.,,. 􀀨􀁾 ..f· ., GINN, INC. March 1, 1990 CONSlJLTING ENGINEERS Honorable Mayor and Council Town of Addison P.o. Box 144 Addison, TX 75001 Ladies and Gentlemen: It is with very deep and mixed emotions that I resign as City Engineer for the Town of Addison via an addendum to our contract. It is difficult because Addison has been such a large part of my life for the past seventeen years. The attached memo to Ron will help you understand this decision. I am very proud of the Town of Addison and will always be its ambassador. Great things are yet to come to Addison and I commend you for your leadership to guide the Town into the future. It has been fun and exciting making ideas and dreams become realities. 􀁳􀀻􀁺􀁾􀁟􀂷__ H. 􀁗􀁡􀁾􀁇􀁩􀁮􀁮􀀬 P.E. HWG/dsp cc: Ron Whitehead, City Manager 17103 Prcston Road • Suite 100 • LB II R • Dallas. Texas 7524R • Phonc 214124R-4900 GINN, INC. CONS1JLTING ENGINEERS MEMORANDUM Date: March 1, 1990 To: Ron Whitehead, City Manager From: H. Wayne Ginn, P.E. 􀀱􀀱􀁾􀁾􀀧 Re: Addendum to Contract Attached is Addendum No. 1 to our contract dated February This request for approval is necessitated by changes in: current climate of Engineering; Ginn, Inc.'s role with the and by our desire to limit our liability. PAST HISTORY: 1980. the Town; At the time we became associated with the Town of Addison in 1974, Mr. Cook was Mayor and Charles Howard was City Manager. Every road was two lane asphalt, the water system was inadequate, a big lake with willows was located at the southeast corner of Belt Line and Marsh, a horse stable was located on the EI Fenix site, and the airport had a crosswind runway. Our basic agreement was that we would serve as City Engineer on all matters pertaining to the Town at 60% of our standard billing rate in return for allowing us to design the CIP projects. We would attend Council meetings and work sessions at no charge to the Town. We would look after the Town's interest and hire specialized consultants for specialized studies or designs when needed. We thought, in the beginning, that this arrangement might last 4 or 5 years or until the first bond program was completed. Never did we envision it lasting 17 years. since that beginning in 1974, we have worked for 3 Mayors, 23 Council members, and 5 City Managers. We have been through it both thick and thin, good and bad. As a Consulting Engineer, we have enjoyed every minute of scratching ideas on napkins and seeing them through to completed projects. It has also been very gratifying, as a City Engineer, working with developers and community leaders in representing Addison's interest to insure orderly growth. 17103 Preston Road • Suite 100 • LO 118 • Dallas, Texas 75248 • Phone 214/248-4900 Mr. Ron Whitehead March 1, 1990 Page 2 PRESENT: We did not want to resign during a time when Addison had a "dark cloud" hanging. Now that the Town is back on an even keel, it is time to submit this addendum to our contract. The position of "City. Engineer" carries with it a tremendous responsibility for the health, welfare and safety of the public. It also carries with it a dedication to put Addison first above all other projects and business interests. It, however, has also become a tremendous potential for liability due to the trend of a litigious society that is encouraged to file frivolous lawsuits. Currently it carries a risk of liability that we can no longer accept. It is for this sole reason that we request this addendum to our contract. This addendum does not affect any of the projects on which we are currently working. It is our desire to continue to provide professional services on any projects that the Town might need. Additionally, we will continue to represent Addison's interest, on a consultant basis, on such matters as the Addison/Farmers Branch Sewer Tunnel, or any other Town matters. FUTURE: Addison still faces many challenges in the development of the remaining undeveloped properties, the theater, and the redevelopment of the Addison Airport. Ginn, Inc.'s desire is to continue its relationship with the Town of Addison on a consultant basis. Our corporate history, experience, and dedication to making Addison the very best makes us the logical choice for future CIP projects. Thank you for your consideration in this matter. , i GINN, INC. CONS1JLTING ENGINEERS ADDENDUM #1 TO: AGREEMENT FOR ENGINEERING SERVICES PUBLIC IMPROVEMENTS CITY OF ADDISON, TEXAS AND GINN, INC. CONSULTING ENGINEERS DATED FEBRUARY 1980 ===============================;================================ Delete the following: Page 15, Paragraph (14): Service: Represent City as city Engineer Compensation: sixty Percent (60%) of hourly rates as shown on Attachment No. 2 (as amended April 1987) Requested: Ginn, Inc. Approved: Town of Addison By: By: Dated: 31!'tJ 7 Title: Dated: J7103 PresIon Road -Suite 100 • LB 118 • Dallas. Texas 75248 • Phone 2141248-4900 · , ...../.-.---' GINN, INC. April 8, 1987 Mr. Ron Whitehead, City Manager P.O. Box 144 Addison, TX 75001 Dear Ron: CONSLLTING ENGINEERS Periodically, we find it necessary to adjust our billing rates to reflect current business costs. Attached is the billing rate that we will use during 1987. These rates will only apply to special assignments. Capital Improvements Projects will remain as a construction. Our fees for percent of Ron, I believe this is the first time we have raised our rates to the Town of Addison since 1980. If you have any questions, please call. We look forward to working with you during the coming year. Sincerely, 􀁦􀀡􀀱􀁾􀁾􀁟􀁁_ H. Wayne Ginn, P.E. Iss Enclosure cc: Randy Moravec 17103 Preston Road. Suite 100 • LB 118 • Dallas, Texas 752-l8 • Plll'ne 214 i 248--l900 􀁇􀁉􀁾􀁾􀀬 INC. RATE SCHEDULE April, 1987 POSITION 1. Principal Engineer 2. Senior Engineer 3. Project Engineer 4. Junior Engineer 5. Senior Draftsman/Designer 6. Draftsman 7. Draftsman 8. Secretary 9. Secretary 10. Clerk/Typist 11. Manager of Field Operations 12. Chief Inspector 13. Inspector 14. Inspector 15. Party Chief 16. Surveyor 17. Surveyor HOURLY RATE 100.00 80.00 70.00 60.00 60.00 40.00 30.00 35.00 30.00 25.00 .·50.00 45.00 35.00 30.00 35.00 30.00 25.00 /> 17\03 􀁲􀁲􀁴􀀺􀁾􀁴􀁬􀀩􀁮 ({pad • Suite 100 • LB 118 • 􀁲􀀩􀀻􀁽􀁬􀁬􀁡􀁾􀀮 Texas 7'i2<1.R • rhnnc 214 :>lS--l900 GINN & CASE, INC. March 13, 1991 Mr. John Baumgartner, P.E. city Engineer Town of Addison P.o. Box 144 Addison, TX 75001 Re: Invoices Dear John: CONSULTING ENGINEERS This submittal is in response to your letter dated March 8, 1991 and our subsequent meeting on March 12, 1991. Rather than belabor the issues with agreements and disagreements of issues, we feel that it is better to list the positive results of the meeting as we understand them. 1. Liquidated damages: We believe the request for a determination of liquidated damages is premature and not immediately available. This determination is normally made after a proj ect is completed. In accordance with your request, we are proceeding to prepare this document. It will take several days but should be available next week. 2. completion date: The project should be complete within the next 3 weeks, weather permitting. 3. We estimate approximately 40 hours of additional project administration time will be required to prepare the final punch lists and close-out out items. 4. We will be happy to supply any information you require. The invoice is a summary of hours. Daily diaries are internal records for our use only; however, they are available for your review at any time. 5. Invoice #1020: Breakdown by Position and hours Administration Beyond Completion Sr. Designer (GF) Secretarial (DP) 25.5 hours 1.0 hours Inspection Beyond Completion Sr. Designer (GF) 43.5 hours 17103 Preston Road • Suite 100 • Dallas, Texas 75248 • Phone 214/248-4900 P.O. Box 796577 • Dallas, Texas 75379-6577 • FAX 214/931-1452 6. To date, we have incurred $3,622.50 of expense for material testing of the Mildred street Improvements which has not been billed to the Town. Taking this into consideration, our net fee for inspection is only 2.1% of construction when the industry standard is 6% to 8%. 7. Attachments: new revised statement, appropriate credit memos, revised invoices, and Gabe's memo regarding activities for Mildred street for the month of February 1991. For the record, we are not in total agreement with the $470.00 credit memo for Mildred street. It was for work performed by us at the request of the Town and was not the amount previously agreed upon. Our acceptance of this is to ensure an amicable settlement so we can proceed to finish the project. We trust that the resolution of these issues and procedures will enable you to promptly process future invoices. Thank you for the cooperative spirit in which you addressed this matter. Sincerely, 􀁻􀁾􀁾􀀬'PoE. HWG/dsp enclosures cc: Ron Whitehead, city Manager Randy Moravec Greg Dunham Sanford W. Case, P.E. File 91130 Invoice Date -12 MAR 1991 SINN &CASE, INC. CONSULTINS ENS Page 1 Invoice Number -CRI0ll I NV0 ICE FROM: SINN &CASE, INC. CONSULTINS ENS TO: TOWN OF ADDISON P. O. BOX 796577 POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MSR DALLAS TX 753796577 ADDIS[IN TX 75001 FOR: JOB 439 MILDRED STREET IMPROVEMENTS/ADDISON SCHEDULED ------WORK COMPLETED ------MATERIALS TOTAL CDMP PCT BALANCE TO RETAINASE PHASE DESCRIPTION VALUE PREVIOUS THIS PERIOD STORED &STORED CMP FINISH AMOUNT 105 PLANS &SPEC INCOME 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 106 DESISN FEES 27,706.00 27,706.00 0.00 0.00 27,706.00 100 0.00 0.00 107 CONTRACT ADMIN 4,889.00 3,422.30 0.00 0.00 3,422.30 70 1,466.70 0.00 108 INSPECTION FEES 12,223.00 8,556.10 0.00 0.00 8,556.10 70 3,666.90 0.00 109 OTHER INCOME 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 260 EASEMENTS/ROW CREDIT PER JB/HWS CONFERENCE 2,757.50 3,227.50 470.00-0.00 2,757.50 100 0.00 0.00 315 ADMIN BEYOND COMPLE 1,565.00 1,565.00 0.00 0.00 1,565.00 100 0.00 0.00 330 INSPEC BEYOND CDMPL 1,957.50 1,957.50 0.00 0.00 1,957.50 100 0.00 0.00 601 SURVEY INS 8,742.00 8,742.00 0.00 0.00 8,742.00 100 0.00 0.00 605 BID ADVERTISEMENT 189.00 189.00 0.00 0.00 189.00 100 0.00 0.00 606 STRUCTURAL ENSR 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 607 ARCHITECT ENSR 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 608 LANDSCAPE ARCHITECT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 609 OTHER CONSULTANT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 610 ABSTRACT/TITLE 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 650 PRINTINS 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 651 CIJURIER 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 660 SPECIAL SERVICES/ROW 743.93 743.93 0.00 0.00 743.93 100 0.00 0.00 Final Total 60,772.93 56,109.33 470.00-0.00 55,639.33 92 5,133.60 0.00 Invoice Date -12 MAR 1991 Invoice Number -CR1011 SINN &CASE, INC. CONSULTINS ENS I NV0 ICE Page 2 FROM: SINN &CASE, INC. CONSULTINS ENG P. O. BOX 796577 DALLAS FOR: JOB 439 IX 753796577 MILDRED STREET IMPROVEMENTS/ADDISON TO: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MSR ADDISON TX 75001 TOWN OF ADDISON DESISN OF MILDRED ST--ADDISON RD TO QUORUM DRIVE CONTRACT AMOUNT $407,431.55 DESIGN &ADMIN 32,595.00 INSPECTION 12,223.00 CONTRACT SUMMARY ORIGINAL CONTRACT SUM NET CHANGE BY CHANGE ORDERS CONTRACT SUM TO DATE TOTAL COMPLETED AND STORED TO DATE RETAINAGE TOTAL EARNED LESS RETAINAGE LESS PREVIOUS CERTIFICATES FOR PAYMENT CURRENT PAYMENT DUE BALANCE TO FINISH, PLUS RETAINASE 60,772.93 0.00 60,772.93 55,639.33 0.00 55,639.33 56,109.33 470.00-5,133.60 GINN & CASE, INC. Principal Engineer Senior Engineer Project Engineer Junior Engineer Chief Designer Technician/Designer Draftsman Secretary Clerk/fypist Manager of Field Operations Chief Inspector Inspector Computer Time Sub-Consultants Facsimile Printing: Zerox -In House Blue Line -In House All Other CONSULTING ENGINEERS APPENDIX A RATE SCHEDULE JANUARY, 1991 Hourly Rate $100.00 80.00 70.00 60.00 60.00 40.00 30.00 35.00 25.00 50.00 45.00 35.00 25.00 Actual Fee x 1.10 $1.00/page 0.08/page 1.00/sheet Actual Cost x 1.10 17103 Preston Road • Suite 100 • Dallas, Texas 75248 • Phone 214/248-4900 P.O. Box 796577 • Dallas, Texas 75379-6577 • FAX 214/931-1452 IB-2 I IA-6 I ISF-A I 􀁉􀁆􀁆􀀭􀁾 I IC-3 I IB-2 I IA-7 I IB-1 I IB-1 I IB-1 I IB-1 I IB-3 I IB-1 I IC-4 I IFF-15 I IB-5 I IB-1 I IB-1 I IB-3 I IC-1 I IB-1 I ISF-B I IFF-17 I /8-1 I IB-3 I ISF-A I ISF-B I IB-41 IA-1 I ISF-B I IA-1 I IFF"';15 I IB-2 I IA-1 I IC-2 I ISF-B I. 􀁉􀁆􀁆􀀭􀀱􀁾 I IB-4 I IB-6 I IACADEMY DRIVE IADDISON IACADEMY DRIVE IADDISON IADDISON AREAS (ORfGINALS) IADDISON IADDISON MAPS (ORIGINALS) IADDISON IADDISON PARK IADDISON IADDISON PARK IADDISON IADDISON PARK IADDISON 1ADDISON ROAD DRAINAGE 1ADDISON, IADDISON ROAD PHASE 2 IADDISON 151 IADDISON ROAD PRO-RATA 1ADDISON 155 'ADDISON ROAD QUANTITIES IADDISON IADDISON ROAD SIGNALS IADDISON IADDISON ROAD STORM SEHER JADDISON 155 IADDISON ROAD (DESIGN) IADDISON 155 IADDISON ROAD (ORIGINALS) , IADDISON 153 IADDISON ROAD (WATER/SEWER) IADDISON IADDISON ROAD/KELLER SPRINGS IADDISON IADDISON ROAD/KELLER SPRINGS IADDISON 201 IADDISON STREETSCAPE IADDISON 156 IADDISON WATER IMPROVEMENTS IADDISON 156 IADDISON WATER IMPROVEMENTS \ADDISON 156 IADDISON WATER IMPROVEMENTS (ORIGINALS) IADDISON 156 IADDISON WATER IMPROVEMENTS (ORIGINALS) IADDISON /ADDISON WATER PHASE '2 IADDISON IADDISON/BELT LINE SIGNALS IADDISON IADDRESS OVERLAY (ORIGINALS) IADDISON IAERIALS OF RAILROAD LOWERING (ORIGINALS)IADDISON IAIRPORT IADDISON 195 IAIRPORT AUTO PARKING IADDISON IAIRPORT LAYOUT (ORIGINALS) IADDISON 233B IAIRPORT .NORTH 40 IADDISON 195 IAIRPORT PARKWAY (ORIGINALS) IADDISON 166 IAIRPORT WATER MAIN IADDISON 233A IAIRPORT (CHICAGO TITLE) IADDISON 233 IAIRPORT (DESIGN) IADDISON IAIRPORT (NEGATIVES) " IADDISON IAIRPORT (ORGIGNALS) IADDISON 195 IAIRPORT (PARKING) IADDISON 233A IAIRPORT (R-R INVESTMENTS) IADDISON JOB NO. IPROJECT NAME (DESCRIPTION) IOWNER/CITY IFILED I _________ J 1 1 1 IBLANK MYLAR I IFF-36 I 􀁉􀁃􀁾􀁃􀁔􀁉􀁏􀁎 PAPER I 􀁾􀀳􀀶 I IFULL 􀁾 1 􀁟􀁾 IFF-36 I IMASTERS (COlfER SHEETS) 􀁾􀀭􀀭􀀭􀀭 IFH I IMASTERS 􀀨􀁑􀁕􀁁􀁎􀁲􀁲􀁾􀀯􀁉􀁎􀁄􀁅 􀁘 SHEETS) ///I IFF-1 I IMISC. NEGATIVES OINmATEVER //I 􀁉􀁆􀁆􀀭􀁾􀁬 I IPLAN/PROFILE//-I IFF-36 I IPRINT PAPER /"',,-I IFF-35 I IQUAD MAPS ' 􀁾 I IFF-37 I ISEPIA MYLA 􀁾 IFF-35 I ISTAND DETAILS (DALLAS) I 􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁾 IFF-2 I IS ARD DETAILS (GARLAND) I ----, IFF-2 " ........" , .•.1 • ,JOB NO. IPROJECT NAME (PESCRIPTION) IOWNER/CITY IFILED I ---------I------------􀁾􀁟1 1 1 IAIRPORT/OVERLAYS (ORIGINALS) IADDISON ISF-A I 􀀧􀁾􀀢􀀭􀀢􀀭􀀧􀀭􀀧􀁬􀀧􀀺􀀮􀁾􀁟􀁾􀁾􀀭􀀮 􀀮􀁟􀀬􀀮􀀻􀀬􀀺􀀢􀀻􀁾􀀮􀁾􀀺􀀬􀁾􀁟􀀮􀁾􀀻􀀧...􀀺􀁾􀁾􀀱􀁾􀁾􀀺􀀺􀁾􀁾􀀻􀀰􀁾􀁾􀂮􀀻􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀀻􀂷􀀺􀁾􀂷􀀺􀀮􀁾􀁾􀀺 􀁾 􀀭􀀺􀀪􀁴􀀺􀀺􀁾􀂷􀁾􀁾􀀺􀀺􀀺􀀮􀀭􀁤􀁪􀁾􀁾􀂷􀀺 JOB NO. IPROJECT NAME (DESCRIPTION) ,OWNER/CITY IFILED I _________ 1 1 1 1 1ARAPAHO CENTER (ORIGINALS) 'ADDISON IARAPAHO/MARCY 1ADDISON 177 IARAPAHO/QUORUM TOPO IADDISON 177 lARAPAHO/QUORUM (ORIGINALS) IADDISON IBARSHELL BROADWAY IADDISON IBASE MAP GRID IADDISON IBASE MAP OVERLAYS (ORIGINALS) IADDISON IBASE MAP (ORIGINALS) IADDISON 'BASE MAPS 29-38 (ORIGINALS) 'ADDISON IBASE MAPS (ORIGINALS) 1ADDISON ' IBASE/AIRPORT MAP (NEGATIVES) IADDISON IBELL BRANCH SAN. SEWER IADDISON IBELLBROOK IADDISON IBELT LINE AERIALS (ORIGINALS) IADDISON IBELT LINE .PULL BOXES IADDISON IBELT LINE ROAD STORM SEWER IADDISON 171 IBELT LINE ROAD (ADDISON) IADDISON 171 IBELT LINE ROAD (DESIGN) 1ADDISON IBELT LINE ROAD (NOEL/PRESTON) IADDISON 171 IBELT LINE ROAD (ORIGINALS) IADDISON IBELT LINE STORM SEWER (ORIGINALS) IADDISON 'BELT LINE/INWOOD 'ADDISON IBELT LINE/MARSH IADDISON IBELT LINE/MARSH BUSINESS PARK 1ADDISON IBELT LINE/MONTFORT AREA 1ADDISON IBELT LINE/SURVEYOR 'ADDISON 280 IBELT LINE/SURVEYOR 'DRAINAGE (DESIGN) IADDISON 280 IBELT LINE/SURVEYOR DRAINAGE (ORIGINALS) IADDISON IBELT LINE/SURVEYOR OFFICE PROJECT IADDISON 196 IBELTWAY STORM SEWER IADDISON IBENT TREE PLAZA PKWY/MASTER PLAN IADDISON 87326 IBOUNDARY SURVEY IADDISON 309 IBROADWAY STREET PAVING (ORIGINALS) IADDISON 287 IBROADWAY STREET WATER (ORIGINALS) IADDISON 331 IBROOKHAVEN DRIVE REPAIRS (ORIGINALS) 'ADDISON 184 IBROOKHAVEN DRIVE SEWER IADDISON 215 ICELESTIAL 6MG GROUND STORAGE (DESIGN) IADDISON 215 ICELESTIAL 6MG GROUND STORAGE (ORIGINALS)IADDISON 217 ICELESTIAL PUMP STATION '(DESIGN) IADDISON 217 \CELESTIAL PUMP STATION (ORIGINALS) IADDISON 226 ICITY HALL ANNEX (DESIGN) IADDISON ICITY LIMITS MAP (ORIGINALS) IADDISON 87369 ICREEK SYSTEM (ORIGINALS) IADDISON 216 ICROSSTOWN WATERLINE (DESIGN) IADDISON 216 ICROSSTOWN WATERLINE (ORIGINALS) IADDISON IDALLAS 36' WATER (BELT LINE ROAD) IADDISON IDALLAS 84' WATER IADDISON 223 IDALLAS PARKWAY (ORIGINALS) IADDISON 235 IDALLAS PKWY. 24' WATER IADDISON 1FF-12 I IB-3 IB-3 1FF-14 ,A-2 IBF-AS IFF-6 ISF-A ISF-B IFF-4 ISF-A IB-6 IA-2 ISF-B IB-4 IB-1 IB-6 IC-3 IB-6 I IFF-16 I IFF-16 1 IB-1 I IB-3 I IB-5 I IBF-A14/IB-3 I IC-3 1 IFF-12 1 IB-4 I IB-5 I IA-1 I IBF-A151 IFF-14 , IFF-14 I IFF-12 I IB-4 1 IC-1 I IFF-13 1 IC-1, I IFF-13 1 IC-2 I ISF-A 1 IFF-12 I IC-4 I IFF-14 I IA-4 1 IA-5 1 IFF-17 I IB-5 / ••.􀁾 ll:, ..•. ,. . 􀁾􀁜 . , '. 􀀻􀀮􀀧􀁴􀀧􀁾􀀬 " .\ .'. ".": 􀁾􀁟C-'; . I . 􀁾 • ', . . JOB NO. IPROJECT NAME (DESCRIPTION) IOWNER/CITY IFILED I _________ 1 1 1 1 235 IDALLAS PKWY. 3D' WATER IADDISON 235 IDALLAS PKWY. 8' WATER (BELT LINE/ALPHA) IADDISON 235 IDALLAS PKWY. SOUTH WATER MAIN IADDISON. IDALLAS PKWY. (635/BELT LINE) IADDISON. IDALLAS PKWY. (BELT LINE/KELLER SPRINGS) IADDISON IDALLAS PKWY. (GENERAL LAYOUT) 1ADDISON IDALLAS TOLLWAY IADDISON IDAL-MAC DELEVOPMENT IADDISON 152 IDOOLEY ROAD METER STATION IADDISON 136 IDooLEY ROAD WATER 1ADDISON 136 IDOOLEY ROAD WATER (DESIGN) IADDISON 263 IDOOLEY/KELLER SPRINGS (DESIGN) IADDISON 263 IDOOLEY/KELLER SPRIHGS(.ORIGINALS) 1ADDISON 141 IELEVATED STORAGE TANK (ORIGINALS) IADDISON 349 IELEVATIONS FOR RUNWAY EXTENSION (ORIG.) tAODISON IFACTORY STREET WATER IADDISON IFARMERSBRANCH SEWER LINE 1ADDISON IFARMERSBRANCH SEWER SYSTEM 1ADDISON IFARMERSBRANCH SEWER SYSTEM (ORIGINALS) IADDISON IFARMERSBRANCH WASTEWATER INTERCEPTOR IADDISON jFARMERSBRANCH WASTEWATER INTERCEPTOR(O) IADDISON 195 IFIRE STATION NO. 1 IADDISON 225 IFIRE STATION NO.2 (ORIGINALS) IADDISON IGREENHILL PARK 1ADDISON IGREENHILL SCHOOL (BOUNDARY/TOPO) IADDISON IGRID/ADDRESS MAPS (ORIGINALS) IADDISON 141 IGROUND STORAGE 2MG (DESIGN) IADDISON '141 IGROUND STORAGE TANK 2MG (ORIGINALS) IADDISON 141 IGROUND STORAGE TANK SITE. IADDISON 183 IHANGER ROAD (DESIGN) IADDISON 183' IHANGER ROAD (ORIGINALS) IADDISON IHURD DELEVOPMENT SURVEY IADDISON 176 lINWOOD ROAD IMPROVEMENTS IADDISON lINWOOD ROAD (DALLAS) IADDISON 176 lINWOOD ROAD (DESIGN) jADDISON lINWOOD ROAD (FARMERSBRANCH) /ADDISON 176 IINWOOD ROAD (GAS MARK:'UPS) IADDISON 176 lINWOOD ROAD (ORIGINALS)' 1ADDISON 136 lINWOOD SEWER/DOOLEY WATER (ORIGINALS) IADDISON 145 lINWOOD/BELT LINE INTERCHANGE IADDISON IJIM MILLER BROADWAY IADDISON IKELLER SPRINGS ROAD TRACTS IADDISON 228 ILAKE FOREST/BELT LINE 1ADDISON 172 ILAKE FOREST/BROOKHAVEN DRAINAGE IADDISON 172 ILAKE FOREST/BROOKHAVEN DRAINAGE (ORIG.) IADDISON ILES LACS ' 1ADDISON ILES LACS GARDEN HOMES IADDISON ILES LACS HOMES IADDISON ILES LACS PLAZA IADDISON IB-5 IB-2 IB-3 IB-2 IB-2 IB-2 IA-7 IB-5 IB-1 IB-1 IC-2 IC-2 IFF-12 I IFF-17 I ISF-A I IA-6 I IB-4 1 IA-6 1 ISF-A I 1BF-A9 I ISF-A 1 IB-5 I IFF-12 1 IBF-A7 1 IBF-Al0j . ISF-A IC-2 IFF-17 IB-1 IC-3 IFF-14 IA-2 IB-l IA-6 IC-3 IB-5 IB-2 IFF-17 IFF-16 IB-1 IA-l IB-2 IB-4 IB-2 IFF-16 IA-1 IB-6 IB-3 IB-4 JOB NO. IPROJECT NAME (DESCRIPTION) IOWNER/CITY IFILED 1 _________ 1 1 1 1 ILES LACS VILLAGE IADDISON IB-3 ILES LACS VILLAGE (PAVING) IADDISON IB-4 ILIBERTY PLAZA IADDISON IA-1 ILIBERTY PLAZA MASTER PLAN IADDISON IBF-A12 269 ILINBERG ROAD EXTENSION IADDISON IB-2 181 ILINBERG ROAD (ORIGINALS) IADDISON IFF-17 197 IMARSH LANE IADDISON IB-4 IMARSH LANE PROJECT/CARL SliMMERS IADDISON IB-5 197 IMARSH LANE R.O.W. (ORIGINALS) IADDISON IFF-17 152/211 IMETERING STATIONS (DESIGN) IADDISON IC-l 152/211 IMETERING STATIONS (ORIGINALS) IADDISON " IFF-16 IMIDWAY DITCH ALTERNATE SCHEME 'ADDISON IB-3 IMIDWAY MEADOWS IADDISON IB-3 IMIDWAY ROAD IADDISON IA-7 IMIDWAY ROAD IADDISON IA-2 187 IMIDWAY ROAD EXTENSION IADDISON IB-l 112 IMIDWAY ROAD SAN. SEWER (ORIGINALS) IADDISON IFF-16 IMIDWAY ROAD (CARROLLTON) IADDISON ",B-5 175 1MIDWAY. ROAD .(DESISN) IADDISON IC-3 IMIDWAY ROAD (FARMERSBRANCH) IADDISON IA-7 IMIDWAY ROAD (KELLER SPRINGS/DOOLEY) IADDISON IB-3 187 IMIDWAY ROAD (ORIGINALS) 􀁾􀁁􀁄􀁄􀁉􀁓􀁏􀁎 IFF-16 175 IMIDWAY ROAD (ORIGINALS) 1ADDISON IFF-17 IMIDWAY ROAD (TOPO) IADDISON IBF-All 287 IMIDWAY/BELTWAY INTERSECTION (ORIGINALS) IADDISON IFF-12 IMIDWAY/SPRING VALLEY IADDISON IA-7 IMISC. DRAINAGE PROJECTS (ORIGINALS) IADDISON IFF-17 236 IMISC. SIGNALS (ADDISON/AIRPORT PKWY) IADDISON IFF-8 236 IMISC. SIGNALS (ADDISON/ARAPAHO) IADDISON IFF-8 236 IMISC. SIGNALS (ADDISON/BROADWAY) /AQDISON IFF-8 236 IMISC. SIGNALS (ADDISON/KELLER SPRINGS) IADDISON IFF-8 236 IMISC. SIGNALS (ADDISON/SOJOURN) IADDISON IFF-8 236 IMISC. SIGNALS (ADDISON/WESTGROVE) IADDISON" IFF-8 188 IMISC. SIGNALS (BELT LINE/BELTWAY) IADDISON IFF-8 "188 IMISC. SIGNALS (BELT LINE/COMMERCIAL) IADDISON IFF-8 188 IMISC. SIGNALS (BELT LINE/FIRE STATION) IADDISON IFF-8 188 IMISC. SIGNALS (BELT LINE/INWOOD) IADDISON IFF-8 188 IMISC. SIGNALS (BELT LINE/MARSH) IADDISON IFF-8 188 IMISC. SIGNALS (BELT LINE/MIDWAY) IADDISON IFF-8 188 IMISC. SIGNALS (BELT LINE/QUORUM) IADDISON IFF-8 188 IMISC. SIGNALS (BELT LINE/SURVfYOR) IADDISON 1FF-8 291 IMISC. SIGNALS (LINBERG/MIDWAY) IADDISON IFF-8 291 IMISC. SIGNALS (MIDWAY/BELTWAY) IADDISON IFF-8 311 ,MISC. SIGNALS (MIDWAY/PROTON) IADDISON IFF-8 261 IMISC. SIGNALS (QUORUM/A1RPORT PKWY) IADDISON IFF-8 261 IMISC. SIGNALS (QUORUM/ARAPAHO) IADDISON IFF-8 261 IMISC. SIGNALS (QUORUM/KELLER SPRINGS) IADDISON IFF-8 --261 IMISC. SIGNALS (QUORUM/WESTGROVE) IADDISON IFF-8 207 IMISC. SIGNALS "(SPRING VALLEY/MIDWAY) IADDISON IFF-8 JOB NO. IPROJECT NAME (DESCRIPTION) IOWNER/CITY IFILED I _________ 1 1 1 1 IMONTFORT DRIVE IADDISON IA-6 I IMONTFORT DRIVE STORM SEWER 1ADDISON IB-1 1 INEW DOOLEY ROAD 1ADDISON IB-4 I 293 INEW RATLIFF LANE (DESIGN) /ADDISON IC-1 I 293 INEW RATLIFF LANE (ORIGINALS) 1ADDISON 1FF-12 1 'NOEL ROAD 12" WATER IADDISON /B-6 1 /NORTH/SOUTH QUADRANTS (ORIGINALS) /ADDISON ISF-B I IOAK BEND ESTATES IADDISON IB-6 1 1OAKS NORTH WATER/SEWER IADDISON IA-1 1 IOAKS NORTH (DRAINAGE STUDY) IADDISON IB-5 I 242 IOLD ADDISON IADDISON IBF-A5 242 IOLD ADDISON (NEGATIVES) IADDISON . /SF-B 242 IOLD ADDISON (NEGATIVES) IADDISON ISF-A 222 IOLD TOWN ADDISON IADDISON IBF-AI3 222 IOLD TOWN ADDISON (ORIGINALS) 1ADDISON ISF-A 222 IOLD TOWN ADDISON (ORIGINALS) IADDISON IFF-14 309/287 IOLD TOWN/BROADWAY PAVING-HATER (DESIGN) IADDISON IC-l IOLD HATER/SEHER/ZONING MAPS (ORIGINALS) IADDISON ·ISF-A IPALMER NATIONAL BANK 1ADDISON IA-6 IPLAZA AT THE QUORUM 2 IADDISON IA-6 IPOWER EASEMENT IADDISON IBF-A5 IPRESTON MEADOWS IADDISON IB-2 217 IPUMP STATION FIRST SITE IADDISON IBF-A3 149 IPUMP STATION &MAINS (ORIGINALS) IADDISON IFF-17 I IQUORU!LCaUER IADDISON IA-l 1 203 IQUORUM DRIVE (ORIGINALS) IADDISON IFF-14 1 203 IQUORUM DRIVE -1/2 SIZE (ORIGINALS) /ADDISON IFF-14 I IQUORUM NORTH 1ADDISON IB-2 1 203 .1QUORUM ROAD (DESIGN) 1ADDISON jC-3 I /QUORUM SOUTH /ADDISON IBF-AI2 IQUORUM SOUTH 1ADDISON IB-2 IQUORUM WEST IADDISON /B-2 IQUORUM WEST IADDISON IA-7 147 IRATE·OF FLOW CONTROLLER IADDISON . IB-2 IRATLIFF LANE (ORIGINALS) IADDISON IFF-16 IRETAIL DELEVOPMENT (BELT LINE/INWOOD) IADDISON IB-5 IRETAIL SITE AT INWOOD ROAD 1ADDISON IB-l ISAN. SEWER (NOEL/BELT LINE) IADDISON IB-3 ISEASHELL RESTAURANT 1ADDISON IB-1 ISERVICE.CENTER 1ADDISON IA-6 290 ISERVICE CENTER EXPANSION IADDISON IB-6 290 ISERVICE CENTER SURVEY 􀀨􀁏􀁒􀁉􀁇􀁉􀁾􀁁􀁌􀁓􀀩 IADDISON IFF-12 ISEHER LINE (PKWY/ADDISON RD.) ·IADDISON IB-5 ISEHER MAP IADDISON IBF-AS ISEWER MAP (MARK-UPS) , 1ADDISON IBF-AI3 152 ISEWER METERING STATION IADDISON IB-5 331 ISOPRAS CIRCLE (ORIGINALS) /ADDISON IFF-12 I ISOUTHRIOGE ESTATES IADDISON IB-2 I ISPECTRUM DRIVE MEDIAN MODIFICATIONS IADDISON IB-4 I • JOB NO. IPROJECT NAME (DESCRIPTION) IOWNER/CITY IFILED _________ 1 1 1 _ 178 ISPRING VALLEY ROAD IADDISON 18-4 ISPRING VALLEY ROAD LAYOUT IADDISON 18F-A9 178 ISPRING VALLEY ROAD (DESIGN) IADDISON IC-4 178 ISPRING VALLEY ROAD (ORIGINALS) IADDISON IFF-15 ISPRING VALLEY WATER/SEWER IADDISON 18-4 1SPRING VALLEY/MARSH LN. CENTRE 1ADDISON 1A-1 ISPRINGHAVEN APARTMENTS IADDISON 18-3 ISQUARE FOOTAGES IADDISON IBF-A3 1STANDARD· DETAILS (ORIGINALS) IADDISON IFF-3 ISTREET MAP IADDISON IBF-A2 ISTREET MAP (ORIGINALS) IADDISON . ISF-A ISUNBELT BUSINESS PARK IADDISON IB-5 ISUN8ELT CORP. HEADQUARTERS IADDISON IBF-A8 ISURVEYOR PUMP STATION (DESIGN) 1ADDISON IC-4 ITHE ATRIUM IADDISON 1B-4 ITHE WOODS· 1ADDISON IA-1 ITHOROUGHFARE MAP (ORIGINALS) IADDISON ISF-B ITOLLWAY AERIAL IADDISON IA-7 ITOLLWAY 80RING IADDISON IA-7 ITOLLWAY CONSTRUCTION 1ADDISON IA-7 145 ITOLLWAY CROSSINGS IADDISON IA-7 ITOLLWAY GRADES 1AnDISON IA-7 ITOLLWAY PAVING 1ADDISON IA-7 228 ITOWN HALL ANNEX (ORIGINALS) 1ADDISON IFF-17 ITOWN HALL SHOPPING CENTER 1ADDISON IB-2 164 ITOWN HALL STREET (ORIGINALS) IADDISON IFF-16 ITOWN HALL (TREE LOCATIONS) 1ADDISON IB-4 ITRAFFIC FLOW 1ADDISON IBF-A2 ITRAFFIC FLOW IADDISON IBF-A4 ITRAFFIC FLOW (ORIGINALS) IADDISON ISF-A 182 1VOSS/DOOLEY SAN . SEWER . 1ADDISON 18-2 182 IVOSS/DOOLEY SEWER (DESIGN) IADDISON IC-2 IVOSS/DOOLEY SEWER (ORIGINALS) IADDISON' IFH5 JWATER MAP IADDISON IBF-A8 IWATER/SEHER MAPS IADDISON IBF-A9 IWATER/SEWER OVERLAYS (ORIGINALS) IADDISON ISF-A IWATER/SEWER (SEPIAS) IADDISON ISF-A . 1WATER/SEWER/DRAINAGE IMPROVEMENTS (ORIG) IADDISON IFH 7 IWATER/SEWER/ZONING MAPS (ORIGINALS) IADDISON IFF-5 IWEST DRIVE/RUNYON ROAD IADDISON IB-1 IWESTGROVE AT LIBERTY PLAZA , IADDISON IA-1 192 IWESTGROVE/VOSS DRAINAGEIADDISON IB-4 192 IWESTGROVE/VOSS (ORIGINALS) IADDISON IFF-15 324 IWHITEROCK JOGGING TRAIL (ORIGINALS) IADDISON IFF-12 219 IWINNWOOD SEWER (DESIGN) IADDISON IC-1 219 IWINNHOOD SEWER (ORIGINALS) IADDISON IFF-13 87328 /WINNWOOD/CELESTIAL PHASE 3 (ORIGINALS) IADDISON IFF-13 265 IWINNWOOD/CELESTIAL ROAD (DESIGN) IADDISON IC-3 265 IWINNWOOD/CELESTIAL (ORIGINALS) IADDISON IFF-13 J_O_B__N__O_. __ I1P_R.OJEC._T•N•AME (DESCRIPTION) l1OHNER/CITY I1FILED I1 IZONING MAP IADDISON IBF-A121 IZONING MAP (PRELIMINARY) IADDISON IBF-A141 IZONING (SEPIA). IADDISON ISF-A 1 IIONING/SEHER MAPS IADDISON IBF-A9 I IlONING/STREET MAPS (ORIGINALS) IADDISON ISF-A I IFARMERSBRANCH 16' HATER IADOSION 18-4 1 . :;. .. \.'. ':".' .. '.... r M'-' . ';1.. 1.• ,_ 􀁾􀀮 : ).1. Eat 4_ MMI.hUq;.;,liNllQ., PAl) i CITY ENGINEER'S OFFICE Post Office Box 144 Addison. Texas 75001 (214) 450-2886 16801 Westgrove February 25, 1991 Wayne Ginn, P. E. Ginn & Case, Inc. Consulting Eng. P. O. Box 796577 Dallas, Texas 75379-6577 RE: Invoice 1011 -Mildred street Improvments Item 260 Resolving Benchmark/Grades Dispute Dear Wayne: Per our conversation on February 25, 1991, the amount requested for item 260 has been adjusted to $250.00. This amount is intended to cover the costs associated with relating Cadence's benchmark to Center! ine' s and determining that the basis of el evation was different. If you have any additional information regarding this issue please call me, if not, please issue a credit for the $470.00 difference. John City 􀁊􀁃􀁾􀁃􀁬􀁁􀁾'l-z..>' '11 R. Baumgar ner, P. E. Engineer JRB/rp MILDRED STREET IMPROVEMENTS -TOWN OF ADDISON TIME JUSTIFICATION FOR MONTH OF FEBRUARY, 1991 FOR GABE FAVRE FEB 1 -2 1/2 hours {admin) ... discussed plans for next week with the contractor ••. discussed plans for Saturday (2-2-91) doing the alley paving and the Julian Street asphalt work. Discussed with Cadence Group superintendent and then Cunningham Architects the location of Station 4+28.56, centerline of drop off area ••• after much discussion, it was agreed by all present that we should move the "point" approximately 7" east to accommodate the present location of the building ... as this would work best where the building is now located. Additionally, we discussed with Cunningham the elevations of the proposed grades for the pavement in the drop off area to be sure it agreed with what he wanted to accomplish. We had the contractor verify the grades of the building's walk to determine what the top curb grade should be to be in accordance with Cunningham's plans. FEB 2 -2 hours ... site visit to verify that asphalt work was being done ... no workers on site.•• no charge to project time. FEB 4 -1/2 hour {admin) .•• site visit to discuss with contractor additional saw cutting in alley for preparation of pavement. FEB 5 -1 hour {admin) ... phone calls to and from contractor, discussing requirements for densities for flex base and sUbgrade material for area of Julian Street being prepared for asphalt. Contacted lab for densities to be taken on project. FEB 6 -1 hour {admin) ..• site visit today, after rains yesterday, to determine if contractor was working ••• excavation subs were working to dry out the base ••. witnessed TU Electric crews working on relocating the power poles which were in conflict with construction.•• phone calls to contractor to determine status of when work was to continue. FEB 7 -2 hours {admin) ... site visit with contractor to discuss in more detail the alley pavement ••• we walked the alley and discussed the potholes, alligator cracks and general poor condition of the alley and to what extent the contractor was responsible ... returned to office and contacted contractor to discuss fully what was to be done ••• discussed the placement of lime which was beginning today... and schedule for next week. FEB 8 -3 hours {admin) ... site visit with Rick Waters of Centerline contractors to discuss the alley pavement and their responsibility.•. after reviewing the area in detail, and visiting with Ann Cavin regarding the area in front of her house, the contractor agreed to repave the asphalt as we discussed. Additionally I contacted Robin Jones to set up meeting at 2 p.m. today to visit site and have further discussions as to what area needs to be repaved by contractor at no cost to city and what could be done for the other areas that were in poor state of disrepair ... Met with Robin and Bruce Ellis at 2 p.m. Later, Robin returned my call and advised us that $2500 was allocated to proj ect for additional asphalt work to fully pave the alley portions that were in bad shape. GINN & CASE, INC. -PROJECT NO. 439 15 MAR 91 MILDRED STREET IMPROVEMENTS -TOWN OF ADDISON TIME JUSTIFICATION FOR MONTH OF FEBRUARY, 1991 FOR GABE FAVRE FEB 11 -5 1/2 hours (3 1/2 -admin. and 2 -inspect.) ••• reviewed alley areas that were removed earlier to determine if they met requirements our last discussions ..• contacted lab personnel to come out and take gradations of materials that is being placed for base material •.. initial review of pay application received today •.. inspected re-mixing of north paving lanes subgrade work..• inspected placement of 2" irrigation pipe at drop off area. FEB 12 -5 hours (3 -admin. & 2 -inspect.) ...meeting in field with Ann Cavin. Asphalt contractor told her some things that were incorrect and she was concerned... discussed with contractor and his asphalt sub areas that will be done as discussed with Rick Waters yesterday•.. met with Robert Wood and Slade strickland on southeast corner of Julian and Broadway to discuss cleanup of McFarland property... got back with contractor and relayed message of cleanup to him..• witnessed placement of asphalt in alley as patch work was being done contacted lab to take densities of subgrade work being done advised lab of location of densities to be taken ... checked depths of base material for correct thickness as per plans. FEB 13 -4 hours (3 -inspect. & 1 admin.) ... had to contact lab to verify the proctors and densities taken yesterday .•• inspecting final grading of base material ... had lab retake densities that failed yesterday•.. contacted contractor as to why the asphalt was not completed. FEB 14 -3 hours (2 inspect. & 1 admin.) ... resolved conflict with our contractor and Cadence contractor regarding setting of crane to pump concrete, onto the newly completed base material ••• phone call from Cadence requesting that our contractor allow him to set his pumper trucks on the sub-base material ... contacted labs about retesting done yesterday ..• some still failed had to retest again today. FEB 15 -3 hours (inspect) •.. reviewed forms set for 22.5' pavement, verify depths of proposed pavement ••. reviewed alley paving, which was completed by 10 a.m .•.• discussed the abandonment of the manhole in Mildred Street and how it should be done ... contacted lab about yesterdays densities and new moistures that were taken. FEB 18 -2 hours (1-inspect. & 1 admin.) ... inspected the final grading and grades for the paving to be done •.. inspected the forms and checked depths and dimensions ... discussed with contractor considerations of how the blockouts should be done and means of work sequence for the concrete pour. FEB 19 -1 hour (inspect.) ••• steel inspection and final subgrade inspection •.. discussed blockouts and their location and construction in vicinity of drives and alley. GINN & CASE, INC. -PROJECT NO. 439 15 MAR 91 MILDRED STREET IMPROVEMENTS -TOWN OF ADDISON TIME JUSTIFICATION FOR MONTH OF FEBRUARY, 1991 FOR GABE FAVRE FEB 20 -4 1/2 hours (inspect.) ••• inspected concrete pour today... began at 7:45 am... had problems with paving machine and had to do some hand work•.• contractor stopped short of full days work due to those problems ••• had to repair machine ••• made sure header was properly set and that finishwork was done properly... returned later to verify that curing compound was placed properly. FEB 21 -9 hours (inspect.) ••• began pouring concrete where they left off yesterday ... poured over 300 yards of concrete today...was there to inspect all of the work, including the finish, curing and saw cutting of yesterdays work... had onsite discussion with Slade strickland about the removal of the TU Electric poles that are still located in the bus lanes. FEB 22 -2 hours (inspect.) ••. reviewed the saw joints and proposed joints that will be done today .•. verified that barricades were in place ..• inspected traffic interconnect being placed today. FEB 23 -1 hour (admin.) ..• site visit on Saturday to see if contractor was working and verify that barricades were still in place.•. no charge to project time. FEB 25 -3 hours (admin) ••• phone calls to and from Bruce Ellis regarding barricades being down on Mildred Street ••• contacted contractor and went out to site to verify what was going on... recontacted contractor to have him contact his barricades people to get barricades properly placed ••• discussed with contractor and sub the correct location of the interconnect that was continuing to be placed today from Julian Street to Addison Road ... FEB 26 -3 hours (admin) .•• contacted contractor again concerning the barricades had to go back out to site to verify that it would be done preliminary discussions with contractor about next months pay application quantities as to what would be able to be paid and what was not eligible for paYment ... discussed the sequence of work for next few days for pouring bus lane concrete and curbing, etc. FEB 27 -4 hours (1 admin. & 3 inspect) •.• Contacted Slade strickland to advise him that forms would be set in area of dropoff and for him to contact Cunningham, if he wanted, to review the grades that were set ••• visited site and discussed with Cunningham the grades .•. reviewed forms and grades for the bus lanes and the brick pavers construction. FEB 28 -10 hours (inspect) ... pouring bus lanes and drives today along with the drop-off area ••• worked from 7:30 a.m. to 7:30 p.m. GINN & CASE, INC. -PROJECT NO. 439 15 MAR 91 .,'\ j CITY ENGINEER'S OFFICE Post Office Box 144 Addison, Texas 75001 (214) 450-2886 16801 Westgrove March 8, 1991 H. Wayne Ginn, P. E. Ginn & Case, Inc. P. O. Box 796577 Dallas, Texas 75379-6577 Re: Mildred street Improvements -Invoice Number 1020 Dear Wayne, Thank you for taking the time to discuss invoice 1020 and your philosophy with regard to additional services for the construction administration and inspection services provided by your firm. After reviewing the Agreement between the Town of Addison and Ginn, Inc. dated March 24, 1980 it does not appear that construction phase services are tied to the length of the construction schedule. However, it appears that there may be basis for additional compensation based on historical precedent. In an effort to determine a fair val ue for addi tional services please provide the following information: 1. The Engineers evaluation/recommendation with regards to liquidated damages. If you are recommending the assessment of liquidated damages, is the contractor aware of your recommendation and what is their position? 2. Please provide an updated construction schedule. 3. In conjunction with the construction schedule, provide and estimate of your additional services and the basis for that estimate to complete the project. 4. On future invoices pI ease provide a more detai 1ed summary of the services provided. This summary could include a copy of the daily log maintained by the inspector with a summary of hours. 5. For invoice 1020 please provide a detailed breakdown of hours by position and a copy of the inspection reports for the billing period. Thank you for your help with these issues. Please call me if you have any questions since your response is necessary to 􀁾􀁲􀁯􀁣􀁥􀁳􀁳 this invoice. Sincerely yours, 􀁾􀁗􀁾􀁦 Addison 􀁾􀁪􀀿􀁅􀁾􀁡􀀯􀁬􀁤􀁷􀁺 John R. Baumgadlner, P. E. City Engineer JRB/rp .A:DbIsoN CITY ENGINEER'S OFFICE ----------Post Office Box 144 Addison, Texas 75001 March 8, 1991 H. Wayne Ginn, P. E. Ginn & Case, Inc. P. O. Box 796577 Dallas, Texas 75379-6577 Re: Mildred street Improvements -Invoice Number 1020 Dear Wayne, (214) 450-2886 16801 Westgrove Thank you for taking the time to discuss invoice 1020 and your philosophy with regard to additional 'services for the construction administration and inspection services provided by your firm. 􀁁􀁦􀁴􀁾􀁲 reviewing the Agreement between the Town of Addison and Ginn, Inc. dated March 24, 1980 it does not appear that constructi on phase services are tied to the length of the construction schedule. However, it appears that there may be basis for additional compensation based on historical precedent. In an effort to determine a fair value for additional services please provide the following information: The Engineers evaluation/recommendation with regards to liquidated damages. If you are recommending the assessment of liquidated damages, is the contractor aware of your recommendation and what is their position? Please provide an updated construction schedule. 3. 4. In conjunction with the construction schedule, provide and estimate of your additional services and the basis for that estimate to complete the project. On future invoices please provide a more detailed summary of the services provided. This summary could include a copy of the daily log maintained by the inspector with a summary of hours. For invoice 1020 please provide a detailed breakdown of hours by position and a copy of the inspection reports for the billing period. Thank you for your help with these issues. Please call me if you have any questions since your response is necessary to process this invoice. Sincerely yours, rr:.}wn;ff Addison 􀀹􀀭􀁾􀀻􀀲B . cV7 rfw-z IJohn R. 􀁂􀁡􀁕􀁭􀁧􀁾􀁲􀀬 P. E. City Engineer JRBjrp 10,00 --------------._--_.._--------------------------,------------􀁟􀁾 􀁾􀀯􀀳􀀬 /0 __.__. _ €£E 􀁾􀀭􀀭􀀭􀀾􀀮􀀮􀀮􀀮􀀾􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀀱􀁐􀀭􀀺􀀮􀀮􀀮􀀮􀀳􀀮􀁬􀀮􀀮􀀮􀀮􀀺􀀮􀁴􀁉􀀮􀀺􀀡􀀮􀀮􀀮􀀮􀀡􀀮􀁩􀀮􀀮􀁟 􀀮􀀮􀀡􀀡􀀲􀁾􀀮􀀮􀀮􀀮􀀮􀀮􀀡􀁳􀀺􀀧􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁟7􀁊􀀭'􀁌2 Iq270.OO 􀀺􀀲􀀮􀁓􀀶􀀬􀁾 _ 􀁾􀁾􀀺􀁵􀁳􀀮􀀮􀀮􀁾􀁾􀁊􀀮􀀺􀀲􀁦􀁊􀁌􀀧􀁴􀀺􀀺􀁊􀀵􀀢􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭_ 􀁟􀁟􀁟􀁟􀁟􀀧􀁾􀁾􀀱􀁏􀁾􀁌􀀮􀀮􀀧􀀮􀁄􀁾􀁏� � 􀁟􀁟􀁟􀁟􀁟􀁟􀀢􀀲􀁟􀁾􀀯􀀳􀁾􀀮􀀭􀀭􀀭􀀭􀀭􀀢􀀵􀀰􀁾􀀭􀀭 _ 􀀧􀁊􀀮􀀮􀀮􀀮􀀮􀁌􀂣􀁾􀀢􀀮􀁌􀀡􀁕􀀻􀀺􀀮􀀮􀀭􀁅􀁾__􀁾􀀢􀁟􀁟􀁟􀀧􀁟􀁟􀀮􀀽􀁟􀀭􀁴􀁁􀁟􀀽􀁏 3......6.<....L._ 􀁾 _ Z5..6.00 􀀭􀀭􀀭􀀭􀀴􀁤􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭� �􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 __--'=20.!l!L.q:.L d/A 7-07.00 '-7 􀀢􀀸􀀮􀀮􀁥􀀮􀁹􀁾 . . '" 62:L.-25 1 'l.:z..s= ;. 􀁾 '._ 􀁬􀁾 730 387 . . 􀁉􀁾 sa-S"'-23'1, /7J _ -5£ __􀁾􀀶􀀯􀁁􀁌􀁾􀁾􀀬􀀬􀁧􀁂􀀲 􀀳􀁾 -:;-... -.ER.. . C--IPfiL 􀁣􀀺􀀮􀀴􀁉􀀶􀁾􀁌􀀮􀀮􀀮􀀧_--,----....J-.XfJ"-::z..=SQe<::.-􀁱􀀼􀀭􀂷􀀭􀀧􀁾􀀺􀀺􀀺􀀾􀀮􀀮􀀮􀁌􀀮􀀮􀀮􀀭􀀭􀀭􀀭􀀢􀀢􀁾􀀭􀀭􀀭􀀮􀀭􀀮􀀭􀀺 _ :3 􀁾 3/8.75 6 Zz 􀁃􀀶􀁟􀀭􀁉􀀧􀀭􀁴􀁬􀁴􀀧􀀭􀀧􀀭 􀀭􀀧􀁾􀀢􀀬􀀮􀀭􀀮􀀵􀀼􀀭􀀭􀀭􀀭 -_ 'j 􀀭􀁾􀁾􀁣􀀵􀀯􀀶􀀬􀁁􀀯 . 2.5 358: 0 L' . '.) 5/b 171:$ 􀁾􀀭􀁟􀀭􀀭􀀭􀀭􀀭􀀭􀀮􀀭􀁾􀀭􀀭􀀭􀀮􀀭􀀮 __._-__􀁾􀀭􀀺􀀳􀀮􀀰􀀱􀀮􀁢􀀿 C/aiJo/CONsrZU072o/,1 ?!tAS£. 5"-/-9tJ 􀀭􀁦􀁣􀀾􀀱􀁢􀁾􀀵􀁙􀀱􀀱 -.... --------f.-L--C>..L:jl-! 􀁾􀀮􀁾􀀮 􀁾􀀮􀁾􀀧􀀮 -' . --' ___d _􀁾􀁾􀁾􀀲􀀲􀁓􀁣􀁤 . _ G, 331,---=-$2.=-'-------__ _'D,:o',:,'o,1 􀁾􀀢􀁟􀀻􀀢􀁟􀀺􀁾􀀭􀀬􀀭􀀭􀀮􀀲􀁥􀁌􀁕􀀷� �􀁾􀀮􀁣􀁥􀀺􀁯􀁾􀀲􀁚􀀢􀀩􀀬􀀮􀀮􀁌􀀭􀀭􀀭􀁾 __-----k2b...L3-,-.􀀭􀀭􀀽􀀡􀀮􀀭􀀺􀀻􀁾􀁧􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 .... _. :=&ka_.􀁾__. _ i 􀁾􀀭􀀭􀀭􀀭-)---.··l------􀀭􀀭􀀭􀁾􀀭 -----􀀭􀀭􀁾3·" 6. 1 􀁾􀁾􀀮􀀭􀀧􀀭􀀡􀀱􀀭􀀭􀁌􀀻􀀭􀀭􀀭􀁻􀀻􀀯􀀢􀀮􀁌􀁐􀁾􀀧􀀧􀀧􀀢􀁬􀁤􀀧􀀧􀀧􀀭􀀭􀀺􀁾􀀭􀁽􀀬􀀮􀀭􀁊􀁾 _ ;:: 􀁾 􀁾 􀀭􀀭􀀺􀀺􀁾 􀀧􀀽􀀧􀀭􀁾 1208 􀁨􀁲􀀮􀁾__· . .__-.-:__ _ _ 7 S G ,. 0" 6 c::.-eic:;.. ...􀁾 __---.-.-:___ _ .-:z..o 7. OD 15/1/􀁾􀁉 "3 '$ er...n'__.􀁇.􀀮􀀮􀀮􀀮􀀮􀀬􀁇􀀢􀀧􀀭􀀭􀀢􀁏􀁾􀀭􀁲􀀺􀁣􀀮􀀮􀀮􀀬􀀭􀀭 􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀺􀀭􀀭􀁣􀀭􀀭􀀭􀀭􀀧􀀭􀀭􀀭􀀭􀀭􀀭􀁾􀀭􀀭􀀧􀀭􀀭􀀭􀀭􀀭􀀭 Ie; • (;0 􀁃􀁏􀁾􀀬􀁥􀀮􀀬 􀁾􀀷􀀯􀀬􀀰􀀹􀀱􀁉􀁯􀁯􀀯 􀀮􀁾􀁾 _._------------􀀭􀀭􀁾􀁾􀀭􀀭􀀭 􀁾􀁾􀀭􀀢􀀭􀀭􀁾􀀭􀀮􀀭􀁾􀀭􀀮􀀭􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 I'II .. J! . 1.00 '$.7 ,/0 7.93 1/, So 756.00 􀀭􀁾􀁟􀀮􀁟􀀭􀀭􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀁾􀁾􀀭􀀮􀀭􀀬􀁾􀀭􀀭􀀭􀀭􀀮􀀭􀀭􀀭􀀭􀀭􀀭􀀮􀀭􀀮􀀢􀀭􀀧􀀭􀀧􀀭􀀭􀀮􀀧􀀭􀀭􀀺􀀭􀀭􀀧.􀀭.􀀭-􀀭.-. 􀀭􀀭􀀭􀀺􀀭􀀬􀀬􀀭􀀭􀀭􀀭􀀬􀀭􀀭􀁾􀀭􀀮􀀮􀀬􀀮􀀭􀀭􀀭􀀭􀀭� �􀀭􀀭􀁾􀀮􀀬􀀮􀀮􀀮􀀮􀀮􀀮􀀭􀀭􀀭􀁟􀀮􀁟􀁾􀀭􀀭􀀭􀀭􀀭􀁟􀀮􀁟􀀭􀀭􀀭􀀭 -3/-9CJ ."-􀀺􀁦􀀻􀀺􀀭􀀻􀀢􀁩􀀺􀀻􀀻􀁾􀀺􀀭􀁲􀀧􀀭􀀭􀁾􀀭􀀭􀁾􀁾􀁾-􀁾􀁾􀁾􀀺􀀺 • • ... _ ..---,-->0.􀁾􀀬􀁾􀁌.􀁊..!:Z.L.L.. ...ii!..􀁾􀀭􀀧􀀭􀀭􀀭􀀭 􀀧􀀭􀀺􀀭􀀭􀀭􀀬􀀭􀀭􀀬􀀬􀀭􀀬􀁟􀀭􀀭􀀭􀀭􀀬􀀭􀀭􀀧􀀭􀀭􀀭􀀬􀀭􀀭__􀁾􀁟􀀭 􀀭􀁟􀀭􀁾􀀭􀀭􀀭􀀭􀀬􀀭􀀭􀀭􀀭__ 'P . 3> I ·90 4/1. 60 t/0:',0 9-30·70 􀀺􀀧􀀻􀀺􀀻􀁯􀀧􀀾􀀺􀀺􀀬􀀬􀀻􀀧􀁊􀀭􀁾􀀭􀀧􀀭􀀭􀀾􀀯􀀭 10 􀀭􀀧􀀳􀀯􀀭􀁚􀁑􀁾􀁾􀁟􀀭􀀭􀀭􀀭􀀬􀁾􀀷􀀳􀀬􀀬􀀢􀀬􀀭 􀁾􀁟 0-,90 £#6􀀯􀁁􀁌􀁅􀁅􀁉􀁾􀀮 -------------.,' -2.,0 .. 􀁾􀀯􀁢􀁏􀁏 :---.,------.-.----,------_.,-_._-'-_..,...-:-----------------.-----.-_.__... _----,-------------_. (􀀮􀀬􀁾􀀮􀀺􀀬􀁹􀁜􀀭􀀭􀀭􀀭􀀭􀀫􀀭􀀭􀀭􀁾􀀭􀀭� �􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁾􀀭􀀭 I------L-I--􀀳􀁾􀀺􀀹􀀰 ._ ____"a=e""""t!!O"''''-=__ 􀀳􀀧􀁟􀁟􀀧􀀧􀀶􀁾􀁦􀁉􀀧􀁟􀀧􀁟􀁾􀁣􀀽􀀵􀀧􀀧􀁟􀁟􀁟􀁣􀁟􀁟􀁾..·-<£/).􀂣..􀀮.􀁓􀀢􀀢􀀢􀁉􀀧􀀭􀀢􀀧􀁾􀀽� �􀀮􀀯􀁾􀀮􀀬􀀭􀀭􀁟6-3·p-90 􀀮􀀭􀁟􀀭􀁾􀀭􀀬􀀭􀀭􀀭􀀭􀀸􀁑 cL_-._.􀁾􀁾􀀮􀁟􀀮􀀮􀀬􀀮􀀬􀀭􀀮􀀮􀀬􀀮􀀬􀀭􀁟l[l-􀁾􀀶􀀭 􀀹􀀰􀀭􀀭􀀱􀀧􀁢􀁾􀀶􀁾􀁏􀁣􀀺􀀭􀀢 􀀭􀀮􀀬􀀭􀀭􀁾 .:...---';z,-.___:0':' --'.--,.. /2.-3/-90 􀁱􀁏􀀨􀀡􀁰􀀧􀁾 􀀮􀁾􀀱􀀳􀁑􀀩 35. s: -8-9/􀀯􀁏􀀬􀁾 ( 􀀩􀁾􀀭􀀭􀀧􀀱􀀧􀀭􀀢􀀧􀀲􀀽􀀭􀀭􀀭􀀢􀀧􀀳􀀰􀀮􀀮􀀮􀀮􀀰􀀮􀀱􀀭􀀭􀀭􀀧􀀭􀀷􀀱􀀭􀀽􀁏􀀭􀀭􀁟􀀭􀀭􀀭􀀭􀀭􀀭􀀧􀀢􀀢􀀶􀀮􀁌􀀮􀀮􀀹􀀰􀀢􀀢􀀧􀀭􀀧􀀭􀀭􀀭􀀭􀁟􀁾􀁾􀀭􀀭􀀭􀀭􀁌􀀮􀀮􀀮􀁉􀀮􀁌􀀮􀀮􀀯� �􀀭􀀬􀀭􀀭􀀢􀀧􀁾􀀬􀁟􀀭 ---'-􀁾 , 1-3/-91 3.';-􀀱􀀭􀀧􀀭􀀭􀀬􀀭􀀬􀁟􀀭􀀭􀀬􀀭􀀭􀀭􀁟􀀭􀀭􀀭􀀧􀀶􀁾􀀭􀁟􀀳􀀰􀀮􀀺􀀬􀀽􀁟􀁟􀁟􀁟􀀬􀀭􀁾􀀹􀀰 /02.0 12, CJ -/-90 -:2/. 0 -􀁾 --􀁯􀀺􀀺􀀺􀀺􀀡􀀺􀀻􀀿􀀻􀁟􀁾􀀡􀁾􀀧􀁪􀀭􀀭􀀭􀀭􀀪 􀁾􀁾􀁾􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀁾􀀭􀀭􀀭􀁾􀀭􀁾􀀺􀁾􀀽􀀭__􀁕􀁾􀁾􀀺􀀭􀀭􀀭􀀭􀀭 􀁾􀁾􀁚􀀭􀀢􀀬􀁾􀁾__-----'-I1..!..L.,e-=--=5 -----I-'---,-----...-L...--"",-'-I___,-.:...:90=---?.6 4'0 􀁱􀁾􀀬D 1-'-􀀭􀀭􀀭􀀭􀀧􀀭􀀭􀀭􀀮􀀳􀀰 􀁾􀀹􀀰 . I W 0 g 3 _c;--3 -9'0 /90 .;Z/, 􀁾 􀀼􀀺􀁽􀁾 􀀺􀀬􀀻􀁊􀀭􀀭􀀭􀀭􀀬􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭---------._-----u_u u ----------__ • ----u __---- 􀁾􀀭􀀭􀀭􀁟􀀮􀁟􀀮-------------------_. -_.._-"-----------_.---_. 􀀭􀀭􀀭􀁟􀀮􀀧􀀭􀀭􀁾􀀭􀀭􀀭􀀽􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀧􀀭􀀭􀀭􀀭􀀽􀀭􀀭􀁟􀀮􀁟􀀭􀀭 __􀁾 􀁟􀀢􀀢􀀧􀀲􀁾􀁓􀀽􀀶􀁟􀀧􀁟􀁟􀀧7􀀬'-----".:£lzC-:..... .zs-. .<..........L 􀁾 􀁾 _ __􀁾􀁟􀁟􀁟􀁟􀀾􀁯􀁏􀁾􀀢􀁺􀁾􀁟􀁟􀁟􀁟􀁟􀀢􀀢􀀧􀁟􀁟􀁳􀀽􀁟 623, Z5. 􀀺􀀷􀀮􀁁􀀯􀁾􀁐􀁥􀁾􀀷􀀡􀁾􀁎􀀮 __ 􀁬􀁡􀁾􀁏 􀁾0 cu5:..... ---=2"'----<9:'-..L.!O"-"'-..L-'.II£.s.. --------"---. 􀁾 􀁾􀀯􀀬􀁟􀀮􀀮􀀮􀀮􀀮􀀬􀀵􀀢􀀧􀁟􀁟􀁟􀁟􀁟􀁟􀁨􀁌􀁟􀁟􀁌􀁟 . 􀁾 .. .. _ 3"S-􀁾􀁾􀀮􀁣􀀮􀁟􀁴􀀮􀀷􀁡􀀮􀀮_o>_oo<.o_-_-----,--__ 17,50 ;-fo jj L/0 I 􀀷􀁾__ ---,-----------,-:-,10..5..,.06 􀁾􀁯__ J7 ,.,.=00 $" 0 􀁾􀁾􀀽􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀮􀀮􀀮􀁄􀁌􀀮􀀬􀀺􀀻􀀻􀀺􀀾􀀮􀀮􀀮􀁾􀁯􀀭􀁌􀀭􀀭􀀭􀀭􀀭􀀭􀁾􀀭􀀢􀀧􀀽􀀭􀀭􀀭􀀽􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀧􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 o ( -----􀀭􀁾􀀭 ------------_.._._--_.".. ----.------......_---_ ..._------_.---------------------------------------------􀀭􀀭􀀭􀀢􀀢􀀢􀀧􀀭􀀭􀀭􀀭􀀧􀁾􀀮􀁾􀀹􀀰􀀮􀁌􀁾􀀭􀀭􀀭􀁱􀁌􀀮􀀮􀀮􀀮􀀮􀁱􀀧􀀮􀀡􀁾􀀮􀀽􀀶􀀭􀀢􀀢􀀧􀁄􀀧􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀧􀀭􀁉􀁌􀁌� �􀁉􀀴􀀭􀀭'5􀀭"􀀢.L􀀮-../h"-"r<----􀁾 .. 􀀬􀀮􀀮􀁾􀀭􀀭􀀳􀀭 )-?O 􀁾􀁟􀀮􀀭􀀡􀀳􀀳􀀰 __􀁾􀀺􀀳􀀬􀀮􀁣􀀬􀀳􀁾􀀬􀀲􀁳􀀺􀀮􀀮􀀮􀁌􀀮􀀺􀀮􀁨􀁟􀀧􀁟􀁲 _ ....-.••.•• e---􀀭􀁟􀀬􀁟􀀩􀀭􀀮􀁺􀁾􀁾􀀢􀀭􀀭􀀢􀁦􀀧􀀢􀀢􀀧􀀭􀀭􀁾􀀭􀀭. -<...£.0'---'----=:.....:...-_ 􀁾􀀧􀁩􀀮􀀡􀀩 --_._-------􀀭􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁟􀀮􀁟􀀭􀀭 -------_._--.--_. ----_._.--.... -__ ------;:----@2 1rolhl'; ---_.._--::". ........... _ _._ _._---_ __.__._-_._--._._._-._.􀀧􀀭􀀭􀀢􀁾􀀧􀁾􀁟􀀮 􀁲􀀽􀀽􀀽􀁾􀁾􀁾􀀮􀁾􀀮􀁟􀀮'-'"._ -..-. __.· 􀀮􀀭􀀭􀀮􀁌􀁦􀀮􀀮􀀮􀀺􀀲􀀮􀁣􀁟􀀮􀀺􀁪􀁐􀁾 __.􀁟􀁾􀁧 C.(00 bJLQ ._.-'-L3.!-􀀹􀁾 J gqQ. . ...3u...I-'-,_s="--------'--'=---"------'--;-9/-6--0-)c__􀀮􀀲􀀮􀁾 􀁡􀀮􀁾􀀮􀀡􀀱/􀁾 􀁾􀁟􀀻􀀲􀀮􀀷􀀰 .. __ 􀁃􀁦􀀬􀁾 􀀭􀀭􀀭􀀭􀁾􀀮􀀭􀀫􀀭 f-------...--.------.-----------..--.-􀁉􀀭􀀭􀀧􀀭􀀭􀀭􀀽􀁾􀁾􀁾􀁾􀁟􀀧􀁟􀁟􀀧􀁟􀁟􀁴􀁟􀁾􀁾􀀭􀀭􀀭􀀭􀀮􀀭􀀮􀀭􀀭􀀭􀀭􀀭􀀭􀀮􀀭􀀭􀀭􀀭􀀭􀀭--.::.";O. ,.,}---------1-------..-.-.--...--..--.. ......-: ..:.".'----􀁾􀀻..􀁟--'--'-' . 􀀯􀂷􀁾􀀺􀀼􀂷􀀬􀀺􀂷􀀺􀀺􀀺􀁴􀀽􀂷􀂷􀀭􀂷􀀭􀂷􀀭􀀧􀀭􀀭􀀢􀀧􀀭􀁾􀀮􀀽􀀮􀀧 '-'-'--..-'-_ 􀁟􀀮􀁾 􀀷􀁾􀁛􀀻􀁾􀀡􀀺􀁩􀁾􀁲􀀭􀀭􀀭􀀭􀀺􀁽� �􀀺 􀀻􀀮􀀺􀀮􀀺􀁻􀁬􀁲􀀭􀀭􀀮􀀮􀀮􀀮􀁊􀀮􀀭􀀭􀀭􀀼􀀮􀀮􀀮􀁴􀁌􀀭􀁾􀀭􀀭􀀭􀁾􀀹􀁄 2./. 2 < hrs.. 􀁉􀀭􀀭􀁾􀁾􀁾􀁾􀀢􀀢􀀢􀀧􀁆􀀭􀁾􀀢􀀧􀀭􀀭􀀭􀁾􀀭 􀀭􀀭􀀭􀀭􀀭􀀭􀀧􀀭􀀭􀀯􀁾􀀵􀀮􀀮􀀡􀁬􀁏 3""-.-..9...􀀬.􀀧􀀭􀀭􀀢􀀷􀀭􀀭􀀭􀀧􀁾 􀁾 _"___ 􀁾􀁾􀁾􀀭􀁾􀀧􀀭􀀽􀀭􀀭􀀴􀀭􀀧􀀭􀀭􀁾􀁾􀀢􀀧􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀮􀀲􀀢 7..2-C2. . 08.0 .2,.E10 7,O 􀁾􀀭􀀭􀀭􀀭􀀭􀁾 8,0 􀁾􀁾__ o -1-------------------------+------------------_._-,-􀀭􀀭􀀭􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁟􀀮􀀺􀀮􀀮􀀭􀀮􀀮􀀭􀀭􀀭􀁟􀀮􀁾􀀭􀀭􀀢􀀭􀀬􀁟􀀺􀀮􀀺􀁟􀀭􀁟􀀮􀀺..􀀮_􀀮---)$;Q 􀁾􀁾􀁃􀀩􀀽􀀭􀀮􀀡􀀷􀀮􀀭􀀧􀀭 􀀧-L9-"'C7"'-----'--􀁾 Z,v IIt'Mffl; e.t2t.ue12l£f!-. 10,00 ------------------------------------------_._--._--------_._-------􀀭􀀭􀀭􀀭􀀭􀀭􀂷􀀭􀁾 􀀢􀁣􀁾􀁾__ 􀁾􀁾__ -----------.--------. ---,-+----------------._---_..-----+----------------------􀁾􀀧 ... MISe..-dfO 􀁟􀁾􀁟􀁾􀀳 􀁾􀁦􀁯 J------<) ./1---------------------------------------􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁉􀀭􀀭􀀭􀀭􀀬􀀭􀀭􀀭􀁾 􀁉􀀭􀀭􀀭􀀭􀀭􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀁉􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 􀁟􀀺􀁦􀀭􀀻􀀮􀀻􀀾􀀺􀁩􀀻􀀺􀀻􀁊􀀺􀀭􀀭􀀭􀀭􀀭􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 􀀩􀀻􀀺􀁹􀀭􀀧􀀺􀁻􀁴􀀭􀁾 􀁾􀀭--_+--_ TO J5i03-·preston Road Suite 100, LB·U8 DALLAS. TEXAS 75248 (214) 248·4900 --XouJJ of Aoo 􀁈􀁾 WE ARE SENDING YOU 􀁾o Under separate cover via_----IMI.lU.􀀮􀀭.􀁣􀀺􀁾􀁬 the following items: 0 _ o Shop drawings o Copy of letter o Prints o Change order o Plans o Samples o Specifications COPIES OATE NO. DESCRIPTION I 􀁾 ..V..1/􀁾􀁲-t"dtkd.ouit\ ""-􀁾􀁌􀀮􀁴 /j..:'_ .. 􀁾􀀭 ---'-t:.,}11"" F,4\1fZ..FI'\II.J AA \'<:..,. .-1,\ 􀁾 􀁾􀁴􀁊􀁶􀁲 􀁾􀁾􀀮 .:r Pr 1)1 􀁾􀀻􀀢􀀧􀀻 J-􀁾􀁟􀁾􀁉􀀧􀀧􀀧􀀧 U -tCiC1 I fJ "..,J\. THESE ARE TRANSMITTED as checked below: o 􀁾􀁰􀁰􀁲􀁯􀁶􀁡􀁬 gFor your use 􀁾 requested o Approved as submitted o Approved as noted o Returned for corrections o Resubmit__copies for approval o Submit__copies for distribution o Return__corrected prints o For review and comment 0 _ o FOR BIDS DUE 19 0 PRINTS RETURNED AFTER LOAN TO US REMARKS-ALL 􀀺􀁡􀁴􀀧􀀿􀁾􀀧􀁦 􀁾􀁰􀁥􀁲􀁡 UlErY! 􀁎􀁥􀁣􀁾􀁾􀁩 ___􀀭􀀭􀀭􀀴􀁁􀀭􀁬􀀺􀁾...􀀽...􀁮. 􀁊􀁾􀁌􀀬􀁬􀀭􀁁􀀢􀀢􀀬􀀭􀁾􀀭􀀮􀀧􀀧 􀀭􀁉􀁦􀀭􀁕􀀢􀀧􀁾􀀧􀁃􀀻􀀬􀀮􀀮􀁬􀁊􀀮􀀮􀀯􀁯􀁌􀀮􀁕􀀡􀀡􀁲􀁴􀀮􀁾􀁴􀁚􀀧􀀭􀁉􀁇􀁯􀀻􀀻􀁵􀀮􀀢􀁴􀀮􀀬􀁾􀀭􀀽􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 ___􀁾􀀮􀀮􀀬􀁌􀀮􀀮􀁍􀁮􀁖􀁫􀁴􀀿 'to\) ktMe-Att:i 􀁾􀁶􀁦􀀲􀀮􀀬􀁾 􀁡􀁾􀁴􀀷􀀧􀀧􀀡􀀧􀁩􀁑􀁎􀁳􀀧􀁽 ____(?Le-A<6 􀁾􀀼􀀱 Ouo OfI:=FLC5'-. COPY TO W.6Lt'lb r 􀀢􀀮􀀮􀀨􀁑􀁾􀀬 h' {p PROOOCT240-3 /NEf1iS!Inc., GIlIblo. lOa 01471. SIGNED: 􀁾􀀮􀁾􀁥􀀮 It enclosures are not as noted. kindly notify us at once. 􀀱􀂷􀁉􀁊􀀮􀀮􀀻􀀩􀁶􀁉􀀺􀁉􀀮􀀮􀁉􀀮􀀮􀁁􀁎􀁴􀀺􀁕􀁕􀁾 PAVEMENT PROJECT -TOWN OF ADDISON TIME JUSTIFICATION FOR MONTH OF FEBRUARY. 1991 FOR GABE FAVRE FEB. 1 -1/2 hour ... review preliminary quantities for this months p.3Y appl ication as submitted by the contractor 􀁾 .. miscellaneous phone calls to contractor to verify' same quantities and discuss what 􀁾􀁩􀁬􀁬 be approved for payment. FEB 6 status 1/2 hour ... several phone calls of when the punch list items will to contractor be done. to check FEB 1 1 1 1/2 hou r' s ... sit e visit to all areas of project to determine \oIha t work has been done on punch 1 is t items that contractor was to begin today ... on site .discussion with contractor about specific items listed and ho\oI to proceed. FEB 12 -1 1/2 hours ... r·evie\>ll pay ,":lpplication, .\>Ilrite letter, process document to city for further processing. FEB 13 -1 hour ... si te visit to inspect status of punch 1ist item \.,ork ... phone calls to 􀁣􀁯􀁮􀁴􀁲􀁾􀁡􀁣􀁴􀁯􀁲 to inquire about specific portions of work to be done. FEB 14 -1/2 hour ... proJect status check ... ran through project to verify if contractor is working. FEB 18 -2 hours ... inspection of Quorum south concrete removal, discussion with foreman as to status of other areas of project punch list completion ... went with contractor to other portion of project to help identify exact location of work to be done. FEB 19 -2 1/2 hours ... steel inspection ... \oIatched concrete pour of work on Quorum south ... discussed finish work and location of joints with contractor. FEB 20 -'1/2 hour ... site inspecti.on to verify joints were done correctly and that barricades were properly placed.etc. Aarons FEB 25 1/2 hour·s ... review claims, research information sent to us by Robin Jones regarding sawing company claims against XIT company: FEB 26 -2 hours ... review light fixture submittal North bridge ... phone calls to and from Slade regarding the l'ight 􀁦􀁩􀁸􀁴􀁵􀁲􀁾􀁥 and its solution. Slade and then contractor regarding the different the. 􀁏􀁡􀁫􀁾􀀧􀁎􀁯􀁯􀁲􀁴􀁨 bridge wall. copies of Concrete prob 1em on Oa ks and contractor Discussion with color bricks in FEB 27 'f hour· ... !:dte inspection to bridge to view the br'ick color ... phonecalls to brick manufacturer and contractor to determine 􀁷􀁨􀁡􀁾 could be done to remedy the problem, if possible. TOTAL 15 hours for the entire month of February. 􀀽􀀮􀀧􀀬􀀧􀀮􀀺􀀱􀁾􀀺􀀾 /GINN, INC. February 28, 1989 hitehead ager f Addison P.o. ox 144 ' Add 'son, Tx 75001 CONSULTING ENGINEERS 􀁾􀁥􀀺 Miscellaneous Pavement Improvements Dear Mr. Whitehead:, Uvalde Construction will soon begin construction 'of the Midway Road pavement repairs.' The contractor is required to do his construction work between 9:30a.m. and 3:30 p.m. and he will be allowed to close two lanes of traffic during these hours. As you know the· volume of traffic on Midway Road is greater than the street capacity. Due to these conditions, Randy Hill and Robin Jones had previously discussed with you the possibility of Ginn, Inc. providing "full-time" inspection during reconstruction of Midway Road. . " Our fee by contract allows-·us to budget approximately 107 hours for an inspector on work associated with Midway Road. We estimate a full time inspector will need to be at the site from 9:00 a.m. to 3:30 p.m. 'or'6-1/2 hours per day. The contractor estimates 50 working days to 􀁣􀁯􀁭􀁰􀁬􀁥􀁴􀁥􀁴􀁨􀁾􀀧􀁗􀁯􀁲􀁫on Midway Road. Thisa,mounts to 325 hours for full time inspecti.on. The difference in l:lours multiplied by our billing rate of $30/hour for our'-ingJPec1:or amounts to $6,540. Therefore, we are asking' for authorizAtion of the "full time" inspection services prior to the 􀁃􀁯􀁮􀁴􀁾􀁡􀁣􀁴􀁯􀁲 beginning this work. -,'" We are available convenience. to further discuss . .' this issue at your 􀁓􀁉􀁬􀁾􀁪􀀺􀀭􀁟􀀢􀀢 H. Wayne Ginn, P.E. HWG/RCH/rch cc: Randy Hill Edna Ginn . /Robin Jones V file: 87372 Approved by: Ron Whitehead 17103 Prcslon Road • Suile 100 • LB 118 • Dallas, Texas 75248. Phone 214/248-4900 17103 Preston Road. Suite 100 • to 118 • Dallas, Texas 75248 • Phone 214/248-4900 CUSTOMER DATE NUMBER 28 FEB 1991 ADD TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD. CITY MGR ADDISON TX 75001 ADD DATE· 28 FEB 1991 GINN & CASE, INC. CONSIJLTING ENGINEERS STATEMENT DETACH AND RETURN THIS PORTION WITH YOUR REMITTANCE INVOICE NO. .DATE DESCRIPTION TOTAL AMOUNT "1 rr,r.lM 􀁛􀀲􀁾 FEB 1991 LATB CHARGE 􀁾 102.73 1011 a1 .JAN 1991 MILDRED STREET IMPROV 1.575.60 1020 128 FEB 1991 MILDRED S7 􀁉􀁍􀁐􀁒􀁏􀁖􀁅􀁍􀁅􀁾􀀷􀁓 .4.175.00 2528 131 DEC 1990 MILDRED STREET IKPROV 4.278.00 2529 􀁾􀀱 DEC 1990 ENGINEERING 103.03 1001 al .JAN 1991 1990 MlSCPAVEMENT 􀁉􀀢􀁐􀁾􀁏 1.535.25 1012 28 FEB 1991 1990 HISC·PAVEHEN7 913.53 2533 31 DEC 1990 90 MISC PAVEMENT IMPROV 3.426.45 2537 31 DEC 1990 24·' WATER LINE 411.25 1023 29 FEe 1991 ENGINEERING 34.70 1003 􀁾􀀱 JAN 1991 ADDISON/FB SEWER TUNNEL 140.00 1014 29 FEe 1991 ADDISON/Fe SEWER TUNNEL 120.00 CURRENT OVER 30 DAYS OVER 60 DAYS OVER 90 DAYS TOTAL DUE 8596.81 82}r8.73 0.00 0.00 16.815.54 INVOICE NO. TOTAL AMOUNT L10228 102.73 1011 1.575.60 1020 4.175.00 2528 4.278.00 2529 103.03 1001 1.535.25 1012 913.53 􀀲􀀵􀀳􀁾 3.426.45 2537 411.25 1023 34.70· 1003 140.00 1014 120.00 I TOTAL DUE 16.815.54 17103 Preston Road • Suite 100 • LB 118 • Dallas, Texas 75248 • Phone 214/248-4900 STATEMENT CUSTOMER DATE NUMBER 31 DEC 1990 ADD CUSTOMER NUMBER ADD r:'/t. G -(;//J() "i 􀁾􀀮􀁌 DATE DETACH AND RETURN THIS PORTION WITH YOUR REMITTANCE INVOICE NO. TOTAL AMOUNT 􀁾􀀵􀀱􀀷 60.00 7493 1,610.00 7493 1,610.00-2522 2,674.56 2528 4,278.00 7498 4,770.24 7498 4,770.24-12523 1,304.75 7499 5,986.50 7499 5,986.50-2504 760.04 2529 103.03 7480 450.00 7480 450.00-TOTAL DUE CONTINUED REMITTO: GINN, INC. CONSULTING ENGINEERS Lock Box 118. Dallas, Texas 􀀷􀁓􀀲􀀴􀁾 31 DEC 1990 CONSlJLTING ENGINEERS TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MCR ADDISON TX 75001 GINN, INC. INVOICE NO. DATE DESCRIPTION TOTAL AMOUNT 2517 􀁾􀁏􀀧􀁎􀁏􀁖 1990 CREEK SYSTEM IMPROVEMENT 60.00 7493 􀁾􀀱 OCT 1990 CREEK SYSTEM IMPROV -1,610.00 7493 P4 DEC 1990 PAYlfElfT ,-1,610.00-k 2522 􀁾􀁏 NOV 1990 MILDRED ST IMPROVEKENTS 2,674.56 '/110 2528 􀁾􀀱 ,DEC 1990 MILDRED STREET IHPROV 4,278.00 7498 􀁾􀀱 OCT 1990 MILDRED STREET IKPROV --4;770.24 7498 P4 DEC 1990 PAYlfElfT '--'-4; 770 .24-2523 􀁾􀁏 NOV 1990 SANITARY SEWER IMPROVE 1,304.75 7499 􀁾􀀱 OCT 1990 SANITARV SEWER IHPROV .5,986.50 7499 p4 DEC 1990 PAYJfENT 􀁟􀁾􀀵􀀬􀀹􀀸􀀶􀀮􀀵􀀰􀀭 2504 􀁾􀁏 NOV 1990 ENGINSERING 760.04 2529 I:ll DEC 1990 ENGINEERING 103.03 7480 􀁾􀀱 OCT 1990 ENGINSERING -'-450.00 7480 f>4 DEC 1990 PAVMENT ---450.00-CURRENT OVER 30 DAYS OVER 60 DAYS OVER 90 DAYS TOTAL DUE CONTINUED 17103 Preston Road. Suite 100 • LB 118 • Dallas, Texas 75248 • Phone 2141248-4900 GINN, INC. CONSULTING ENGINEERS REMIT TO: GINN, INC. CONSULTING ENGINEERS Lock Box 118 • Dallas, Texas 􀀷􀀵􀀲􀀴􀁾 CUSTOMER DATE NUMBER 31 DEC 1990 ADD' TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON 􀁗􀁈􀁉􀁔􀁅􀁈􀁅􀁁􀁄􀁾 CITY MGR ADDISON TX 75001 DATE 31 DEC 1990 CUSTOMER NUMBER ADD STATEMENT INVOICE NO. DATE DESCRIPTION' TOTAL AMOUNT 2516 ao NOV 1990 SPECIAL SERVICES 291.38 7483 􀁾􀀱 OCT 1990 SPECIAL SERVICES '---1',333 ..66 7483 1)4 DEC 1990 PAYHENT .'-1,333.66-2508 􀁾􀁏 NOV 1990 1990 MISC PAVEMENT IMPRO 5,499.53 2533 􀁾􀀱 DEC 1990 90 MISC PAVENEN7 IKPROV 3,426.45 7484 􀁾􀀱 OCT 1990 1990 MISC PAVEMENT IHPRO --6;479.83 7484 1)4 DEC 1990 PAYMENT 6;479.83-2512 􀁾􀁏 NOV 1990 2411 WATER LINE RELOCATE 651.58 2537 u-DEC 1990 24" WA7ER LINE 411.25 7487 􀁾􀀱 OCT 1990 2411 WATER LINE RELOCATE ---2r'03'1.19 ·7487 1)4 DEC 1990 PAYHENT _.2,037.19-CURRENT OVER 30 DAYS OVER 60 DAYS OVER 90 DAYS TOTAL DUE 8218.73 11241.84 0.00 0.00 19,460.57 DETACH AND RETURN THIS PORTION WITH YOUR REMITTANCE INVOICE NO. TOTAL AMOUNT 2516 291.38 7483 1,333.66 7483 1,333.66-2508 5,499.53 2533 3,426.45 7484 6,479.83 7484 6,479.83-2512 651.58 2537 411.25 7487 2,037.19 7487 2,037.19-TOTAL DUE 􀀱􀀹􀁾􀀴􀀶􀀰􀀮􀀵􀀷 17103 Preston Road. Suite 100 • LB 118 • Dallas, Texas 75248 • Phone 214/248-4900 GINN, INC. CONSULTING ENGINEERS REMIT TO: GINN, INC. CONSULTING ENGINEERS Lock Box 118. Dallas, Texas 􀀷􀀵􀀲􀀴􀁾 CUSTOMER DATE NUMBER 30 NOV 1990 ADD TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MGR ADDISON TX 75001 STATEMENT·· INVOICE NO. DATE DESCRIPTION . TOTAL AMOUNT 2517 130 NOY 1990. CREEK SYSTEH IMPROVEMENT 60.00 7493 􀁾􀀱 OCT 1990 CREEK SYSTEM IMPROV 1,610.00 2522 􀁾􀁯 NOV 1990. HILDRED ST IMPROVEMENTS 2,674.56 7498 91 OCT 1990 MILDRED STREET IKPROV 4,770.24 2523 􀁾􀁏 NOV 1990 SANITARY SEWER IMPROVE 1,304.75 7499 91 OCT 1990 SANITARY SewER IKPROV 5 .. 986.50 2504 30 NOY 1990 ENGINEERING 760.04 7480 91 OCT 1990 ENGINEERING . 450.00 2516 30 NOV 1990 SPECIAL SERVICES 291.38 7483 31 OCT 1990 SPECIAL SERVICES 1 .. 333.66 '2508 30 NOV 1990 1990 MISC PAVEMENT IMPRO 5,499.53 7484 91 OCT 1990 1990 MISC PAVEMENT IKPRO 6,479.83 2512 30 NOV 1990 24"" WATER LINE RELOCATE 651.58 7487 31 OCT 1990 24" WATER LINE RELOCATE 2,037.19 CURRENT OVER 30 DAYS OVER 60 DAYS OVER 90 DAYS TOTAL DUE 33909.26 0.00 0.00 0.00 33909.26 CUSTOMER DATE NUMBER 30 NOV 1990 ADD DETACH AND RETURN THIS PORTION WITH YOUR REMITTANCE INVOICE NO. TOTAL AMOUNT 2517 60.00 7493 1,610.00 2522 2,674.56 7498 4,770.24 2523 1,304.75 7499 5,986.50 2504 760.04 7480 450.00 2516 291.38 7483 1 .. 333.66 2508 5,499.53 7484 6,479.83 2512 651.58 7487 2,037.19 TOTAL DUE 33,909.26 \' ... .􀀬􀀭􀀭􀀭􀁟􀀮􀁟􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀮􀀻􀀭􀀮􀀭􀀭􀀭􀁟􀀮􀁾􀀭􀀭􀀬 PAY" 'f TO THE" ORDER OF. . ,L . 􀀭􀀭􀁾 .. 􀁟􀁾􀀮􀁾􀁾􀁾􀀺􀀧 ", -. 􀀧􀀼􀀧􀁾􀁣􀀧 .; ':." . ' 017533 NO. 017533 001035 GINN INC TOWN OF ADDISON, P.O. BOX 144, ADDISON, TX 75001, ( 1 ) 450 06 , NVOICEDATE INVOICE NUMBER .:: ...... ACCOUNTNUMBER :. GROSS DISCOUNT NET AMOUNT 12/04/90 2504,2516 􀁾􀀱􀀭􀀱􀀷􀀱􀀭􀀵􀀶􀀵􀀷􀀰􀀭􀀰􀀰􀀰􀀰􀀰􀀭􀀰􀀰􀀰 1,051.42 0.00 􀁬􀀬􀀰􀀵􀀱􀁾􀀴􀀲 L2/04/90 2517 􀁾􀀲􀀭􀀰􀀰􀀰􀀭􀀵􀀶􀀵􀀷􀀰􀀭􀀰􀀰􀀱􀀹􀀰􀀭􀀰􀀰􀀰 60.00 0.00 60.00 ::'2/04/90 2522 . 􀁾􀀱􀀭􀀰􀀰􀀰􀀭􀀵􀀶􀀵􀀷􀀰􀀭􀁮􀀰􀀳􀀳􀀰􀀭􀀰􀀰􀀰 2,674.56 0.00 2,674.56 1.2/04/90 2523 􀁾􀀲􀀭􀀰􀀰􀀰􀀭􀀵􀀶􀀵􀀷􀀰􀀭􀀰􀀰� �􀀹􀀰􀀭􀀰􀀰􀀰 1,304.75 0.00 1,304.75 􀁾􀀲􀀱 041 90 2508 􀁾􀀱􀀭􀀰􀀰􀀰􀀭􀀵􀀶􀀵􀀷􀀰􀀭􀀰􀀰􀀳􀀴􀀰􀀭􀀰􀀰􀀰 5,499.53 0.00 5,499.53 􀀮􀁾􀀲􀀯􀀰􀀴􀀯􀀹􀀰 2512 *5-000-56570-00330-000 491.29 0.00 491.29 􀁊􀀲􀀭􀀰􀀰􀀰􀀭􀀵􀀶􀀵􀀷􀀰􀀭􀀰􀀰􀀳􀀳􀀰􀁾􀀰􀀰􀀰 160.29 0.00 160.29 11,241.8 0.00· I··. 11:;,2.4ill ..,84 2 4 -7 2 TOWN OF ADDISON PAYMENT AUTHORIZATION MEMO Vendor No. Vendor Name Address Address Address Zip Code /1. -f1f-q & 􀁾 CLAIM # _ CHECK AMOUNT $ _ DEPT OBJ PROJ (", 1,"11) (",,,,,,,,,,,,,) (",,,, ",,,,,,,) /7/5?S70 􀁾􀁴􀁊􀁾􀁾􀁴􀀺􀁬 i/?JIJ !7-th/O 􀁴􀁊􀁴􀀷􀀯􀀹􀁾 tJetCJ .9C,§/'tJ ett1fftJ GJcJtJ .$1C,97c:1 t1tJ..!cJt1 ,C;-?.5t-7C) dlt1JJ 0 .\ . 91 '-..::;..."i l 􀀧􀁉􀁾'􀀧:!; ";,j}.'.ll' ORIGINAL TO ACCOUNTINGIYELLOW FOR DEPARTMENT FILE .' --'-􀀧􀀭􀀬􀀭􀀭􀀮􀁾􀀭􀀭􀁟􀀮􀁟􀀭􀀭􀀭􀀭 􀀭􀀭􀀭􀀭􀁾􀀭􀁟􀀮 􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁾􀀭􀁹--􀁾􀀭􀀭 ------_. ---------􀀭􀁾􀀭􀀭􀀭􀁾􀁾􀀭􀀭􀁾􀀭􀀭􀀭􀀭-----􀀭􀀭􀀭􀀭􀁾􀀭------GINN, INC. CONSULTING ENGINEERS 17103 Preston Road • Suite 100 • LB 118 • Dallas, Texas 75248 • Phone2141248-49oo CUSTOMER DATE NUMBER 04 DEC 1990 ADD TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON 􀁗􀁈􀁉􀁔􀁅􀁈􀁅􀁁􀁄􀁾 CITY KGR ADDISON TX 75001 STATEMENT .. INYOICENO. DATE DESCRIPTION TOTAL AMOUNT 2517 􀁾􀂷􀀮􀁏􀁖 1990 CREEK SYSTS14 INPROVEMSMT 60.00V 7493 􀁾􀀱 OCT 1990 CREEK SYSTEM IMPROV 􀀱􀁾􀀶􀀱􀀰􀀮􀀰􀀰 7493 􀁾􀀴􀀮 DEC 1990 PAYItEItT 􀀱􀁾􀀶􀀱􀀰􀀮􀁏􀁃􀀺􀁖􀀧 2522 􀁾􀁏 NOV 1990 NILDRED ST XMPROVENEKTS 2,.674.56 7498 􀁾􀀱 OCT 1990 ItILDRED STREET IMPROV 4,770.24 7498 􀁾􀀴 DEC 1990 PAYMENT 􀀴􀁾􀀷􀀷􀀰􀀮􀀲􀀴􀀭 2523 􀁾􀁏 NOV 1990 SAItITARY SEWSR IMPROVE 1,304.75 V 7499 􀁾􀀱 OCT 1990 SANITARY SEWER IMPROV 5.986.50 7499 􀁾􀀴 DEC 1990 PAYItBItT 5,986.50-2504 BO NOV 1990 ENGXMEERIJIG 760.041/7480 B1 OCT 1990 EIIGn.EERING 450.00 7480 􀁾􀀴 DEC 1990 PAYHENT 450.00-l--l--2516 iO IIOV 1990 SPECIAL SERVICES 291.38V 7483 􀁾􀀱 OCT 1990 SPECIAL SERVICES 1..333.66 , , h.. CURRENT OVER 30 DAYS OVER 60 DAYS OVER 90 DA􀁙􀁾􀀧 􀁾􀁔􀁏􀁔􀁁􀁌 DUE i"il '1;) 9l CONTINUED 􀀮􀁾􀀧􀁾􀁩􀀱􀀧 l 0, ...... ... -" -".---_. -.----.-". -" ...."._-... 􀀭􀀭􀀭􀀭􀁾 --_.--􀀮􀀭􀀮􀀬􀀮􀁟􀁾􀁟􀀮􀁾􀁾􀀭􀀭􀀭􀀭􀁟..• --_. ---_._.__._-------------....:.--_.. 􀀭􀀭􀁾􀁟􀀮􀁟􀀭􀀭􀀭􀁟.._----_.__._._------GINN, INC. CONSULTING ENGINEERS 17103 Preston Road. Suite 100 • LB 118 • Dallas, Texas 75248 • Phone 2141248-4900 DATE CUSTOMER NUMBER 04 DEC 1990 ADD TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD,. CITY MGR ADDISOH TX 75001 STATEMENT INVOICE NO. DATE DESCRIPTION TOTAL AMOUNT .-7483 􀁾􀀴 DEC 1990 PAYMENT 1,.333.66-2508 􀁾 NOV 1990 1990 NZSC PAVEMENT IJIPRO 5.499.53V 748. 􀁾􀀱 OCT 1990 1990 MISO PAVEMENT IMPRO 6,.479.83 7484 fl4 DEC 1990 PAVIIEIIT 6,.479.83-,/251,2 􀁾􀁏 HOY 1990 24·' WATSR LINE Rm..OCATE 651.38V 7487 􀁾􀀱 OCT 1990 24'· WATER LINE RELOCATE 2,,037.19 7487 􀁾􀀴 DEC 1990 PAYMENT -, 2,,037.19-j/\i'-J. 1 ' . l..91, ' -'.,J, CURRENT OVER 30 DAYS OVER 60 DAYS OVER 90 DAYS TOTAL DUE 11241.84 0.00 .If .',( 􀁾 J 􀀧􀁾􀀺􀁏􀀺􀀢􀁏􀁏 0.00 11241.84 Invoice NUlber: 2504 Invoice Date: 30 NOV 1990 Page: 1 Fro.: For Job: 90130 GINN INC. CONSULTINGENGINEERS ENGINEERING -ADDISON POST OFFICE BOX 796577 TOWN OF ADDISON MISC. PROJECTS DALLAS, TX 753796577 To: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MGR ADDISON, TX 75001 PHASE DESCRIPTION CONTRACT AMOUNT QUANTITY RATE UNIT GROSS ----RETENTION ----AMOUNT AMOUNT PCT TAX 1 AMOUNT TAX 2 AMOUNT 100 SENIOR DESIGNER RESEARCH QUORUM DRI ARAPAHO SIDEWALKS PER ROBIN JONES 100 PROJECT ENGINEER STAFF I1EETING CREEK SYSTEM 601 SURVEYING EXHIBITS FOR SMITH VS TONN OF ADD ION 0.00 0.00 0.00 1.00 1.50 552.42 60.00 80.00 1.05 60.00 120.00 580.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Invoice SUlmary Invoice Totals Gross Retention Tax 1 Tax 2 760.04 0.00 0.00 0.00 Invoice NUlber: 2516 Invoice Date: 30 NOV 1990 Page: 1 From: For Job: 90408 GINN INC. CONSULTING ENGINEERS ADDISON SPECIAL SERVICES POST OFFICE BOX 796577 FOR TOWN OF ADDISON DALLAS, TX 753796577 To: TOWN OF ADDISON POST OFFICE BDX 144 ATTN: RON WHITEHEAD, CITY MGR ADDISON, TX 75001 PHASE DESCRIPTION CONTRACT AMOUNT QUANTITY RATE UNIT GROSS ----"RETENTION ----AMOUNT AMOUNT PCT TAX 1 AMOUNT TAX 2 AMOUNT 601 SURVEYING 4500 BELT LINE RD 0.00 277.50 1.05 291.38 0.00 0.00 0.00 0.00 Invoice SUlBmary Invoice Totals Gross Retention Tax 1 Tax 2 291.38 0.00 ,0.00 0.00 Ir,' ._91 ", : Invoice Date -30 NOV 1990 GINN INC. CONSULT INS ENSINEERS Page 1 Invoice NUlber -2517 I NV0 ICE FROM: SINN INC. CONSULTINS ENSINEERS Til: TOWN OF ADDISON POST OFFICE BOX 796577 POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MSR DALLAS TX 753796577 ADDISON TX 75001 FOR: JOB 369 CREEK SYSTEM IMPROVEMENTS -ADDISON SCHEDULED ------WORK COMPLETED ------l'IATERIALS TOTAL COMP PCT BALANCE TO RETAINASE PHASE DESCRIPTION VALUE PREVIOUS THIS PERIOD STORED &STORED CMP FINISH AMOUNT 105 PLANS &SPEC INCOME 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 106 DESISN FEES 2B,764.00 28,764.00 0.00 0.00 2B,764.00 100 0.00 0.00 107 CONTRACT ADMIN 4,960.14 4,960.14 0.00 0.00 4,960.14 100 0.00 0.00 lOB INSPECTION FEES 12,400.34 12,400.34 0.00 0.00 12,400.34 100 0.00 0.00 109 OTHER INCOME 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 260 EASEMENTS/ROW 6,201.25 6,201.25 0.00 0.00 6,201.25 100 0.00 0.00 280 SPECIAL PROJECTS 12,566.25 12,566.25 0.00 0.00 12,566.25 100 0.00 0.00 285 CO I 4 SABION RWALL 2,197.00 2,197.00 0.00 0.00 2,197.00 2,197.00 100 0.00 0.00 315 AllMIN BEYOND COMP 17,127.25 17,067.25 60.00 0.00 17,127.25 100 0.00 0.00 330 INSPECT BEYOND COMP 2,025.00 2,025.00 0.00 0.00 2,025.00 100 0.00 0.00 601 SURVEYINS 17,318.33 17,318.33 0.00 0.00 17,318.33 100 0.00 0.00 603 ELECTRICAL CONSULT 766.50 766.50 0.00 0.00 766.50 100 0.00 0.00 605 BID ADVERTISEMENT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 60B LANDSCAPE ARCHITECT 8,527.56 8,527.56 0.00 0.00 8,527.56 100 0.00 0.00 609 OTHER CONSULTANT 10,641.68 10,641.68 0.00 0.00 10,641.68 100 0.00 0.00 610 ABSTRACT/TITLE 187.01 187.01 0.00 0.00 187.01 100 0.00 0.00 611 HYRAULIC ENSINEER 117.59 117.59 0.00 0.00 117.59 100 0.00 0.00 650 PR INTI NS 1,056.28 1,056.28 0.00 0.00 1,056.28 100 0.00 0.00 651 COURIER 15.76 15.76 0.00 0.00 15.76 100 0.00 0.00 .iAN II 8. 91 Final Total 124,871.94 124,811.94 60.00 0.00 124,871.94 100 0.00 0.00 L/2-. -CO!) -${,.:.;7 /'d -cJoJf/O·-dOa Invoice Date -30 NOV 1990 Invoice Number -2517 GINN INC. CONSULTING ENGINEERS I NV0 ICE Page 2 FRDM: GINN INC. CONSULTING ENGINEERS POST OFFICE BOX 796577 DALLAS FOR: JOB 369 IX 753796577 CREEK SYSTEM IMPROVEMENTS -ADDISON TO: TDWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MGR ADDISON TX 75001 DESIGN, CONST. &INSPECT FOR CHANNEL IMP WATER RECIRCULATIONS CONTRACT AMT $413,344.60 DESIGN FEE $33,067.57 INSPECTION FEE·@3,0 X $ 12,400,34 CONTRACT SUMMARY ORIGINAL CONTRACT SUM NET CHANGE BY CHANGE ORDERS CONTRACT SUM TO DATE TOTAL COMPLETED AND STORED TO DATE RETAINAGE TOTAL EARNED LESS RETAINAGE LESS PREVIOUS CERTIFICATES FOR PAYMENT CURRENT PAYMENT DUE BALANCE TO FINISH, PLUS RETAINAGE 124,871.94 0.00 124,871.94 124,871.94 0.00 124,871.94 124,811.94 60.00 0.00 .JI-;". f'l1 . l 􀁾 Invoic:e Date -30 NOV 1990 GINN INC. CONSULTING ENGINEERS Page 1 Invoic:e Number -2522 I NV0 ICE FROM: GINN INC. CONSULTING ENGINEERS W." ",,\' .... ; TO: TOWN OF ADDISON POST OFFICE BOX 796577 POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MGR DALLAS TX 753796577 ADDISON TX 75001 FOR: JOB 439 MILDRED STREET IMPROVEMENTS/ADDISON SCHEDULED ------WORK COMPLETED ------MATERIALS TOTAL COMP PCT BALANCE TO RETAINAGE PHASE DESCRIPTION VALUE PREVIOUS THIS PERIOD STORED &STORED CMP FINISH AMOUNT 105 PLANS &SPEC INCOME 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 106 [IESI8N FEES 27,706.00 27,706.00 0.00 0.00 27,706.00 100 0.00 0.00 107 CONTRACT ADMIN 4,BB9.00 1,320.03 635.57 0.00 1,955.60 40 2,933.40 0.00 lOB INSPECTION FEES 12,223.00 3,300.21 l,5B8.99 0.00 4,B89.20 40 7,333.BO 0.00 109 OTHER INCOME 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 260 EASEMENTS/ROW 2,507.50 2,057.50 450.00 0.00 2,507.50 100 0.00 0.00 601 SURVEYING 8,742.00 B,742.00 0.00 . 0.00 B,742.00 100 0.00 0.00 602 TRAFFIC CONSULT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 603 ELECTRICAL CONSULT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 604 GEOTECHNICAL INVEST, 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 605 BID ADVERTISEMENT 189.00 189.00 0.00 0.00 189.00 100 0.00 0.00 606 STRUCTURAL ENGR 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 607 ARCHITECT ENGR 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 608 LANDSCAPE ARCHITECT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 609 OTHER CONSULTANT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 610 ABSTRACT/TITLE 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 650 PRINTING 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 651 COURIER 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 660 SPECIAL SERVICES/ROW 743.93 743.93 0.00 0.00 743.93 100 0.00 0.00 i􀀯􀀮􀁾 \'1 t -j< 91 (.I.-Final Total 57,000.43 44,058.67 2,674.56 0.00 46,733.23 82 10,267.20 0.00 I/S tJzjO -£1,57& o () :J:JzJ 4-/-O{)o-'::;&570-b0330 Invoice Date -30 NOV 1990 Invoice Number -2522 GINN INC. CONSULTING ENGINEERS I NV0 ICE Page 2 FROM: GINN INC. CONSULTING ENGINEERS POST OFFICE BOX 796577 DALLAS FOR: JOB 439 IX 753796577 MILDRED STREET IKPROVEKENTS/ADDISON TO: TOWN OF ADDISON POST OFFICE BOX 144 " ATTN: RON WHITEHEAD, CITY KGR ADDISON TX 75001 . TOWN OF ADDISON DESIGN OF MILDRED ST--ADDISON RD TO QUORUK DRIVE CONTRACT AKOUNT $407,431.55 DESIGN &ADKIN 32,595.00 INSPECTION 12,223.00 ORIGINAL CONTRACT SUK NET CHANGE BY CHANGE ORDERS CONTRACT SUK TO DATE TOTAL COKPLETED AND STORED TO DATE RETAINAGE TOTAL EARNED LESS RETAINAGE LESS PREVIOUS CERTIFICATES FOR PAYKENT CURRENT PAYKENT DUE BALANCE TO FINISH, PLUS RETAINAGE 57,000.43 0.00 57,000.43 46,733.23 0.00 , 46,733.23 44,05B.67 ;l, 2,674.56 10,267.20 Invoice Date -30 NOV 1990 GINN INC. CONSULTINS ENSINEERS Page 1 Invoice NUlber -2523 I NV0 ICE FROI'l: SINN INC. CONSULTINS ENSINEERS TO: TOWN OF ADDISON POST OFFICE BOX 79b577 POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY I'lSR DALLAS IX 75379b577 ADDISON TX 75001 FOR: JOB 443 SANITARY SEWER II'lPROVEI'lENTS SCHEDULED ------WORK COI'lPLETED ------MATERIALS TOTAL COI'lP PCT BALANCE TO RETAINASE PHASE DESCRIPTION VALUE PREVIOUS THIS PERIOD STORED 11 STORED CI'lP FINISH AI'lOUNT 105 PLANS &SPEC INCOI'lE 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 lOb DESISN FEES 12,42b.00 12,42b.00 0.00 0.00 12,42b.00 100 0.00 0.00 107 CONTRACT ADI'lIN . 2,193.00 1,820.19 372.81 0.00 2,193.00 100 0.00 0.00 108 INSPECTION FEES 5,482.00 4,550.0b 931.94 0.00 5,482.00 100 0.00 0.00 109 OTHER INCOI'lE 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 2bO EASEI'lENTS/ROW 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 bOl SURVEYINS 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 b02 TRAFFIC CONSULT 0.00 0•.00 0.00 0.00 0.00 0 0.00 0.00 b03 ELECTRICAL CONSULT 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 b04 SEOTECHNICAL INVEST 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 b05 BID ADVERTISEI'lENT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 bOb STRUCTURAL ENSR 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 b07 ARCHITECT ENSR 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 b08 LANDSCAPE ARCHITECT 0.00 0.00 0.00 0.00 0.00 Q 0.00 0.00 b09 OTHER CONSULTANT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 bl0 ABSTRACT/TITLE 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 b50 PRINTING 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 b51 COURIER 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 j"N ,1 8.'91"' 􀁾􀀹􀀱 " 􀁾􀁾 Final Total 20,101. 00 18,79b.25 1,304.75 0.00 20,101.00 100 0.00 0.00 it> 2-(}t}0-􀁾􀀮􀀮􀀬􀀭􀀨􀀬 § 7 (7 -tJ tJ 2f10 -c:;J?'c/ Invoice Date -30 NOV 1990 Invoice NUlber -2523 GINN INC. CONSULTING ENGINEERS I NV0 ICE Page 2 FROM: GINN INC. CONSULTING ENGINEERS POST OFFICE BOX 796577 DALLAS FOR: JOB 443 TX 753796577 SANITARY SEWER IMPROVEMENTS TO: ,TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MGR ADDISON TX 75001 TOliN OF ADDISON DESIGN OF SANITARY SEWER IMPROVEMENTS FOR ·OLD TOliN· AREA OF ADDISON, MILDREDI JULIAN/BROADWAY/RAILROAD/DUORUM AREA ACTUAL CONTRACT AMOUNT: $182,740.00 CONTRACT SUMMARY ORIGINAL CONTRACT SUM NET CHANGE BY CHANGE ORDERS CONTRACT SUM TO DATE TOTAL COMPLETED AND STORED TO DATE RETAINAGE TOTAL EARNED LESS RETAINAGE LESS PREVIOUS CERTIFICATES FOR PAYMENT CURRENT PAYMENT DUE BALANCE TO FINISH, PLUS RETAINAGE 20,101.00 0.00 20,101.00 20,101.00 0.00 20,10Loo ,>18,]90.25 1,304;75 0.00 Invoice NUlber: 2508 Invoice Date: 30 NOV 1990 Page: From: For Job: 90433 GINN INC. CONSULTING ENGINEERS 1990 MISCELLANEOUS PAVEMENT IMPROV POST OFFICE BOX 796577 TOWN OF ADDISON PREPARATION OF CONTRACT DOCU"ENTS F[IR DALLAS, TX 753796577 1990 MISCELLANEOUS PAVEMENT AND DRAINAGE IMPROVEMENTS IN THE TOWN OF ADDISON CONSTRUCTION ADMIN/INSPECTION OF 1990 MISCELLANHIUS PAVEMENT IMPRIlV To: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MGR ADDISON, TX 75001 CONTRACT GROSS ----RETENTION ----TAX 1 TAX 2 PHASE DESCRIPTION AMOUNT QUANTITY RATE UNIT AMOUNT AMOUNT PCT AMOUNT AMOUNT 100 PRINCIPAL ENGINEER 0.00 2.00 100.00 200.00 0.00 0.00 0.00 0.00 100 SENIOR DESIGNER 0.00 28.25 60.00 1,695.00 0.00 0.00 0.00 0.00 100 SENIOR ENGINEER 0.00 2.00 80.00 160.00 0.00 0.00 0.00 0.00 102 INSPECTOR 0.00 60.00 40.00 2,400.00 0.00 0.00 0.00 0.00 103 SECRETARY 0.00 1. 75 35.00 61.25 0.00 0.00 0.00 0.00 604 GEOTECHNICAL INVEST 0.00 935.50 1.05 982.28 0.00 0.00 0.00 0.00 650 PRINTING 0.00 0.95 1.05 1.00 0.00 0.00 0.00 0.00 0.00 _. :). 􀁾􀀱 Invoice Summary Invoice Totals Gross Retention Tax 1 Tax 2 -,-;::;: 5,499.53 0.00 0.00 0.00 Invoice NUlber: 2512 Invoice Date: 30 NOV 1990 Page: 1 Froll: For Job: 90442 SINN INC. CONSULTING ENGINEERS 24" WATER LINE RELOCATION-ELEV TANK POST OFFICE BOX 79b577 DESIGN OF RELOCATION OF 24" WATER LINE IN VICINITY OF ELEVATED TANK, ADDIS[lN DALLAS, TX 753796577 CONFERENCE/THEATER CENTER CONSTRUCTION AD"INISTRATION AND INSPECTION OF PROJECT To: TONN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY "GR ADDISON, TX 75001 ----------------------------------------------------------------------------------------------------------------------------------CONTRA CT GROSS ----RETENTION ----TAX 1 TAX 2 PHASE DESCRIPTION AIIOUNT QUANTITY RATE UNIT A"OUNT AIIOUNT PCT AIIllLlNT A"OUNT 100 SENIOR DESIGNER 0.00 6.00 60.00 360.00 0.00 0.00 0.00 0.00 102 INSPECTOR 0.00 2.75 40.00 110.00 0.00 0.00 0.00 0.00 103 SECRETARY 0.00 1.00 35.00 35.00 0.00 0.00 0.00 0.00 60b STRUCTURAL EN6R 0.00 138.00 1.05 144.90 0.00 0.00 0.00 0.00 650 PRINTING 0.00 1.60 1.05 1.68 0.00 0.00 0.00 0.00 Invoice SUlDmary /f9/. i 9 /I/O·t. f &iJ7 􀁾􀀭􀁦􀀧 /.)S -000 -Sf!, .!T7t:} -C7C1.3.J'd -cJcJcJ t.t-􀁾􀁌􀀷􀁃􀁊 􀁟􀀤􀀿􀀭􀁾􀀮􀂧􀀷􀁃􀀱􀀭􀁾􀁾􀁓􀀮􀀮􀀿􀁾􀀭􀁣􀁊􀁯􀁯 .. 􀁾􀀹􀀱 Invoice Totals Gross Retention Tax 1 Tax 2 651.5a 0.00 0.00 0.00 \' '< .--------------------,-.---------------------------,-----------_.,---_.. -PAY" TOiTHE: ORDER _ OF L ' ", 016217 NO. 016217 TOWN OF ADDISOI\l, P.O. BOX 144, ADDISON, TX 75Q01, (214) 450·7062 NVOICEDATE 19/30/90 J9/30/90 ')9/30/90 :J9/30/90 ;)9130190 09/30/90 09/30/90 INVOICE NUMBER' rOC 􀀧􀀭􀁾 . 0.00 0.00 􀁏􀁾􀁏􀁏 0.00 0.00 0.00 0.00 ,,--., < NETAMOUNT_ 11,686.91 281.69 300.00 3,832.75 3,666.66 7,643.50 2,196.30 ... 􀀭􀁾􀀭􀁾􀀭􀀭􀀭􀁟..._-,.--,_. ' GINN, INC. CONSULTING ENGINEERS 17103 Preston Road • Suite 100 • LB 118 • Dallas, Texas 75248 • Phone 2141248-4900 CUSTOMER DATE NUMBER 30 SliP 1990 ADD TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON 􀁗􀁈􀁉􀁔􀁅􀁈􀁅􀁁􀁄􀁾 ,CITY KGR ADDISOM TX 75001 STATEMENT .. INYOICENO. DATE DESCRIPTION TOTALAMOUNT -2470 v 31 AUG 1990 CREEK'2J¥S'J'IDf-JMPROVDSN"l 1';223.00 24;91/30 SEP 1990 CREEK 'SYS1EHI:MPROV' 337.50 2497v 30 SEP 1990 IIILDREDSI'RDT :IItPROV 7,306.00 24;91/30 SEP 1990 @NZTARY SEWER :IMPROVE 􀀲􀁾􀀶􀀰􀀹􀀮􀀷􀀵 --2459V 31 AUG 1990 EJii:'I1fSD:IIfG 1,101.69 􀀲􀀴􀀷􀀹􀁾 30 SEP 1990 ENGI:NEERIIIC 􀀱􀁾􀀶􀀱􀀶􀀮􀀳􀀰 2443 30 SSP 1990 SPECIAL SERV:ICSS 60.00 -2462,; 31 AUG 1990 1990 ItZSC PAVEMENT IIIPRC 4,172.53 2444/30 SSP 1990 1990 M:ISC PAVEMENT IItPRC 􀀷􀁾􀀵􀀱􀀴􀀮􀀳􀀸 ..-Q467 31 AUG 1990 24" WATER L:INE RELOCATIC 1,298.32 2444 30 SSP 1990 24" WATSR L:INE RELOCAT 2,36e.34 ,---,. .. , .. 􀁏􀁬􀁾􀀻 3 \j, . If\ CURRENT OVER 30 DAYS OVER 60 DAYSC\. dvrbt go'DAYS TOTAL DUE 29607.81 0.00 0.00 0.00 29607.81 TOWN OF ADDISON PAYMENT AUTHORIZATION MEMO DATE -.LQ..LilJ 90 CLAIM # _ CHECK AMOUNT $ _ " Vendor No. 􀀨􀀩􀁏􀀯􀀰􀀳􀁾 Vendor Name Address Address Address Zip Code RJND DEPT OBJ PROJ SAC AMOUNT 9/;,1 􀁊􀀮􀀮􀁦􀁾􀁊􀀯 1'/(, "", 1, . '.1, Cl 􀁓􀀢􀀨􀀢􀁦􀁲􀀯􀁾 􀁐􀀧􀁾􀁾􀁾 . 􀁾􀁤􀁬􀁃􀁊 1'" ilf:t7 elF 􀀬􀀭􀁱􀀭􀁾􀁧􀁒 dtkklGJ tr#o 'f'1()' l.J/91 􀁾􀁉 'dCJ 5"6.9.'1-d#d 1;,t/, 1 4.9-/-' Cl §t,...9".7d t70&c:J c:Jdt? 1.1/9'1 :1/9/JY6-􀁾􀁴􀁦􀁬􀁃􀁊 /:T&.9761 􀁯􀁾􀁦􀀮􀀮􀀱􀁤 tJl !I'I) 1.1/19 􀁾􀀯 7/1 􀁓􀀭􀁴􀀬􀂧􀀢􀀷􀁾 d tit/de? '-FIN . ; "'.A ..... 􀁮􀁾􀀨􀀬 􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭� �􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀮􀀮􀀮􀀮􀀮􀀮􀀻􀀮􀀮􀀮􀀭􀀭􀀭􀀭􀀮􀀮􀀮􀀻􀀮􀀻􀀮􀀢􀀬􀀫􀀯􀁴􀁩􀂣􀁾􀀡􀀮􀀭􀀭􀀭􀀭􀁊-􀀭􀀺 .. ,.. 3 (',' ',.,-\ u_ . . '-􀁾 -. '. } ORIGINAL TO ACCOUNTINGNELLOW FOR DEPARTMENT FILE Invoice Number: 2484 Invoice Date: 30 SEP 1990 Page: From: For Job: 90433 GINN INC. CONSULTING ENGINEERS 1990 MISCELLANEOUS PAVEMENT IMPROV POST OFFlCE BOX 796577 TOWN OF ADDISON PREPARATION OF CONTRACT DOCUMENTS FOR DALLAS, TX 􀀷􀁓􀀳􀀷􀀹􀀶􀁾􀀷􀀷 1990 MISCELLANEOUS PAVEMENT AND DRAINAGE IMPROVEMENTS IN THE TOWN OF ADDISON CONSTRUCTION ADMIN/INSPECTION OF 1990 MISCELLANEOUS PAVEMENT IMPROV To: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MGR ADDISON, TX 75001 􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭� �􀀭􀀭􀀭􀀭􀀭􀀭 􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 CONTRACT GROSS ----RETENTION ----TAX 1 TAX 2 PHASE DESCR IPTI ON AMOUNT QUANTITY RATE UNIT AMOUNT AMOUNT PCT AMOUNT AMOUNT 100 SE'UOR DESIGNER 0.00 35.50 60.00 2,130.00 0.00 0.00 0.00 0.00 102 INSPECTOR 0.00 55.25 40.00 2,210.00 0.00 0.00 0.00 0.00 103 SECRETARY 0.00 2;00 35.00 70.00 0.00 0.00 0.00 0.00 604 GEOTECHNICAL INVEST 0.00 2,949.00 1.05 3,096.45 . 0.00 0.00 0.00 0.00 650 PRINTING 0.00 7.55 1.05 7.93 0.00 0.00 0.00 0.00 \,', 3 O. 90 􀁾􀁩􀁲􀁔 􀁾 􀀨􀁾 ',...... l 6 Cnvoic2 Summary Invoice Totals Gross T.. " i ! 􀁾􀀬􀀮􀀬 .1 t""" '.' iQ,., 􀁾 Current Amount Due 0.00 Invoice NUlber: 2462 Invoice Date: 31 AUG 1990 Page: 1 Fro.: For Job: 90433 GINN INC. CONSULTING ENGINEERS 1990 MISCELLANEOUS PAVEMENT IMPROV ·POST OFFICE BOX 796577 TOWN OF ADDISON PREPARATION OF CONTRACT DOCUMENTS FOR DALLAS, IX 753796577 1990 MISCELLANEOUS PAVEMENT AND DRAINAGE IMPROVEMENTS IN THE TOWN OF ADDISON To: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MGR ADDISON, TX 75001 -----------------------------------------------------------------------------------------------------------------------------------CONTRACT GROSS 􀀭􀀭􀁾􀀭 RETENTION ----TAX 1 TAX 2 PHASE DESCRIPTION AMOUNT QUANTITY RATE UNIT AMOUNT . AMOUNT PCT AMOUNT AMOUNT 100 PRINCIPAL ENGINEER 0.00 14.50 100.00 1,450.00 0.00 0.00 0.00 0.00 CONTRACT ADMIN 100 SENIOR DESIGNER 0.00 44.00 60.00 2,640.00 0.00 0.00 0.00 0.00 103 SECRETARY 0.00 2.25 35.00 78.75 '0.00 0.00 0.00 0.00 650 PRINTING 0.00 3.60 1.05 3.78 0.00 0.00 0.00 0.00 Invoice Summary Invoice Totals Gross Retention Tax 1 Tax 2 Current Amount Due Invoice Number: 2483 Invoice Date: 30 SEP 1990 Page: From: For Job: 9040B GINN INC. CONSULTING ENGINEERS ADDISON SPECIAL SERVICES POST OFFICE BOX 796577 FOR TOWN OF ADDISON DALLAS, TX 753796577 To: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MGR ADDISON, TX 75001 CONTRACT GROSS ----RETENTION ----TAX 1 TAX 2 PHASE DESCRIPTION AMOUNT QUANTITY RATE UNIT AIIOUNT AMOUNT PCT AMOUNT AMOUNT 100 SENIOR DESIGNER 0.00 1.00 60.00 60.00 0.00 0.00 . 0.00 0.00 REVIEW PLANS AIRPORT ADDIS[IN AIR TERMINAL "J'f. Invoice Summary 1 8. .. Invoice Totais 8ross Retention Tax 1 Tax 2 Current Amount Due 60.00 0.00 0.00 0.00 60.00 Invoice Number: 2459 Invoice Date: 31 AUG 1990 Page: 1 From: For Job: 90130 To: GINN INC. CONSULTING ENGINEERS CITY ENGINEERS -ADDISON TOWN OF ADDISON POST OFFICE BOX 796577 TOliN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MGR DALLAS, TX 753796577 ADDISON, TX 75001 ------------------------------------------------------------------------------------------------------ ----------------------------CONTRACT GROSS ----RETENTION ----TAX 1 TAX 2 PHASE DESCRIPTION AKOUNT QUANTITY RATE UNIT AKOUNT AMOUNT PCT AKOUNT AMOUNT 􀁾􀁏􀁏 PRINCIPAL ENGINEER 0.00 1.00 100.00 100.00 0.00 0.00 0.00 0.00 GREENHAVEN SEilER CROSSING 100 SENIOR DESIGNER 0.00 1.00 60.00 60.00 0.00 0.00 0.00 0.00 RESEARCH SCHOOL FLASHER PER BRUCE ELLIS 􀀭􀁾 PROJECT ENGINEER 0.00 9.75 80.00 780.00 0.00 0.00 0.00 0.00 STAFF KEETING 4.75 􀁾 GREENHAVEN SEilER LINE XING 5 HR 103 SECRETARY 0.00 0.25 35.00 8.75 0.00 0.00 0.00 0.00 260 SENIOR DESIGNER 0.00 2.50 60.00 150.00 0.00 0.00 0.00 0.00 RESEARCH ROil AS PER BRUCE ELLIS/MISC INTERSECTIONS Q 650 PRINTING 0.00 2.80 1.05 2.94 0.00 0.00 0.00 0.00 BOUNDARY SURVEY GREENHAVEN APT SEWER tJ /-/1/-5(.,.£1 1 tJ 􀁩􀀯􀁟􀁬􀀯􀀯􀀭􀁾􀀭􀁾􀀦􀀷􀀨􀁊 Invoice Summary t /-7/1 -6-0/-/7/-G"U7tJ -cJCJt17C7d-ddO ,it!!,? f jJtJ, 􀁴􀁊􀁾 1;11J/.-f49 ... (""'7' ,/. r .' 􀁶􀂷􀁾 '; G. ----, 3 0.;0 -,,-Invoice Totals Gross Retention Tax 1 Tax 2 Current Amount Due 1,101.69 0.00 0.00 0.00 1,101.69 Invoice Number: 2479 Invoice Date: 30 SEP 1990 Page: 1 From: For Job: 90130 To: SINN INC. CONSULTING ENGINEERS CITY ENGINEER -ADDISON TOWN OF ADDISON POST OFFICE BOX 796577 TOWN OF ADDISON POST OFFICE BOX 144 MISC. PROJECTS ATTN: RON WHITEHEAD, CITY MGR DALLAS, TX 753796577 ADDISON, TX 75001 ----------------------------------------------------------------------------------------------- -----------------------------------CONTRACT GROSS 􀀭􀀭􀀭􀁾 RETENTION ----TAX 1 TAX 2 PHASE DESCRIPTION AMOUNT QUANTITY RATE UNIT AIIOUNT AIIOUNT PCT AMOUNT AMOUNT 􀁾􀁏􀁏 PRINCIPAL ENGINEER 0.00 2.00 100.00 200.00 0.00 0.00 0.00 0.00 GREENHAVEN SEWER 100 SENIOR DESIGN 0.00 0.50 60.00 30.00 0.00 0.00 0.00 0.00 RESEARCH/PHONE/CHERY MILAM RE:CREEKSYS PAY APP IIARCH 90 􀁾SENIOR DESIGN 0.00 2.00 60.00 120.00 0.00 0.00 0.00 0.00 6REENHAVEN APTS SANITARY SEWER EIIERGENCY REPAIR 100 SENIOR DESIGN 0.00 0.50 60.00 30.00 0.00 0.00 0.00 0.00 RESEARCH PRINTS OF 4500 EELTLINE SURVEY 􀁾 PROJECT ENGINEER 0.00 4.50 80.00 360.00 0.00 0.00 0.00 0.00 GREENHAVEN SEWER CROSSING 100 PROJECT ENGINEER 0.00 3.00 80.00 240.00 0.00 0.00 0.00 0.00 STAFF MEETING 􀁾 STRUCTURAL ENGR 0.00 599.50 1.05 629.47 0.00 0.00 0.00 0.00 GREENHAVEN SEWER 􀁾􀁏 PRINTING 0.00 .j.50 1.05 6.83 0.00 0.00 0.00 0.00 SREENHAVEN FOR DON PREECE 0/, /71, tF" §7t? 􀁤􀁬􀁊􀁴􀁊􀀮􀁾􀁴􀁉 􀁾􀀯 -11/-$'(,.&7'0 I; .J/(',.10 ..., !\ 􀀢􀀧􀁊􀁾 􀁾 '.. . 􀀬􀀩􀁾􀀬 ' 'J -I) (.,1("./tJ ___.i 􀁾􀁜􀁃􀀱􀀻 􀁾 8. ' 􀁾 􀀧􀁾 . \ Invoice SU!I!iflary invoice Totals Gross '1,616.30 Retention 0.00 Tax 1 0.00 Tax 2 0.00 Curren t Amoun t Due . 1,616.30 Invoice Date -31 AUG 1990 GINN INC. CONSULTING ENGINEERS Page 1 Invoice NUlber -2470 I NV0 ICE FROM: GINN INC. CONSULTING ENGINEERS TO: TOWN OF ADDISON POST OFFICE BOX 796577 POST OFFICE BOX 144 􀁁􀁔􀁔􀁎􀁾 RON WHITEHEAD, CITY MGR DALLAS TX 753796577 ADDISON TX 75001 FOR: JOB 369 CREEK SYSTEM IMPROVEMENTS -ADDISON SCHEDULED ------WORK COMPLETED ------MATERIALS TOTAL COMP PCT BALANCE TO RETAINAGE PHASE DESCRIPTION VALUE PREVIOUS THIS PERIOD STORED &STORED CMP FINISH AMOUNT 105 PLANS &SPEC INCOME 0.00 0.00 0.00 0.00 0.00 (J 0.00 0.00 106 DESIGN FEES 28,764.00 28,764.00 0.00 0.00 28,764.00 100 0.00 0.00 107 CONTRACT ADMIN 4,960.14 4,960.14 0.00 0.00 4,960.14 100 0.00 0.00 108 INSPECTION FEES 12,400.34 12,400.34 0.00 0.00 12,400.34 100 0.00 0.00 109 OTHER INCOME 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 260 EASEMENTS/ROW 6,201.25 6,201.25 0.00 0.00 6,201.25 100 0.00 0.00 280 SPECIAL PROJECTS 12,566.25 12,566.25 0.00 0.00 12,566.25 100 0.00· 0.00 285 CO I 4 GABION RWALL 2,197.00 2,197.00 0.00 0.00 2,197.00 100 0.00 0.00 315 ADMIN BEYOND CCIMP 15,119.75 13,959.75 1,160.00 0.00 15,119.75 100 0.00 0.00 330 INSPECT BEYOND COMP 2,025.00 2,025.00 0.00 0.00 2,025.00 100 0.00 0.00 601 SURVEYING 17,318.33 17,318.33 0.00 0.00 17,318.33 100 0.00 0.00 603 ELECTRICAL CONSULT 766.50 703.50 63.00 0.00 766.50 100 0.00 0.00 605 BID ADVERTISEMENT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 -608 LANDSCAPE ARCHITECT 8,527.56 8,527.56 0.00 0.00 8,527.56 100 0.00 0.00 609 OTHER CBNSULTANT 10,641.68 10,641.68 0.00 0.00 10,641.68 100 0.00 0.00 . 610 ABSTRACT/TITLE 187.01 187.01 0.00 0.00 187.01 100 0.00 0.00 611 HYRAULIC ENGINEER 117.59 117.59 0.00 0.00 117.59 100 0.00 0.00 650 PRINTING 1,056.28 1,056.28 0.00 0.00 1,056.28 100 0.00 0.00 651 COURIER 15.76 15.76 0.00 0.00 15.76 100 0.00 0.00 Final Total 0.00 0.00 0.00 lfl-OO()-Sl,§ 70 -(JO J '1tJ -C)tJt'J .5/13 4:2-ovo _56670-tJO/90 I Invoice Date -31 AUG 1990 Invoice Number -2470 FRO": GINN INC. CONSULTING ENGINEERS POST OFFICE BOX 796577 DALLAS TX 753796577 GINN INC. CONSULTING ENGINEERS INVO-ICETO: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY "GR ADDISON TX 75001 Page 2 FOR: JOB 369 CREEK SYSTE" IMPROVE"ENTS -ADDISON DESIGN, CONST. &INSPECT FOR CHANNEL I"P WATER RECIRCULATIONS CONTRACT A"T $413,344.60 DESIGN FEE $33,067.57 INSPECTION FEE @3.0 X $ 12,400.34 CONTRACT SU""ARY ORIGINAL CONTRACT SU" NET CHANGE BY CHANGE ORDERS CONTRACT SU" TO DATE TOTAL CO"PLETED AND STORED TO DATE RETAINAGE TOTAL EARNED LESS RETAINAGE LESS PREVIOUS CERTIFICATES FOR PAY"ENT CURRENT PAY"ENT DUE BALANCE TO FINISH, PLUS RETAINAGE 122,864.44 0.00 122,864.44 122,864.44 0.00 122,864.44 121,641.44 1,223.00 . 0.00 Invoice Date -30 SEP 1990 GINN INC. CONSULTING ENGINEERS Page Invoice Number -2491 I NV0 ICE FROIl: GINN INC. CONSULTING ENGINEERS TO: TOWN OF ADDISON POST OFFICE BOX 796577 POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY M6R DALLAS IX 753796577 ADDISON IX 75001 FOR: JOB 443 SANITARY SEWER IIlPROVEIlENTS SCHEDULED ------WORK CO"PLETED ------MATERIALS TOTAL COIlP PCT BALANCE TO RETAINA6E PHASE· DESCRIPTION VALUE PREVIOUS THIS PERIOD STORED & STORED CIlP FINISH AIlOUNT 105 PLANS &SPEC INCOI'lE 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 106 DESIGN FEES 12,426.00 10,200.00 2,226.00 0.00 12,426.00 100 0.00 0.00 107 CONTRACT ADIHN 2,193.00 0.00 109.65 0.00 109.65 5 2,083.35 0.00 lOa INSPECTION FEES 5,482.00 0.00 274.10 0.00 274.10 5 5,207.90 0.00 109 OTHER INC[lME 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 260 EASEIlENTS/ROW 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 601 SURVEYING 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 602 TRAFFIC CI]NSULT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 603' ELECTRICAL CONSULT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 604 GEOTECHNICAL INVEST 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 605 BID ADVERTISEMENT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 606 STRUCTURAL ENGR 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 607 ARCHITECT ENGR 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 60a LANDSCAPE ARCHITECT 0.00 0.00 0.00 0.00 0.00 0 . 0.00 0.00 , 609 OTHER CONSULTANT 0.00 0.00 0.00, 0.00 0.00 0 0.00 0.00 610 ABSTRACT/TITLE 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 650 PRINTING 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 651 COURIER 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 , ... -. " . : i D 8. " 􀀢􀀬􀀺􀁾􀁔 1 '" j 􀁜􀀮􀀮􀁾 j' 􀁾􀀩 :' 􀁾􀀮􀀧􀀬􀀮􀀬 l ' -Final Total 20,101.00 10,200.00 2,609.75 0.00 12,809.75 64 7,291.25 0.00 "-'II-(}(}IJ-$"" .s7tJ-oo.:J9tJ -clClCJ :-u) 􀀧􀁾 , .: ,'\: 􀀬􀁾 j' r-,.kL)V 9-30-Cf() Invoice Date -30 SEP 1990 Invoice Number -2491 SINN INC. CONSULTING ENSINEERS I NV0 ICE Page 2 FROM: . GINN INC. CONSULTING ENGINEERS POST OFFICE BOX 796577 DALLAS FOR: JOB 443 IX 753796577 SANITARY SEWER IMPROVEMENTS TO: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MGR ADDISON IX 75001 TOWN OF ADDIS[IN DESIGN OF SANITARY SEWER IMPROVEMENTS FOR BOLD TI]WNB AREA OF ADDISON, MILDREDI JULlAN/BROADWAY/RAILROADIUUORUM AREA ACTUAL CONTRACT AMOUNT: $182,740.00 CONTRACT SUMMARY ORIGINAL CONTRACT SUM NET CHANGE BY CHANGE ORDERS CONTRACT SUM TO DATE TOTAL COMPLETED AND STORED TO DATE RETAINAGE TOTAL EARNED LESS RETAINAGE LESS PREVIOUS CERTIFICATES FOR PAYMENT CURRENT PAYMENT DUE BALANCE TO FINISH, PLUS RETAINAGE 20,101.00 0.00 20,101.00 12,809.75 0.00 • 12,809.75 10,200.00 ...􀁾... 2,609.75 7,291.25 Invoice Number: 2488 Invoice Date: 30 SEP 1990 Page: 1 From: For Job: 90442 GINN INC. CONSULTING ENGINEERS· 24" WATER LINE RELOCATION-ELEV TANK POST OFFICE BOX 796577 DESIGN OF RELOCATION OF 24" WATER LINE IN VICINITY OF ELEVATED TANK, ADDISON DALLAS, TX 753796577 CONFERENCE/THEATER CENTER CONSTRUCTION ADMINISTRATION AND INSPECTION OF PROJECT To: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY M.GR ADDISON! TX 75001 ----------------------------------------------------------------------------------------------------------------------------------CONTRACT GROSS ----􀁾􀁅􀁔􀁅􀁎􀁔􀁉􀁏􀁎 ----TAX 1 TAX 2 PHASE DESCRIPTION 􀁁􀁾􀁏􀁕􀁎􀁔 QUANTITY RATE UNIT AMOUNT AI10UNT PCT AMOmH AMOUNT 100 SENIOR DESIGNER 0.00 19.50 60.00 1!170.00 0.00 0.00 0.00 0.00 100 SENIOR ENGINEER 0.00 2.00 80.00 160.00 0.00 0.00 0.00 0.00 102 INSPECTOR 0.00 25.50 40.00 1,020.00 0.00 0.00 0.00 0.00 103 SECRETARY 0.00 0.50 35.00 17 .50 0.00 0.00 0.00 0.00 650 PRINTING 0.00 0.80 1.05 0.84 0.00 0.00 0.00 0.00 S/B 75, q. % jq, &; o.;b Invoice SUiIlmary 􀀮􀀮􀁴􀁾 CfF.. LUis e-PF /715,73 􀁏􀁃􀁉􀀵􀁾􀁩􀁾 􀁾􀀯 23tF, 31-Invoice Totals Gross , ") Retention Tax 1 Tax 2 '-'" ,.,,' 􀁣􀁾􀁩􀀻􀁥􀁮􀁴 Amount Due 2,368.34 0.00 0.00 0.00 2,368.34 Invoice NUlber: 2467 Invoice Date: 31 AUG 1990 -Page: 1 Frol: For Job: 90442 GINN INC. CONSULTING ENGINEERS 24" WATER LINE RELOCATION-ELEV TANK POST OFFICE BOX 796577 DESIGN OF RELOCATION OF 24" WATER LINE IN VICINITY OF ELEVATED TANK, ADDISON DALLAS, TX 753796577 CONFERENCE/THEATER CENTER To: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MGR ADDISON, TX 75001 CONTRACT GROSS ----RETENTION ----TAX 1 TAX 2-PHASE DESCRIPTION AMOUNT QUANTITY RATE LIN IT AMOUNT AMOUNT PCT AMOUNT AMOUNT 100 SENIOR DESIGNER 0.00 20.00 60.00 1,200.00 0.00 0.00 0.00 0.00 CONTRACT ADMIN 􀁾 102 INSPECTOR 0.00 1.25 40.00 50.00 0.00 0.00 0.00 0.00 103 SECRETARY 0.00 1.25 35.00 43.75 0.00 0.00 0.00 0.00 650 PRINTING 0.00 4.35 1.05 4.57 0.00 0.00 0.00 0.00 5//3 I Invoice Summary 􀀷􀀶􀀭􀀬􀀷􀁌􀀥􀁾 q;r 􀁊􀀮􀀮􀁾􀁊􀁴􀁊 /0 0/5 cPF /J.Le. lfU 9/3O/c16 97%,93 319,39 ------. I?-98",3;2 .. c. , v. Invoice Totals Gross Retention Tax 1 Tax 2 Current Amount Due 􀀱􀁾􀀲􀀹􀀸􀀮􀀳􀀲 0.00 0.00 0.00 1,298.32 \ Invoice Date-30 SEP 1990 SINN INC. CONSULTIN6 EN6INEERS Page Invoice Number -2497 I NV0 r CE FROM: 6INN INC. CONSULTIN6 EN6INEERS TO: TOWN OF ADDISON POST OFFICE BOX 796577 POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY M6R DALLAS TX 753796577 ADDISON IX 75001 FOR: JOB 439 MILDRED STREET IMPROVEMENTS/ADDISON SCHEDULED ------WORK COMPLETED ------MATERIALS TOTAL CUMP PCT BALANCE TO RETAINA6E PHASE DESCRIPTION VALUE PREVIOUS THIS PERIOD STORED &STORED CMP FINISH AMOUNT 105 PLANS &SPEC INCOME 0.00 0.00 0.00 0.00 . 0.00 0 0.00 0.00 106 DESI6N FEES 27,706.00 20,400.00 7,306.00 0.00 27,706.00 100 0.00 0.00 107 CONTRACT ADMIN 48.89 0.00 0.00 0.00 0.00 0 48.89 0.00 108 INSPECTION FEES 12,223.00 0.00 0.00 0.00 0.00 0 12,223.00 0.00 109 OTHER INCOME 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 260 EASEMENTS/ROW 1,907.50 1,907.50 0.00 0.00 1,907.50 100 0.00 0.00 601 SURVEYIN6 8,742.00 8,742.00 0.00 0.00 8,742.00 100 0.00 0.00 602 TRAFFIC CONSULT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 603 ELECTRICAL CONSULT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 604 6EOTECHNICAL INVEST 0.00 0.00 0.00 0.00 0.00 (I 0.00 0.00 605 BID ADVERTISEMENT 189.00 189.00 0.00 0.00 189.00 100 0.00 0.00 606 STRUCTURAL EN6R 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 607 ARCHITECT EN6R 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 608 LANDSCAPE ARCHITECT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 609 OTHER CONSULTANT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 610 ABSTRACT/TITLE 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 650 PRINTING 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 651 COURIER 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 660 SPECIAL SERVICES/F:IJW 743.93 743.93 0.00 0.00 743.93 100 0.00 0.00 .--􀀺􀀮􀁾 i-I 􀁾 Final Total 51,560.32 31,982.43 􀀬􀀬􀁾􀁔 􀁴􀀬􀀳􀁾􀀮􀀰􀁾􀀮􀁊 0.00 39,WB..43 76 12,271.89 0.00 ...·Vill .,) ., f LJ5 -dad -,s-t,§7d -dtJ..;'SeJ -t:Jc:+:J ,,-' Ir. "'. ·J/f ·-.. i''-: ._ 1"' ",-...." 􀁾􀀭􀀮􀀬􀀮􀁾 􀀮􀁾􀁾 9/3() 19() I Invoice Date -30 SEP 1990 Invoice Number -2497 GINN INC. CONSULTING ENGINEERS I N V 0 ICE Page 2 FROM: SINN INC. CONSULTING ENGINEERS POST OFFICE BOX 796577 DALLAS FOR: JOB 43S' IX 753796577 MILDRED STREET IMPROVEMENTS/ADDISON TO: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY MGR ADDISON TX 75001 TOWN OF ADDISON DESIGN OF MILDRED Si--ADDISON RD TO QUORUM DRIVE CONTRACT AMOUNT $407,431.55 DESIGN &ADMIN 32,595.00 INSPECTION 12,223.00 CONTRACT SUMMARY ORIGINAL, CONTRACT SUM NET CHANGE BY CHANGE ORDERS CONTRACT SUM TO DATE TOtAL COMPLETED AND STORED TO DATE RETAINASE TOTAL EARNED LESS RETAINASE LESS PREVIOUS CERTIFICATES FOR PAYMENT CURRENT PAYMENT DUE BALANCE TO FINISH, PLUS RETAINAGE 51,560.32 0.00 51,560.32 39,288.43 0.00 􀁾 39,288.43 *31,982.43 7,306.00 12,271.89 Invoice Date -30 SEP 1990 Invoice Number -2491 SINN INC. CONSULTING ENGINEERS i N V 0 ICE Page 2 FROM: GINN INC. CONSULTING ENGINEERS POST OFFICE BOX 796577 DALLAS FOR : JOB 369 IX 753796577 CREEK SYSTEM IMPROVEMENTS -ADDISON TO: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY M6R ADDISON TX 75001 DESIGN, CONST. &INSPECT FOR CHANNEL IMP WATER RECIRCULATIONS CONTRACT AMT $413,344.60 DESIGN FEE $33,067.57 INSPECTION FEE @3.0 7. $ 12,400.34 CDNTRACT SUMMARY ORIGINAL CONTRACT SUM NET CHANGE BY CHANGE ORDERS CONTRACT SUM TO DATE TOTAL COMPLETED AND STORED TO DATE RETAINAGE TOTAL EARNED LESS RETAINAGE LESS PREVIOUS CERTIFICATES FOR PAYMENT CURRENT PAYMENT DUE BALANCE TO FINISH, PLUS RETAINAGE ... 123,201.94 0.00 123,201.94 123,201.94 0.00 123,201. 94 122,864.44337.50 0.00 \' .... 2,037.19 6,479.83 1,610.00 1,703.66 80.00 NO. 016738 INC , 2,037.19 6,479.83 1,610.00 1,703.66 80.00 5-000-56570-00330-000 1-000-56570-00340-000 􀀱􀀭􀀰􀀰􀀰􀀭􀀵􀀶􀀵􀀷􀁡􀁾􀁮􀀰􀀱􀀹􀀰􀀭􀀰􀀰􀀰 1-171-56570-00000-000 􀀱􀀭􀀷􀀱􀀱􀀭􀀵􀀶􀀵􀀷􀀰􀀭􀀰􀀰􀀰􀀰􀀰􀁾􀁏􀁏􀁏 016738 001035 NVOICEOATE' .L 10/31/90 7487 .10/31/90 7484 10/31/90 7493 10/31/90 7483,7480 10/31/90 7480 TOWN OF ADDISON, P.O. BOX 144, ADDISON, TX 75001, (214) 450-7062 TOWN OF ADDISON PAYMENT AUTHORIZATION MEMO CLAIM # _ CHECK AMOUNT $ i, 1-. tt, '7,yL } Vendor No. 1035 L{j-:JJl, /tTtJ Vendor Name 􀀴􀁾􀀨􀁾􀁤􀀮􀀮􀀮􀁉􀀮􀁊􀁤􀁾􀀡􀀭􀀽􀀫􀀺􀀺􀀺􀁺􀀺􀂷􀀻􀀻􀀬􀁪􀀱􀁬􀀱􀁾􀂷􀀮􀁬 􀁯􀀮􀁃􀀬􀀭􀀭 _ Address IZla! 􀁾􀁾 􀁾􀀮 Address 􀀻􀁫􀁩􀀮􀁾 1(j1J 􀁾 􀁾1/1' Address 􀀵􀁕􀁡􀁾􀀻􀀬 t/jL Zip Code 􀁾􀀷􀁇􀀺􀀺􀀮􀀺􀀺􀀮􀀮􀀮􀁣􀀺􀁧􀀺􀀮􀁌􀀣􀀢􀀦􀀮􀀮􀀨􀁉􀀧 _ DEPT OBJ PROJ SAC AMOUNT !. /t#J.rI tJ.tltJ 5&-97& da:?8c:J '(}()lfb t'l#& 􀀮􀀹􀁾􀁓􀀷􀁴􀀧􀁬 􀁾􀁡 􀀧􀀮􀀮􀀵􀀧􀁾 d'did II t1t1u 􀀮􀁧􀁴􀀦􀀢􀀷􀁾 􀁾􀀱􀀡􀁉􀁊􀀧􀀮􀁹􀁴􀀧􀁬 ' 􀀿􀀧􀁾􀁾 !OOll I CJdd Sc,sh #t'J96' #dI,g /trN..J () J'1/􀀮􀂧􀀧􀁾􀁇􀀢􀀷􀁾 􀀣􀁴􀁬􀁾􀁴􀀧􀁬􀁴􀀧􀁬 􀁴􀀧􀁬􀁾􀁴􀀧􀁬 !d'lt/bl 7//􀀦􀀦􀀬􀁧􀀭􀀷􀁾 􀁐􀀧􀁴􀀧􀁬􀁥􀀱􀁾􀁾 t:J?/d TOTAL . 􀁅􀁘􀁐􀁌􀁁􀁎􀁁􀁔􀁉􀁾􀁾 ·'·:'lJ 􀁾􀁬􀀧 L. • I Y" • • . • ORIGINAL TO ACCOUNTINGlYELLOW FOR DEPARTMENT FILE , ._' 􀁾􀁾 ANCE .. ,. GINN, INC. CONSULTING ENGINEERS 17103 Preston Road. Suite 100 • LB 118 • Dallas, Texas 75248 • Phone 214/248-4900 CUSTOMER DATE NUMBER 31 , TOWN OF ADDISON 􀁾􀁾􀁲􀁮􀁛􀁪􀁜􀁙􀁊􀁾􀁲􀁾􀁾􀀧􀁾􀁪 POST OFFICE BOX 144 ,--ATTN: RON WHITEHEAD, CITY HGR 􀁾 NOV -7 1990; :!I ' . ADDISON TX 75001 \ >" ij I • STATEMEAT 1I -INVOICINO. DATE DESCRIPTION TOTAL AMOUNT .-2470 31 AUG 1990 CREEK 'SYSTEM :IMPROVEMEN1 􀀱􀁾􀀬􀀲􀀲􀀳􀀮􀀰􀀰 , 2470 31 OCT 1990 PAYIIEIIT 1,223.00-2491 30 SSP 1990 CREEK SYSTEM :IMPROV 337.50 2491 31 OCT 1990 PAYJlENT 937.50-"493 31 OCT 1990 CREEKSYSTEJt :IMPROV 1';'tn:o.00 2497 30 SEP 1990 H:ILDRED STREET IMPROV 􀀷􀁾􀀳􀀰􀀶􀀮􀀰􀀰 2497 31 OCT 1990 PAYlfEN7 7,306.00-7498 31 OCT 1990 HZLDRED STREET :IMPROV' 4',770.24 2491 30 SSP 1990 SANI7ARY SEWER :IMPROVE 􀀲􀁾􀀶􀀰􀀹􀀮􀀷􀀵 , . 2491 31 OCT 1990 PAYJlERT 2,609.75-7499 31 OCT 1990 SANITARY SEWER :IMPROV 􀀵􀁾􀀹􀀸􀀶􀀮􀀵􀀰 2459 31 AUG 1990 ENGINEERING 1,101.69 2459 31 OCT 1990 PAYlfEN7 1,101.69-2479 30 SEP 1990 ENGINEERING 1,616.30 CURRENT OVER 30 DAYS OVER 60 DAYS OVER 90 DAYS TOTAL DUE \ l lUll -􀁾 :'. .-CONTINUED --.._------------/.. GINN, INC. CONSULTING ENGINEERS 17103 Preston Road • Suite 100 • LB 118 • Dallas, Texas 75248 • Phone 214/248-4900 CUSTOMER DATE NUMBER 31 OCT 1990 ADD TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD" CITY MGR ADDISON TX 75001 STATEMENT -INYOICENO. DATE DESCRIPTION TOTAL AMOUNT 7487 31 OCT 1990 24·· WATER LIMB RELOCATE . 2,037.19 . , , .--, _.--. _._ ".l • -' ._. -N(]J 30 ' 􀁾􀁩􀀮 "; NOV 1 t.; .. 􀁾 . . -I .. CURRENT OVER 30 DAYS OVER 60 DAYS OVER 90 DAYS TOTAL DUE 22667.42 0.00 0.00 0.00 22667.42 .. Invoice Date -31 OCT 1990 GINN INC. CONSULTING ENGINEERS Page 1 Invoice NUlber -7499 I NY0 ICE FRO": GINN INC. CONSULTING ENGINEERS TO: TOliN OF ADDISON POST OFFICE BOX 796577 POST OFFICE BOX 144 ATTN: RON IIHITEHEAD, CITY "GR DALLAS TX 753796577 ADDISON TX 75001 FOR: JOB 443 SANITARY SEilER I"PRoYE"ENTS SCHEDULED ------lIoRK Co"PLETED ------"ATERIALS TOTAL CO"P PCT BALANCE TO RETAINAGE PHASE DESCRIPTION YALUE PREVIOUS THIS PERIOD STORED • STORED C"P FINISH 􀁁􀁾􀁕􀁎􀁔 105 PLANS • SPEC INCo"E 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 106 DESIGN FEES 12,426.00 12,426.00 0.00 0.00 12,426.00 100 0.00 0.00 107 CONTRACT AD"IN 2,193.00 109.65 1,710.54 0.00 1,920.19 83 372.81 0.'00 108 INSPECTION FEES 5,492.00 274.10 4,275.96 0.00 4,550.06 83 931.94 0.00 109 OTHER INCo"E 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 260 EASE"ENTS/RDII 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 601 SURYEYING 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 602 TRAFFIC CONSULT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 603 ELECTRICAL CONSULT 0.00 0.00 0.00 0.00 0.00 0 0 0.00 0.00 604 GEOTECHNICAL INYEST 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 605·BID ADYERTISE"ENT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 606 STRUCTURAL ENGR 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 607 ARCHnECT ENBR 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 609 LANDSCAPE ARCHITECT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 609 OTHER CONSULTANT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 610 ABSTRACT/TITLE 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 650 PRINTING 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 651 COURIER 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 :.......􀁾 ! 􀂷􀀬􀀮􀀧􀁾􀁖 , i-I-..V; .. . ' . Final Total 20,101.00 12,B09.75 5,986.50 0.00 19,796.25 94 1,304.75 -0.00 LjS -OCJtJ-G"(,,§ '7cJ -otJ v....;a -c:JC?c:? 0/s (!PF .()U1dMe!-RL__ . .<.1 d 􀁾 Cv1) 1/-30 -9 (/f2u1:t Invoice Date -31 DCT 1990 Invoice NUlber -7499 FRD": GINN INC. CDNSULTING ENGINEERS PDST OFFICE BDX 796577 DALLAS TX 753796577 GINN INC. CDNSULTING ENGINEERS I NYDICETD: TDIIN DF ADDISON PDST DFFICE BDX 144 ATTN: RDN IIHITEHEAD, CITY "GR ADDISDN TX 75001 Page 2 FOR: JDB 443 TDIIN DF ADDISDN DESIGN DF SANITARY SEilER I"PRDVE"ENTS FDR "DLD TOliN" AREADF·ADDISDN,"ILDREDI JULIAN/BRDADIIAY/RAILROAD/DUDRU" AREA ACTUAL CDNTRACT A"DUNT: . $182,740.00 CDNTRACT SU""ARY ·DRIGINAL CONTRACT SU" NET CHANGE BY CHANBE DRDERS CONTRACT SU" TD DATE TDTAL·CD"PLETED AND STDRED TD DATE RETAINABE TOTAL EARNED LESS RETAINAGE LESS PREYIDUS CERTIFICATES FDR PAY"ENT CURRENT PAY"ENT DUE BALANCE TD FINISH, PLUS RETAINABE 20,101.00 0.00 20,101.00 18,796.25 0.00 t;18,796.25 12,809.75 fk 5,986.50 1,304.75 Invoice Date -31 OCT 1990 GINN INC. CONSULTING ENGINEERS Page 1 Invoice NUlber -7498 I NV0 ICE FROK: GINN INC. CONSULTING ENGINEERS TO: TOliN OF ADDISON POST OFFICE BOX 796577 POST OFFICE BOX 144 ATTN: RON IIHITEHEAD, CITY "GR DALLAS TX 753796577 ADDISON TX 75001 FOR: JOB 439 KILDRED STREET IKPROVEKENTS/ADDISON SCHEDULED ------1I0RK COKPLETED ------KATERIALS TOTAL COKP PCT BALANCE TO RETAINAGE PHASE DESCRIPTION VALUE PREVIOUS THIS PERIOD STORED • STORED CKP ·FINISH AKOUNT 105 PLANS. SPEC INCOKE 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 106 DESIGN FEES 27,706.00 27,706.00 0.00 0.00 27,706.00 100 0.00 0.00 107 CONTRACT ADKIN 4,889.00_ 0.00 1,320.03 0.00 1,320.03 27 3,568.97 0.00 108 INSPECTION FEES 12,223.00 0.00 3,300.21 0.00 3,300.21 27 . 8,922.79 0.00 109 OTHER INCOKE 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 260 EASEKEN1S/ROII 2,057.50 1,907.50 150.00 0.00 2,057.50 100 0.00 0.00 601 SURVEYING 8,742.00 8,742.00 0.00 0.00 8,742.00 100 0.00 0.00 602 TRAFFIC CONSULT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 603 ELECTRICAL CONSULT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 604 GEOTECHNICAL INVEST 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 605 BID ADVERTISEKENT 189.00 189.00 0.00 0.00 189.00 100 0.00 0.00 606 STRUCTURAL ENGR 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 607 ARCHITECT ENGR 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 608 LANDSCAPE ARCHITECT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 609 OTHER CONSULTANT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 610 ABSTRACT/TITLE 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 650 PRINTING ...' -:) . ' ,0;QO'11 0.00 0.00 0.00 0.00 0 0.00 0.00 􀁟􀁾􀀭􀀧 LI'''L\UW 651 COURIER 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 660 SPECIAL SERVICES/ROil NOV 3 0. 90 743.93 743.93 0.00 0.00 743.93 100 0.00 0.00 .-􀁾 --._.. _" NOV· 􀁾 i.: " , ... . Final Total 56,550.43 39,288.43 4,770.24 0.00 44,058.67 78 12,491.76 0.00 9'5"-t/c?o-􀀦􀁾􀀵 7c:? -c:7c:?..5Ya -c:7Clc:? 􀁓􀁶􀁾􀀮 VJF-􀁾 . Invoice Date -31 OCT 1990 Invoice NUlber -7498 FRO": GINN INC. CONSULTING ENGINEERS POST OFFICE BOX 796577 DALLAS TX 753796577 GINN INC. CONSULTING ENGINEERS I NV0 ICETO: TOliN OF ADDISON POST OFFICE BOX 144 ATTN: RON IIHITEHEAD, CITY KGR ADDISON TX 75001 Page 2 FOR: JOB 439 TOliN OF ADDISON DESIGN OF KILDRED ST--ADDISoN RD TO DUoRU" DRIVE CONTRACT A"oUNT $407,431.55 DESIGN. AD"IN 32,595.00 INSPECTION 12,223.00 CONTRACT SU"KARY ORIGINAL CONTRACT SUI' NET CHANGE BY CHAN6E ORDERS CONTRACT SUI' TO DATE TOTAL COKPLETED AND STORED TO DATE RETAINAGE TOTAL EARNED LESS RETAINA6E LESS PREVIOUS CERTIFICATES FOR PAY"ENT CURRENT PAYKENT DUE BALANCE TO FINISH, PLUS RETAINAGE 56,550.43 0.00 56,550.43 44,058.67 0.00 􀁦􀀴􀀴􀀬􀀰􀀵􀀸􀁾􀀶􀀷 ...,. 39,288..43 4,770.24 12,491.76 Invoice NUlber: 7487 Invoice Date: 31 OCT 1990 Page: 1 Frol: For Job: 90442 To: BINN INC. CONSULTINB ENBINEERS 24" WATER LINE RELOCATION-ELEV TANK TOWN OF ADDISON POST OFFICE BOX 796577 DESI6N OF RELOCATION OF 24" WATER LINE POST OFFICE BOX 144 IN VICINITY OF ELEVATED TANK, ADDISON ATTN: RON WHITEHEAD, CITY "BR DALLAS, TX 753796577 CONFERENCE/THEATER CENTER ADDISON, TX 75001 CONSTRUCTION AD"INISTRATION AND INSPECTION OF PROJECT ----------------------------------------------------------------------------------------------------------------------------------CONTRA CT BROSS ----RETENTION ----TAX 1 TAX 2 PHASE DESCRIPTION A"OUNT QUANTITY RATE UNIT A"OUNT A"OUNT PCT A"OUNT A"OUNT 100 SENIOR DESIBNER 0.00 17.00 60.00 1,020.00 0.00 0.00 0.00 0.00 CONTRACT AD"IN "-100 SENIOR ENBINEER 0.00 3.00 80.00 240.00 0.00 0.00 0.00 0.00 CONTRACT AD"IN 102 -INSPECTOR 0.00 17.25 40.00 690.00 0.00 0.00 0.00 0.00 103 SECRETARY 0.00 0.75 35.00 26.25 0.00 0.00 0.00 0.00 260 SENIOR DESIBNER 0.00 1.00 60.00 60.00 0.00 0.00 0.00 0.00 RI6HT-OF-WAY 650 PRINTINB 0.00 0.90 1.05 0.94 0.00 0.00 0.00 0.00 75. Lf 􀁾 􀁾􀁾 ('jf :1 1/. 6 J6.; w\C:J 􀁾􀁾r 1J.u flU //-30 -90 SCI. IS ;2 037/; NOV 1 􀁾􀀮 . 􀁾 '/§-tJ(Jt!-􀁓􀀭􀁾􀂧 7() -eJo:l3'tJ-000; ! : 􀁾 Invoice SUllary NOV 3 0. 90 Invoice Totals Bross Retention Tax 1 Tax 2 Current Alount Due 2,037.19 0.00 0.00 0.00 2,037.19 Invoice NUlber: 7484 Invoice Date: 31 OCT 1990 Page: 1 Frol: For Job: 90433 GINN INC. CONSULTING ENGINEERS 1990 "ISCELLANEOUS PAVE"ENT I"PROV POST OFFICE BOX 796577 TOWN OF ADDISON PREPARATION OF CONTRACT DOCU"ENTS FOR DALLAS, TX 753796577 1990 "ISCELLANEOUS PAVE"ENT AND DRAINAGE I"PROVE"ENTS IN THE TOWN OF ADDISON CONSTRUCTION AIl"INIINSPECTION OF 1990 "ISCELLANEOUS PAVE"ENT I"PROV To: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY "GR ADDISON, TX 75001 CONTRACT GROSS ----RETENTION ----TAX 1 TAX 2 PHASE DESCRIPTION A"OllNT IJUANTITY RATE UNIT A"OUNT A"OUNT PCT A"OUNT A"OUNT 100 PRINCIPAL ENGINEER 0.00 10.00 100.00 1,000.00 0.00 0.00 0.00 0.00 100 SENIOR DESIGNER, 0.00 27.00 60.00 1,620.00 0.00 0.00 0.00 0.00 ( 102 INSPECTOR 0.00 85.75 40.00 3,430.00 0.00 0.00 0.00 0.00 103 SECRETARY 0.00 0.50 35.00 17.50 0.00 0.00 0.00 0.00 604 GEOTECHNICAL INVEST 0.00 392.00 1.05 411.60 0.00 0.00 0.00 0.00 650 PRINTING 0.00 0.70 1.05 0.73 0.00 0.00 0.00 0.00 ...... . ' I Invoice SUlury NOV 3 0. 00 Invoice Totals Gross Retention Tax 1 Tax 2 Current Alount Due T 6,479.83 0.00 0.00 0.00. 􀂷􀂷􀂷􀀧􀁾􀀢􀁩􀁾􀀧􀁬􀀿􀂷􀁾􀀧􀁡 􀁗􀁊􀀱 Invoice Date -31 OCT 1990 GINN INC. CONSULTING ENGINEERS Page 1 Invoice NUlber -7493 I NV 0 ICE FRO": GINN INC. CONSULTING ENGINEERS TO: TONN OF ADDISON POST OFFICE BOX 796577 POST OFFICE BOX 144· ATTN: RON WHITEHEAD, CITY "GR DALLAS TX 753796577 ADDISON TX 75001 FOR: JOB 369 CREEK SYSTE" I"PROVE"ENTS -ADDISON SCHEDULED ------WORK CO"PLETED ------"ATERIALS TOTAL CO"P PCT BALANCE TO RETAINAGE PHASE DESCRIPTION VALUE PREVIOUS THIS PERIOD STORED • STORED C"P FINISH A"DUNT 105 PLANS &SPEC INCO"E 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 106 DESIGN FEES 28,764.00 28,764.00 0.00 0.00 28,764.00 100 0.00 0.00 107 CONTRACT AD"IN 4,960.14 4,960.14 0.00 0.00 4,960.14 100 0.00 0.00 108 INSPECTION FEES 12,400.34 12,400.34 0.00 0.00 12,400.34 100 0.00 0.00 109 OTHER INCO"E 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 260 EASE"ENTS/RON 6,201.25 6,201.25 0.00 0.00 6,201.25 100 0.00 0.00 280 SPECIAL PROJECTS 12,566.25 12,566.25 0.00 0.00 12,566.25 100 0.00 0.00 285 CD I 4 GABION RNALL 2,197.00 2,197.00 0.00 0.00 2,197.00 100 0.00 0.00 315 AD"IN BEYOND CO"P 17,067 .25 15,457.25 1,610.00 0.00 17,067.25 100 0.00 0.00 330 INSPECT BEYOND CO"P 2,025.00 2,025.00 0.00 0.00 2,025.00 100 0.00 0.00 601 SURVEYING 17,318.33 17,318.33 0.00 0.00 17,318.33 100 0.00 0.00 603 ELECTRICAL CONSULT 766.50 766.50 0.00 0.00 766.50 100 0.00 0.00 605 BID ADVERTISE"ENT 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 608 LANDSCAPE ARCHITECT 8,527.56 8,527.56 0.00 0.00 8,527.56 100 0.00 0.00 609 OTHER CONSULTANT 10,641.68 10,641.68 0.00 0.00 10,641.68 100 0.00 0.00 610 ABSTRACT/TITLE 187.01 187.01 0.00 n.oo 187.01 100 0.00 0.00 611 HYRAULIC ENGINEER 117.59 117.59 0.00 0.00 117.59 100 0.00 0.00 650 PRINTING 1,056.28 1,056.28 0.00 0.00 1,056.28 100 0.00 0.00 651 COURIER 15.76 15.76 0.00 0.00 15.76 100 0.00 0.00 . -􀁾 􀀧􀀭􀁾􀀧 ----􀀮􀁾􀁟􀀯124,811.94 100 3 0.00 0.00 NCN . 0, 90 Sl8 􀁾 􀀴􀀧􀁊􀀭􀀶􀀰􀀨􀁊􀀭􀀵􀁾􀀵􀀱􀁄􀀭 􀁯􀁯􀁬􀁃􀀻􀁏 I 1,610.0.0.\ i 􀁾 /... O.OQ i ' •. 'i j .;'. Final Total 124,811.94 123,201.94 Invoice Date -31 OCT 1990 Invoice Nu.ber -7493 FRO": GINN INC. CONSULTING ENGINEERS POST OFFICE BOX 796577 "DALLAS TX 753796577 GINN INC. CONSULTING ENGINEERS I NV0 ICETO: TONN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY "GR ADDISON TX 75001 Page 2 FOR: JOB 369 DESIGN, CONST. &INSPECT FOR CHANNEL I"P WATERRECIRCULATIDNS CONTRACT A"T $413,344.60 DESIGN FEE $33,067.57 INSPECTION FEE @3.0 1 $ 12,400.34 CONTRACT SU""ARY ORIGINAL CONTRACT SU" NET CHANGE BY CHANGE ORDERS CONTRACT 􀁾􀁕􀀢 TO DATE TOTAL CO"PLETED AND STORED TO DATE RETAINAGE TOTAL EARNED LESS RETAINAGE LESS PREVIOUS CERTIFICATES FOR PAY"ENT CURRENT PAY"ENT DUE BALANCE TO FINISH, PLUS RETAINAGE 124,811.94 0.00 124,811.94 124,811.94 0.00 124,811.94 123,201.94 1,610.00 0.00 Invoice NUlber: 7483 Invoice Date: 31 OCT 1990 Page: 1 Frol: For Job: 90408 GINN INC. CONSULTING ENGINEERS ADDISON SPECIAL SERVICES POST OFFICE BOX 796577 FOR TOWN OF ADDISON DALLAS, TX 753796577 To: TOWN OF ADDISON POST OFFICE BOX 144 ATTN: RON WHITEHEAD, CITY "GR ADDISON, TX 75001 CONTRACT GROSS ----RETENTION ----TAX 1 TAX 2 PHASE DESCRIPTION A"oUNT QUANTITY RATE UNIT A"OliNT A"DliNT PCT A"OUNT A"OUNT 601 SURVEYING 0.00 1,270.15 1.05 1,333.66 0.00 0.00 0.00 0.00 FILING PLAT FOR 4500 .BELTLINE AS REOliESTE BY CAR"EN "oRAN 􀁾􀁉􀁏􀂷V 􀁬􀁾􀀧 C/-/7/-§",S7d -cJ&YOt?-􀁴􀁬􀁾􀁤 Invoice SUllary NOV 3 O. 90 Invoice Totals Gross Retention Tax 1 Tax 2 rll,.,."nt A.nunt 􀁄􀁵􀁾 1,333.66 0.00 0.00 0.00 1.333.66 Invoice NUlber: 7480 Invoice Date: 31 OCT 1990 Page: 1 Frol: For Job: 90130 To: GINN INC. CONSULTING ENGINEERS ENGINEERING -ADDISON TOlIN OF ADDISON POST OFFICE BOX 796577 TOliN OF ADDISON POST OFFICE BOX 144 "ISC. PROJECTS ATTN: RON IIHITEHEAD, CITY K6R DALLAS, TX 753796577 ADDISON, TX 75001 ---------------------------------------------------------------------------------------------- ------------------------------------CONTRACT 6RoSS ----RETENTION ----TAX 1 TAX 2 PHASE DESCRIPTION A"oUNT QUANTITY RATE UNIT AKoUNT A"oUNT PCT A"oUNT A"oUNT 100 SENIOR DESI6NER 0.00 0.50 60.00 30.00 0.00 0.00 0.00 0.00 "TIN6/PHoNE CALLS II/CKORAN RE: CARROLL/ADD BOUNDARY 100 SENIOR EN6INEER 0.00 2.25 BO.OO 180.00 0.00 0.00 0.00 0.00 COORDINATION ISSUES 1I1TH THEATRE CENTRE 100 PROJECT EN6INEER 0.00 2.00 80.00 160.00 0.00 0.00 0.00 0.00 STAFF "EETINGS 100 PROJECT ENGINEER 0.00 1.00 BO.OO 80.00 0.00 0.00 0.00 0.00 GREENHAVEN APT SEilER" 0/-/7 j-􀁾􀁻􀀬􀂧 􀀷􀁾 􀁾􀁪􀀭 7//-G"t.§ 70 Invoice SUllary NOV 3 0, 90 Invoice Totals Gross Retention Tax 1 Tax 2 Current Alount Due .. :-J 450.00 0.00 0.00 0.00 450.00 GINN, INC. CONS1JLTING ENGINEERS Honorable Mayor Lynn Spruill Town of Addison 5300 Belt Line Road P.O. Box 144 Addison, Texas 75001-0144 Dear Mayor Spruill: May 26,1992 'r􀁾l ., .. , ..,..... 􀀬􀀺􀀭􀀻􀁾􀀮 " .. 0 t 92 " 􀁾􀁪 􀀭􀀭􀁾 During the past 20 years, we have looked with pride to the various projects which we have designed for the Town of Addison. Now it gives me great pleasure to inform you that we won the 1991 "Award of Excellence" from the Portland Cement Association for the 6 Million Gallon Reservoir on Celestial Drive. It is my understanding that an article will soon .be published in the Public Works Magazine regarding this national award. -Under separate cover, I am forwarding the plaque presented to the Town of Addison. We would appreciate it being displayed in a place of prominence. 4?p-.-"--H. Wayne Ginn, P.E. HWG:sb cc: Council Members RQI;lFWhitehead Don Preece File 17103 Preston Road. Suite 100 • LB 118 • Dallas, Texas 75248 • Phone 214/248-4900 r:'\ r,= 􀁨􀁾􀁾􀁮 􀁲􀀭􀁉􀀩􀁾 .. . " "i J 􀁾 .,r /: ......>" .\ : , ! ...... P .,' YAY 2 1 91 J I Ii GINN & CASE, I ':" . CON CiTY MANAGEH May 20, 1991 Mr. John Baumgartner, P.E. City Engineer Town of Addison P.o. Box 144 Addison, Texas 75001 Re: Mildred street Improvements Dear Mr. Baumgartner: LTING ENGINEERS Work for the above referenced project has been completed and inspected by representatives of Ginn & Case, Inc. and the Town of Addison. The work was found to be in general conformance with the contract documents. The original contract completion date was January 29, 1991. The project was substantially complete on April 4, 1991. Enclosed are three (3) copies of Application for Payment No. 6 (FINAL) in the amount of $94,396.10 from Centerline Constructors, Inc. representing work performed on the project through completion, including: the final change order reflecting overruns and underruns of the estimated quantities; and, request for previously held retainage. We have reviewed the application and" recommend that payment in full be made at this time and that the City Council formally accept the project and begin the one year warranty period. Also enclosed are the project close-out submittals and other items of correspondence and project supporting documents for" your information and use in making the decision to accept the project and make final payment. The submittal includes: 1) Executive Summary; 2) , Summary of Change Orders; 3) Final recap of cons:':r-uc·t:ic:>n costs; 4) Contractor's Affidavit of debts and claims; 5) letter of warranty; 6) Consent of Surety Company to final payment; 7) Record Drawings for the project -mylar reproducibles and two blue line prints, under separate cover. If appropriate, please place this item on the next Council Consent Agenda to serve as pUblic notice that FINAL PAYMENT, in accordance with the Contract Documents, in the amount of $94,396.10 will be made to Centerline Constructors, Inc. for the construction of the Mildred Street Improvements project. The contract requirements have been completed, all documents are in order, and the project is ready for acceptance by the Town of Addison.17103 Preston Road -Suite 100 -Dallas, Texas 75248 -Phone 214/248-4900 P.O. Box 796577 -Dallas, Texas 75379-6577 -FAX 214/931-1452 May 20, 1991 Mr. John Baumgartner, P.E. Page 2 Should you require any further information, please contact our office. Sincerely, 􀁾􀁾􀁥􀀬 SWC/GF/dsp enclosures P.E. cc: Ron Whitehead, City Manager Slade strickland Robin Jones Don Preece Larry McCallum Centerline Constructors, Inc. Gabe Favre File 439 EXECUTIVE SUMMARY MILDRED STREET IMPROVEMENTS TOWN OF ADDISON. TEXAS 1. The project was advertised July 26 and August 7, 1990. Bids were opened on August 14, 1990. Seven bids were received and ranged from a low of $590,171.55 to a high of $679,781.00. 2. On August 28, 1990, the City Council awarded a unit price contract to Centerline Constructors, Inc., Ft. Worth, Texas, in the amount of $590,171.55 for all the work as proposed. 3 • A pre-construction conference was held on September 21, 1990. Notice to proceed was given as on or before October 1, 1990. Contract time was 120 calendar days. Contract completion date was January 29, 1991. were set at $500.00 per day. Liquidated damages 4. Some of the initial delays which occurred were obtaining the OPUBCO easement parallel to the railroad. This prevented the contractor from doing work in this area at the beginning of the project. We denied, at the beginning of the project, a request to close down Mildred Street from Addison to Julian. The contractor requested this to expedite the completion of the project. It was denied due to the fact that the theater center was having plays at the time and the theater contractor had to utilize Mildred Street for access& 5. A delay occurred early in the project due to the necessary fabrication of the 24" waterline material by Gifford-Hill. This work could not be performed until the pipe was uncovered and accurate measurements were taken. 6. Due to either rain or poor working conditions, the contractor was unable to work the following days: Oct. 3, Oct. 9, Oct. 31, Nov.' 8, Nov. 21, Nov. 26, Nov. 27, Nov. 28, Nov. 29, Dec. 11, Dec. 17. From approximately December 18, 1990 t6January 15, 1991, very little work was completed due to the inclement weather. 7. On February 4, 1991, we notified the contractor that the contract completion date of January 29, 1991 had passed. 8. The contractor requested a final walk-through on April 4, 1991. On April 5, 1991, a punch list of items to be completed or corrected was prepared and presented to the contractor. Additionally, a certificate of Substantial Completion as of April 4, 1991 was prepared. 9. As of April 15, 1991, all items of the punch list had been addressed to the satisfaction of the Town of Addison and Ginn & Case, Inc. representatives. 10. When the weather permitted, the contractor prosecuted the work in a timely manner, in our opinion. Based on the knowledge we have of the proj ect, we would not recommend assessing liquidated damages. We feel that the contractor has done an admirable job on the project. 11. Due to a minimum overrun of quantities, combined with thorough inspections and comprehensive contract administration, the· total proj ect contract price, before change orders, 􀁩􀁾 approximately $1,294.45 less than was bid. Original contract price was $590,171.55. Contract price prior to change orders is $588,877.10. The actual final contract price will be $596,184.60 which includes change orders and field changes. 12 • We hereby recommend that the proj ect be accepted and that final payment in the amount of $94,396.10 be paid in full at this time. SUMMARY OF CHANGE ORDERS MILDRED STREET IMPROVEMENTS CHANGE ORDER NO.1 Install approximately 1150 LF of 2" PVC conduit for future traffic signal interconnect as requested by Mr. Bruce Ellis. ADD: $4,232.50 to contract amount CHANGE ORDER NO.2 Install additional 2" thick HMACP in alley behind Broadway street from Julian street to Addison Road, to repair damaged pavement, as approved by Mr. Robin Jones. Add: $2,500.00 to contract amount CHANGE ORDER NO.3 Cost overruns/underruns for project. (See attached spreadsheet) Deduct: $1,294.45 from original contract price FIELD CHANGE NO.1: Provide additional 4" diameter PVC sleeve, under walk, for future irrigation; and, relocate water valve as per Mr. Slade Strickland. ADD: $575.00 to contract amount FINAL RECAP OF CONSTRUCTION COSTS original Contract Amount $590,171.55 Change Order No. 1 (Add) 4,232.50 Change Order No. 2 (Add) 2,500.00 change Order No. 3 (Deduct) 1,294.45 Field Change No. 1 (Add) 575.00 TOTAL CONSTRUCTION COSTS $596,184.60 CHANGE ORDER ;..•..·i .. ....􀁾􀀭􀁟􀀮 (Inslruclions on rcvcrsc sidc) No. Three (3) FINAL PROJECT: Mildred Street Improvements DATE OF ISSUANCE: May 20, 1991 OWNER: (Namc. Addrcss) Town of Addison P.O. Box 144 Addison, TX 75001 CONTRACTOR: Centerline Constructors, 2525 Ridgmar Blvd. Fort Worth, TX 76116 Inc. OWNER's 􀁐􀁲􀁾􀁪􀁥􀁣􀁬 No. __--,-_ ENGINEER: . Gl'nn &Case Inc . , . CONTRACT FOR: Construction of Mildred Street . from Addison Road to Quonnn Drive ENGINEER's 􀁐􀁲􀁾􀁩􀁣􀁣􀁬 No. __4_3_9 _ You arc dircclcd 10 makc Ihc following changcs in the Conlracl Documenls. Dcscriplion: Quantity overrWls/Wlderruns Purpose of Change Order: Allachmenls: (List docllmenls supporting ch;1I1ge) CHANGE IN CONTRACT PRICE: CHANGE IN CONTI{ACTTIME: Original Conlracl Pricc Original Conlracl Timc 590,171.55 $,---'-------------------120 􀁤􀁒􀁙􀁾 or c.1nle Previous Change Orders No.__1__ 10 No. _.;::.2---,-__ Nel changc from prcvious Change Orden; $,_6--,-'_73_2_._5O---=-p_lu_s_F_.C__._#_1􀀭􀀭􀀭􀀬􀀨􀁾􀀤􀁟􀀵7_5_._00-,,)'--__ -0-dny. Contracl Price prior 10 this Change Order Contracl Time Prior to this Change Ordcr $ 597 ,479.05 120 d.y. 0' d.'e 􀁎􀁣􀁲􀁾(deaease) of this Change Order Nel IncrC;lse (decrc;lsc) of lhis Change Order $ J,294.45 -0-d.y. Contracl Price with all approved Changc Orders Contracl Time wilh all approved Cha....ge Orders $ 596,184. 60 120 d.y. o,d.le Town of Addison Centerline Constructors, Inc. APPROVED: 􀁁􀁾􀁉􀀧􀁒􀁏􀁖􀁅􀁄􀁾 by 􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀺􀀨􀀩􀁜􀀽􀀭􀀧􀀭􀀮􀁮􀀮􀀭􀀧􀀭􀀭􀀭􀀭􀀭􀀭􀁑􀀺􀀮􀀮􀀮􀀮􀀺􀀺􀀺􀀻􀀺􀁣􀁯􀁾􀁮􀀺􀀺􀀺􀁉􀀧􀀮􀀺􀀺􀀧􀁣􀁬􀀧􀀡􀁬􀀮􀁏􀀧􀁾􀀭􀀭􀀭􀀭􀀭 RECOMMENDED: 􀁾 1 by If.." /. t"' !nlt;neer Gi &Case Inc. EJCDC No. 1910-s-d (1983 Edilion) I'repAred hy the 􀀢􀁮􀁾􀁩􀁮􀁥􀁥􀁬􀀧􀀢 Joinl C"nlrAcI 􀁉􀀩􀀢􀁣􀀢􀀬􀀬􀀬􀁣􀁮􀁬􀁾 C,,,nn,illce A,,,I c",lor,cll hy The A••"dAleti Gene,.' ConlrAc'"," "r Arneric•. APPLICATION FOR PAYMENT "/-􀁾 -􀁾 􀁾􀁾 PAYMENT REQUEST NO. __􀀽􀁓􀀱􀁘􀀽􀂷􀁾􀀨􀁾􀀶􀁾􀀩 􀁾 􀁾􀁆􀁾􀁉􀁾􀁎􀁾􀁁􀁌􀁾􀁂􀁾􀁉􀀽􀁌􀁌􀀽􀁉􀁾􀁎􀁾􀁇􀁾__SHEET 1 OF 4 FOR·WORK COMPELTED THROUGH THE DATE OF:_· 􀁾􀁁􀀽􀁰􀀽􀁾􀀽􀁩􀁬􀁾􀀳􀁾􀁏􀁌􀀬 19 91 PROJECT TITLE: MILDRED STREET IMPROVEMENTS -SANITARY SEWER IMPROVEMENTS LOCATION: DESCRIPTION: TOWN OF ADDISON, TEXAS CONSTRUCTION OF MILDRED STREET FROM ADDISON ROAD TO QUOURM DR ALONG WITH STORM SEWER AND SANITARY SEWER INSTALLATION OWNER/ENGINEER INFORMATION: CONTRACTOR INFORMATION: OWNER: TOWN· OF ADDISON CONTRACTOR: CENTERLINE CONSTRUCTORS ADDRESS: P.O. BOX 144 ADDRESS: P.O. BOX 11721 CITY/STATE: ADDISON, TX. 75001 CITY/STATE: FT. WORTH, TEXAS 76110 CONTACT PERSON: SLADE STRICKLAND PHONE NO.: 214-450-2869 ENGINEER: GINN, INC. -ENGINEERS ADDRESS: 17103 PRESTON RD., #100 CITY/STATE: DALLAS, TX. 75248 CONTACT PERSON: GABE FAVRE PHONE NO.: 214-248-4900 CONTACT PERSON: BARNEY BOYDSTON PHONE NO.: 817-732-0882 INSURANCE CO: SEABOARD SURETY CO. ADDRESS: 5750 PINELAND CITY/STATE: DALLAS, TEXAS BONDING AGENT: STEVEN B. SIDDONS ADDRESS: 3519 WEST VICKERY BLVD CITY/STATE: FT. WORTH, TX 76107 CONTRACT NO.: CONTRACT DATE: AUGUST 29, 1990 PROJECT NO. 439-443 TOTAL ORIGINAL CONTRACT AMOUNT: $ 590,171.55 TOTAL CHANGE ORDERS NOS ._3_-__AMOUNT $_7_3_0_7_.5_0 _ TOTAL CONTRACT AMOUNT TO DATE: $ 590,171.55 + Change Order #1($4232.50) + Change Order 􀁾 ($2500.00) + Field Change Order #1($575.00} = $597,479.05 NOTICE.TO.PROCEED DATE: OCTOBER 1, 1990 COMPLETION DATE:120 CALENDAR DAyS CONTRACT COMPLETION DATE: JANUARY 29, 1991 PERCENT TIME 􀁅􀁌􀁁􀁐􀁓􀁾􀀮􀁾􀀮􀀺 .. l_O_O% PERCENT WORK 􀁃􀁏􀁍􀁐􀁾􀁅􀁔􀁅􀁄􀀺 l_O_O\ I . 􀁬􀁾 Centerline Constructors, Inc. 2525 Ridgl8llr, Su'ite 321 Fort Worth, Texas 76116 TOI Town Of Addiion P.O. Box 144 Addison, TX 75001 U7·6 Final Mav 14, 1991 187 Mildred Avenue Item APprox. Unit Quantitv Total Alllount No. Quantitv Unit Item Duc. Price To Date Due -----_ .. _--_............ .._ .. -----Street Improvement s 100.1 6.55 Stations Prepare ROW 65' $1,300.00 6.55 $8,515.00 100.2 5.50 Stations Prepare ROW 80' Sl,300.00 5.50 $7,150.00 100.3 0.65 Stations Prepare ROW 60' $l, 300.00 0.65 $845.00 104.1 240 Lin. Ft. .Saw-Cut Full Depth Asphalt or Concrete $4.50 240.00 $1,080.00 104.2 75 SQ. Yds. Remove Old Concrete or Asphalt Concrete $l1. 00 75.00 $825.00 110.0 3,500 Cu. Yds. Roadwav Excavation Densitv Control $3.75 3500.00. $l3,125.00 160.0 2,800 SQ. Yds. Furnfsh &Place Topsoil incl Rve Grass $1. 50 2800.00 $4,200.00 248.0 25 Cu. Yds. Flex. Base, TYpe A, Grade 1, Class 3, Compl $90.00 21.50 $l, 935.00 260.0 4,500 SQ. Yds. lime Treatment for Materials in Place $2.30 4500.00 $lO, 350. 00 262.0 2,650 SQ. Yds. Lime Treatment for Base Course $2.30 2755.00 16,336.50 264.0 100 Tons Hvdrated LIme (6\ bv weightl $81. 00 100.00 $8,100.00 340 150 SQ. Yds. 6' Thick Tvpe DHMACP $22.00 130.00 $2,860.00 360.1 6,000 SQ. Yds. 8' Thick Reint. Conc. Class C $l7.95 6102.00 $109,530.90 360.2 835 SQ. Yds. 6' Thick Reinf. Conc. Class C $l8.00 760.00 $l3, 680. 00 360.3 37 Lin. Ft. Concrete Street Header $4.75 37.00 $l75.75 400 1 L.SUDl Trench Safetv for Storm'Drainage Lines $550.00 1. 00 $550.00 464.1 320 Lin. Ft. 18' Reinf. Conc. Pipe C-7b $37.00 339.00 $12,543.00 464.2 385 Lin. Ft. 24' Reinf. Conc. Pipe C-7b $55.00 385.00 $21,175.00 464.3 530 Lin. ft. 30' Reinf. Conc. Pipe C-76 166.00 548.00 $36,168.00 470.1 5 Each 10' Standard Curb Inlet $3,800.00 5.00 $19,000.00 470.2 5 Each 10' Modified Curb Inet $4,000.00 5.00 $20,000.00 479.1 2 Each Adjust Existing Manhole $450.00 2.00 $900.00 500 1 L. Sum Mobi 112at ion $30,000.00 100.00\ $30,000.00 530.1 2,100 Lin. Ft. Concrete Curb and Gutter $1. 35 2097.00 $2,830.95 530.2 730 SQ. Yds. Concrete Sidewalk 4' THick $21.15 688.00 $14,551.20 530.3 140 SQ. Yds. Concrete Drivewavs 6' Thick $20.50 142.00 $2,911.00 530.4 840 SQ. Yds. Brick Pavers $35.00 760.00 $26,600.00 . 582.1 1 Each Adjust Existing Water Valve $75.00 1. 00 t75.00 582.2 1 Each Relocate Existing Water Meter $350.00 1. 00 $350.00 582.3 80 Lin. Ft. Lower 24' PCCP Water LIne $265.00 80.00 $21,200.00 618. 1 425 Lin. Ft. 2'/4' Electrical Conduit $5.50 433.00 $1,381.50 618.2 40 Lin. Ft. 2' Irrigation Conduit $7.00 40.00 $280.00 666.0 1 L.SuDi Pvmt Markings -24' Stop Bars Etc. $3,700.00 1. 00 $3,700.00 676.1 108 Each Traffic Buttons P-7W Single Refl. White $3.00 ·108.00 $324.00 676.2 108 Each Traffic Buttons P-15 WDouble Refl White $4.70 108.00 $507 .60 . 676.3 152 Each Traffic Buttons P-117Y Double Refl Yellow 16.10 152.00 $927.20 Total Amount Bid: (Street Improvementsl $405,682,60 6\\eiTy\)o. 􀁾􀀼􀁒􀁴-􀁴 "( 􀀬􀁾 SanitarY Sewer Improvements H&.l &70 Un. Ft. a' Diameter PVC Dr 3& ra'·10' Deep) SIn Sewer '33.00 &30.00 t17,490.00 46&.2 1,240 Lin. Ft. 8' Dia. PVC Dr 35 110'·12' Deep) San Sewer $38 .. 00 1280.00 $48.640.00 465.3 1,070, .Lin 􀁾 Ft. 12' Ohm. PVC DR 35 16'.-8' Deep) San Sewer $28: 00 1051. 00 $29,428.00 465.4 485 Lin. Ft. 12' Diem. PVC DR 35 (8'-10' Deep) San Sew'er $31. 00 394.00 $12,214.00 465.5 650 Lin. Ft. 12' Diam. PVC DR 35 (10'-12' Deep) San'Sewer $42.30 760.00 $32,148.00 465.6 100 Lin. ft. 4' Diameter PVC DR 35 18'-10' Deep! San Sewer $31.50 97.00 $3,055.50 465.7 ' 60 Lin. ft. 6' Diam.PVC DR 35 (8'-10' Deep) San Sewer $53.00 60.00 ,$3,180.00 470.3 2 Each Sanitary Sewer Manhole 16'-8' Deep) Complete $2,000.00 3.00 $6,000.00 470.4 4 Each SanitarY Sewer Manhole (8'-10' Deep) Complete $2,200.00 4.00 $8,800.00 470.5 9 Each San. Sewer Manhole (10'-12' Deep) Complete $2,400.00 8.00 $19,200.00 472.0 160 Lin." ft. Relaying Culvert Pipe $19.00 131. 00 $2,489.00 400.1 1 L.Sum Trench Safety for Sanitary Sewer Lines $550.00 1. 00 $550.00 Total Amount Bid (SanitarY Sewer): $183,194.50 Change Orders &field Extras CO 11 1 L. Sum Change Order 11 -Ad 2' Conduit Pull Boxes $4,232.50 1. 00 $4,232.50 CO 12 1 L. Sum Change Order 12 -HMAC Pavement Patch $2,500.00 1. 00 $2,500.00 1 L. Sum field Change 11 -Sdwlk Sleeve &Reloc W.M. $575.00 1. 00 $575.00 Total Amount of Change Orders etc: $7,307.50 Amount Completed: Retainage O.OOt Net Amount Due: Less Previous PaYment: Total Amount Due: $596,184.60 $0.00 $596.184.60 $501,788.50 $94,396.10 􀁐􀁒􀁏􀁾􀁅􀁃􀁔􀀺 MILDRED STREET IMPROVEMENTS 􀀮􀁃􀁏􀁎􀁔􀁒􀁁􀁃􀁔􀁏􀁾􀀺 CENTERLINE CONSTRUCTORS, INC. OWNER..: 'TOWN OF ADDISON , TEXAS ENGINEER: GINN, INC. CONSULTING ENGINEERS SHEET NO. 4 OF 4 APPLICATION FOR PAYMENT NO. 6 DATE: April 30 19 91 ACCOMPANYING DOCUMENTATION: c... GROSS AMOUNT DUE ••••..• $ 596,184.60 ,LESS 5 % RETAINAGE ..• $ 􀀭􀁟􀁏􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 AMOUNT DUE TO DATE •.•.. $ 596,184.60 LESS PREVIOUS PAYMENTS. $ 501,788.50 TOTAL AMOUNT DUE THIS APPLICATION •.••••• $ 94,396.10 REVIEWED BY: DATE: CHECKED BY: 􀁾􀁄􀁁􀁔􀁅􀀺􀁓􀁾􀁾􀀯 CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment numbered 1 through 6 inclusive; and (2) title to all materials and all equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens, Claims, security interests and encumbrances (except such as covered by Bond acceptable to OWNER). Dated May 17, 19 91 CONSTRUCTORS, INC. SUbscribed ,Before Ma This Date, May 17, 1991 􀁾􀁾􀁯􀁲􀀼􀁜􀁜􀁜􀁾 Title: Richard Waters, President Jan Ieretro, NotllY Public Carro Exp: 7/27/92 ENGINEER'S RECOMMENDATION: This Application for Payment (with accompanying documentation) meets the requirements of the Contract Documents and payment of the above TOTAL AMOUNT ,DUE THIS APPLICATION is recommended. Ginn, Inc. Consulting Engineers By: 􀁇􀁫􀁾􀂷 . Title: Project Manager OWNER'S APPROVAL: Application for Payment received on 19 by ---..;, _ Approved for payment on day of ---..;, 19 Town of Addison, Texas By:------------------Title:---------------- CENTERLINE CONSTRUCTORS, INC. May 16, 1991 ML. Gabe Favre Ginn &Case, Inc. 17103 Preston Road Suite 100 Dallas,TX 75248 RE: Mildred Street IrnProverrents 􀁾 ML. Favre: Pursant to Division I, Section 01300, Paragraph 1.3 of the General requirements, notice is hereby given of canpletion of the above referenced project. . Sincerely, ENTERLINE 􀁃􀁏􀁎􀁓􀁔􀁒􀁕􀁃􀀧􀁉􀁄􀁾􀀬 IOC. Richard Waters President" P, O. Bo x 11721 • Fort Worth i ;1.1 . T e x a s, 7 () 1 1 0 • 817-732-0882 CENTERLINE CONSTRUCTORS, INC. May 20, 1991 city of Addison c/o Ginn, Inc. -Consulting Engineers 17103 Preston Rd., Ste. 100 Dallas, TX 75248 RE: Mildred street Improvements Dear Mr. Favre: Pursant to section 01700, "Contract Closeout" paragraph 1.4, subparagraph 3 of the general requirements of the above referenced contract, Centerline Constructors, Inc. hereby warrants all work to be free of defects for a period of one year. SincerelY, 􀁾􀁉􀁎􀁅 CONSTRUCTORS, INC. Richard Waters President P. O. B"ox 11721 • Fort Worth Texas.. 7()110 • 817-732-0882 .' THI STATIO' TEXAS •• COUNTY OF Tarrant • BEFORE ME. tbe underaiancd authority, • Notlry Publlc In and for the Stato of TCl.a'.'l-on tbis day personally appeared Richard Waters • whO, bcina by me 􀁦􀁩􀁾􀁳􀁴 duly .worn. upon o"hdcpOICI and lIy': 1. -I am an owner or duly authorIzed offlcer of the undcrsilnod Contrlctor. subcontractor. or material suppller In connection with the construction of the Mildred Street and Sanitary Sewer Improverrents in Addison Dallas .County. TexI., Cor Town of Addison (horolnafter referred to .a "Owner·). Ind lam authorllcd In such capacity to make thit affidavit. . 2. I heroby certify thlt III debts and obllsation, incurred by tho undersl.ned In tho erection. construction. and compledoll or tho boreinabovo dClcrlbcd project (inciudina. but not limited· to. thoae for labor. matorial. cquipment. ltUppJlCI. IIcrvlccs. Inluranco. tII.CS. and other co.ta). have been paid Ind dilcharlod in full. 3. To induce Owner to mako tlnal payment in the amount or S 94« 396 .10 • and upon receipt of luoh payment. tho undcrsianed hcrcby releases and dlacharlel tho Ownor. the contraotor or subcontractor and Iny financial institution which haa or hat had any lien. asainu the hereinabove dellcribed project. from any and all liona. claiml. riaMs. and/or equitici wbatsoever alainll the hcrelnabove delcribed project and hereby waives and surrenders any and all rlabel of thc under,lancd to make ,uoh a claim for licn rCluJllns from labor. materiall, equipmeDC. supplies. lervices. insurance. and/or other coat. incurred by the undersilncd. 4. The undersisncd further asree, to Indemnify and hold harmlcal the Owner or the. financial institution which bas or bas bad any Uen, I'lin't tbe hereInabove described project. from and a.llnlt any aDd all liens, claim•• expenlOI. IOlS010r dlm'los. or whatever kind and nature, by realon of any debts or obllsatlons incurred, or ,lIcle4 to havc becn incurred. by the undcrsiSDed. ita aBcntl, employee., and/or .ubcontraoton in connection with the erection, construction. and/or Improvements or said property.-FINAL RELEASE AND WAIVER or LIEN RIGHTS -P." 1 ,, \ SIONED thl. the 􀁟􀀭􀀭􀀽􀀭􀀱􀀷􀁾􀁟 day of Ma ..v ..J. 􀀱􀀹􀁾􀀮 '. CONTRACTOR, SUICONTRACTOa OR 􀁾􀀢􀁌􀁉􀀧􀀢 N!i\COt Affiant Bjcband Waters President Thlc of Arfiant SWORN AND SUBSCRIBED TO BEFORE ME ,hI. thc 17 day of May • 19 􀀹􀁾 by • Affiant. to certiry which .whnc.. my hand and official Ical. (t:\forw\co"'&\A.b,doc) FINAL RELEASE AND WAIVER OF LIEN RIGHTS· P.lt 2 ( "CONSENT OF SURETY COMPANY TO fiNAL PAYMENT AlA DOCUMENT G707 PROJECT: (narnli', 􀁡􀁤􀁤􀁲􀁥􀁳􀁾􀀩 OWNER ARCHITECT CONTRACTOR SURETY OTH[R oooo I ARCHITECT'S PROJECT NO: 439 CONTRACT FOR: Mildred Street Improverrents TO (Owner) r . Town of Addlson 5300 Belt Line Road Addison, TX 75240 L .J CONTRACT DATE: 8/29/91 CONTRACTOR: Centerline Constructors, Inc. In accordance with the provisions of the Contract between the Owner and the Contractor as 􀁩􀁮􀁤􀁩􀁣􀁾􀁴􀁥􀁤 ..bov., the ( Seaboard Surety Canpany 5750 Pineland Dr., Suite 304 Dallas, Texas 75231-5366 on bond of «he,. Imen 􀁮􀁾􀁭􀁥 and .ddress 01 Conuatro,l , SURETY COMPANY, centerline Constructors, Inc. 2525 Ridgrnar Blvd, Suite 321 , CONTRACTOR, Fort Worth, Texas 7611 6 hereby 􀁾􀁰􀁰􀁲􀁯􀁶􀁥􀁳 of the final payment 10 the Contractor, and agrees thaI (inal payment to the Contractor shall not relieve Ihe Surely Company of any of its obligations to (here inletl name anI;! 􀁾􀁤􀁤􀀧􀁨􀁓 01 O....ner) Town of Addison 5300 Belt Line Road , OWNER. Addison, TX 75240 75240 as 􀁈􀁾􀁬 forth in the said Surely Company's bond. IN WITNESS WHEREOF, the Surety Cornpany has hereunto set its hand lhis 17th day o( May 1991 AlleSl: (Seal) : _ Seqboarq. Surety..Company __.... , .__.. _ Surety Company 􀁊􀁾􀁾􀁾􀁾 Signature of ·Authorized 􀁒􀁥􀁰􀁲􀀨􀀧􀁾􀁥􀁮􀁴􀁾􀁬􀁩􀁶􀁥􀀭􀀭􀀭􀂷􀂷 .._-.. Steven B. Siddons, Attorney-in-fact Ii'lle !'Ion: 11"1 101m 􀁉􀁾 10 be 􀁬􀀺􀁾􀁴􀀧􀁤 3\ 􀁾 wn·'t>.nion d(lcumenl 10 AlA DOCUI\·lENT C7OG, CONTRAC10f< S MflD....VIT or PAYMENT OF DEIIlS AND Cl 􀀢􀀢􀁜􀀮􀁜􀁾􀀮 ("rrMl (tl'toon ::"71C::: 􀁓􀀬􀀲􀀭􀁎􀁾􀁾􀁾􀁆􀁉􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀁍􀁍0228 . ..•..... ... . . . POWER OF ATTORNEY •. , . . ' .. KNOW ALL MEN BY THESE PRESENTS: That SEABOARD SURETYCOMPANY, a Gorporation of the State of NewYork, has· made. constituted and appointedand bythese presents doesmake,constitute and appoint. Robert> C. Si440ns ..•.or 􀀮􀀮􀁒􀁯􀁢􀁾􀁊􀀻􀁴 c. 􀁆􀁘􀀢􀁩􀁣􀀪􀁾 '.. 􀁯􀁲􀀱􀀳􀁥􀁴􀀺􀁴􀁙􀁾 􀁁􀁭􀁲􀁒􀁑􀁧􀁥􀁊􀀺􀀧 S.Qr . Wi11iam A•. Grote.' or 􀁌􀀺􀁩􀀮􀁮􀁤􀁾􀁣􀁱􀁬􀀬􀁬􀁥􀁹􀁯􀁊􀀺􀀢􀂷 Jessi,:ca 􀁋􀁥􀁮􀁤􀁲􀁩􀁣􀁫􀁯􀁴􀁾􀀧􀀺􀁓􀁴􀁥􀁶􀁥􀁮􀁂􀁾􀁓􀁩􀁧􀁤􀁯􀁮􀁳􀁻'--of Austin I . Texas . .' . . . ....." . . ..... . . . .•........ 􀁩􀁴􀁳􀀮􀀱􀁲􀁊􀁊􀁾􀁾􀁮􀁤􀁬􀁡􀁷􀁦􀁬􀁬􀁬 􀁁􀁴􀁴􀀨􀀩􀁲􀁮􀁥􀁹􀁾􀁩􀁮􀀭􀁆􀁡􀁣􀁴􀀬 to make, e)(ecute 􀀢􀀱􀁊􀁾􀁴􀁾􀁥􀁬􀁩􀁶􀁥􀁲Q!"l its 􀁢􀁥􀁟􀁨􀁾􀁬􀁦􀁬􀁮􀀤􀁉􀀬􀁭􀁕� �􀀬􀁣􀁥 policiCitS, surety bOl'ui$, u!"ldertilklogS ilod_., 􀁩􀀮􀁴􀁩􀁬􀁾􀁉􀀭􀁉􀁾􀁩􀁾􀁫􀁾􀁾􀁾􀁴􀁾􀁾􀀻􀁾􀀡􀁩􀁬􀁦􀁪􀁲􀀡􀁲􀁾􀁾􀁴􀁾􀀱􀁾􀁾􀁓􀁾􀁩􀁾􀁉􀁾􀀧􀁬􀁴􀁾􀀱􀁟􀀰􀀱􀀱􀁬􀁩􀀻􀁾􀁪􀁾􀀡 . . 􀀭􀀺􀀺􀁾..􀁾􀁟..􀁾 􀀺􀀭 . 􀁾􀀮 􀁟􀀺􀁾􀁾􀁟􀀺􀀺􀀻􀀭 . :. -:---:' . . 􀁾 .:.: ..􀀭􀀺􀀮􀁾􀀮 -.:.;. .: -:" -_0-. Such insurance policies, surety bonds. undertakings and instruments for said purposes, when duly executed by the aforesaid 􀁁􀁴􀁴􀁯􀁲􀁮􀁥􀁹􀁾􀁩􀁮􀁾􀁆􀁡􀁣􀁴􀀬 shall be binding uponthesaid Company as fully and to the sarneextent as if signed bylhe duly authorized 'officers of the Qornpanyand sealed with its corporate seal; and all the aGts Of said Attorney-in'-Fact, pursuant to the authority hereby given, are hereby ratified and confirrned, This. appointment is. made pursuant tathe following By.,.l-aws which were duly adopted by the Boarcl of Direc.;tors of the said Corripanyon DeGember 8th, 1927; with Amendments to and including January 15,1982 and are still ,in full force and effect: ARTICLE VII, SECTION 1: "Policies, bonds, recogllizances. stipulations. consents of surety, underwriting undertaldngs and Instruments relating thereto. Ins\Jrance policies, bonds, recognizances, stipulations, consents of surety and underwriting undertakings 01 the Company. and releases, agreements and other writing!; relating in any way thereto or to any claim or loss thereunder, shall be signed in the name and on behallol the Company (a) by the Chairman 01 the Board, the President, a VicecPresident or a ResidentVice-President and by the Secretary. an Assistant Secretary. a Resident Secretary or a Resident Assistant Secretary; or (b) by an Attorney-in-Fact lor the Company appointed and authorized by the Chairman 01 the Board, the President or a Vice-President to make such signature: or (c) by such other officers or representatives as the Board may lrom time to time determine_ The seal 01 the Company shall il appropriate be affixed thereto by any such officer. Attorney-in-Fact or representative." IN WITNESS WHEREOF, SEABOARD SURETY COMPANY has caUSed these presents to be signed by one of its 􀁖􀁩􀁣􀁥􀁾 . Presidents. and its corporate seal to pe hereunto affixed ano duly attested byane of its Assistant Secretaries. this .•14tlk". 􀁾􀂷􀀮􀀵􀁻􀁴􀁩􀀺􀁡􀁙􀁾􀁾􀀡􀁅􀀻􀀺􀀳􀀧􀁾􀀢􀀻􀁍􀀭􀁾􀁘􀀺􀁐􀀺􀁬􀁬􀀬􀀻􀀬􀀬􀀻􀀬􀀮..􀀬., ,...􀁾􀀮􀀡 19.•..􀀬􀁾􀀻􀀱 . . ··,.,--,·tY '. '. 􀀢􀀧􀀯􀁾􀀿 .'0 . "]. 􀀢􀀬􀁣􀀺􀁾􀀬􀀬􀁟􀀬􀀭􀀺􀀺􀀬 e SEABOrr:J.:::J.MPANY . .•.•. 􀀬􀁉􀁜􀀻􀀺􀁾􀁬􀀢􀀬􀁉􀀬􀀬􀀨􀁳􀁥􀀮􀀬􀀩 􀁾􀁌􀀡􀀡􀀬􀁉􀁦􀀧􀀡􀀡􀀡􀀺􀂷􀁾􀀡􀀺􀀧􀀼􀀮􀀮􀁾􀁹 .'.􀁾􀀮􀀻...:􀁟.:·..".'_.v.16. 􀁾􀀮􀀺'.:•.􀁾.•.•.􀀬k.·...•.-.._•·...•....'c ....·•:•.•-..•... _ 􀁾....•.•.•...••....' _._•.•:_.:•..:._....-.•• 􀀭􀁾.•..... .._.:._ 􀁟.....•............•.•... 􀁾.....•...•.....•...•...•􀁾:'.___ ..•.•....•. 􀀬􀁾•..•..,.•.....•........-..•..-..•. ..•-..•••.....••...•..•..•....'..-....•. .•...•...•.•.,. •••.-•__.•.....•.....,..•........:•....•..•:.••..•...•• -..•􀁾..:.•.•'..•........••.............:•.......:...•.•:.......•....'...•.•:.....•••. .•..G.:•:..,._u.':.'...-.-.:_.V•·•.·•.-_ 􀀭􀀮􀁾 •.••..>.•..I.􀀺􀀮􀂷􀀮􀁾􀀮􀁾 •.•:•.·..•••-.·••.••.•:•.••....•••_•..· 􀂷􀁲􀀺􀀻••·s..'..·•.\•·d·.·•••e....••·•·.··•..n.•·-.'.·.t•:__••..•..-.•.. ._.•.-''__'􀁷􀀨􀀻􀁩􀁬􀁾􀁋􀁾􀀡􀁾􀁢􀁾􀁾􀁾􀁾􀂷􀀬􀁾􀁾􀁾􀁾􀁾􀁊􀁬􀁴􀀻􀁩􀁣􀀮 'I 􀁾􀀮 <; . .'" ... On this 􀁬􀀮􀁴􀁾􀀮􀁴􀁧 : day of., , March. March. : ,.. 19.9. before me personally appeared ......._ 􀁍􀀺􀀮􀁾􀀮􀀹􀀮 􀁾􀀮􀁾􀁊 􀁾..􀁾 􀁋􀁾􀀮􀁾􀁧􀁾􀁾 _ a Vice-President of SEABOARD SURETY COMPANY. with whom I am personally acquainted, who, being by me duly sworn, said that he resides in the State of ...New...Jersey-; that he is a Vice·President of Sl:ABOARD SURETY COMPANY, the corporation described in and which executed the foregOing instrument; that he knows the corporate seal Of the said Compliny; that the seal affixed to said instrument is such corporate seCiI; that it was. so affixed by oroerof the Board of Directors of said Company; and that hesign is name thereto liS 􀁖􀁩􀁣􀁥􀁾􀁐􀀮 . ent of said COffiPa",nlubY like authority. ..' FELICE M, ZUBRYCKI . '::. ii"\':,,8-llt-􀀮􀀮􀁾􀀹􀁔􀁁􀁒􀁙􀁾􀁹􀁡􀁬􀁉􀁃􀁐􀁲􀁎􀁅􀁗􀁊􀁾􀁒􀁓􀁅􀁙 .' 􀀢􀁾􀁓􀀺􀁾􀁾􀀡􀀩􀀭􀀭􀁬􀀺􀀺􀁾􀁾􀀻􀀻􀀧􀁽 ,":C' 􀀭􀁽􀁣􀂷􀁍􀁹􀁾􀁑􀁭􀁾􀁦􀁾􀁾􀁲􀀹􀀰􀁾􀁘􀁰􀁾􀁾􀁾􀁳􀁎􀀭􀀢􀁥􀀫􀁛􀀱􀀹􀀿􀀱􀀲􀁾􀁾􀀴􀁾􀀲􀁾􀁇􀀲􀁾􀀺􀁦􀁪􀁴􀁪􀁾􀀲􀀺􀁉􀁔􀀲􀁳􀀺􀀲􀀱􀁚􀀲􀁾􀁾􀁾􀁾􀁾􀁾􀀧􀁾􀁯 'v 􀁾 􀁎􀁅􀁾 ) I, the under!;igned Assistant Assistant Secretary of SEABOARD SURETY COMPAN do hereby certify that 􀁴􀁨􀁾 : inal Power of Attorney of WhiCh 􀁴􀁨􀁥􀁦􀁯􀁲􀁾􀁧􀁯􀁩􀁮􀁧 is a full,lri,!e anq correct COpy, is in 􀁦􀁵􀁬􀁬􀁬􀀨􀀩􀁲􀁣􀁥􀁾􀁬􀁮􀁤ellect on the date 01 􀁴􀁨􀁩􀁾 Certificate arid! qo further certify that t.he VicecPresident who executed the said Power of . Attorney Will> pneofthe Qlliqersauthorized by the Board 01 Directors to appointan attornEly-in-lact as prgvidedin Article VII. Section 1, 01 􀁴􀁨􀁥􀁂􀁹􀁣􀁌􀁡􀁾􀁓 01 SEABOARD SURETY COMPANY. • ..' .... . . . This Certificate may be signed and sealed by lacsimile under and by authority of the following resolution of the Executive Committee 01 the Board 01 Directors 01 SeABOARD SURETY COMPANY at a meeting duly called and held on the 25th day of March 1970. .􀀢􀁾􀁅􀁓􀁏􀁌􀁖􀁅􀁄􀀺􀀨􀀲􀀩 That the use 01 a printed lacsimile 01 􀁴􀁨􀁾 corporate seal 01 the Company lln<:l gfthe signature 01 lin Assistant Secretary on llny certification of the correctness 01 a copy olan Instrument executedby the President or a Vice·Presidentpursuant to Article VII, Seption 1,01 t.he By.l,.aws appgilltinglihdauthoriZing an allorney"in.fact to si!;)n in.the name ang 􀁯􀁮􀁾􀁥􀁨􀁡􀁬􀁬 of the Companyswety bonds,undElrwriting undertakings or other ..instrl,lmentsctesqribelj in !;llidArticle VII, Section-1,with like ellec\as if such seal and such signature had beenmanually alfi)(ed and made. hereby is .'::authorizedand approved." . . '" '.' . 􀁟􀀭􀁽􀁎􀁗􀁉􀁔􀁾􀁉􀀻􀁓􀁓 􀁗􀁈􀁅􀁒􀁾􀁏􀁆􀀬􀁬􀁨􀁡􀁶􀁥 hereunto set my handCind affixed thecorporatsealof the Company to 􀁴􀁨􀁥􀁾􀁥 presents this • • 􀁩􀁩􀁩􀁩􀀭􀀭􀁁􀁬􀁬􀁬􀁬􀁌􀁾􀀡 􀁉 􀀮􀁾 􀁾􀁾 􀁾 􀁾 􀁾􀁾 􀁾􀁾􀀭􀀭􀀭􀀺􀀽􀀺􀀺􀀺􀀺􀀺􀀺􀀺􀀺􀀺􀀺􀀺􀀺 􀁾􀁾􀁾􀁾􀁾 􀁡􀀭􀁾 􀀺􀀺􀀺􀀺􀀭􀀭􀀽􀀺􀀺􀀮􀀮􀀮􀁾 For verification of the authenticity of this Power of Attorney you may call, eollect, 201-658-3500 and ask for the Power of Attorney clerk. Please refer to the Power of Attorney number, the above named individual(s) and details of the bond to which the power is attached. In New York, Dial 212·627-5444. APPlICAliON FOR PAYMENT MILOREO SIREEI IMPROVEMENTS BIO OATE: AUGUST 14, 1990 NOTICE TO PROCEEO DATE: OCTOBER I, 1990 CONTRACT AIIOUNT: I 590, 171.55 OlINER: TOHN OF AOOISOH, TEXAS EMGINEER: GINN, INC. CONSULIING ENGINEERS CONTRACTOR: CENIERlINE CONSTRUCTORS APPlICATION FOR PAYMENT NO.6. (FINAL) FINAL PAY QUANllllES FINAL QUANIITIES TNIS PAY APPlICATlOH OVERRUNS/UNOERRUNS IIEM I OESCRIPTION I BID I I BIO I BID TOTAL lIolY 10 I AMOUNT II OTY 10VER(UNOER) II HO. I (OTY IUNIIIUNII PRICE' AMOUNI IIOATE I TO DATE ".(-) ITOIAL AMOUN'l1 ..•..·I..•......Utt.....u-..****...... ......... 1.......·1 ......•..*****.. 1·........•..·1 f....... 1.............. **..•..,·..•..•..***·11 10D.! IPREPARE RIGHT-OF-HAY (65') I 6.55 ISlA 11.300.00 I 18,515.00 II 6.55 \ 18,515.00 0 I 10.00 " 100.2 IPREPARE RIGHT-OF-HAY (80') I 5.5ISTA 11,300.00 I 11,150.00 II 5.5 I 17,150.00 0 I 10.00 II IOU IPREPARERIGHT-OF-HAY (60') 10.65 ISlA 11,300.00 I '845.00" 0.65 I IB45.00 0 I $8.00 II 104.1 'SAH-CUT FUll DEPTH ASPHALT/CONC PAVEHENT 240 ILF 11.50 I H,080.00 210 I 11,080.00 0 I 10.0011 IOU (REMOVE OLD CONCRETE/ASPHALT PAVEMENT 75 ISY 111.00 I 1825.00 75 I U25.00 0 I 10.00 II 1'0.0 IROAOHAY EXCAVATION (DENSITY CONTROLf 3500 ICY 13.75 I 113,125.00 3500 I 113,125.00 0 I 10.00 " 160.0 IFURNISHING , PLACING TOPSOIL/RYE GRASS 2800 ISY 11.50 I 14,200.00 7800 I 11,200.00 0 I $8.00 II 148.0 IFLEXIBLE BASE, IY A, GRAO.E 1. CLASS 3 25 ICY 190.00 I 11,250.00 21.5 I 11,935.00 -3.5 I (1315.00)11 260.0 ILIME TREATMENT FOR MATERIALS 1M PLACE 4500 ISY 12.30 I 110,350.00 4500 I 110,350.00 0 10.00 II 262.0 ILIME TREATMENT FOR'BASE COURSE 2650 ISY 12.30 I 16,095.00 2755 I 16,336.50 105 1241.50 II 264.0 IHYORATEO LINE, IY A, 6\ BYHGT.-271/SY 100 ITONS I 181.00 I 18.100.00 100 I 'B,100.00" 0 10.00 " 340.0 16' THICK IYPE '0' HMACP PAVEMENT 150 ISY I 122.00 I 1l.300.00 130 I 12,860.00 II -20 (lUD.OOllI 360.1 \B' THICK REINF CONC PAVEMENT, CLASS C 6000 ISY I 111.95 1107,700.00 I 6102 I 1109,530.90 II 102 IT,830.90 " 360.2 16' IHICK REINF CONC PAVEMENT, CLASS C 835 (SY I I 118.00 115,030.00 II 760 I 113,680.00 II -75 (11.350.001 36o:J ICONCRETE STREET HEADER' 37 ILF I IUS 1175.75 II 37 I 1175.75 II 0 10.00 100.0 IIRENCH SAFElY FOR STORN DRAINAGE LINES IlLS I 1550.00 1550.00 II I I 1550.00 II 0 10.00 464.1118' RCP,C-76,CLASS III. STORM SEHER PIPEI 320 ILF I Ill. 00 "',840.00 II m I 112.543.00" T9 1103.00 464.2 124' RCP,C-76,CLASS III. SrORM SEHER PIPEI 385 ILF I 155.00 121,175.00 II 3B5 I 121.175.00 II 0 10.00 464,3 flO' RCP,C-76.CLASS Ill, STORM SEHER PIPE/530lLF I '66.00 1l4,980.00 II 548 I 136,168.00 II 18 11,188.00 410.1 (10' STANOARO CURS INLEI I 5 lEA I 13,800.00 119,000.00 II 5 I 119.000.00" 0 10.00 470.2 110' MOOIFIEO CURB INLET I 5 lEA I '4,000.00 120,000.00 II 5 I 120,000.00 II 0 I 10.00 419.1 IAOJUST EXISIING MANHOLE I 2 lEA 1450.00 1900.00 II 2 I 1900.00 II 0 I 10.00 500.0 IMOBILIlATlON I IlLS 130,000.00 130,000.00 II 1 I 130.000.00" 0 I 10.00 II 530.1 ICONCRETE CURS AND GUIlER 12100 ILF 11.35 12,835.00" 2097 I 12,830.95 II -3 I (14.05111 530.2 ICONCRETE SIOEHALK, 4' THICK I 730 15Y 121.15 115,43UO II 688 114,551.20 II -42 I (1888.30JlI 530.3 ICONCRErE ORIVEHAYS, 6' IIIICK I 140 ISY 120.50 12,870.00 I 142 12.911.00 /I 2 I 141.00 II 530.4 18RICK PAVERS I 840 ISY 135.00 129,400,00 760 126,600.00 II -80 I (12.800.00111 582. I IAOJUSr EXISr HATER VALVE I 1 lEA 175.00 175.00 I 175.00 II 0 I 10.00 II 582.2 IRElOCAlE EXISI HATER MEIER I 1 lEA 1350.00 1l50.00 1 1350.00 II 0 I 10.00 II 582.3 ILOHER 24' PeCP HAlER LINE f 80 ILF 1265.00 121,200.00 80 121,200.00 II 0 I 10.00 /I 618.11 2'/4' ElECIRICAL COHoolI I m ILF 15.50 12,337.50 m 12,381.50/1 8 I 144.00/1 618.2 12' IRRIGATION CONOUII I 40 ILF 17.00 I 1280.00 40 1280.00 II 0 I 10.00 II 666.0 'PAVEMENT MARKINGS, 24' STOP BAR, TURN LNI I /LS 13,700.00 I 13,100.00 T 13,700.00 II 0 I 10.00 " 676.1 IrRAFFlC BUIIONS P'lH, IIHIIE, NON-REFLECT I 108 lEA 13.00 I \324.00 108 \324.00 II 0' 10.00 II 676.2 ITRAffiC BUllotlS P-15H, HH lIE SINGLE-REFl/108 lEA 14.70 I 1501.60 lOB 150T. 60 II 0 I 10.00 II 676.3 ITRAFFIC BUITONS P-I17Y, YElLOH, OBLE REFI 152 lEA 16.10 I U21.20 152 1927.20 II 0 10.00 II 465.118' DIAM PVC, DU5 SANITARY SEHER 8'-10' I 510lLF \33:00 I 118,810.00 I 530 111,490.00 II -40 (II,320.001l1 465.2 18' OIAM PVC, OR35 SANIIARY SEHER 10'-12'1 1240 ILF 138.00 I 141.120.00 II 1280 148,640.0011 40 11,520.00 " 465,3 112' OIAM PVC, DR35 SAMIIARY SEHER 6'-8' I 1070 ILF 128.00 f 129,960.00 II 1051 m,428.00" -19 (1532.90)11 465.4 P2' OIAM PVC. DR35 SANIIARY SEHER 8'-10'1 4851LF 1l1.00 I 115.035.00" 394 112,214.00 II -91 (12,821.00)11 465.5 p2' OIAM PVC, om SAMIIARY SEHER 10'-12 650 ILF 142.30 I m,m.oo I 760 \32.148.00 II 110 14,653.00 II 465.6 14' OIAM PVC, DR35 SANITARY SEHER 8'-10' 100 ILF 131.50 I 13,150.00 97 1l,055.50 I -3 (194.50)11 465.7 16' OIAM PVC, DR35 SANITARY SEHER 8'-10' 60lLF 153.00 I 13,180.00 60 I 13.180.00 0 10.00 II 410.3 ISANIIARY SEHER. MANHOLE 6'-8' DEEP 2 lEA 12,000.00/14,000.00 3 I 16.000.00 1 12,000.00 II 410.4 ISANITARY SEHER MANHOLE 8'-10' DEEP 4 lEA 12,200.00 I 18,800.00 4 I 18.BOO.00 0 10.00 II 410.5 ISANIIARY SEHER MANHOLE 10'-11' DEEP 9 lEA 12,400.00 I 121,600.00 8 I 119,200.00 -I (12,400.00111 472.0 IRElAYINGCULVERI PIPE 160 ILF 119.00 I 13,040.00 131 I 12,489.00 -29 (1551.00111 400.1 I'REHCH SAFElY FOR SANITARY SEHER LINES 'lLS 1550.00 I 1550.00 1 I 1550.00 0 10.00 II I SUBTOTAL I 11590,171.55 1588,871.10 (11,294.45111 IICHANGE ORDERS AND FIElD CHANGES I I I II ICHANGE ORDER NO. I -ADO 2' CONWII/PULL IlLS 14,232.50 I 14,232.50 14.232.50 o I 10.00 II ICHANGE OROER NO. 2 -AOOIIIONAL ASPHAlI I 1 /LS 12,500.00 I 12,500.00 12,500.00 0 10.00 " ICHANGE ORDER NO. I IlLS I 10.00 10.00 I -I 10.00 II ICHANGE ORDER HO. I IlLS I 10.00 II 10.00 II -I 10.00 II IFIELO CHANGE NO. I -SlEEVE' RElOC. H.MI I /LS 1515.00 I 1515:00 II 1575.00 II 0 10.00 II IFIELO CHANGE NO. I IlLS I 10.00 " 10.00 II -I 10.00 IFlElO CHANGE NO. I IlLS I 10.00 II U.OO II -I 10.00 IFIELO CHANGE NO. I 'lLS I 10.00 II 10.00 II -I 10.00 IFIELO CHANGE NO. I IlLS I 10.00 /I 10,00 /I -1 10.00 IFIELO CHAHGE NO. I I JLS I 10.00 II 10.00 II -1 10.00 IFIELD CHANGE NO. I IlLS I 10.00 II 10.00 II -1 10.00 IFIELO CHANGE NO. I IlLS I 10.00 /I 10.00 II -I 10.00 SUB-rOIAl 'CHANGES' I I 17,307.50 II 11,307.50 II 10.00 IIOIAL COHIRACI AMOUNT I 11597,419.05 II 11596,184.60 II (II,294,4511 GROSS AMOUNT OUE THIS APPLICATION 1596, 184.60 I. 00\ OVER CONTRAcr AMOUNT FOR LESS 0\ RElAIHAGE 10.00 THIS PROJECT INCLUDING AMOUNT OUE TO DATE 1596,184 .60 CHANGE ORDERS LESS PREVIOUS PAYMENTS 1501,788.50 NEr AMOUNT OUE THIS APPLICATION 194,396.10 CONSULTING ENGINEERS May 17, 1991 Mr. John Baumgartner, P.E. city Engineer Town of Addison P.o. Box 144 Addison, Texas 75001 Re: 1990 Miscellaneous Pavement Improvements Dear Mr. Baumgartner: Work' for the above referenced proj ect has been completed and inspected by representatives of Ginn & Case, Inc. and the 􀁔􀁯􀁾􀁮 of Addison. The work was found to be in general conformance with the contract documents. The original contract completion date was November 30, 1990. Change Order No. 1 provided for a time extension to January 1, 1991. The project was substantially complete on December 19, 1990. Enclosed are three (3) copies of Application for Payment No. 10 (FINAL) in the amount of $20,046.21 from XIT Paving and Construction, Inc. representing work performed on the proj ect through completion, including: the final change order reflecting overruns and underruns of the estimated quantities; and, request for previously held retainage. We have reviewed the application and recommend that payment in full be made at this time and that the City council formally accept the project and begin the one year warranty period • .Also enclosed are the proj ect close-out submittals and other· items of correspondence and project supporting documents for your information and use in making the decision to accept the project and make final payment. The submittal includes: 1) Executive Summary; 2) Summary of Change Orders; 3) Final recap of construction costs; 4) Contractor's Affidavit of debts and claims; 5) ietter of warranty; 6) Consent of surety Company to final payment; 7) Maintenance Bond, and; 8) Record Drawings for the project -mylar reproducibles and two blue line prints. If appropriate, please place this item on the next COuncil Consent Agenda to serve as pUblic notice that FINAL PAYMENT, in accordance with the Contract Documents, in the amount of $20,046.21 will be made to XIT Paving and Construction, Inc. for 17103 Preston Road • Suite 100 • Dallas, Texas 75248 • Phone 214/248-4900 P.O. Box 796577 • Dallas, Texas 75379-6577 • FAX 214/931-1452 May 17, 1991 John Baumgartner Miscellaneous Pavement Improvements the construction of the 1990 Miscellaneous Pavement Improvements. The contract requirements have been completed, all documents are in order, and the project is ready for acceptance by the Town of Addison. Should you require any further information, please contact our office. 􀁓􀁩􀁾􀁉􀁙􀀬 􀀻􀀻􀀺􀀧􀀮􀁾􀁉􀀨􀁾 􀁳􀁡􀁮􀁦􀁾􀁾􀁶􀁷􀀮 Case, P.E. SWC/GF/dsp enclosures cc: Ron Whitehead, City Manager Slade strickland Robin Jones Don Preece Larry McCallum XIT paving and Construction, Inc. Gabe Favre File 90433 EXECUTIVE SUMMARY 1990 MISCELLANEOUS PAVEMENT IMPROVEMENTS TOWN OF ADDISON, TEXAS 1. The project was advertised March 8 and 15, 1990. Bids were opened on MarGh27, 1990. Four bids. were received and ranged from a low of $425,315.00 to a high of $569 r 331.00. 2. On April 10, 1990, the city Council awarded a unit price contract to XIT Paving and Construction, Inc., Garland, Texas, in the amount of $425,315.00. 3. A 􀁰􀁲􀁥􀁾􀁣􀁯􀁮􀁳􀁴􀁲􀁵􀁣􀁴􀁩􀁯􀁮 conference was held on May 1, 1990. Notice to proceed was given as on or before June 4, 1990. Contract time was 180 calendar days. Contract completion ·date was November 30, 1990. Liquidated damages were set at $500.00 per day. 4. The contractor requested a fim!l walk-through on December 19, 1990. Due to the inclement weather and the holidays, we could not schedule a walk-through until January 10, 1991. One was finally made on January 22, 1991. On January 23, 1991 a punch list of items to be completed or corrected was prepared and presented to the contractor. Additionally, a Certificate of Substantial Completion, as of December 19, 1990 was prepared. 5. On March 14, 1991, contractor submitted letter stating that all punch list items had been completed. Representatives of Ginn & Case, Inc. and Town of Addison checked the list and advised contractor of a few minor items that still needed to be addressed. 6. On April 5, 1991, all representatives had a meeting to further discuss the punch list items that remained. 7. As of April 15, 1991, all items of the punch list had been addressed to the satisfaction of the Town of Addison and Ginn & case, Inc. representatives. 8. Due to a minimum overrun of quantities, combined with thorough inspections and comprehensive contract administration, along with the deletion of the Cody drainage part of the contract, the total proj ect contract price is approximately 15% less than was bid. original contract price was $425,315.00, while the actual finai contract price will be $361,024.13. 9. We hereby recommend that the project be accepted and that final payment in the amount of $20,046.21 be paid in full at this time. SUMMARY OF CHANGE ORDERS 1990 MISCELLANEOUS PAVEMENT IMPROVEMENTS CHANGE ORDER NO.1 Contractor requested time extension of 32 days to January 1, 1991 due, in part, to issuance of mUltiple work permits causing delays; and by having specific areas of the project being deferred or deleted. This change order was approved by the Town of Addison on January 10, 1991. No change in contract price. CHANGE ORDER NO.2 cost.overrunsjunderruns for project. (See Attached Spreadsheet) DEDUCT: $64,290.87 from original contract price. FINAL RECAP OF CONSTRUCTION COSTS The attached Change Order No. 2 (FINAL) and computer spreadsheet is provided to reflect all cost overruns and underruns on the project. Original Contract Amount Change Order No.2 (Deduct) TOTAL CONSTRUCTION COSTS $425,315.00 64,290.87 $361,024.13 CHANGE 􀁏􀁒􀁄􀁉􀁾􀁒 (Instructions on reverse side) No. Two (2) Final 􀁾 PROJECT: 1990 Miscellaneous Pvmt. Irnprv. DATE OF ISSUANCE: May 6, 1991 OWNER: Town of Addison (N P.O. Box 144 ame. Add' TX 7 0 1 Address) J-I! lson,· 5 0 .. CONTRACTOR: XIT Paving & Construction, InCOWNER's Project No. __􀁾 .,..,...-P.O. Box 475337 Garland, TX 75047 ENGINEER: Ginn & Case, Inc. CONTRACT FOR: 1990 Miscellaneous Pvmt. Irnprv. ENGINEER's Project No. _----::1.91.10""4.3....3... _ You arc directed to make the rollowing changes in the Contract Documents. Description: Final cost overruns/underruns Purpose or Change Order: Allachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price Original Contracl Time 􀀨􀁊􀁒􀁙􀁾 or dnle $ 425,315.00 180 days Previous Change Orders No. to No. _ Net change rrom previOlls Change Orders $ N/A 32 days doys Contract Price prior to this Change Order· Contract Time Prior to this Change Order $ 425,315.00 212 days (January 1, 1991) daY5 or date Net 􀁬􀁩􀁾􀁾􀁬􀁩􀁊􀀧􀀨􀁤􀁥􀂷􀁣􀁲􀁥􀁡􀁳􀁥􀀩or this Change Order Net Increase (decrease) or this Change Order $ 64,290.87 -0-days Contract Price with all approved Change Orders Contract Time with all approved Cha':lge Orders $ 361,024.13 212 days daY5 (Jr dAle RECOMMENDED: APPROVED: APPROVED: by 􀁟􀁾__---=-_ Owner Town of Addison Inc. Prep.red by the En(linecrs' Joint ('ontmcl Docunlent, C"",,,,iUcc .1111 cllliursed hy The Ass"c;"lcd GCllcr.' C"ntmclors "r A",cric•. 1990 MISCELLANEOUS PAVEMENT IMPROVEMEI PAYMENT APPLICATION BID DATE: MARCH 11, 1990 NOTICE TO PROmo DATE: JUNE I, 1990 CONUACT AMOIINT: 1115,315.00 OWNER: TOWN OF ADDISON, TEXAS ENGINEER: GINN, INC. COIISULTING ENGINEERS CONTRACTOR: XIT PAVING CO. APPLICATION FOR PAYMENT NO. 10 .nd FINAL tn nt'l I' II (111130)11 1587.T0 II (11,850.00)11 (1!91.51'" 111.60 II (11.392.50)" (1150.00)" (111UOl" 1131.00 II 119.00 1/180.00 " 10.00 1/10.00 II (18,01/.11'" (1116.00)"" 10.00 II (11J1.50)1I (11,0/6.00)11 (11,016.15)11 (1156.06)11 {l156.001l1 (1616.00l" 10.00 II (160.00) 1/(118.00)" (11,136.15)11(18UOl"ll (1101.00ll/10.00 11 (l1!0.001i1 16.00 II (11,811.O0lll (151.00'" 10.00 1/(110.00)11 (141.00)11 10.00 " 10.00 II (11,319.10ll110.00 "II (I! ,! 55.11) II (18.000.001l1 (195!.OO) II (1611.95111 (110.599.00lll 11,111.15 " 111.00 II 10.00 II 10.00 " (1 1,000.00)11 10.00 II 10.00 " (113,186.91)11 (115,060.00)"10.00 "II " -I II oII • I ICOOY DRAIIIAGE I IlLS I 115,000.00 I 115,000.00 II o I I I I I I " I IMORMAN LANE DRAINAGE I 'lLS I 111,000.00 I 111,000.00 1/I I I I I I I 1/I IOAKS NORIH BRIDGE I I ItS I 1'0.00000 I on nnn nn II I I FiliAL PAY APPLICATION FINAL RECAP OF QUANTIIIES ITEM I DESCRIPTION I BID I I BID I BID TOTAL IIQTY TO I AMOUNT II QTY 10VER/(UNDER) II NO. I IOTY 11I11ITIUNITPRICE/AMOUN T IIDATE I TODATE 11'(-) IIOTALAMOUNT II Utttt I.......tttUt UUtttt Utttuttt*.. r') 􀁾 C ( ::0 ,