Jim Pierce From: Sent: To: Cc: Subject: Our scores are: Jim Pierce Monday, July 10, 2000 10:18 AM Ron Whitehead Chris Terry; Michael Murphy RE: Dallas County Call For Projects Arapaho Phase III 116 Belt LinefTolI Rd SPUI 91 Belt Line Signal Timing 81 Midway Signal Timing 66 ArapahofTolI Rd U-turn 23 Most projects from other cities scored in the 50 to 80 range. Most cities have one project in the 100 point range. Dallas Co. staff is moving away from comparing scores between cities. The commissioners will make the final decision on what projects make the cut in their district. Nothing prevents them from selecting a low scoring project for funding. I get the sense from the county staff that the project selection is "political" as much as anything else. The staff rankings will be presented to the Count tomorrow. The commissioners will make the final selections in September. Jim. -----Original Message-----From: Ron Whitehead Sent: Sunday, July 09, 2000 11:52 PM To: Jim Pierce Subject: RE: Dallas County Call For Projects So what were our technical scores and how did we fare in comparison tpo other projects? Ron -----Original Message-----From: Jim Pierce Sent: Wednesday, June 07, 2000 2: 17 PM To: Ron Whitehead Cc: Chris Terry; Michael Murphy SUbject: Dallas County Call For Projects I have just received our "technical" scores for the projects we submitted to Dallas County. I made a trip to the County Offices and met with the project manager to go over the scores. There may be some revisions. Overall, the scores were pretty good. However, in a conversation with Don Cranford, Assistant Director, Transportation Division, he made it clear that the technical scores are only a part of the decision making process. The rest of the process is subjective and is up to our District Commissioner. Therefore, I would suggest that we contact Jim Jackson and try to convince him about how great our projects are and how needed they are. I have attached my memo to council to refresh your memory about this. « File: 2000CallMemo to Chris.DOC » Jim Pierce, P.E. Assistant City Engineer PO Box 901'0 Addison, TX 75001-9010 972-450-2879 1 HP LaserJet 3100 Printer/Fax/CopierlScanner 􀀬..)􀀺􀀯􀀢􀀧􀁊􀀮􀀮􀀮"􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭J􀀭􀀭􀀭􀀭􀀢􀂷􀁾􀁫􀁅􀁎􀁄CONFIRMATION REPORT Town of Addison 9724502834 Jun-7-00 3:12PM for Job Start Time Usage Phone Number or ID Type Pages Mode Status 835 61 7 3: 1OPM 2'02" 214 653 6445 Send"""",,,,, ' 51 5 EC 96 Complet ed"",,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Total 2'02" Pages Sent: 5 Pages Printed: 0 From: Jim Pierce, P.E. Assistant aty Engineer Phone: 972/456-2879 FAX: 972/450-2834 jpiera@eLaddUon.tLul PUBLIC WORKS 16801 Wesfgrove P.O.BoJ: 9010 # of pages (including 􀁣􀁯􀁶􀁥􀁲􀀩􀀺􀁾 Addison, TX 75001-9010 Re: 􀁦􀁨􀀭􀁡􀀮􀁰􀁡􀀮􀁾 (?J. 􀁾 AdJtsm. &<. k SMrV!1br 6hlJ.... o OrigiDaJ In maD 0 Ptr your 􀁲􀁥􀁱􀁵􀀢􀁉􀁾􀀧 0 CaB me TOWN OF ADDIsoN To: E1i{b Nj'IJ'b' 􀁾 Company:..lb,ll9;s r:unk, FAX#: Z/Lf-{,c;3-btf'f5 Date: 6 -7-0-0 1-10 -01) 􀁦􀁾􀁴􀁲􀁾􀁾 􀁾􀁲􀁾􀁾􀁾 􀁾􀁾 'Iii,. (f\ ¥ ).-h-& ALIGNMENT STUDY REPORT ARAPABO ROAD EXTENSION for the TOWN OF ADDISON Prepared by: --,.....􀀬􀁾􀁾 􀁟􀀭􀀭􀁾􀁏􀁆 1'.. ...􀀮􀀮􀁴􀁾 •••••••••􀁾􀁌 ,J> ?􀀬􀀮"􀁾.􀀬......*..""'r,o..ds-...'. 1'*.' '«'i t·"!·f.···············..􀂷􀂷􀁾􀀮􀀱􀂷􀀱􀀺􀂷􀁾 l-...􀁾􀁾􀁾􀁾􀁾􀁢􀀮􀀡􀀮􀂷..􀁾􀁾􀂣􀁾􀁾 ...􀁾 􀁾􀁦􀁾􀀱􀀮26569 􀁾􀀧􀁑􀀮􀀯􀀤􀁊 •• • 􀁇􀁉􀁓􀁔􀁾􀁾􀀮􀂷􀂷􀀬􀂧􀀮􀀻􀀧 , •.••••••􀁾􀀧􀁉􀀭􀁜􀁊􀀮􀀮􀀬􀀮􀀢 􀁉􀁏􀁈􀁁􀁜􀀮􀀮􀁾􀁟􀀭 􀀧􀁖􀁩􀁬􀁾 HNTB Corporation GBW Engineers, Inc. Jack Hatchell & Associates January,1999 --"',,\ ,c􀀻􀀧,􀀭􀁜.􀀭􀁾..􀁾.•*􀁾•••O••F•••t•..E.'-.\t:\,_ 􀀮􀀮􀀬􀁾 .. i'*/􀀢􀁜􀀮􀁾 1"·"*8-L•••••••••••"•••••••\l .I.;./!􀁾. l RUCE R. GRANTHAM 􀁾 l ..··\·················••••....... 􀁾 􀁾􀁾􀀮􀀮 62659 􀁩􀁾􀁊􀀬 fn.·. 􀁾 􀁾􀀧􀁑 ..􀁾􀀬 f. .::.•􀀧􀀡􀁉􀁓􀁔􀁦􀀮􀁾•••􀀺􀁾􀁾 ,voS 􀁴􀀮􀀮􀁾􀁶􀀮􀀮􀀺􀀧 \'\.lONA\-_-."".....",- 5 "0 0': Beltway Or :>-Q « '5 .:== 􀁾 " 􀁾 􀁾 0 cS t-"C (/) Boyinqton Of cr:: «􀁾 Ci «--' Midcourt Rd Cl E :c ::> 2; t-"C ::> OC cr:: 0 0 >. Z 0􀁾 "C 􀁾 "C Wiley Post Rd > CD 􀁾Q) i:: :> (/') lindberg Dr I I I' -----PROPOSED ARAPAHO ROAD EXTENSION ARAPAHO ROAD PHASE I ( UNDER CONSTRUCTION ) PROPOSED ARAPAHO ROAD EXTENSION EXHIBIT 'e' DART RAILROAD ALIGNMENT Alternative Alignments (cont'd) The narrowest portion ofthe alignment is between theMNBAbuilding and the DARTrightof-way where 81 feet is available. Although there are no franchise utilities to contend with, a 60-inch Dallas Water Utility (DWU) transmission main is located in a 30-foot easement adjacent to the railroad. A concrete-lined channel is also located along this ,alignment between Midway Road and the Town ofAddison water tower. I Given the potential access and cost benefits associated with the DART railroad alignment, a more in-depth evaluation ofits viability was conducted. 2.4 Traffic Analysis At this point in the study, the project team reviewed traffic assignments for the year 2020 which were prepared bytheNorth CentralTexas Council (NTCOG) ofGovernments for five alternatives for the Arapaho Road Extension. Two ofthese alternatives included entry ap.d exit ramps at Midway Road, one with entry/exit ramps on the north side only and a second with entry/exit ramps on the south side only. These alternatives are described below. xviii) ''No Build" Alternative -what is the impact on adjacent streets ifArapaho Road is not extended? il) v) "At-Grade" Alternative -Arapaho Road extended with the Midway Road intersection at grade. "Grade-Separated" Alternative -Arapaho Road extended with a grade separation at Midway Road without entry/exit ramps. "Ramps on the North Side" Alternative -Arapaho Road extended with a grade separation at Midway Road and entry/exit ramps onthe north side ofArapaho Road. "Ramps on the South Side" Alternative -Arapaho Road extended with a grade separation at Midway Road and entry/exit ramps onthe south side ofArapaho Road. 2.4.1 Projected Traffic Volumes The following table presents a summary ofprojectedtraffic impacts for the extension of Arapaho Road on Belt Line Road and Midway Road assuming that the Keller Springs tunnel is in service. 98-094 11 Februmy 1999 SEPARATED .•.....) Alternative Alignments (cont'd) TRAFFICVOLUME COMPARISON (PROJECI'ED DAILY TRAFFIc VOLUMES BY YEAR2020) 􀁾􀁪􀀭􀁬􀀧􀀮..-bl A-l+erntidt//-!-:j GRADE SEPARATED ; GRADE WITH RAMPS ON WITHRAMPS ON No BUILD AT GRADE SEPARATED NORmSIDE Soum:SIDE ARAPAHO ROAD Addison to Midway 24,000 13,000 18,000 28,000 Midway to Smveyor 6,000 13,000 17,000 17,000 BELT LINE ROAD Addison to Midway 58,000 53,000 54,000 46,000 50,000 Midway to Smveyor 47,000 46,000 42,000 42,000 45,000 MIDWAYROAD North ofArapaho 52,000 36,000 44,000 44,000 32,000 South ofArapaho 58,000 57,000 44,000 50,000 60,000 South ofBelt Line 52,000 46,000 47,000 52,000 2.4.2 Evaluation of Traffic Volumes The existing congestion on Belt Line Road and Midway Road supports an extension ofArapaho Road. Traffic already backs up on Midway Road from Belt Line Road to north ofthe DART railroad much ofthe day; consequently, an at-grade crossing of Arapaho Road at Midway Road may not be feasible without providing dualcoordination of the traffic signals signals along Midway and Belt Line Roads. The grade separated scenarios, with or without ramps, all reduce traffic on Belt Line and Midway Roads withthe exception ofthe section ofMidway Road between proposed· Arapaho Road and Belt Line Road with ramps on the south side. For the grade separated scenario without ramps, year 2020 volumes on Belt Line Road are projected to be approximately 5,000 vehicles per day (vpd) less with Arapaho Road extended. Volumes on Midway Road are projected to be reduced by 8,000 to 12,000 vpd. Arapaho Road is projected to carry 13,000 vpd from Addison Road to Marsh Lane ifno entry or exit ramps are installed at Midway Road. According to the projected traffic volumes, the extention of Arapaho Road can be constructed as a four-lane undivided roadway ifno entry or exit ramps are installed at Midway Road. It should be noted that even though these traffic studies contain a large margin for error, they do serve to support the grade separated configuration with no ramps at Midway Road. 98-094 12 February 1999 May-31-00 l2:41P ) P.Ol LE ·COVE .. h /f),1 IC'(/) hl0-'' 􀁾􀁾􀀿􀀭􀁢􀀶􀁾􀁦􀀭 OATEfTIME: 2 {.//I U 􀀧􀁾 7 . FAX # !214} 653-6416 PHONE # 􀁾􀀱􀀴􀁌􀀶􀀵􀀳􀀭􀀶􀀱􀀷􀀶 TOTAL NUMBER OF PAGES INCLUDING COVER._.__ 􀁃􀁏􀁍􀁍􀁅􀁎􀁔􀁓􀀺􀁾􀁟􀁾􀀽􀀭􀀭􀀭 􀁾􀁾􀁾􀀭􀀭􀀺􀀭􀀺􀀺􀀭􀀭􀀭􀀭􀀭􀀺􀀺􀀭_ _ 􀁐􀁴􀀭􀀭􀁴􀁬􀀺􀁶􀁜􀁾􀁖􀁜􀁑􀀬􀁬􀁙 􀁾􀀭􀀽􀀻􀁌􀀱􀁦􀀺􀀺􀂣􀁌􀁾􀁃􀁬􀁲 􀁲􀁊􀁲􀁾􀂷􀂷􀂷 ****IFYOUDONOT RECEIVE ALL Oli'"THE'PAGES,PLMSECALLTHE NUMBERBELOW. . . 411 ;ELMSTREET DALLAS;TEXAS 7sio2 (214)653-7151 May-31-00 12:41P ) P.02 DALLAS COUNTY PUBLIC WORKS TO: FROM: , DATE: Rc: Dallas County Cities Donald Cranford Assistant Director. Dallas County Public Works Department 31 May 2000 Dallas County Major Capital Improvement Program (MCIP): Preliminary Scoring ofFY 2000 Projects. A preliminary scoring ofall projects submitted under our new Major Capital Improvement Program has been completed, The scores for the projecrs submitted by your city are summarized on the attached table. As this table indicates, projects were scored on ten evaluation criteria, a local cost participation multiplier, and 3 special case ratings, as outlined in our evaluation methodology paper: "Evaluation Methodology to Score and Rank Candidate Thoroughfare System Improvements." The paper referred to above accompanied our original Call for Projecls and is available, upon request, for your review. For quick reference the evaluation criteria are abbreviated as follows: Fe: Sf): TV: TVG: TD: BC; AR: AQ: IMSM: SDR: MULT: ScI: Sc2: Sc3: Functional Classification Rating Speed Delay Rating Traffic Volume Rating Traffic Volume Growth Rating The scores for each project are indicated as follows: Benefit-Cost Ratio Rating Accident Rate Rating Air Quality I Energy Conservation Rating Intennodal /Multimodal I Social Mobility Rating Sustainable Development /Redevelopment /"Smart Growth" Rating Local Cost Participation Multiplier Special Case # 1 Special Case # 2 Special Case # 3 Please note that when the score for any evaluation criteria is recorded as zero, either the project did not qualify for points under the given evaluation criteria (for example proposed new roads do not qualify for accident rate points) or the information that would have qualified the project for rhose points was not available to the evaluators at the time the evaluation was conducted. 411 Elm Street. 4th Floor Dallas, Tex.as 75202 (214) 653-7151 MaY-31-00 12:42P We strongly encourage you to review this information carefully and contact us by June 􀀹􀁾 2000 ifyou 􀁷􀁯􀁵􀁬􀁤􀁾 1) like further clarification on the scoring or evaluation methodology, 2) like to provide additional data, such as cost estimates and accident data that are likely to improve the scoring ofyollr projects, Ifwe do not hear from you by the above deadline, we'll assume you agree with our assessment of your project(s) and proceed to use this information for our final ranking of all projects by June 16, 2000. If you have any questions, do not hesitate to call Edith Ngwa, Ph.D, who has replaced Michael Schrader, our fanner Senior Transportation Planner, or myself. Thank you. Sincerely, 􀁄􀀻􀀩􀁲􀁡􀁮􀁦􀀺􀀺􀁾 (f 􀁾􀁁􀀭􀁃􀀴􀀮􀁈􀀺 tL Assistant Dire or Dallas County Public Works Department (214) 653-7151 P.03 o::t o. Il 􀁾􀁾tJ,ff-8· . 􀁰􀁾 􀁭􀁡􀀲􀀢􀀧􀁾 􀁩􀁲􀀭􀁾 􀁾􀁾􀁾 􀁾􀀮 􀀱􀁾􀁎􀀭􀁬􀁊 􀀭􀀭􀁲􀁾.. Vv'cr---eu::r-1IJ 􀁾 􀀮􀀭􀁥􀀮􀀴􀀭􀁾 Major CapItal Improvement Project Rankillg IV Dis1 Prujt'Ci Lantian 1# ('orr«bbk Lcagth Project Local Percenf )'r(ljet't 􀀬􀁯􀁜􀁣􀁤􀁤􀁾􀁐􀁉􀁓 􀀨􀁍􀁩􀁬􀁣􀁾􀀩 Cos, 􀁉􀀧􀁕􀁊􀁬􀁤􀁩􀁬􀁬􀁾 Ma.ch I)esrrip'iflll Cil)' Beginlling 􀁾􀁮􀁤􀁩􀁮􀁧 Projec' 􀁓􀁲􀀺􀁄􀁲􀁥􀁾 PC .50 W TVG' TO Be Ait :4(! lMSM SDK Ml'L"r TOIIlI ....{ .r.·2 >t·.l "-/􀁥􀁊􀀮􀁬􀂷􀁾 􀁖􀁾􀁜􀁬 48 1 BeltllM Road WJt.. 22" $2,500,000 $1,675,000 75 RelJiiboII'lanon qqv..\. Addi.s.on Dalias Parlc'lray (DNTJ 7 NlA 􀁾􀁾􀀭􀁻􀁽􀀩 C9 s/6/10 10/10/o'" 0/0/1.75 88 􀁾 i I I I I .! . 􀁾􀁾 4V 1 ArapahO Road 64 1,()2 $14,328,120 512,895,308 SO 􀁃􀁑􀀨􀁊􀀮􀁬􀀡􀀬􀀬􀀬􀀬􀁲􀁡􀀨􀁬􀁥􀀬􀀬� �􀁳􀁥􀁣􀀧􀀮􀁊􀁑􀁩􀁉􀁯􀀮􀀧􀁁􀁲􀁾􀁒􀀴􀀻􀁊􀁴􀁊􀁴􀁉􀁇􀁐􀁉 􀁓􀀢􀀧􀁟􀁴􀀧􀁾􀁑􀁉 IJ 􀁾􀁾 Shltllo Adelson Roiid I-0Io r y.uft'(tl McJrSOll AddisDII Road Surveyor &uJevanJ_ I -rJ;:. I l.. 0\ tpt"LA, c:.J'-'-"--7 ,/'-I 􀁲􀀢􀀬􀁾􀀮 --< 􀁾 t"...<" /􀁴􀁶􀁴􀁲􀀧􀁴􀁾 􀀮􀁰􀁾􀀰 0/32 LV (ff tv 6/0/r,/0 "!l 72 􀁾􀁉 I I i 􀁾 􀀮􀁾 45 1 BeD L1nll Road 64 1.7 $700,000 $350,000 􀁾􀁏 Re Mil." me c.c) _ _ 2( h 􀀵􀀢􀁾 "0 CJ /200 _ _____. 􀁾􀁟􀁾 CJ 2.. o/i-L/IO _ ______ . j 􀁾􀁾􀁴􀀺􀁟UJsf Ln c..AAJI􀀻􀀱􀀱􀀭􀁃􀁦􀁬􀁊􀀡􀁌􀁬􀁴􀁲􀁬􀁪􀁬􀁮􀁾􀀭 =-___.._. .. .. _ --11------􀀭􀀭􀀭􀀧􀁬􀁟􀁾 02Y-;-ltmj {,;L -'t9.-th28; 􀁬􀁬􀁾􀁑􀁟􀁟􀁟.. ..... __ ----,,---------.---..-i --------------------------------------------------------.---..-------..-------------------..-------_..----------------t,-.---------- ...--' -.--------------------------_;􀀭􀀮􀁾􀀮􀁾_wd__________ 􀀮􀁟􀀧􀀲􀀮􀀬􀁟􀁫􀁟􀁾t:2l Dc:J()-X--L2..-Uilltfl-fLtlYj-------4-1fCJ,_Af2Q _ ----------------I L .-.-----------------------... 􀁾􀀭􀀭􀀮􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 ..-------------------.---,,-----------.-t-. ----.-.--------------------..---.-.-------JiLhJtf:'1 􀂣􀁡􀁳􀀮􀁦􀁾 􀀭􀁾􀁾􀁚􀀭􀀧􀁦􀁃􀀿 00e>LI. 􀁾 􀁾􀀧􀀧􀀧􀀧􀀧􀀧􀁨􀁾􀁊􀀡􀀱􀁦􀀴 􀁴􀀭􀀺􀀺􀀭􀀱􀀮􀀸􀁾􀁄􀁏􀁢􀀭􀀭 . ,I _____________________ : ;i . ....__... .._______. ------:$---.., . ,, . ._ ___;􀀺􀁾􀁲􀁊􀀦􀁾􀁍􀀷􀁾􀀮􀀮􀀮􀁌􀀱􀁌􀁌􀁃􀁡􀀮􀁳􀁲 ._,": ;;.a3d',dd Environment b Block Number 14000 Environment c Primary Street < Equal To > Environment d Reference Location < Equal To > Environment e Date 01/01/1997 Environment f Manner of COllision [\] Missing Driver/Vehicle g Direction of Travel [\] Missing Environment h Time 0000 Environment i Primary Street < Equal To > Environment Reference Location < Equal To > IIIFII Statement (a AND b AND c AND d AND e AND f AND g AND h) OR (i AND j) Ending Value Missing 15400 DALLAS PKWY BELT LINE RD 12/31/1997 [0] Unknown or N/A [0] Unknown or N/A 1200 ARAPAHO RD DALLAS PKWY ----------------------------------------------------LEVEL 2 Subset Definition -----------------------------------------------------Title Display Order Database in Use Data Group in Use Parent Subset Pre-Subset Dates Last Edit Date Last Run Date All Crashes 1997 97000000 MAIN CRASHES ROOT DATABASE 01/01/1997 -12/31/31/1997 11/09/1999 17:14 11/09/1999 17:51 "Environment ll Records IIDriverll Records IINon-Driver ll Records [Searched] 32707 64709 28004 [Matched] 32707 64709 28004 [Not Matched] ********** oo Variable Group Variable ---.!.!2 Variable Name Beginning Value UIFlI Statement Ending Value ----------------------------------------------------Report Definition Complete-------------------------- --------------------------- Page: 1 of 1 ORIENTATION: Environment K5 ) Opp-#1 Strt,#2 Left Sngl-Turning Left Ang-Both Straight ARAPAHO RD ARAPAHO RD ARAPAHO RD Report Includes 􀁾 􀁾 2310 032397 1330 093097 1435 123197 Kl 256271F 810760F 1047290F Dallas Police Department OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES DETAIL and SUMMARY Information K4 03/08/2000 18:50 3 Records Processed 03/08/2000 18:50 Dallas Police Department Page; 2 OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES ORIENTATION: Environment Report Includes DETAIL and SUMMARY Information SUMMARY Follows for All Variables: ( Left Column => VALUE Right Column => FREQUENCY Column 1 (KEY) Summary ==> Crash Number 256271F 1 810760F 1 1047290F 1 Column 2 (KEY) Summary ==> Time 1300-1359 Hours 1 1400-1459 Hours 1 2300-2359 Hours 1 Column 3 (KEY) Summary --> Date 03/23/1997 1 09/30/1997 1 12/31/1997 1 Column 4 (KEY) Summary ==> Primary Street ARAPAHO RD 3 Column 5 (KEY) Summary ==> Manner of Collision Ang-Both Straight OpP-#l Strt,#2 Left Sngl-Turning Left [1] [25] [41] 111 03/08/2000 18:55 Title Display Order Database in Use Data Group in Use Orientation Report Subset Last Edit Date Last Run Date Report TYpeNumber of Dallas Police Department Report Definition Summary OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO 98000804 MAIN CRASHES Environment 98000804 03/08/2000 18:55 03/08/2000 18:55 List Variables Defined : 5 Variable Description Column Width Sum 􀁾 Crash Number 1 12 YES YES Time 2 4 YES YES Date 3 6 YES YES Primary Street 4 23 YES YES Manner of Collision 5 20 YES YES ----------------------------------------------------LEVEL 1 Subset Definition ALL CRASHES DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO 18:51 18:51 Title Display Order Database in Use Data Group in Use Parent Subset Pre-Subset Dates Last Edit Date Last Run Date OR 2000-0148 98000804 MAIN CRASHES 98000000 ALL DATES 03/08/2000 03/08/2000 IIEnvironment" Records IIDriver ll Records IINon-Driver" Records [Searched] 33647 66947 28263 [Matched] 24o [Not Matched] ********** oo Variable Variable Variable Beginning Ending Group ID Name Value Value Environment a Crash Number < Equal To > Missing Environment b Block Number 14000 15400 Environment c Primary Street < Equal To > DALLAS PKWY Environment d Reference Location < Equal To > BELT LINE RD Environment e Date 01/01/1999 12/31/1999 Environment f Manner of Collision [\] Missing [0] Unknown or N/A Driver/Vehicle g Direction of Travel [\] Missing [0] Unknown or N/A Environment h Time 0000 1200 Environment i Primary Street < Equal To > ARAPAHO RD Environment Reference Location < Equal To > DALLAS PKWY IIIFII Statement (a AND b AND c AND d AND e AND f AND g AND h) OR (i AND j) LEVEL 2 Subset Definition -----------------------------------------------------Title Display Order Database in Use Data Group in Use Parent Subset Pre-Subset Dates Last Edit Date Last Run Date All Crashes 1998 98000000 MAIN CRASHES ROOT DATABASE 01/01/1998 -12/31/1998 11/05/1999 11:23 11/09/1999 17:16 IIEnvironment ll Records IIDriver ll Records IINon-Driver ll Records [Searched] 33647 66947 28263 [Matched] 33647 66947 28263 [Not Matched] ********** oo Variable Group Variable ID Variable Name Beginning Value "IF" Statement Ending Value ----------------------------------------------------Report Definition Complete--------------------------------- -------------------- 03/08/2000 18:55 2 Records Processed .) Dallas Police Department Page: 1 of 1 OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES ORIENTATION: Environment Report Includes DETAIL and SUMMARY Information K1 􀁾􀁾 K4 K5 752782G 0727 100798 ARAPAHO RD Sam-Both Strt,S-Swip 846120G 1650 111098 ARAPAHO RD Sam-Both Strt,R-End 03/08/2000 18:55 Dallas Police Department Page: 2 OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES ORIENTATION: Environment Report Includes DETAIL and SUMMARY Information SUMMARY Follows for All Variables: ( Left Column => VALUE Right Column => FREQUENCY Column 1 (KEY) Summary ==> Crash Number 752782G 1 846120G 1 Column 2 (KEY) Summary ==> Time 0700-0759 Hours 1 1600-1659 Hours 1 Column 3 (KEY) Summary ==> Date 10/07/1998 1 11/10/1998 1 Column 4 (KEY) Summary ==> Primary Street ARAPAHO RD 2 Column 5 (KEY) Summary ==> Manner of Collision Sam-Both Strt,R-End [llJ Sam-Both Strt,S-Swip [12] 11 Dallas Police Department OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES 03/08/2000 19:01 :..) ;/Report Definition Summary Title Display Order Database in Use Data Group in Use Orientation Report Subset Last Edit Date Last Run Date Report TypeNumber of OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO 99000805 MAIN CRASHES Environment 99000805 01/31/2000 10:03 03/08/2000 19:01 List Variables Defined : 5 Variable Description Column Width Sum 􀁾 Crash Number 1 12 YES YES Time 2 4 YES YES Date 3 6 YES YES Primary Street 4 23 YES YES Manner of Collision 5 20 YES YES LEVEL 1 Subset Definition Title ALL CRASHES DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO Display Order Database in Use Data Group in Use Parent Subset Pre-Subset Dates Last Edit Date Last Run Date OR 2000-0148 99000805 MAIN CRASHES 99000000 ALL DATES 03/08/2000 03/08/2000 18:58 18:58 II Environment II Records IIDriverII Records IINon-Driver ll Records [Searched] 31393 62434 26896 [Matched] 410 2 [Not Matched] ********** oo Variable Variable Variable Beginning Group ID Name Value Environment a Crash Number < Equal To > Environment b Block Number 14000 Environment c Primary Street < Equal To > Environment d Reference Location < Equal To > Environment e Date 01/01/1999 Environment f Manner of COllision [\] Missing Driver/Vehicle g Direction of Travel [\] Missing Environment h Time 0000 Environment i Primary Street < Equal To > Environment Reference Location < Equal To > !lIFIl Statement (a AND b AND c AND d AND e AND f AND g AND h) OR (i AND j) Ending Value Missing 15400 DALLAS PKWY BELT LINE RD 12/31/1999 [0] Unknown or N/A [0] Unknown or N/A 1200 ARAPAHO RD DALLAS PKWY ----------------------------------------------------LEVEL 2 Subset Definition -----------------------------------------------------Title Display Order Database in Use Data Group in Use Parent Subset Pre-Subset Dates Last Edit Date Last Run Date All Crashes 1999 99000000 MAIN CRASHES ROOT DATABASE 01/01/1999 -12/31/1999 02/02/2000 08:28 02/02/2000 08:32 II Environment II Records IIDriverII Records "Non-Driverll Records [Searched] 31394 62436 26896 [Matched] 31393 62434 26896 [Not Matched] ********** oo Variable Group Variable ID Variable Name Beginning Value "IF" Statement Ending Value ----------------------------------------------------Report Definition Complete--------------------------------- -------------------- Dallas Police Department Page: 1 of 1 OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES ORIENTATION: Environment Report Includes DETAIL and SUMMARY Information K1 K2 􀁾 K4 K5 427313H 0230 061299 ARAPAHO RD Sam-#l Strt,#2 Stop 678602H 1640 091099 ARAPAHO RD Oth-#l Strt,#2 Prk 764707H 1720 101299 ARAPAHO RD Sam-#l Strt,#2 Stop 973348H 1014 123199 ARAPAHO RD Aug-Both Straight 03/08/2000 19:01 4 Records Processed \" ) 􀁾􀀩 /Dallas OR 2000-0148 ALL CRASHES AT DALLAS 03/08/2000 19:01 Police Department PKWY & BELT LINE RD AND DALLAS CRASHES Report Includes DETAIL "and SUMMARY Information PKWY & ARAPAHO Page: 2 ORIENTATION: Environment SUMMARY Follows for All Variables: ( Left Column => VALUE Right Column => FREQUENCY Column 1 (KEY) Summary ==> Crash Number 427313H 1 678602H 1 764707H 1 973348H 1 Column 2 (KEY) Summary ==> Time 0200-0259 Hours 1000-1059 Hours 1600-1659 Hours 1700-1759 Hours 1111 Column 3 (KEY) Summary ==> Date 06/12/1999 1 09/10/1999 1 10/12/1999 1 12/31/1999 1 Column 4 (KEY) Summary ==> Primary Street ARAPAHO RD 4 Column 5 (KEY) Summary ==> Manner of Collision Ang-Both Straight Sam-#l Strt,#2 Stop Oth-#l Strt,#2 Prk [1] [13] [31] 121 I" February 15, 2000 MEMORANDUM . To: Through: From: Subject: . Chris Terry, Assistant City Manager Michael Murphy, P.E., Acting Director ofPublic Works Jim Pierce, P.E., Assistant City Engineer 2000 Dallas County Call For Projects Dallas County Public Works is soliciting nominations from cities for projects to be funded through the Dallas County Major Capital Improvement Fund Thoroughfare Program. In lieu of a traditional bond program, Dallas County has created the Major Capital Improvement Fund, a "pay"':as-you-go" funding mechanism for financing infrastructure improvements. The County anticipates an annual call for projects. Under this new funding mechanism, approximately $15 million dollars will be available in both FY 2004 and 2005, with $20 million being available annually in FY 2006 and beyond. The County is currently seeking nominations for projects to be funded for construction in FY 2004. $3.75 million will be available for funding in our District in 2004. Applications are due at Dallas County for for this calIon March 13,2000. The County will evaluate the projects submitted using complicated formulas to assign points in the following categories: Roadway Functional Classification Rating (10 points) Speed Delay Rating (10 points) Traffic Volume Rating (10 points) Traffic Volume Growth Rating (10 points) Travel Desire Rating (10 points) Benefit-Cost Ratio (10 points) Accident Rate Rating (10 points) Air QualitylEnergy Conservation Rating (1 0 points) Sustainable DevelopmentlRedevel opmentf'Smart Growth" Rating (10 points) Intermoda1lMultimodal/Social Mobility Rating (10 points) i \ Each project's score is multiplied by a factor that gives credit to local cost participation. For example, ifan applicant pledges a local match of50%, the multiplier is 1.50. Staff has selected five projects to be submitted to the County under this program (with % local .share and cost distribution shown): Belt Line RoadlDallas Parkway Single Point Urban Interchange (75%) Town Share -$1,875,000 County Share -$625,000 Southbound to Northbound U-turn on Dallas Parkway at Arapaho Road (75%) Town Share -$562,500 County Share -$187,500 . Arapaho Road, Phase ill, Surveyor Boulevard to Addison Road (90%) Town Share-$12,895,300 County Share -$1,432,800 Signals Upgrade and Re-timing, Belt Line Rd. from Quorum Dr. to Marsh Lane (50%) Town Share -$350,000 County Share -$350,000 Signals Upgrade and Re-timing, Midway Rd. from Spring Valley to Dooley Rd (50%) Town Share -$196,000 County Share -$196,000 . -. Draft copies of the 2000 Dallas County Call For Projects Applications are attached. They will be finalized once once accident data is received from the City Of Dallas Police Department for the Belt Line Road and Arapaho Road intersections with Dallas Parkway. (These intersections are in the City OfDallas). Staff recommends Council authorize the City Manager to submit applications for the projects listed above to Dallas County for their 2000 Call for Projects. · ,1 ) 2000 Dallas County Call For Projects APPLICATIONINFORMATION Submitting Agency: Contact Person: Address: Telephone: e-mail address: Town of Addison Jim Pierce, P.E., Assistant City Engineer P.O. Box 9010 Addison 972/450-2879 jpierce@ci.addison.tx.us PROJECTINFORMATION TX Facsimile: 75001-9010 972/450-2834 Functional Classification: F # of Correctable Accidents: -Need (over past 3 years) Existing Through lanes -Belt Line -3, Dallas Pkwy -3 Left turn lanes -Belt Line -1, Dallas Pkwy -1 Right turn lanes -Belt Line -1, Dallas Pkwy -1 Sidewalks -Belt Line -S, Dallas Pkwy -0 Bicycle lanes -Belt Line -0, Dallas Pkwy -0 Location: Beginning: Ending: Belt Line Road Dallas Parkway (Dallas North Tollway) N/A (Intersection) MAPSCO: 14D Project Length: 0.00 Avg. Posted Speed: N/A Avg. Operating Speed: N/A Traffic Volume: 58,103 -Belt Line Rd. 31,804 -􀁄􀁡􀁬􀁬􀁾􀁳 Pkwy. Traffic Volume Source: Count 8/99 Proposed Belt Line -3, Dallas Pkwy -3 Belt Line -2, Dallas Pkwy -2 Belt Line -I, Dallas Pkwy -1 Belt Line -Y, Dallas Pkwy -Y Belt Line -0, Dallas Pkwy -0 Description of Proposed Improvement(s): The project will allow the simultaneous operation of left turn lanes for east/west traffic and for north/south traffic. Efficiency of the intersection will be improved by 15 to 20%. The project consists of the removal of existing pavement, medians and bridge parapet walls, installation of concrete drill shafts and cantilever bridge bents, reconstruction of existing retaining walls, construction of additional bridge deck and parapet walls, construction of right-turn lanes, construction of dual left-turn lanes and installation of new traffic signals. Traffic signals will be timed with other signals on Belt Line Road which are covered by another project. Associated work includes traffic control during construction, pavement markings and signing. Even though this project is located in the City of DaHas, Addison is willing to fund the project as it will improve traffic flow on Belt Line Road within the Town. It will also benefit the Dallas North Tollway by improving traffic flow on Dallas Parkway. DART busses will benefit from this project as well. This project is an example of regional cooperation where one Town is willing to fund a project of regional significance (see attached drawing). This is our number 1 priority project for this program. Total Project Cost: Right-of-way Cost: EngineeringlDesign Cost: Utility Cost: Construction Cost: PROJECTCOSTINFORMATION $2,500,000 $ 170,000 $ 240,000 $ 30,000 $2,060,000 Local Cost Contribution: $ in percent of total cost 75 2000 Dallas County Call For Projects APPLICATIONINFORMATION Submitting Agency: Contact Person: Address: Town of Addison Jim Pierce, P.E., Assistant City Engineer P.O. Box 9010 Addison .TX 75001-9010 Telephone: 972/450-2879 Facsimile: 972/450-2834 e-mail address: jpierce@ci.addison.tx.us PROJECTINFORMATION Functional Classification: # of Correctable Accidents: (over past 3 years) Location: Dallas Parkway (Dallas North Tollway) Beginning: Arapaho Road Ending: Existing Arapaho -3 DalJas Parkway -3 Arapaho -1 Dallas Parkway -1 MAPSCO: 4Z Project Length: N/A Avg. Posted Speed: N/A Avg. Operating Speed: N/A Traffic Volume: Arapaho Rd. 15,477 /DalJas Pkwy. 35,221 Traffic 􀁖􀁾􀀩􀀩􀁵􀁭􀁥 Source: '99 traffic count Proposed Arapaho -3 Dallas Parkway -3 Arapaho -1 Dallas Parkway -2 (u-turn, functions like a left turn lane) Arapaho -1 Dallas Parkway -1 1o Arapaho -1 Dallas Parkway -1 1o Through lanes Left turn lanes Right turn lanes Sidewalks Bicycle lanes Dallas Parkway SB to NB u-turn 0 o Description of Proposed Improvement(s): The widening and realignment of Arapaho Road required the elimination of the southbound to northbound u-turn lane to accommodate 6 through lanes and 2 left turn lanes across the bridge. The SB to NB u-turn lane must be reestablished when SB to NB turning movements reach 90 per hour. The project consists of the removal of a portion of existing concrete mono curb along inside curb lines of southbound and northbound Dallas Parkway, removal of a portion of the east and west retaining walls, installation of concrete drill sbafts and concrete abutments on the east and west sides of Dallas North Tollway, installation of AASHTO Type IV beams to span Dallas North Tollway, and construction of reinforced bridge deck and parapet walls with associated retaining wall construction. Associated items of work include traffic control during construction, pavement markings and signage. This is another example of interlocal cooperation where Addison is willing to modify facilities in another city (Dallas) to improve traffic flow for the region. The project will benefit DART busses that use Dallas Parkway. This is our number 2 priority project for this program (see attached sketch). Total Project Cost: Right-of-way Cost: EngineeringlDesign Cost: Utility Cost: Construction Cost: PROJECT COSTINFORMATION $750,000 $ 0 $ 90,000 $ 0 $660,000 Local Cost Contribution: $ in percent of total cost 75 % 2000 Dallas County Call For Projects APPLICATIONINFORMATION .. 􀁾 Submitting Agency: Contact Person: Address: Telephone: e-mail address: Town of Addison Jim Pierce, P.E., Assistant City Engineer P.O. Box 9010 Addison 972/450-2879 ipierce@ci.addison.tx.us PROJECTINFORMATION TX Facsimile: 75001-9010 972/450-2834 Functional Classification: R # of CorrectaliIe Accidents: 64 (on Belt Line Rd.) (over past 3 years) Location: Beginning: Ending: Through lanes Left turn lanes Right turn lanes Sidewalks Bicycle lanes Arapaho Rd. Addison Rd. Surveyor Blvd. Existing ooooo MAPSCO: 14 A, B, C Project Length: 1.02 Avg. Posted Speed: 40 mph Avg. Operating Speed: N/A Traffic Volume: N/A Traffic Volume Source: N/A Proposed 41oo o Description of Proposed Improvement(s): This is Phase III of a three phase project. Phase I was realignment and improvement of Arapaho Road from Dallas Parkway to Addison Road. Phase II will be construction of Arapaho Road from Marsh Lane to Surveyor Blvd., which will take place prior to 2004. This project (phase III) will construct a new section of Arapaho Road from Surveyor Blvd. to Addison Road. The roadway will be 2 lanes in each direction, undivided, except at the intersections with Addison Road and Surveyor Blvd., which will have left turn lanes. The intersection with Midway Road will consist of an overpass with no entrance or exit ramps. The purpose of this project is to reduce traffic congestion on Belt line Road (reliever road or Belt Line by-pass). This project will benefit the bus routes on Belt Line Road by reducing congestion. This is our number 3 priority project for this program. While we would like a 10% match from Dallas County, we realize this would put pressure on a.vailable funds. If it would help.secure' funding, the Town would be willing to contribute 95% to the project. We believe this project will reduce traffic on Belt Line Road and will therefore reduce accidents on Belt Line Road by 15%. Total Project Cost: Right-of-way Cost: EngineeringlDesign Cost: Utility Cost: Construction Construction Cost: PROJECTCOSTINFORMATION $14,328,120 $ 3,180,000 $ 1,230,000 $ 289,200 $ 9,628,920 Local Cost Contribution: $ in percent of total cost 90 % 2000 Dallas County Call For Projects APPLICATIONINFORMATION Submitting Agency: Contact Person: Address: Telephone: e-mail address: Town of Addison Jim Pierce, P.E., Assistant City Engineer P.O. Box 9010 Addison 972/450-2879 jpierce@ci.addison.tx.us PROJECTINFORMATION TX Facsimile: 75001-9010 972/450-2834 Functional Classification: # of Correctable Accidents: (over past 3 years) Location: Beginning: Ending: Through lanes Left tum lanes Right tum lanes Sidewalks Bicycle lanes Belt Line Road Marsh Ln. Quorum Dr. R64 Existing 311 Yo MAPSCO: 13 D, 14 A, B, C Project Length: 1.7 miles Avg. Posted Speed: 40 mph Avg. Operating Speed: 12 mph Traffic Volume: 59,380 Traffic Volume Source: Count 8/99 Proposed 311 Yo Descri tion of Pro osed 1m rovement s): This project provides for retiming the existing 17 year old coordinated signal system along Belt Line Road from Marsh Lane to Quorum Drive. Timing plans for the AM, PM, Off-Peak, and Friday PM Peak periods will be prepared for teach intersection. The signal hardware at each intersection will be upgraded to include video detection, TS-2 cabinets, and TS-2 controllers. Additional phone drops will also be installed to provide a communications link to the traffic service center. Existing hardwire interconnect cables will be used to maintain communication between the signal controllers. Associated work will include installation of new conduit and wiring I at each intersection. The existing power source foe each location will be used. For this section of road, we have had a total of 429 accidents in the last 3 years. We believe retiming will improve traffic flow, and we estimate accidents will be reduced b 15%. . . Total Project Cost: Right-of-way Cost: Engineering/Design Cost: Utility Cost: Construction Cost: PROJECT COSTINFORMATION $700,000 $ 0 . $ 90,000 $ ° $610,000 Local Cost Contribution: $ in percent of total cost 50 % 2000 Dallas County CaD For Projects APPLICATIONINFORMATION Submitting Agency: Contact Person: Address: Telephone: e-mail address: Town of Addison Jim Pierce, P.E., Assistant City Engineer P.O. Box 9010 Addison 972/450-2879 jpierce@ci.addison.tLus PROJECTINFORMATION TX Facsimile: 75001-9010 972/450-2834 Functional Classification: R # of Correctable Accidents: 21 (over past 3 years) Location: Beginning: Ending: Through lanes Left turn lanes Right turn lanes Sidewalks Bicycle lanes Midway Road Spring Valley Road Dooley Road Existing 311o° MAPSCO: 14K, F & B; 4X Project Length: 1.75 miles Avg. Posted Speed: 40 mph Avg. Operating Speed: 16.8 mph Traffic Volume: 51,074 Traffic Volume Source: Count 8/99 Proposed 311o o Description of Proposed Improvement(s): This project provides for retiming the existing 14 year old coordinated signal system along Midway Road from Spring Valley Road to Dooley Road. Timing plans for the AM, PM, Off-Peak, and Friday PM Peak periods will be prepared for each intersection. The signal signal hardware at each intersection wiD be upgraded to include video detection, TS-2 cabinets, -and TS-2 controllers. Additional phone drops will also be installed to provide a communications link to the traffic service center. Existing hardwire interconnect cables wiD be used to maintain communication between the signal controlJers. Associated work wiD include installation of new conduit and wiring at each intersection. The existing power source for each location will be used. For this section of road, we have had a total of 141 accidents in the last 3 years. We believe retiming will improve traffic flow, and we estimate accidents will be reduced by 15%. -Total Project Cost: Right-of-way Cost: EngineeringlDesign Cost: Utility Cost: Construction Cost: PROJECTCOSTINFORMATION $392,000 $ 0 $ 52,000 $ 0 $340,000 Local Cost Contribution: $ in percent of total cost 50 % ) Jim Pierce From: Sent: To: Cc: SUbject: Jim Pierce . Friday, February 18, 2000 9:10 AM Michael Murphy Jim Pierce FW: Projects Mike: FYI. Alan is a contact with Dallas Public Works -he put in their TEA-21 applications and is working on the Dallas County call for projects. Lets discuss. Jim. -----Original Message-----From: Alan Hendrix [mailto:AHendrix@pbw.ci.dallas.tx.us] Sent: Friday, February 18, 2000 8:35 AM To: jpierce@ci.addison.tx.us Cc: JAntebi@pbw.ci.dallas.tx.us; JBrunk@pbw.ci.dallas.tx.us Subject: Projects Jim, Per our telephone conversation, I am forwarding the information you requested. We had two projects on Beltline approved for funding in TEA 21. They are as follows: Beltline from DNT to Preston -Widen existing 6 lane to divided roadway to 8 lane divided EB to Preston and WB from Preston to E. of Prestonwood. Estimated total cost $2.4 million. Federal funds approved $1,403,880. City of Dallas and Dallas County will each provide a 20% local match. Beltline at Preston -Add a WB free right turn turn lane. Estimated total cost $400,000. Federal funds approved $240,000. City of Dallas and TXDOT will each provide a 20% local match. At this time, the following two projects are being recommended by staff for submittal to Dallas County in their call for projects. These projects have not yet been given the official nod by each respective councilmember nor have they been officially blessed by the entire city council. Arapaho from Knoll Trail to Dallas Parkway -Widen existing 6 lane divided roadway to 8 lane divided roadway and widen bridge over DNT to accommodate the widened roadway. Dallas Parkway from Westgrove to Trinity Mills -Widen existing parkway by adding one 12' lane in the northbound 􀁤􀁾􀁲􀁥􀁣􀁴􀁩􀁯􀁮 only. The Arapaho project will be a joint project if both your project and our project are selected. Would Addison consider submitting the widening of the southbound Dallas Parkway from Trinity Mills to Westgrove? Please let me know if you have questions or need additional information. Thanks, Alan 1 M4t1/l 2' t.f-b 70 -'+21,.2.. 2000 Dallas County Call For Projects APPLICATIONINFORMATION Submitting Agency: Contact Person: Address: Telephone: e-mail address: Town of Addison Jim Pierce, P.E., Assistant City Engineer P.O. Box 9010 Addison 972/450-2879 jpierce@ci.addison.tLus PROJECT INFORMATION TX Facsimile: 75001-9010 972/450-2834 Location: Beginning: Ending: Functional Classification: # of Correctable Accidents: (over past 3 years) Existing Through lanes Left turn lanes Right turn lanes Sidewalks Bicycle lanes Description of Proposed Improvement(s): MAPSCO: Project Length: Avg. Posted Speed: Avg. Operating Speed: Traffic Volume: Traffic Volume Source: Proposed PROJECT COSTINFORMATION Total Project Cost: $ Right-of-way Cost: $ Engineering/Design Cost: $ Utility Cost: $ Construction Cost: $ Local Cost Contribution: $ in percent of total cost % ) CITY OF DALLAS February 25, 2000 JAMES C. PIERCE JR. P.O. BOX 9010 ADDISON TX 75001 RE: Public Information Request # 2000-0148 Dear Mr. Pierce: The Records Section received payment of the following amount: $34.67. Enclosed you will find the following information you requested under the Public Information Act: CRIME STATISTICS Ifwe may be of further assistance, please feel free to contact me at (214) 670-5604. Sincerely, -􀁾􀀱􀁲􀀵􀀢 1A#1=. frcj r4. /Yl 􀁾􀁴􀁴􀁣􀀭􀀼􀁲 \' . It 􀀢􀀳􀀭􀀦􀀢􀁾 􀁳􀀮􀁲􀁾 􀁾􀁥􀀮 􀁾 /)CI-t. -£k 􀁷􀀭􀁩􀁊􀀮􀀮􀁊􀁾􀀮 􀀨􀁍􀀭􀁁􀀮􀁰􀀮􀀮􀀮􀀮 􀀬􀁾􀁾􀀭 A.,:) .􀁾 􀁾 􀁾􀁾􀁾􀀬􀁾 􀁾 􀁾􀀯􀁕􀁾􀀭􀁦􀁳 􀁾􀁾 2.1," 4'1-􀁾􀁾 􀁾􀀭􀀭􀀧􀀭􀀭􀁾 􀀭􀀱􀀴􀀱􀀭􀁍􀁾􀂭 􀀮􀁾􀀬􀁾'-􀀮􀁑􀁊􀀭􀀭􀁾􀀧 􀁲􀁲􀀭􀀭􀀭􀁾􀀭􀀴􀁾􀀬􀀮􀀮􀀭􀁌􀁴 k)M) 􀁾􀀭 M..􀁾 .-, . l' "" POLICE DEPARTMENT POLICE AND COURTS BUILDING DALLAS, TEXAS 75201-5203 Db 􀁾􀀢 TERRELL BOLTON CHIEF OF POLICE SJN2781.(11·318 POL·OO152 Log Number 20000148 Dallas Police Department Records Section Open Record Charges and Fees Date Printed 02/02/2000 Reguestee Information: PIERCE, JR., JAMES C. P. O. BOX 9010 ADDISON, TX 75001 The following costs are associated with the preparation of the attached document(s) pursuant to an Open Records Act request. These costs are in compliance with City of Dallas Administrative Directive 2-9 which deals with information subject to public disclosure. REPRODUCTION CHARGES ITEM Sheet Copies Cassette Tapes Video Tapes Offense Reports Accident Reports 911 Call Sheets ' Arrest Reports Prosecution Reports DWI Blood Test Results lAD Resumes Photographs: 3 X 5 5 X 7 8 X 10 RESEARCH AND REVIEW REVIEWER RATE @$ .10 page @$1.00 each @$2.50 each @$ .10 page @$4.00 each @$ .10 page @$ .10 page @$ .10 page no charge @$ .10 page @$ .38 each @$ .80 each @$2.25 each RATE NUMBER 9ooooooooo ooo Sub-Total===»$ TIME COST 0.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.90 COST Personnel charge for Research ** *$ 0.00 0.0 0.00 Postal Fee Crime Analysis/programming ADDITIONAL FEES Description of fees $16.50/hour 2.0 33.00 Sub-Total===»$ 33.00 COST 0.00 0.00 0.00 0.00 0.77 Sub-Total===»$ 0.77 Amount of Deposit: $ 0.00 Grand Total »» $ 34.67 * (Actual cost but not more than $15.00 per hour.) ** (Twenty percent overhead applied to personnel charge for research) 1>1/31/,2000 09:10 Dallas Police Department OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES Report Definition Summary Title Display Order Database in Use Data Group in Use Orientation Report Subset Last Edit Date Last Run Date Report TypeNumber of OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO 97000804 MAIN CRASHES Environment 97000803 01/31/2000 09:10 01/31/2000 09:10 List Variables Defined : 5 Variable Description Column Width Sum 􀁾 Crash Number 1 12 YES YES Time 2 4 YES YES Date 3 6 YES YES Primary Street 4 23 YES YES Manner of Collision 5 20 YES YES LEVEL 1 Subset Definition Title ALL CRASHES DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO Display Order Database in Use Data Group in Use Parent Subset Pre-Subset Dates Last Edit Date Last Run Date OR 2000-0148 97000803 MAIN CRASHES 97000000 ALL DATES 01/31/2000 01/31/2000 08:54 08:54 llEnvironment ll Records IIDriverII Records "Non-Driver" Records [Searched] 32707 64709 28004 28004 [Matched] 12 25 12 [Not Matched] ********** oo Variable Variable Variable Beginning Group ID Name Value Environment a Crash Number < Equal To > Environment b Block Number 14000 Environment c Primary Street < Equal To > Environment d Reference Location < Equal To > Environment e Date 01/01/1997 Environment f Manner of Collision [\] Missing Driver/Vehicle g Direction of Travel [\] Missing Environment h Time 0000 Environment i Primary Street < Equal To > Environment Reference Location < Equal To > IIIFII Statement (a AND bAND c AND d AND e AND f AND g AND h) OR (i AND j) Ending Value Missing 15400 DALLAS PKWY BELT LINE RD 12/31/1997 [0] Unknown or N/A [0] Unknown or N/A 1200 DALLAS PKWY ARAPAHO RD ------------------------------------ ----------------LEVEL 2 Subset Definition -----------------------------------------------------Title Display Order Database in Use Data Group in Use Parent Subset Pre-Subset Dates Last Edit Date Last Run Date All Crashes 1997 97000000 MAIN CRASHES ROOT DATABASE 01/01/1997 -12/12/31/1997 11/09/1999 17:14 11/09/1999 17:51 "Environment II Records IIDriverII Records IlNon-Driverll Records [Searched] 32707 64709 28004 [Matched] 32707 64709 28004 [Not Matched] ********** oo Variable Group Variable ID Variable Name Beginning Value IIIFII Statement Ending Value ------------------- ---------------------------------Report Definition Complete----------------------------------------------------- 01/31/2000 09:10 Dallas Police Department OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES Report Includes DETAIL and SUMMARY Information SUMMARY Follows for All Variables: ( Left Column => VALUE Right Column => FREQUENCY Column 1 (KEY) Summary ==> Crash Number 134381F 1 135980F 1 284525F 1 365282F 1 367266F 1 400145F 1 677905F 1 735034F 1 802206F 1 908989F 1 982882F 1 1037766F 1 Column 2 (KEY) Summary ==> Time Page: 2 ORIENTATION: Environment 0000-0059 Hours 0900-0959 Hours 1000-1059 Hours 1100-1159 Hours 1200-1259 Hours 1400-1459 Hours 1500-1559 Hours 1600-1659 Hours 1900-1959 Hours 2100-2159 Hours 2200-2259 Hours 11111121· 111 Column 3 (KEY) Summary ==> Date 02/14/1997 2 04/01/1997 1 04/27/1997 1 04/28/1997 1 05/09/1997 1 08/12/1997 1 09/02/1997 1 09/27/1997 1 11/06/1997 1 12/05/1997 1 12/27/1997 1 Column 4 (KEY) Summary ==> Primary Street DALLAS PKWY 12 Column 5 (KEY) Summary ==> Manner of Collision Ang-Both Straight Sam-Both Strt,R-End Sam-Both Strt,S-Swip Sam-#l l Strt,#2 Stop Sam-#l Strt,#2 Right Opp-#l Strt,#2 Left [1] [11] [12] [13] [14] [25] 411213 Page: 1 of 1 ORIENTATION: Environment K5 Opp-#l Strt.#2 Left Opp-#l Strt.#2 Left Sam-#l Strt.#2 Stop Sam-#l Strt.#2 Right Sam-#l Strt.#2 Stop Ang-Both Straight Ang-Both Straight Sam-Both Strt,S-Swip Opp-#l Strt.#2 Left Ang-Both Straight Sam-Both Strt,R-End Ang-Both Straight PKWY PKWY PKWY PKWY PKWY PKWY PKWY PKWY PKWY PKWY PKWY PKWY DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS Police' Department PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES DETAIL and SUMMARY Information 􀁾 K4 021497 021497 040197 042797 042897 050997 081297 090297 092797 110697 120597 122797 ) Report Includes K2 0920 1935 1525 1420 1000 1521 2110 1135 1242 0020 2220 1610 K1 134381F 135980F 284525F 365282F 367266F 400145F 677905F 735034F 802206F 908989F 982882F 1037766F Dallas OR 2000-0148 ALL CRASHES AT DALLAS 1>1/31/.2000 09:10 12 Records Processed 61/31/02000 09:40 .) Dallas Police Department OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES Report Definition Summary Title Display Order Database in Use Data Group in Use Orientation Report Subset Last Edit Date Last Run Date Report TypeNumber of OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO 98000804 MAIN CRASHES Environment 98000804 01/31/2000 09:40 01/31/2000 09:40 List Variables Defined : 5 Variable Description Column Width Sum 􀁾 Crash Number 1 12 YES YES Time 2 4 YES YES Date 3 6 YES YES Primary Street 4 23 YES YES Manner of Collision 5 20 YES YES LEVEL 1 Subset Definition Title ALL CRASHES DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO Display Order Database in Use Data Group in Use Parent Subset Pre-Subset Dates Last Edit Date Last Run Date OR 2000-0148 98000804 MAIN CRASHES 98000000 ALL DATES 01/31/2000 01/31/2000 09:35 09:35 IIEnvironment ll Records IIDriverII Records lINon-Driverll Records [Searched] 33647 66947 28263 [Matched] 10 19 6 [Not Matched] oo Variable Variable Variable Beginning Group --.fQ Name Value Environment a Crash Number < Equal To Environment b Block Number 14000 Environment c Primary Street < Equal To > Environment d Reference Location < Equal To > Environment e Date 01/01/1998 Environment f Manner of Collision [\] Missing Driver/Vehicle g Direction of Travel [\] Missing Environment h Time 0000 Environment i Primary Street < Equal To > Environment Reference Location < Equal To > IIIFII Statement (a AND b AND c AND d AND e AND f AND g AND h) OR (i AND j) Ending Value Missing 15400 DALLAS PKWY BELT LINE RD 12/31/1998 [0] Unknown or N/A [0] Unknown or N/A 1200 DALLAS PKWY ARAPAHO RD LEVEL 2 Subset Definition -----------------------------------------------------Title Display Order Database in Use Data Group in Use Parent Subset Pre-Subset Dates Last Edit Date Last Run Date All Crashes 1998 98000000 MAIN CRASHES ROOT DATABASE 01/01/1998 -12/31/1998 11/05/1999 11:23 11/09/1999 17:16 "Environment ll Records IIDriver ll Records IINon-Driver" Records [Searched] 33647 66947 28263 [Matched] 33647 66947 28263 [Not Matched] ********** oo Variable Group Variable --.fQ Variable Name Beginning Value "IF" Statement Ending Value ----------------------------------------------------Report Definition Complete----------------------------------------------------- Page: 1 of 1 ORIENTATION: Environment K5 Sam-#l Strt,#2 Right Opp-#l Strt,#2 Left Ang-Both Straight Sam-Both Strt,R-End Sam-Both Strt,S-Swip Sam-Both Strt,S-Swip Ang-Both Straight Ang-Both Straight Sngl-Moving Straight Sam-Both Strt,R-End PKWY PKWY PKWY PKWY PKWY PKWY PKWY PKWY PKWY PKWY DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS K3 010298 031598 032698 030598 041198 042198 043098 050598 081398 100198 􀁾1729 1905 1500 1430 1543 1812 1115 1829 0820 1910 5492G 185950G 214299G 242140G 258505G 286814G 310309G 325967G 604943G 737165G Kl Dallas Police Department OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES Report Includes DETAIL and SUMMARY Information K4 \)1/31/,2000 09:40 10 Records Processed 􀁾􀀱􀀯􀀳􀀱􀀨􀀲􀀰􀀰􀀰 09:40 Dallas Police Department Page: 2 OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES ORIENTATION: Environment Report Includes DETAIL and SUMMARY Information SUMMARY Follows for All Variables: ( Left Column => VALUE Right Column => FREQUENCY Column 1 (KEY) Summary ==> Crash Number 5492G 1 185950G 1 214299G 1 242140G 1 258505G 1 286814G 1 310309G 1 325967G 1 604943G 1 737165G 1 Column 2 (KEY) Summary ==> Time 0800-0859 Hours 1100-1159 Hours 1400-1459 Hours 1500-1559 Hours 1700-1759 Hours 1800-1859 Hours 1900-1959 Hours 1112122 Column 3 (KEY) Summary ==> Date 01/02/1998 1 03/05/1998 1 03/15/1998 1 03/26/1998 1 04/11/1998 1 04/21/1998 1 04/30/1998 1 05/05/1998 1 08/13/1998 1 10/01/1998 1 Column 4 (KEY) Summary ==> Primary Street DALLAS PKWY 10 Column 5 (KEY) Summary ==> Manner of Collision Ang-Both Straight Sam-Both Strt,R-End Sam-Both Strt,S-Swip Sam-#l Strt,#2 Right Opp-#l Strt,#2 Left Sngl-Moving Straight [1] [ll] [12] [14] [25] [39] 322111 D1/31J2000 10:03 Title Display Order Database in Use Data Group in Use Orientation Report Subset Last Edit Date Last Run Date Report TYpeNumber of Dallas Police Department Report Definition Summary OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY" & ARAPAHO 99000805 MAIN CRASHES Environment 99000805 01/31/2000 10:03 01/31/2000 10:03 List Variables Defined : 5 Variable Description Column Width Sum 􀁾 Crash Number 1 12 YES YES Time 2 4 YES YES Date 3 6 YES YES Primary Street 4 23 YES YES Manner of Collision 5 20 YES YES LEVEL 1 Subset Definition Title ALL CRASHES DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO Display Order Database in Use Data Group in Use Parent Subset Pre-Subset Dates Last Edit Date Last Run Date OR 2000-0148 99000805 MAIN CRASHES 99000000 ALL DATES 01/31/2000 01/31/2000 09:56 09:58 IIEnvironment ll Records IIDriver ll Records "Non-Driver" Records [Searched] 31352 62358 26850 26850 [Matched] 816 5 [Not Matched] ********** oo Variable Variable Variable Beginning Group ID Name Value Environment a Crash Number < Equal To > Environment b Block Number 14000 Environment c Primary Street < Equal To > Environment d Reference Location < Equal To > Environment e Date 01/01/1999 Environment f Manner of Collision [\] Missing Driver/Vehicle g Direction of Travel [\] Missing Environment h Time 0000 Environment i Primary Street < Equal To > Environment Reference Location < Equal To > IlIFlI Statement (a AND b AND c AND d AND e AND f AND g AND h) OR (i AND" j) Ending Value Missing 15400 DALLAS PKWY BELT LINE RD 12/31/1999 [0] Unknown or N/A [0] Unknown or N/A 1200 DALLAS PKWY ARAPAHO RD LEVEL 2 Subset Definition -----------------------------------------------------Title Display Order Database in Use Data Group in Use Parent Subset Pre-Subset Dates Last Edit Date Last Run Date All Crashes 1999 99000000 MAIN CRASHES ROOT DATABASE 01/01/1999 -12/31/1999 11/03/1999 17:03 01/12/2000 10:18 "Environment ll Records IIDriverll Records IINon-Driver ll Records . [Searched] 31352 62358 26850 [Matched] 31352 62358 26850 [Not Matched] oo Variable Group Variable ID Variable Name Beginning Value "IF" Statement Ending Value ----------------------------------------------------Report Definition Complete----------------------------------------------------- Page: 1 of 1 ORIENTATION: Environment K5 Sngl-Moving Straight Ang-Both Straight Ang-Both Straight Sam-Both Strt,S-Swip Ang-Both Straight Ang-Both Straight Sam-#1 Strt,#2 Stop Ang-#1 Strt,#2 Stop PKWY PKWY PKWY PKWY PKWY PKWY PKWY PKWY DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS DALLAS 􀁾031299 050799 051999 061499 063099 091299 100999 121099 -.B...2200 1730 1728 1747 1530 0200 0910 1450 Kl 174089H 324719H 359827H 434792H 478935H 682997H 755433H 921020H Dallas Police Department OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES Report Includes DETAIL and SUMMARY Information K4 '01/3J!/2000 10:03 8 Records Processed '01/32/2000 10:03 Dallas Police Department Page: 2 OR 2000-0148 ALL CRASHES AT DALLAS PKWY & BELT LINE RD AND DALLAS PKWY & ARAPAHO CRASHES ORIENTATION: Environment Report Includes DETAIL and SUMMARY Information SUMMARY Follows for All Variables: ( Left Column => VALUE Right Column => FREQUENCY Column 1 (KEY) Summary ==> Crash Number 174089H 1 324719H 1 359827H 1 434792H 1 478935H 1 682997H 1 755433H 1 921020H 1 Column 2 (KEY) Summary ==> Time 0200-0259 Hours 0900-0959 Hours 1400-1459 Hours 1500-1559 Hours 1700-1759 Hours 2200-2259 Hours 111131 Column 3 (KEY) Summary ==> Date 03/12/1999 1 05/07/1999 1 05/19/1999 1 06/14/1999 1 06/30/1999 1 09/12/1999 1 10/09/1999 1 12/10/1999 1 Column 4 (KEY) Summary ==> Primary Street DALLAS PKWY 8 Column 5 (KEY) Summary ==> Manner of Collision Ang-Both Straight Ang-#l Strt,#2 Stop Sam-Both Strt,S-Swip Sam-#l Strt,#2 Stop Sngl-Moving Straight [1] [3] [12] [13] [39] 41111 Jim Pierce From: Sent: To: Cc: .Subject: Alan Hendrix [AHendrix@pbw.cLdallas.tx.us] Thursday, February 24, 2000 5:03 PM jpierce@ci.addison.tx.us JBrunk@pbw.ci.dallas.tx.us Dallas County Call for Projects I just wanted to let you know we will not be submitting a project to Dallas County on Arapaho at this time. The councilmember for that district, Ms. Finkelman, felt there was a greater need to widen Alpha than Arapaho. We will still be submitting a project on the NB Dallas Parkway from Westgrove to Trinity Mills. 1 #2a -#2b -#2c-#2d -#2e -#2f -#2g -#2h -CONSENT AGENDA Approval of the Minutes for the February 8, 2000, and February 15, 2000, Council Meetings. Award a contract for services in an amount not to exceed $27,500 to Don Paschal for airport operator contract development services. Award a contract for services in an amount not to exceed $51,000 to Deloitte & Touche for airport operator contract development services. Award of the purchase of services in the amount of $25,860.50 to Paradigm Traffic Systems, Inc., for rebuilding and replacing signal equipment. Consideration of a Resolution authorizing the City Manager to renew the agreement with Mr. Pat Haggerty to provide consulting services associated with land, ROW, and easement acquisitions. Consideration of a Resolution authorizing the City Manager to submit applications for five public works projects for funding through the Dallas County Major Capital Improvement Thoroughfare Program. Consideration of a Resolution authorizing the City Manager to enter into an an easement agreement with Southwestern Bell Telephone. Award of purchase of services in the amount of $17,000 to Dallas Backup, Inc. for stage and sound for Taste Addison. City Council Agenda 02-22-00 Cell:B18 Comment: BEGINNING--For linear projects, enter the point of beginning; for intersections, enter the cross-street Cell:F18 Comment: PROJECT LENGTH--Length in miles. For intersections, enter 0.00 Cell: B19 Comment: ENDING--For intersections, enter NIA Cell: F19 Comment: AVG POSTED SPEED--For corridors with more than one speed limit, the average posted speed (in miles per hours) is the weighted average of the posted speeds. For intersections, enter "N/A" Cell: F20 Comment: AVG OPERATING SPEED--Operating speed at period of peak demand, in miles per hours, calculated by dividing the length of the project by the time required (in hours) to traverse the projects. Cell: B21 Comment: 1999 REGIONAL THOROUGHFARE PLAN FUNCTIONAL CLASSIFICATION-F (Freeway) R (Regional Arterial) o (Other Arterial) N (Not on Regional Thoroughfare Plan) Cell: F21 Comment: TRAFFIC VOLUME--The average daily traffic (adt) of the facility to be improved. For new roadway facilities, enter "N/A" /-VJ-oo Cell:B22 Comment: NUMBER OF CORRECTABLE ACCIDENTS--number of accidents over that past three that probably would not have occurred had the proposed improvements been in place Cell: F22 Comment: TRAFFIC VOLUME SOURCE--The source of traffic volume information. For estimates, enter "Estimate"; for real world data, enter "Count" and the month and year of the count. Cell:B25 Comment: THROUGH LANES--For corridors, use the minimum number of through lanes in both directions anywhere within the project limits. For example, a roadway that at its narrowest provides for one lane of through traffic in each direction would be encoded as "2". Note that dual left tum lanes or auxiliary lanes are not included. CFor intersections, use the maximum number of lanes available for through traffic for the direction fJ. I.D . with the minimum number of lanes, including shared lanes. For example, an intersection that 􀁾 provides for 3 through or shared Ithrough lanes in one direction but only two in the other would be encoded as "2". Note that exclusive turn lanes are not included in this count. 􀁾􀁷􀁊􀁾􀀵 7 Jim Pierce From: Sent: To: Subject: Joni Ramsey Friday, January 28,20001:18 PM Jim Pierce FW: ACCIDENTS Hope this is what you needed. Let me know if we can be any further help! -----Original Message-----From: Louise Calvillo Sent: Friday, January 28, 2000 12:40 PM To: Joni Ramsey Subject: ACCIDENTS 5000 BELT LINE RD 1997 26 5 C'" ., 1998 33 0 l; 1999 23 2000 1 TOTAL 83 5000 ARAPAHO RD 1997 3 1998 0 1999 1 2000 0 TOTAL 4 3698 -4998 BELT LINE RD (QUORUM -MARSH) 1997 137J 1998 146 4JJf 1999 146 2000 14 TOTAL 443 3D 0: 􀁉􀁉􀁾 ".+-.l 􀀢􀁝􀀩􀁾􀁉􀁬􀁾 13800 -15798 MIDWAY RD (SPRING VALLEY -DOOLEY) 1997 53] 1998 47 ., ttl 1999 41 2000 2 TOTAL 143 1 ;:\) Jim Pierce From: Sent: To: SUbject: Jim Pierce Monday, February 28, 2000 3:45 PM Michael Murphy Dallas County District No. 'I Boundaries Cathy Ways asked for District boundaries the other night -1don't have a map, but the cities in District No. 1 are: (North) Dallas, the Park Cities, Irving, Farmers Branch, Coppell, Carrollton, Addison, and Richardson. That's our "competition" for the County Call for Projects. Jim Pierce, P.E. Assistant City Engineer PO Box 9010 Addison, TX 75001-9010 972-450-2879 1 ;::..• -: II . ---.J. . I􀁾 )j.1t? 􀁾􀁊􀀺􀀺􀀺􀁪􀁐􀁾􀁾􀁾 ---·.1_¥--􀀮􀀭􀀮􀀭􀀭􀁾􀁟􀀮􀀭􀁾􀁾􀀭-__.I􀁾􀁾􀁙􀀽􀁟􀀱􀀡􀁊􀁟􀁾 -.-.-.-..-.-----'j.l. '.' 􀀮􀁾􀁁􀀺􀀺􀀺􀀺􀀮􀀭􀁾􀀭􀀭􀀮􀀭􀀭􀀭 .---.---.------.--.--.-----.--- -.-..---.--.-.--.-.-------.... -.. -··--·-·--· .. -.l.·•. 􀂷􀂷􀂷􀂷􀀭􀂷􀂷􀂷􀂷􀂷􀂷􀁾􀁾􀁭􀀭􀀺􀁬􀁾􀁾􀁾􀀭􀀽􀀺􀁌􀀭􀀽􀀭 􀁾_L 􀁟􀁾􀁾􀀭􀁭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁟 --.--.------l: ----..-..-.--..􀀭􀀭􀀭􀁾􀀭􀁾􀀭􀀭􀁾 􀀭􀀭􀀭􀁾􀀭􀀭􀀭 􀁾􀀭􀀭􀀮􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀮􀀭 _--.-..__.----..----............-....··--wJd-----'.--...􀁾􀀭􀁾􀁾􀁾􀀭􀀢􀀭􀀭􀀭 .. --'1' --. 􀀭􀀭􀀭􀀭􀀭􀁾􀁾􀀭 '... -' -'---.•􀁾􀀮􀀮􀀮􀀮􀀱􀀱􀀭􀂷􀀮􀂷� �􀂷􀂷􀂷􀂷􀂷􀂷􀁾􀁾􀁾􀁾􀁾􀁾􀁟􀁾􀁾􀁾􀁾􀁾􀀽􀁾􀁾􀁾􀁾􀁾􀁾􀀱􀁉􀀡􀀧􀁟􀁾􀁾􀁾 l _. .. jd"J'j /) -1-:' ---􀁟􀀮􀁾􀀮􀁟_--------_-....... --iii 􀁾􀁾􀀭􀀧 '. 􀁾􀁾 . 􀂷􀂷􀂷􀁬􀁪􀀱􀁾􀁾􀁾􀂷􀁾􀁾􀂷􀁟􀁾􀀽􀁾􀁾􀁾􀀭􀁾􀂷􀀢􀁾􀀽 􀂷􀀢􀁟􀂷􀁾􀁾􀂷􀀽􀀭􀂷􀀽􀁾􀂷􀂷 . III 􀀮􀁴􀁦􀀻􀁾􀁤􀁩􀀷􀀮􀁾􀁾􀁾􀀮􀁟􀁾􀀽􀀽􀁾 __-... . !ll III 􀁾􀁾 /J{A 􀁾􀁾 .􀂷􀁬􀁬􀁬􀀭􀂷􀂥􀁾􀀽􀀭􀀽􀁾􀀽􀀢􀁾􀀽􀀽􀀽􀀽􀁾􀁾􀂷􀁾􀀭 .• -􀁾 i jl _ ............._ _ _ _._.. _. ...., _ __ __." , .. __.._ _ _ _ __ __ .. __ .. '"_. ......... ."... .: . 􀁶􀁾􀀭􀀭􀀭􀀭􀁫􀀭􀀺􀀮􀀭􀁾􀁾􀁾􀀮􀁾􀁾 ..􀀭􀀭􀁾􀁾􀁾􀀮􀁟􀀮 III 􀁾􀁆􀁾􀁾􀁾􀀺􀀺􀁢􀁾 d. " /,.., 􀁾 . III 􀁐􀁾􀁾􀁉􀁾􀁾􀁾􀂷􀀫􀀱􀀧􀀭􀀼􀀭 l!Il --{ 􀁾􀀭 􀁾􀁾􀀰􀁾􀀭􀀭􀂷􀁾􀀭􀀭􀀭􀂷􀁟􀀭􀁾􀀭 .---.􀀭􀀭􀀮􀀭􀀭􀀭􀀭􀀭􀁾􀀭􀀮􀀭􀀭􀀭􀀭􀀭􀀭 􀁾􀀽􀁪􀁒􀁥􀁬􀀺􀀺􀀺􀁮􀁦􀁫􀁟􀁪􀂣􀁊􀁫􀂷􀀭 􀁟􀀮􀁟􀀽􀁾􀁟􀀮􀀭􀀭􀁾􀀭􀀭􀀭􀁾􀀭􀀭 􀁾􀁾•••􀁾•••.••..-...... 􀁾􀁾􀀭􀀷􀁊􀀻􀀽􀁾􀁾 􀁌􀁊􀁌􀁾􀁾􀁾􀀭􀀱􀁉􀁊􀀭􀁾􀀮􀀻􀂷􀀮􀀽􀀭􀀭􀀽􀀮􀁾􀁾 􀁣􀀭􀁾􀁾 􀁌􀀱􀁾 _ 􀀽􀀭􀁾􀀭􀁾􀁾􀀽􀁬􀂷 .•􀁾.•..􀀭􀀭􀂥􀁊􀀭􀀭􀁩􀁟􀁬􀀮􀀭􀁾􀁾􀁾-􀀭-.-􀀮􀁟.--􀀭􀁾􀀭􀀭􀁟􀀽􀀭􀀭􀁾􀁾••􀁾􀁟􀁾􀁣􀀭􀁟􀀮􀁟􀀽􀁾􀀽􀀽� � ••_ 􀀭􀀭􀀭􀀭􀁾 ..t:;;2 􀀭􀀭􀀭􀀮􀀭􀀭􀀭􀀮􀀭􀀭􀀮􀀭􀀭􀁾􀀭􀀭􀀭􀁾􀀭􀁾􀀭􀁾􀀭􀀭􀁾􀀭􀀭􀀮􀀭􀀮􀀭􀀮􀀭 􀀽􀀽􀀮􀀭􀂷􀁬􀂷􀀭􀀽􀀽􀁈􀀽􀀭􀁾􀁾􀁟 􀀮􀁾􀀭􀀭􀁟􀀮􀁟􀁾􀁾􀁾􀀭__. 􀀭􀁟􀁮􀁾􀀭􀀮􀁾􀀽􀀮􀀭􀂷 j *' _ -== :::sat-􀂷􀂷􀀭􀂷􀀭􀂷􀂷􀂷􀂷􀂷􀂷􀂷􀀭􀀭􀀭􀀭􀂷􀀭􀂷􀂷􀀭􀂷􀂷􀂷􀂷􀁾􀁩􀀮􀀧􀀭 -􀀭􀀭􀁾􀁾􀀭􀀭􀁦􀁁.:=-77--...---. ......------.. -------.-----OJ 􀀮􀀭􀀭􀀭􀀭􀀭􀀭􀁾 ..----------.---.-.---.-..--..---􀀭􀀭􀀭􀀭􀀮􀁾􀀭􀀮� �􀀭􀀭􀂷􀁲􀀺􀀺􀀺􀁾􀁦􀀧􀀼􀁬􀂷􀀭􀀭􀀭􀀭􀀭􀂷􀀭 __ ---.-.-.---.--.------.-.-. (1..---.----. ··------Ir-····...0--􀀭􀀮􀀭􀀭􀀮􀁾􀀭􀀭 -----.. -.-e--·--·__··-_· -..-.--.-.-.. -. .-.--_-._--.-.-.-.-. . ..-... .--..-. ----.......---. 􀁾􀁟􀁟􀁟􀁾 .__ ._. I-􀀲􀀭􀁊􀀭􀁾 􀁾􀀭􀀭 􀁗􀁾 . ._._--􀁾􀀽􀂮􀁬􀁾􀁾􀀽􀀭􀁾􀁾􀀽􀀴􀀺􀁾􀁾􀀭􀁾􀁩􀀽􀀭􀀽􀀽􀁾􀁾􀀽􀀽 I 􀁾􀁻􀁑􀀽􀀧􀀭􀁾 l4 􀀭􀁾􀀭􀀮􀀭􀀭􀁴 􀁾􀁟􀀽 !J 􀀮􀀭􀁾􀁌􀀮􀀭􀀭 .....A:CQ--.=􀀭􀁾􀁾􀀭􀁾􀁟•􀀭􀀮􀀭􀀮􀀽􀀮􀁾􀀽􀀽 I 􀁦􀁯􀁳􀁦􀁾􀀱 􀀮􀀭􀀭􀁾􀀭􀁃􀀱 --.... -------'---·----··_·-------1 􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀮􀀭􀀭􀀮􀀭􀀮􀁾􀀭 ---"-----.-----------. ----.-' ----.---------..􀀭􀀮􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁾􀀭􀀭􀁾􀁾􀀭􀀭􀁾􀀭 -.----.--,.-... ',-----,--'.-_..._._--_. .---. -----..---.---..-----------.---. --.-...---...-----..-.-....􀀢􀀢􀀭􀀭􀀭􀀭􀁾􀀭􀁟􀀮􀀭􀀮􀀭􀀭� �􀀭􀀮 -,.-._ .____􀀮􀁾 . 􀁾􀁾􀀮􀁾􀁾􀁟􀁾􀁾􀁴􀁦􀀡􀁟􀀭􀀭􀀭􀀭􀀭 _. .___ .__ .._.___ . __ •􀀽􀁲􀁊􀀭􀁾􀁾􀀭􀀺􀀺􀀺􀀺􀁾􀁾􀁉􀁑􀁦􀁾􀁾􀀺􀀭􀁩􀁴􀁾􀀭􀀮􀁾􀁾• 􀁾􀀭􀀭􀀭 􀀭􀀭􀀬􀁩􀁊􀀡􀀺􀁤􀁾􀁴􀁦􀀺􀀵􀁴􀁾􀁾􀁾 􀁾 ell :;. i ·HI rIHi! l!l lJ] lit ii, j j 􀁾 IJI .......---, ---tllrt-''.. -_ 􀁾􀁾􀁟􀀮__􀁾􀁟􀁾􀁟􀀬 􀁾􀁟􀀮􀀬..., 􀀬􀁾􀀬􀀮 __􀀬􀀮􀁟􀁾􀀬..􀁟􀁾􀀢􀀢􀁾􀀮􀁾􀁟􀀭􀀭􀀭􀀮􀀭􀀮􀁾 ..-..􀁟􀀭􀀭􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭 ----.--.-.----􀀭􀀭􀀮􀁾􀀭􀀭..-.-._._-_. .. .. . IiI . ._._. . 􀁾__. .__ __..􀁾􀀮􀁟.._ 􀁾 '.'"''''_''' 􀀭􀀭􀀭􀂷􀀭􀀭􀀭􀀭􀀭􀂷􀁾􀀭􀂷􀀭􀀭􀀭􀂷􀁲􀁲􀁲 ....--.--.-.....--..---------..-.-.---..-..--J j; 􀁾􀀫􀁴􀁴􀂷􀁟􀀭 .. 􀀭􀀭􀀭􀀭􀀭􀁾 􀀭􀁾􀀧􀀢 ..-li, --HItlt-􀁾 ; j H1 '--m 􀀭􀀭􀀭􀁾􀁾 􀀭􀀭􀁟􀀮􀁟􀁾 n1; Ii Iii I􀁾 ---------------------It􀁾􀁾 􀁾􀀩􀁾􀀭􀀭􀁾 􀁾 _ 􀀭􀁬􀁲􀁴􀁾􀀭􀀭􀁾􀀭􀀭􀀭􀀭 --------􀀭􀀭􀀭􀀭􀀭􀁦􀀭􀀭􀀭􀀭􀀭􀁾􀀭􀀭􀀭􀀭􀀭 ---------------w ...._--􀀭􀀭􀀭􀁾 -------------􀁾􀁾􀁾􀁾􀁾􀀽􀀴􀁬􀁾􀀺􀁨􀁬􀀱􀀺􀁾􀁾􀁾􀁾􀁾􀀭􀁾􀀽􀀭􀀭 11------􀀷􀀨􀀮􀀭􀁴􀁴􀀭􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁟􀁾􀁾􀁾􀁾􀀭􀀭􀁾 I 􀁾 _ --------------------.------ --------------------􀀮----􀁾0--􀀮--------------------------- 􀀭􀁾􀀭􀁟􀀮􀁟􀀮􀁟􀀭􀀭􀀭􀀭􀀭􀂭 'J -0·---··_·-􀀱􀀱􀁾 . 􀀭􀀭􀀭􀁾 􀀮􀁟􀀭􀁾􀀭􀀭 /Z :5,1'f-. '\) 􀀮􀂷􀁚􀀱􀀻􀀻􀀻􀁌􀀻􀁾􀀻􀁴􀁾􀀭􀁦􀀡􀁾􀁾􀀽􀁾􀁭􀀻􀁹􀁾􀁬􀀭􀀭􀀽••.􀁾􀂷•....•.••••••.. 􀀶􀀬􀁾􀁴􀀺􀀭 􀁪􀁾􀁺􀁾􀁲􀀮􀀨􀁧 ·Qm;Y1 ... 11,0rrttA . 􀁨􀀡􀀮􀁉􀁾􀁴􀀢 .. /' 􀁺􀁾􀁟􀀮􀀮 􀀴􀁾􀀹􀀬􀁾􀀱􀁾 J1,Q /1'Lyh. ..􀁦􀁩􀁟􀁱􀁾__t.. 􀁬􀁬􀁟􀁾􀀮 __ ., .. 􀁟􀀿􀀺􀀮􀀮􀁾􀁾􀀯􀁾􀀮 ,,,_._-JZ·Q .....􀁾􀀮􀁾􀀮 , II􀁾􀁉􀁊 JI _ _____􀀮􀁟􀁾􀁟􀀭􀀫􀀫􀀫􀀭􀀭􀁉 􀁾􀁾􀀽􀁾􀀾 ._ E. ! 􀀽􀀭􀀭􀀽􀀽􀀭􀀡􀀭􀁾􀀦􀁊􀁲􀁬􀁾􀁾􀁾􀀽􀁾􀁇􀀭 􀀽􀁾__􀁾􀀭􀀭􀁌􀁾 ---.----.-.--.-i -------'-----_._--------------------_.._---_._-_.--,.._--.__. _..-􀁟􀁟􀁟􀁾 I ---􀁾 􀀶􀁾􀀭􀀬 _ --􀀧􀁟􀁾􀀱􀁌􀁂􀁟􀀻􀁊0 i l _ , tV 􀀸􀀢􀁾􀁜 , 5 r; yo-;/, ----------.-.-.------􀀮􀁟􀁾􀀭􀁟􀀭-----------.L.!..)-._._.,... 􀁾􀀮􀁟􀁾􀁾􀀮􀀮􀀮􀀮􀁌􀀮􀀮􀀮􀁾􀁟􀀮􀁟􀀮__ ,0. 􀀬􀁾􀀯 '. _' , ' . . I --------+t+--__􀁾􀁟I 􀀭􀀭􀁁􀁾􀁦􀀢􀀢􀁾􀀧􀀦􀁕􀁬􀁌􀁜􀁊􀀱􀁾􀁾􀀭􀀭􀀭􀁄􀁾􀀯􀁾 􀁉􀁾 . _ -----H+-----J_fL }Ytr__􀁾􀁾􀁾 􀁟􀁾__N'CL .__. _ 􀀭􀀭􀀭􀀭􀀭􀁾􀀮 􀀺􀁟􀁾􀀽􀁟􀁾􀀽􀁾􀁾􀁾􀁾􀁾􀀿 􀀭􀀭􀀽􀁟􀁾􀀭􀁾􀀭􀁾􀁾􀁾􀁲􀀻 􀀵􀁾􀀻􀀺-______._ I 􀁟􀀯􀁾 􀀮􀀭􀀭􀀭􀀦􀁊􀀻􀁴􀁫􀀱􀀷􀁾􀀭􀁟􀁟􀀻􀁟􀀭􀀭􀀭􀁮􀁾􀀮􀀭􀀭..􀁾􀁾􀀭􀀭􀀭􀀮􀁾􀀮􀀭􀁾􀀳􀁶􀀭 .. . 􀁾 a: 􀀮􀁟􀀽􀀭􀀽􀁾􀀭􀀭􀁪 􀁬􀀭􀀭􀁾􀁾􀀺􀀻􀀮􀁾􀁾􀁾􀁾􀀽􀁾􀀯􀁩􀁩􀁾 􀀽 􀀭􀁾􀀭􀀭􀀭􀀽 􀁾􀀭􀁐􀁬􀁾􀀭 .---j\••􀁾􀂷􀀭􀁫􀁩􀁾􀀭􀁾􀀭􀀭􀁩􀁬􀀯􀀧􀁍􀁾􀀽􀀭􀀭􀀭􀁾􀀭􀀽􀀭􀀽 􀀮􀀽􀁾􀀽􀀭􀀭􀀭 I .__.._._..--􀁾􀀭􀀭􀀭􀀭􀁟􀀮􀁟􀀭􀁟􀀮__.._--._-_....__ .... _-..__._._------_.... _---------_._-.._-_.-._._.. _-_..._------..__.__.----. .' 􀁾􀁟􀀮􀁾􀁾 􀁾 .._--------_..._------.-----::1I -·-·----··-----·------·· -------.---------.-----.----.--..--.-------.-.-.-.-. -.--...---.--.-.-I ____. i L_______. .... .__._. .n.__._... . . . __ ..._.. ..__ ._.. _. __.. _ ._.. . _. ._.. ..iI -_-_ __. '-".-' -.. ---_.--"--" -__ __._---_.__. __.._ _-.-.. -.-" ._ _ -'-'-' .. _-_._ __ _ -_ . 􀁡􀁬􀀱􀁾􀁾 􀀭􀀭􀁾•• -. __ ••• -.< ...",••...• , .. 􀀬􀀮􀁟􀀭􀀭􀀭􀀬􀀮􀁾􀀮􀀭 •. """ --"., ",-_' .-•• -._ •• --_•••••-.--_.__ ••• .-_., •• 􀀬􀀭􀀭􀁾􀀭􀁟􀀮􀀬 •• ",,-_., .-----.--_.-• •• 􀀧􀀭􀀭􀁾􀀭􀀭􀁟􀀮􀁾􀀭 I! .. ) iI! I 􀁴􀁴􀁮􀁦􀁁􀀮􀀦􀁾 ------.-----.-----􀁾􀁴􀁟􀁟􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 ---'C...f,L----.----􀀽􀁾􀀭􀀭􀀭􀀭􀀻􀁾􀁾􀁾􀀭􀁾􀀭􀀭􀀭􀀽􀀭􀀭􀀭􀁾􀀭􀀭􀀭􀀭􀁟􀀮􀁟􀀭􀀭􀀭􀀭􀁾 􀀽􀁾􀀽􀀽 --! .---􀁎􀁂􀁾􀀭􀀭􀀮 '2£;>. .--------------------ri-------􀀽􀁩􀁥􀁬􀀧􀁾􀀱􀀮􀁌􀀭􀀭 /. __ -3 -fiuu--􀁾 􀁾􀀮􀁟􀁾􀀭􀀭 􀂷􀀭􀁾􀁾􀁬􀀭􀁾􀀭􀀭 /􀁾 􀀭􀁾􀀭 -------+--􀀭􀀭􀀭􀀭􀀭􀀭􀁟􀀮􀁟􀀭􀀭􀁾􀀨􀀭􀁾􀁾 􀁾􀀭 -----.! 􀁾􀁉􀁦􀁲􀀮􀀻􀀻􀀨 . I 􀁾 􀁾 ---11,, . ( -------:-. 􀀱􀁾􀀭􀂷􀁾􀀭􀁾􀀭􀀭􀀭􀀭􀀭􀀻􀁲􀁗􀀭􀂷􀂷􀀪􀀭􀂷􀂷.􀁾-􀀭. 􀀭􀁾􀀭􀁾􀀭􀁾􀀭􀀮􀀭􀀭􀁾􀀭􀁾􀀭􀀭􀀭􀁾􀁾􀀮􀁩􀁲􀁾􀀿􀁊􀀮􀂣􀀻􀀻􀀻􀀭􀀭􀁟􀂷 􀁾􀁾􀁟􀀮􀀭􀁾􀁟􀀭􀀮_--_-.-__.-.--4+-1--1 1,.... 􀁾􀀭􀀮􀀭􀀭􀀭􀁾􀀭􀁾􀀭..-.-----.-----.-􀀭􀀮􀀭􀀭􀀭􀀮􀀮􀀮􀁾􀁴􀁪􀁴􀀱􀀺􀀭􀀽􀀽􀀽􀁾􀁾􀁾􀁾•.•=....􀁾• --. -=.---=-= _._._---.._-------_._._.__._.._._._-_..__.._- _... __ .--..__._._---_._._------_.....----...---._--_.-._-_._-_._._.----_._..._-.-._------------_.._--._----------------􀁾 .----------ft----------.-------------.-...---------------.-----.-.. -------..----------:1 ._-_..._ ......._---..._._ .._----_... _.. _._-_._----_.--._-_.-ii 􀀽􀀽􀀽􀀽􀀭􀁾􀀭􀁾 􀁲􀀭􀀽􀀭􀀭􀀮􀀽􀀽􀀽􀂷􀂷􀂷􀂷􀂷􀂷􀁾􀀽􀀭􀀭􀀭􀀭􀀮􀀺􀀺􀀺􀀭􀀽􀀭􀂷􀀽􀀽􀀽􀀽􀀽􀀭􀀽􀀭􀀭􀀭􀀽􀀭􀀭􀀭􀀭􀀽􀀭� �􀀽􀀭􀀽 􀀮􀁾 _. L_... . . ._.__. ... .. .._ ..__..__. .. . .. _ , 􀁾􀁾Ii ---------_.------􀁾..._------------------_.-_.__..._.__._-._-----------_..._----_._---_ ..__._-_.----.._------_._--_._-----_.. .-. 􀁾􀁬 . 􀁾􀀺􀁲􀀭􀀭􀀭􀀭􀀭􀀭􀁾􀁾 􀀭􀀭􀀭􀀮􀀭􀀭􀀭􀀭􀀭􀁾􀀭.._--------------, --_ .. -------,---------------_ .._--_.__. 􀀭􀁾􀀭􀀭􀀭􀀭􀀭 I . 􀁾 ..---.----.-:􀁾􀁴􀀺􀁾􀀭---.-.--------------....----.------. --.-.--Ii--· -------. ...........---------.-.------------.------.---·--·r t-·--·-----------··--·--+􀁾􀀮 11 1IlIl . I -------11 -1; ___I 100.0 oPoints 50.0 -99.99 3 Points 10.00 -49.99 5 Points 5.00 -9.99 7 Points < 4.99 10 Points Sustainable Development! Redevelopment! "Smart Growth" Rating (10 Points) Each project submittal will be evaluated with respect to encouraging regional sustainable development or "smart growth" patterns (i.e. densification of the urban core counties) 6r redevelopment of distressed areas. There will not be a sliding scale of points available for this criterion. Each project will either receive the full 10 points or will receive a zero. A project located within a census block classified as "Distressed" or "Under-Utilized" as defined in the Dallas County Tax Abatement Policy will receive the full 10 points; all other projects will receive a zero. The aforementioned policy defines a "Distressed" area as a census block whose median family income is less than or equal to 150% of the poverty level for a Dallas area family of four or a census block contained within a federally or state-designated enterprise zone. An "under-utilized" area is a census block that meets three of following five criteria: 1) Low population growth (percentage change in population that is less than the County average for 1980-1995) 2) Low employment growth (percentage change in employment that is less than the County average for 1990-1995) 3) Low traffic congestion (roadways where, in 1995, no more than 30% of lane miles exceeded free-flow traffic levels during peak hours) 4) Low property values (median value of owner-occupied structure is no greater than 50% of the County median) 5) Predominantly low/moderate income population (at least 51% of population earns less than 80% of the Dallas area median household income) For census blocks that are at least two-thirds (2/3) undeveloped, only one of the five criteria listed above need to be met to qualify as "under-utilitized." 9 Intermodall Multimodall Social Mobility Rating -(10 Points) Each project submitted for funding will receive a score based either on its ability to involve more than a single mode of travel or its long-term economic development potential that could benefit the community. There will not be a sliding scale of points available for this criterion. Each project will either receive the full 10 points or will receive a zero. There are four separate elements that comprise this scoring criteria and a project that addresses anyone of these elements will receive the full 10 points. These four elements are: • Intermodal Project -A project that provides for the interaction of two or more transportation modes in a given area and which promotes the efficient movement and transfer of people or goods. • Multimodal Project -A project that facilitates non-SOV (single occupant vehicle)modes of transportation. • Social Mobility Project -A project that provides transportation services to individuals or groups who need some form of transportation due to an inability to utilize existing forms of transportation. This can· include services to the elderly and disabled or economically disadvantaged individuals. • Infrastructure Investment Project -A capital project with a likelihood of producing long-term economic benefits as opposed to an operational project which only provides direct benefits for a given short time period. Special Case Rating Methodology Special Case #1 -If all or part of a roadway consisted of a new roadway, then it was not possible to calculate a Speed Delay Rating, a Benefit-Cost Ratio Rating, or an Air Quality Rating. In these cases, the Speed Delay Rating, the Benefit-Cost Ratio Rating, and the Air Quality Rating are all given zero points, and the maximum points for the Traffic Volume Rating are increased to 40. This is accomplished by multiplying the Traffic Volume Rating by four. Special Case #2 -In certain situations, the Benefit-Cost Ratio may be misleading because the traffic induced by the capacity improvement was so great that the resulting congestion was higher than without the improvement. This signifies that the project is highly warranted. Projects falling under the Special Case #2 category will receive zero points for the Benefit-Cost Ratio Rating, and the maximum allowable points for the Traffic Volume Rating will be increased to 20. This is accomplished by multiplying the points assigned to the Traffic Volume Rating by two. Special Case #3 -The criteria which use percent change as a basis for scoring, Traffic Volume Growth Rating and Travel Desire Rating, could be misleading if the absolute value of the traffic volumes is less than 5,000 in the year 2020. To avoid overrating these projects, the maximum points available for the Traffic Volume Growth Rating Criteria and the Travel Desire Rating will be reduced to five for each rating element. This is accomplished by dividing the score for these two criteria by two. 10 ) j LOCAL COST PARTICIPATION MULTIPLIER In order to aide in the successful implementation of the Dallas County CMIP, it is imperative to accept only those projects for funding that have a strong commitment from all the stakeholders. One strong indicator of this commitment is the value of resources being contributed. In order to reward those projects with strong commitments, a multiplier based on the value of the local commitment (as a percentage of the total project value) will be applied to the aggregate scores..This multiplier will be equal to 1 plus the percent of local match, expressed as a decimal. .Thus, if a City commits to a match of 50 percent of a project's value, that project's aggregate score will be multiplied by·1.50 in determining the final score. For a match of 20%, the multiplier is 1.20. As the financial resources of all possible stakeholders are not equal, said multiplier may be considered to be inherently biased against those possible stakeholders with limited resources. Therefore, in order to mitigate this perception of inherent bias, bonus points will be assigned to those cities where 60% of the land area falls in census blocks defined as "Distressed" or 51% Low/Moderate Income. This bonus consists ·of adding 0.3 to the multiplier for any project submitted by a city qualifying for the bonus. For example, a the multiplier for a project submitted by a qualifying city contributing 20% of the total cost of the project will be 1.50 (1.20 plus 0.30), the same multiplier applied to a project for a nonqualifying city contributing 50%. In other words, the qualifying city is receiving the equivalent of 60% of the local contribution factor (30 of the 50%) in the multiplier. Example 1. Projects for Cities A, 8, C, and D all finish with aggregate scores of 80. Cities A, 8, C, and D agree to contribute 50%, 20%, 0%, and 20%, respectively, of the cost of the project. City D qualifies for the 60% local match mUltiplier bonus. The multiplier for the four projects are as follows: City A -1.50 City 8 -1.20 City C -1.00 City D -1.50 The final point totals for the four projects, computed by multiplying the aggregate total by the multiplier, are as follows: City A -120.0 City 8-96.0 City C -80.0 City D -120.0 Example 2. City Q is a qualifying city and contributes 20% of the project cost. a's project finishes with an aggregate score of 70 and a total score 105.0. City R's project finishes with an aggregate score of 100, but since R is not willing to commit local resources (and is nonqualifying), the project finishes with a total score of 100.0, below a's. So does City S's project with a total score of 102.0, which finished with a higher aggregate score of 85 but was supported with a 20% local commitment (S is a non-qualifying city) resulting in a multiplier of 1.20 compared to Q's 1.50. 11 I I 1990 BLOCK GROUPS N DISTRESSED AREAS • PREDOMINATELYLOWIMODERATE W E INCOME BLOCK GROUPS 8 0 8 Miles S 􀁾􀁩􀁾􀁾􀁾􀁾 􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀁩 LOt lion of Distressed ...}eas and Under-Utilized Areas Under Dallas County Tax Abatement Policy. I I 1990 CENSUS TRACTS _ DISTRESSED AREAS UNDER-UTIUZED AREAS s SCALE: i"" = 4 MILES 2000 Dallas County Call For Projects APPLICATION INFORMATION Submitting Agency: Contact Person: Address: Telephone Number: e-mail address: Your agency name Your name Street 1 Street 2 (123) 456-7890 johndoe City TX ZIP Facsimile Number: (123) 456-7890 @isp.net PROJECT INFORMATION Location: Beginning: Ending: Functional Classification: # of Correctable Accidents: (over past 3 years) Through lanes Left turn lanes Right turn lanes Sidewalks Bicycle Lanes Big Street Cross Street NIA R Existing 111oo o MAPSCO: Project Length: Avg Posted Speed: Avg Operating Speed: Traffic Volume: Traffic Volume Source: Proposed 111YY 45Y 0.00oooo Description of Proposed Improvement(s): This is where you describe the project in greater detail. At a minimum, this description should detail existing conditions, the proposed project, and how the proposed project will be an improvement, including the social mobility benefits. For example afacility that serves as abus route will score higher on the ·social mobility rating" than an equal facility that is not a bus route Schools, low income housing facilities, elderly housing facilities, facilities for the disabled, transit centers, "Park-and-Ride ots, HOV or similar ·diamond" lanes, an abundance of underdeveloped, undeveloped,· and economically distressec properties, and connections to the veloweb and other similar facilities are elements that can boost a project's score an should be enumerated in this detailed description. Note, however, that it would be redundant to reiterate information (such as project 􀁣􀁯􀁳􀁾 traffic counts, accident data, etc., tha lappears elsewhere on this form. 2000 Dallas County Call For Projects APPLICATION INFORMATION Submitting Agency: Contact Person: Address: TX Telephone Number: e-mail address: Location: Beginning: Ending: Functional Classification: # of Correctable Accidents: (over past 3 years) Facsimile Number: @PROJECTINFORMATION MAPSCO: Project Length: Avg Posted Speed: Avg Operating Speed: Traffic Volume: Traffic Volume Source: Through lanes Left turn lanes Right turn lanes. Sidewalks Bicycle Lanes Existing Proposed Description of Proposed Improvement(s): Total Project Cost: $ Rjght-of-way Cost: $ Engineering/Design Cost: $ Utility Cost: $ Construction Cost: $ Local Cost Contribution: $ in percent of total cost: PROJECT COSTINFORMATION 511121 20% 2000 Dallas County Call For Projects APPLICATION INFORMATION Submitting Agency: Contact Person: Address: TX Telephone Number: e-mail address: Location: Beginning: Ending: Functional Classification: # of Correctable Accidents: (over past 3 years) Facsimile Number: @PROJECTINFORMATION MAPSCO: Project Length: Avg Posted Speed: Avg Operating Speed: Traffic Volume: Traffic Volume Source: Through lanes Left tum lanes Right tum lanes . Sidewalks Bicycle Lanes Existing Proposed Description of Proposed Improvement(s): Total Project Cost: $ Right-ot-way Cost: $ Engineering/Design Cost: $ Utility Cost: .. $ Construction Cost: $ Local Cost Contribution: $ in percent ot total cost: PROJECTCOSTmFORMATION % i j January 20, 21J00 PUBLIC WORKS DEPARTMENT Post Office Box 9010 Addison, Texas 75001-9010 ) (972) 450-2871 16801 Westgrove City of Dallas Open Records Section Attention Lieutenant Wesson Via Fax: 214-670-5180 Re: Request for Accident Infonnation Dear Lieutenant Wesson: I am preparing applications for Dallas County Public Works funding through their "2000 Dallas County Call for Projects". We are applying for funding for improvements at the intersection of Belt Line Road and Dallas Parkway, and, the intersection of Arapaho Road and Dallas Parkway. One ofthe application requirements is that we attach three years worth of actual accident data for each intersection. The infonnation will be used to determine if the improvements will reduce the accident rate. I am requesting this information pursuant to the Open Government statutes in Texas. I am requesting information about: DescriptionlDetails ofthe accident Report Number I understand that ifany accident about which I have requested information is pending litigation I will receive only that portion that is required to be released. I understand that the City of Dallas has ten days to process my request. I understand that in lieu of releasing the infonnation the City of Dallas may request an opinion from the Office ofthe Attorney General. I understand I will be contacted by mail or by phone when this request is completed. I understand that completed requests will be held for only fifteen calendar days after notification by mail or phone. (My phone number is 972-450-2879). Thank you for your assistance. Town of Addison EVIT"'-W'􀁾􀁾 es C. Pierce, Jr., P.E. 􀁾􀁳􀁩􀁳􀁴􀁡􀁮􀁴 City Engineer cc: Chris Terry, Assistant City Manager Michael E. Murphy, P.E., Acting Director of Public Works HP LaserJet 3100 Printer/Fax/CopierlScanner :,) 􀀭􀀻􀀺􀀢􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁾'SEND CONFIRMATION REPORT for Town of Addison 9724502834 Jan-20-00 11:13AM Job start Time Usage Phone Number or 10 Type Pages Mode Status 462 1/20 11 : 12AM 0'30" 2146705180 Send .... ,........ , 11 1 EC144 Completed ........................................ Total 0'30" Pages Sent: Pages Printed: 0 􂀢􀁾􀀮􀀭􀀺􀁾􀁾 i • ' 􀁾 􀁾 .ADDisoN PIIIIUC WORKS DEPARTMENT 􀀢􀁶􀀻􀀱􀀮􀁜􀁗􀀮􀀮􀁾􀁾􀁾􀀪 􀁐􀁾􀁬􀁯􀁭􀁣􀁥􀁂􀁯􀁮􀀮􀀹􀀰􀀱􀀰 AddiaGa,Tuu 75001.9010 city of Dallas Ope" Records Section Attention Lieutenant Wesson Via Fax: 214-670·5180 Rc: Request for Accid.:nt lnfonnation Dear Licutenant Wesson: (972)450-2871 lliOO1WeatlfOYC J am preparing applications for Dallas County Public Worics funding througb their "2000 Dallas County Call for Projects", We are applying for funding fur improvements at the intersectiOD ofBelt Line Road and Dallas Parltwuy. aDd. the intersection of ArapaJ1.o Road and Dallas Pari",,'8.)'. One of the application requirements is that we attach three years ,",,'Orth ofactual accident data for each interst:etion. The informatioD wiD be used. to detennine ifthe improvements will reduce the accident ralc. I am requesting this infonnatioD pursuant to the Open Govemmcnt statutes in Texas. I am requesting informatioD about: DescriptionlDetails of the accident Report Number I understand that if an)' accideDt about whiclt I have requested information is pending litigation 1will receive only that portion that is required 10 be released. I understand thal the City of DaUas has ten days to process my request I understand Iha1 in lieu of releasing the infonnation the City of Dallas may request an. opinion from the Office of Ole Attorney General. I understand I will be contacted by mail or by phone when this request is completed. I understand lhal completed requests will be held for only fifteen calendar days after notification by mail or pbone. (My phone number is 972-450-2879), Thank you for }"Our assistance. Town of Addison 􀁾􀁾􀁩􀁾􀁾 􀁾􀁳􀁴􀁡􀁯􀀬 City EogUu:er cc: Chris Terry. Assistant City Manager Michael E. Murphy. P.E.. Acting Din:clor of Public Works Jan-20-00 09:46A AOO:":}N COURT P.02 db, (TftrI..􀁾􀁄􀁥􀁰􀁡P􀁲o􀁾li􀁔c􀁮e􀁥􀁮􀁾 PLEASE PHINT ALL IN¥ORMATION 'l.'oday·s natc: . Requesto['s Name: Comp 1e tc Mail i n q """':A:'"'"d-:-d-:--r-e-s-s-:-- __--' .. Home Phone Number: Work Phone Nurnb-e-r_:--------.._--------I am requesting infot"mation pursuant to the Open Government statutes i.n 'l'exas. I am requesting information about: Type of Incidp.nt: _ Report Number: ----Address of IncIdent;----,,-------Name of Party{Parties):-------------------_. ----_. 􀀭􀁟􀀮􀁟􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 -_..---..􀁟􀀭􀁟􀀮􀀢􀀭􀀭􀀭􀀭􀁾􀀭􀀭􀀭----_.---I understand that if the incident about which r have requested information is pending litigal.i.on I will receive only that portion that is required to be released. I understand that the Addison Police Department has ten days to process my request. r understand that in lieu of releasing _the information the Addison Police Department may request an opinion from the Office of the Attorney General. I understand that r will be contacted by phone or mail when my request is completed. I understand that completed requests will be held for only fifteen calendal; days after notification by mail or phone, Signat:.\ire of Requestor... ·----OI!'L·'lCF.: US F: ON LY Oil Le No l. i 􀀨􀁩􀀨􀁾􀁤 : 􀁍􀀮􀁾 i 1 ny WhOlll: Pholle -. -_..._-- ..Jan-20-00 09:46A ADD!-?N COURT 􀀹􀀷􀁾 J50 􀀡􀀮􀁈􀁾􀀬􀁏 .........==-_ 􀁾􀀮􀀬􀁏􀁬 " , ) ' .. ,., .. 􀀢􀁟􀀧􀁟􀀧􀁟􀀭􀀧􀀭􀀺􀀭􀀭􀀺􀀭􀀴􀁾􀀢 It:t., '.7••• :., 􀁨􀁾􀁾􀀬􀀻􀀮􀀢 􀀧􀁾􀁩􀀮􀁦􀀤􀀺􀀻􀀻􀀻􀀻􀀻􀁾􀀬 .. 􀀺􀀧􀁾􀀭􀀺􀀺􀀺􀀧􀀡􀁾􀀻􀁾􀀮􀁾􀁾 􀀢􀀧􀂷􀀧􀁾􀀭􀀧􀀺􀀧􀁾􀁾􀀺􀀧􀁾􀁾􀁾􀂷􀀺􀀺􀀻􀀺􀀽􀀭􀀭􀀺􀂷􀀻􀀢􀁃􀁾􀀴􀀵􀁾􀁾􀀧􀁕􀁾􀁪􀁯􀁾􀁾􀀣􀁾􀀡􀀡􀁦􀁾􀁾􀀭􀀭􀂷􀀺􀁴􀁲􀁾􀁾􀁾􀀷􀀧􀀽􀀰􀁾􀀹􀁩􀁩􀁦􀀬 .;􀀺􀁾􀀨􀀺􀀬􀀭􀀺􀀺􀀮􀀭􀀢􀀧􀀷􀀧 􀁬􀀧􀀻􀀭􀀭􀀽􀀮􀀮􀁹􀁯􀀬􀀬􀀭􀁾􀀺􀀮􀀮􀀺􀀢􀀬 􀀮􀁾􀁩􀁾􀀭􀀧􀁾􀀮􀁾􀁾􀀻􀁌􀀻􀀺􀀭􀀺􀁩􀁾􀀣􀀺􀀻􀁾􀀬􀀮􀁩􀁾􀁾􀀻􀀻􀀻􀀢􀁾􀀱􀁩􀁪􀁩􀀺􀀬􀀺􀀻 􀁾􀁾􀁾􀁾􀀧􀀬􀁾􀀮􀀭􀀮􀁾􀀽􀀭..'._, '."=.':: 􀀯􀁾􀁾􀀻􀀭􀁾􀀮􀁴􀁾􀁾􀀮􀀮 _. 􀁾􀀮􀀮 􀁩􀁴􀁩􀁬􀁬􀀢􀁒􀁾􀀧􀀧􀀧􀀧􀀧􀀺􀀺 .-:􀁾􀁾􀁾. 􀀢 . '.' :"".'"."':'.'t:􀁾.􀀢􀀢 • ",....•.. < 􀀢􀂷'􀁾􀂷"􀂷􀀧􀁙􀁗􀂷􀂷􀀷.W􀀺􀁭􀀡J􀀷J􀁾.􀁉..􀀻􀁾v􀁾·􀁾'􀁬r􀀺􀀧􀀢 .--.. ":" Fax To: From: .. . '" 􀀭􀀭􀀭􀀬􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭 · ..... iii . ) 􀁾􀁾􀁴􀀭 J.-1t(.-053 -1151 JI! 􀁾 􀁾 . ... . ._._._J:::-_I. 􀁾􀀮􀁟􀁾􀀮􀁟􀀮__.._._. . .------..------I: 􀀭􀀭􀂷􀂷􀀭􀁾􀀭􀀭􀁦􀁃􀁬􀁾􀀭􀀭􀁾􀂷P􀂷􀁾􀀭􀀽􀀭􀀭􀁬􀀭􀁾􀀺􀀻􀁬􀀭􀀭􀀱 7 t:':'" l . _..__._.__._ I L -b5'3 -t. ;;;) . ._.. _ '. ! 􀁾􀀭􀀮􀀧􀀺􀀡􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭..-.---. '. L... _ .-i-:;... 7 .-------...--.-...-.-.-....+.: ---.. -. __..[ft--. t.A: . 􀁾􀁾􀁾􀁾􀀴􀁁􀁍􀀭􀀱􀁾_ _'"'_JlJ ! ..__.._.... _ ----·-------·-1i--"􀁾􀀭􀀭􀁾􀀭􀀬􀁾􀀭􀁾􀀺􀁲􀁾􀀭􀀭􀀭.􀁾􀀭􀁁􀀡􀀯􀁁􀁟􀀭􀀭􀀭􀀭􀀭 . --.--.-----.-..􀀭􀀭􀀭􀀭􀀭􀀮􀀭􀀮􀀭􀀭􀀭􀁾 i 􀁾􀀭􀀭􀀭􀁟􀀮􀀭􀀭􀀭􀀮􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭...-...--.-_ . ..__._,. _ .. ._.. .__ 􀂷􀀭􀁾􀁾􀁾􀀽􀁾􀁾􀁾􀁩􀁴􀁾􀁾􀁄􀁾􀁾 \;:=.􀀭􀀭􀀭􀀭􀀽􀀽􀀽􀀽􀁟􀁾􀀽􀁾􀀭􀀭􀁾 ---.---.-.-.----I!-----􀁾.h..:.-t.. --. -.---1.: __.__..-;; . '._ . -.---.----i-----.--.----􀀭􀁾 n..A. -􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀱􀀩􀀨􀀢􀀢􀀭􀁾􀀷􀀭􀀭􀀮􀀭􀀭􀀭􀀭..-.. 􀁾􀁟-.-. 1._..._.._ ..__.. ;. _ hl_ 􀁾􀁾􀀮􀀬 􀁥􀁯􀁾 .._.__._. _ -------T . ._----_._--􀁉􀀭􀀭􀀭􀀭􀁾􀁾􀀽􀁾􀁾􀀽􀀽􀀽􀀽􀁲􀀭􀁾􀀭􀁟􀀭􀁵. 􀀧--=-. . _ 􀀮􀁟􀀮􀁟􀁜􀁟􀁾 -----􀁾􀁾􀁾􀀮􀀭􀀺􀀽􀀭􀁾􀁾􀀭􀀿􀀭􀀭􀂣􀂣􀀷􀀺􀀻􀀭􀀭􀁾􀁴􀀭 -.􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁾􀀭􀀭􀀭􀀭􀀭􀀭 i--'--􀀭􀀭􀀭􀀭􀁕􀁍􀀭􀀭􀁾􀁟􀁾 􀀭􀀭􀁾􀀧􀀭􀀭􀀭􀀭􀀭􀀢􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀧􀀭􀀧􀀭􀀭􀀧􀀭􀀧􀀭􀁊 􀁉􀀿 + -.---.-----+I -..-------.--_.. /.1 -. .-----*1-----------. _ 􀁾\􀀯􀀭I􀁟􀀮__. 􀁾􀁟􀀮􀀽􀀽..􀀻􀀮􀁾􀁾􀁾􀁾 .._-------. -􀁾􀁾􀁾􀁾􀀽 ! -.-(p".rLL . 􀀮􀁬􀁾􀁟􀀮 ..._... _. ---------------.1-.----.---.- I ---------------------------􀀭􀁊􀁙􀀭􀁾 _ ----------􀁉􀀭􀁾􀁾􀀭 􀀭􀁾 􀀭􀀭􀀽􀁾 ---------------------.----V-􀀩􀁊􀁖􀁾􀁾􀀭..􀁾􀁩􀁟􀀭􀀭􀀭􀀭􀀮􀀭􀀭 -----------i 􀀷􀁾􀀭􀀭􀀭􀀭 ) ---􀁾􀀭 ----------------------- -----􀁾􀀭􀀭􀁾􀀭 ---------------._-􀁾I 􀀭􀀭􀁟􀀮__._ . -....--..... .._--------I "-.----. --1"---"'·-1L_ .': ... :.\ ::iI '-1--6C;; 3 􀁾 7 /f£"( 􀂷􀂷􀁾􀁾􀁾􀁾􀁬 􀁦􀀱􀀧􀁁􀀭􀀭􀀮􀁾 􀁾􀁾􀁟􀀮 ,-.# I I I I I I I I I I I I I I I I I I I I HP LaserJet 3100 Printer/Fax/Copier/Scanner SEND CONFIRMATION REPORT for TOWN OF ADDISON 9724502837 Jan-19-00 12:39PM Job Start Time Usage Phone Number or ID Type Pages Mode Status 141 1/19 12:38PM 1'12" 972 599 9008 Send .............. 4/4 EC 96 Completed ........................................ Total 1'12" Pages Sent: 4 Pages Printed: 0 TOWN OF ADDISON, TEXAS SERVICE CENTER FAX NUMBER: 872/45002837 :rD' 􀀧􀀽􀁦􀁾 􀀯􀀳􀀬􀁪􀁊􀁾􀀮 FROM, 􀁾􀁊􀁾􀀶􀀧 COMPANY. 􀁾􀀢􀀭􀁾 FAX 􀁎􀁕􀁍􀁉􀁉􀁅􀁒􀀮􀁱􀀷􀀬􀁬􀀮􀀯􀀮􀀵􀀱􀁩􀀧􀁑􀁾􀀢􀁏􀀮i) DEPARTMENt'. Building ............,on PHONE, OATE:. I-I If-DO NUMBIIlR UP 8HlEEnI' 1/(lHC:L.UIJINCi COVDI .HIUn) -, .. • . i '. 􀁾 " ,. , OOMMENTB• \) 􀁾 .,. . 􀀬􀀱􀁲􀁾 􀁾􀁃􀁩􀁬􀁬􀁲􀁾 . ---.--t-----.----.--..---.. --------.. -------.--.-.-.--.. -.-.---------.-------.---... --. -----.-----.-------.-.---------.---.--. I . . jr c .. flLj.·Pki ... ... 􀁾 ........... 􀁾􀀮􀁧􀁧􀀮􀀮􀁉􀀮􀀮􀀮􀀮􀀮􀀮 􀁾 _______________ J,?Qf>__ 􀁾 􀁊􀀲􀀭􀁾􀁾􀁟􀀮􀁅􀁲􀀮􀀱􀀺􀁾􀁾􀁦􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭 􀁟􀁟􀁟􀁟􀁟􀁟􀀨􀁣􀀲􀀧􀁾􀁨􀁾􀁴􀀭􀀭 ? _______.__. . 11_. ----. . . 􀁾 . .__. _ -'-.---.. _.--_..-􀀭􀀮􀁾􀁟􀀮􀀭 .__.---_. 􀀭􀀮􀁟􀁾􀀭 ._---._.._--..􀀭􀀭􀀭􀀭􀀭􀀧􀀭􀀭􀀭􀀭􀀭􀀭􀀮􀁟􀁾􀁟..􀁾􀀭􀀮􀀬 •....._--._--_...._.---,,,,---,--􀀭􀀬􀀭􀀭􀀭􀀭􀀭􀁾􀀮􀁟􀀬􀁾..._ ---' ..---..-.._,".--,--'-..􀀧􀀭􀀢􀀭􀀧􀁾􀀭􀀭 -----_.. ... .-. -.. ' --_._..... _. .._---_.. 􀁾􀁾􀁾􀁾􀀭􀁾􀀽􀀽􀀽􀀱􀁾􀀺􀂷􀁾􀁾􀁾􀂷􀁾􀀺􀁾􀀽􀀭􀀽􀀭􀁾􀂷􀂷􀂷􀀭􀀭􀀺􀀭􀀽􀀽(P-tl 􀁾􀁩 􀀮􀁾.􀁾􀁾 .... ,:;;i-. 􀁾􀁾􀀯􀀻􀀺􀁾􀀮 II F (103 1/􀁾􀀢􀁄􀁛􀀼􀀺􀀮􀀮 ... .... . 11------------------ll-·---I:IJ:.;;-,fJ-;?-----·-·c.-·-.ilL_·_----_·.-.-.-. --------.----I] 􀁾􀀭􀀭􀀭􀀭􀀭􀁾􀀭 P -.-------1.1-􀁾􀁾􀀮 .... . .. . .._-. ,J)J-I"'-···11 EL'oll).?,,01::._. 􀀭􀀭􀂷􀁔􀁾􀁔􀁄􀁉􀂥􀁊􀁙􀀧􀂷.... . --􀁩􀀺􀁉􀁉􀁆􀁹􀀩􀁏􀀧􀁌􀀱􀀩􀀭􀀵􀀢􀁾􀁣􀀩􀁾􀀭􀀭􀀭􀀭􀀭􀀮 -.----. '-. -..--_,.􀁾􀀭􀁟􀁟􀁟..__􀁅􀀮􀁴􀁾􀀲􀁟􀁾 􀁴􀀬􀁟􀁾..􀁉􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀮􀀭􀀭􀀭􀀭􀀭􀀭􀀭 ..-.--_.----------... . . . .. __ _ ___ 􀀺􀁜􀁾􀁟􀁟􀁟_􀁾􀁜􀁌􀀮􀁟􀀡􀀺􀀿􀁟􀁾􀁾􀁌 􀀮􀀺􀀱􀁊􀀭􀁾􀁟􀁾 􀁾 ... .________ __. . ----.----,. 􀀭􀀯􀀻􀀭􀁾 ..􀀭􀀭􀀭􀁾 .. 􀀭􀁾􀁊􀁪􀀮􀁾􀀭 ..------.---".--..-_.------.----------------.---.-.-------,---"-.---.. -... .--..... --.. ....__.. _---------. 􀀭􀀭􀁾􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀁟􀀮􀁟􀀭􀁟.._.--._. -------------------_.. --.._,_ ...-._----------------_.-----,---._----_.----------------------------.-----------.. ----. --._-._-----.. ----_. 􀁾 '" 􀁾 rY )63 -----_. .--'--􀁾􀀮􀁟􀀮􀀭 .".'". 􀀭􀁾􀀭􀁾 􀀬􀀬􀀭􀀮􀀭􀀭􀀭􀁾.._._.._--_---' ..".-'-􀀭􀀬􀁟􀀮􀁟􀀬􀁟􀀮􀁾 '.", -..􀁾 . I .--􀁾􀀭 -".-.-_k'_ --t---._.,-. ---.--.---.._ '._.-..􀀭􀀭􀁾 .,----',' _.. ----..􀁾􀀭􀀭􀀭 -􀁾􀁟..􀁟􀀭􀀮􀁾􀀮􀁾􀁟 􀀮􀀬 _.' .--_. ._u __._ _A .' .-. . .• -_._••••􀁟􀁾􀀭 -_.-_•••_". ---,----••••--','-• __ .. ---•.-.-" • -'.") .' .I 􀀭􀀭􀀭􀀭􀀭􀀮􀀭􀀭􀀭􀀭􀀫􀁬􀀫􀀭􀀭􀀭􀀭􀀭􀀮􀀭􀀭􀀭􀁾 ...---------. .-'-'.--.--....---' l·----·------------.-----------....-.-...---.--...--... I! -._..... _._ .._-_...._----_..-_._-_..__._-_._. -----' ;;-.---------------------------------,e/o.---------..--.---------------..-----...-1_.---..-..-..--...----.........-..-------....-_... -..--.---..--...--.-.-.-._.__"'1..􀁾􀁟􀁟􀁟..__._....._ ----...---......--_.._-.----.---..----.-.--......---..-; .. ( " ..... -••.•_-----_._--.-. I I"_._-_.-. 􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀮􀁾􀀭􀀭􀀮􀀭􀀭􀀭􀀭􀀭------􀀭􀀭􀀮􀀭􀀭􀀮􀀭􀀬􀀬􀀭􀀭􀀭􀀭􀀭􀀮􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀮􀁾 􀀭􀀭􀀭􀀮􀁟􀀭􀀭􀀭􀀭􀀮􀀭􀀭􀀭􀀮􀀭􀀭􀀮􀀭􀀮􀀭•􀀭•􀀭--------------.-----------••------.-------.-.-------••------.-----'.---••-----..... '._----.. -.... --.----..-----_.------􀀮􀀭􀀭􀁾􀁾􀀭 --II -------------------------------------------.-------------------._----􀁾􀀭--..---.---------H+---􀀽􀀭􀁾􀁬􀁬􀀭􀁾􀁾􀁾􀁾􀀭􀀭􀀭􀀭􀀽􀁾 􀁾􀁾􀀭􀁾􀀽􀁾􀁾􀀭􀁬􀀡􀁾􀁾􀁾􀁾􀀭􀀽􀀭􀀽􀀽􀀽􀀭􀀭􀀭􀀭􀁳􀀭􀁥􀁊􀀻􀀻􀀽􀁾􀀭􀀭􀀭� �􀂷􀂷􀂷􀂷􀁾􀂷􀂷􀂷􀂷􀂷􀂷􀁾􀂷􀁾􀁾􀀽􀀭 􀁾 " 􀁐􀁾􀀯􀀲􀀳􀀯􀀹􀁕 15:17 􀁴􀁲􀀹􀀷􀀲􀀴􀀹􀀰􀁾o􀀲j􀀶􀀱 PARSONS TRANSPOR '. III UOl1015 , oL FAX TRANSMIS -° J'-"------NO. OF PAGES IINCLUDING THIS PAGEl 15" 1 (./.ESCRIPTJON UNITS UNIT COST QUANTITY COST ,-􀁌􀁾􀀺􀁾 S50.000.00 .' PAVBMENT REM.IPREP 1 550,000.00 r--,-MOBll.IZAnON LS $50,000.00 1 $SO,OOO.OO ,-.' BARRICADE, SIGN, TRAFFIC CONT LS SSO,OOO.OO J 550,000.00 CONC PAY (CPCD) Sy _$35.00 200 $7.,000.00 1"--" 1--cONe CURB (TV II)(MONO) LF $2.00 200 $400.00 TV IV 􀁃􀁾􀁎􀁃 BEAM LF $65.00 440 528,600.00 0--" CONCABVT CY $460.00 82 537,720.00 -" 􀁄􀁾􀁾 SHAFT (30") LF S81.00 350 $28,350.00 RET WALL SF 540.00 1200 $48.000.00 C;:ONC (pARAPET) .-CY 5460.00 25 SI1,SOO.00 ---' RAIL .. LF $40.00 300 SI2,OOO.00 RESJRlPING LS $30,000.00 1 530,000.00 .. CONC 􀁓􀁌􀁁􀁾 eCL S) CY S300.00 115 534,500.00 1-. --I---SO.OO SO.OO 0-$0.00 􀁾 . ... 50.00 1----I--. .-$0.00 $0.00 I-----SO.OO SO.OO 1---." $0.00 􀁾 $0.00 f--. 􀁾 $0.00 -. ". . so.oo SO.OO 1-----... ,-SO.OO ,--$0.00 ----r--50.00 SUBTOTAL 5388,070.00 r-" '--' 1--. CONTINGENCIES $201,796.40 201,796.40 f--ENGINEERlNG/SURVEY/GEOTECH 585,000.00 RIGHT-OF-WAY $0.00 1-. '----TOTAL 5674,866.40 .- IotETRIC SCALE •. 1: 1000 .) SINGLE POINT UR BELT IJNE ROAD BAN INTERCHANGE AT DALLAS PARKWAY 􀁲􀀭􀀭􀀭􀁾 VILLAGE /IE'OISIC'N 1 PAKDWDYlHRU LANES ON DAL Pli SAKOWITZ ·.. ) BANK 0 F AMERICA \\ ( II \\ \\ 1J ,I i/////ff Ii \\\' 􀀮􀁾􀀮􀁾\\\ 􀁾􀀺􀀮􀁜􀁜 􀁾 \\ \\ PROP. R.O.W. \:\\􀁾 􀁜􀁜 \. \ '. 􀁾 i: \\ ADDIllONAL 460 lA2 (49SR•0 •Wo S.F•".) EXIST. R.O.W. SPECTRUM CENTER PEDESTRIAN (lHUR5. _ COUNTS OCT. 2, 1997) 5/28/3 AM /NOON /Plot 􀁾 i E ? 􀁾 ... ':' -􀁾 􀁾 5 of 􀁾 􀁾 : 􀀭􀀭􀀭􀁾 .• SrAl[ tlIv. ItO. OIST. NO. METRIC SCALE: 1: 1000 ARSONS TRANSPORT, 1A"\ l1llO1--z: iii: IAVM1 0.1 HUlON SV11Va