadleck & Associates 555 Republic Drive, Suite 115 Plano, Texas 75074 972-881-0771 lkadleck@verizon.net