'. z o• Trinity River Authority ofTexas Northern Region Office 3110.800/July 14, 2005 Ms. Nancy Cline Director of Public Works Town of Addison P.O. Box 9010 Addison, Texas 75001-9010 RE: Central Regional Wastewater System FY 2005 Mid-Year Reallocation Revised Monthly Billing Dear Ms. Cline: In the planning. and development efforts for establishing each contributing party's proportionate share of the Central Regional Wastewater System annual operation, maintenance and debt service costs for Fiscal Year 2005, each city's wastewater flow volumes were estimated on the basis of historical flows, city projections and Authority management's judgment. The System obligation was distributed among all of the contracting parties on the basis of a percentage obtained by dividing each party's predicted annual contributing flow by the total estimated System flow, times the proposed annual budget requirement. At mid-year, actual metered flow data has become available necessitating an evaluation and aqjustment. of each contracting party's flows and monthly payment obligations. Based upon a review of the year-to-date metered flows this fiscal year and actual flows over the past twelve months, the monthly billings have been re-detennined for the last four months of FY 2005 to reflect changes in the predicted obligation for all contracting parties. The adjustment for the Town of Addison is attached, reflecting that the monthly billing will change from $70,040 to $78,515. The above revised amount will be billed to your city monthly beginning with the August billing to be mailed during July. At the end of the fiscal year, the difference between the reallocated obligation and the actual obligation will be detennined and the Authority will submit the variance as a credit or debit. If you have any questions conceming the mid-year reallocation, please contact this office. 􀁾􀁬􀁥􀁉􀁙􀀮􀀠1. 􀁾􀀠􀁾􀁾􀁾􀁎􀁄􀀠Manager, Operations Northem Region PMC/rrr Enclosure c: Danny F. Vance, General Manager Warren N. Brewer, Regional Manager, Northern Region John M. Nelson, Manager, Operations Services Bill Tatum, Project Manager, Central Regional Wastewater System Frank S. Garcia, Jr., Chief Accountant P.O. Box 􀁾􀁯􀁮Mackey, Internal Auditor Arlington. Texas 76004·0240 (817) 403-5100 CENTRAL REGIONAL WASTEWATER SYSTEM -FY 2005 MID YEAR REALLOCATION REVISED BILL(4MOS $78,515 $4,644,588$55,735,050 􀁾􀁾􀁾􀀮􀀠" 􀁾􀁾􀁾􀁾􀀠Minor variations may occur due to rounding CONTRACTING 2605 20115 . BUDGETED ... MONTHLY 200S 2005 REVISED PARTY BUDGET BUDGET REVENUE BILL(S MOS) REVISED REVISED REVENUE MGD % SHARE MGD % SHARE IADDISON II 2.2S0 I $840,480 " 􀁾􀁾􀁾􀁾􀀠$70,0401.508% 2.269 1.569% $874,380 TOTAL 151.247 100.000% $55,735,050 $4,644,588 144.632 100.000% HP LaserJet 3200S8 inventHP LASERJET 3200 JUL-22-2005 09:29 Fax Call Report Job Date Time Type Identification Duration Pages Result 385 7122/2005 09:28:22 Send 99727160834 0:42 2 OK Trinity . 311o.!IOOI..I\tJ 14.2005 .tm:yaneDndorof P\bIIeWOIU 􀁔􀀨􀁍􀀡􀁴􀀮􀁉􀁾􀀠P.o.80.dOl0 Addilla!, T/PlI815OO1-9010 RE: CorM! ReglOR!ll WIllltaw8tor Syatllm FY 2005 MId·Year Realloeallon ReVised MOMth/y SUUng Dsar Ms. CIne-: 􀁬􀁮􀁩􀁨􀁂􀀧􀁰􀁬􀁡􀁍􀁩􀁮􀁧􀁡􀁮􀁣􀁬􀁣􀁫􀁍􀁬􀁉􀁑􀁰􀁭􀀮􀁮􀁦􀁥􀁦􀁴􀀧􀁴􀁈􀁕􀁦􀁯􀁴􀁥􀁳􀁭􀀧􀁢􀁬􀁬􀁾􀀸􀁡􀁴􀁢􀁾􀁰􀁡􀁲􀁴􀁹􀀢􀁴􀁾􀁬􀁉􀁨􀁥􀁮􀁬􀁯􀁲􀀡􀁍􀀠􀁃􀁬􀁬􀁮􀁴􀁲􀁡􀁬􀁒􀁥� �􀁦􀁯􀁯􀁡􀁬􀁗􀁾􀁓􀁾􀀢􀀢􀀢􀁾􀁉􀀧􀁜􀁩􀁬􀁩􀁯􀁮􀀮􀁾􀁍􀁤􀁤􀁥􀁢􀁴􀁬􀁉􀁏􀁦􀁉􀁲􀁩􀁥􀁴􀁾􀁦􀁯􀁲􀁆􀁬􀁳􀁣􀀺􀁥􀁬􀁙􀁥􀁬􀁬􀁲􀀠200S, oam cH;r1 wastewIItet fkMyolurnel \iII'!:'U$" ost\mGfed on 1M 􀁢􀀸􀁉􀁉􀀦􀁯􀁦􀁾Ibw5 . city 􀁾􀀠IWd Authodly 􀁾􀁾􀁉􀁉􀀡􀁌ThtSyam obIgat\Mwasdlltlll::itlted8l'l'lOflQaIi 􀁯􀁴􀁬􀁨􀀦􀁾􀀠􀁰􀁥􀁴􀁉􀁫􀁉􀀧􀁃􀁦􀁬􀁴􀁨􀁥􀁢􀁡􀁥􀁬􀁬􀁬􀁯􀁦􀀸􀁾􀁯􀁢􀁴􀁬􀁉􀁉􀀮􀁮􀁉􀁤􀁬􀁎􀁾􀁯􀁥􀁤􀁬􀁰􀁡􀁲􀁴􀀩􀀧.. 􀁾􀀮􀁴􀁩􀁍􀁴􀀮􀁉􀁦􀁬􀁉􀂢􀁏􀁾􀀱􀁢􀁎􀁢􀁹􀀠􀁴􀁨􀁡􀁬􀁲􀁩􀁴􀁬􀁬􀁾􀁾􀁓􀁹􀁡􀁴􀁡􀁭􀁦􀁴􀁯􀁷􀀮􀁬􀁴􀁏􀁏􀁳􀁴􀁨􀁥􀁾􀁬􀁬􀁉􀀢􀁊􀁉􀁗􀁉􀁢􀁵􀁤􀁧􀁳􀁴􀁾􀁮􀁬􀀮􀀮􀀠􀁁􀁴􀁾􀀮􀁥􀁤􀁩􀁉􀀡􀁲􀁉􀁾􀁬􀁴􀁯􀁷􀁤􀀮􀁥􀁩􀁡􀁨􀁡􀁊􀁢􀁥􀁯􀁯� �􀀦􀁬􀁍􀁬􀁩􀁉􀁡􀁬􀀺􀁬􀁨􀁳􀁾􀁡􀁮􀁾􀁡􀁮􀁤􀁾􀁮􀁴􀁯􀁦􀀠..ch􀁭􀁾􀁾/lows end montbiyl'll)m&nl obIf;a'.iaM. 885ed upon • nwkIW or !he 􀁹􀁯􀁯􀁴􀁾􀀠rne\l.rnK! 1kIwII this 1be8I)'$at end eduall'low:l QWW' rn. piIIfi 􀁾􀀱􀁶􀀸􀀠monilia, ¥WI toonb'y bllw,gat\ava been (a.d6(sm!ned for !he 1m four rnorl!ha (II FY 2005 to «InDd: chwlgos in the prtldlc\ed t»l!geUOtl fl)r ttll cul'ltftlotlng partie" TtJ$ tIdI\I&1ti'!lIn! !Clr'.hu Town of Add'Ist>n 13 .oltOOled, 1eIl6¢titlg !I'\allhe monthly biDing wi! d'lenQei from $10,040 ID $78.516. Theabovo 􀁲􀁥􀁾amourt Will be bil!lldto ytlurdtymfll'llhl)' beginning wlLh the AuglJ11 billing to bo mateo dlll1ng Jufy. At !be and 01100 fisc:aI yBtlr, Iha dlffllMI'lCG between Lhe I'lIslIcc:a1OO obligallon Mt:.I the adlIal ol;)Ilgntkm wJD be dlllennlned Blld the AiJlhQrlty 'fI4illNbmlt the Vllriam:o BS II cnidtl ct debit. If)'OU hayS any QUBBlione etJflCJ!IrMlg the 􀁾􀁥􀁡􀁲􀁲􀁥􀁡􀁾􀀬please conilid 1flI1i ofIIc8. 􀁾􀁾􀁗􀁩􀁊􀀠Manager, (iperoUon! NDrttlem Rligbn .....,.,. ."""..... e: Danny F. Vitnce. GeMt&l Manetet 􀁷􀀮􀁲􀀮􀁯􀁴􀁬􀁾􀀮R&glorlal Mi!WiQW, Notth\'lm Rogllln John M. NeJaon, MIIItIIgIII". Opsl1lltoM SeJ\llolu BID TIItIm, Pm.lBd Manager, C&n.tnI1 RfIgIoN!.l Wuta ....... r S)'vIem Ftank S, Gan:la, .... , Chle! Ac.Y:otmIant RO..Ikr:IMlon MBI:tsy. In'-tmal AudItor Mncto\ 'lilllu1flJ04.024Q • (e1n"-9MllX1 0- HP LaserJet 3200S8 n v e n tHP LASERJET 3200 JUL-22-2005 11:46 Fax Call Report Job Date Time Type Identification Duration Pages Result 387 7/22/2005 11:45:32 Send 7065 1:05 2 OK River 3'10.8OOIJuly 14, 2005 􀂷􀁾􀀢􀀻􀀮􀁎􀁡􀁮􀁥􀁹Cine •OlrectProl PWIIcWorke TownOJfAddiaon P.O. Box 9010 AddlIon, TUJUIII 76001-9010 .' RE: Cei1lrDl ReglonolWaatawaterSystem FY 2006 Mkl-Year ReaDoc:atlon Revised MonINy BIlling Dear Me. Cline: In tho plannlrll and devebpmenl efJorb foreatahlliNng each contributing party's pitlportJonata ahara ol1tle Central ReglonalWutawalflr System &Mual opol'Dllon, mslnlflnanee arw:l doblservlce I;tIN forFl$Ca1 Year 2005, each clty'a waslawatur flow lIOIull'Ml:9 'IYere (lslimeled on the ba5ls aI' hlslDrIcal fIowa, city projections . and Autnoritj management's Juclgmenl The Systamoblljjatlon was d18trtbutfld among aD of \he cOn!ratllng parties on the baaIa of a pM)9n\age obtained by dividing each party'. pradlcled amuaI CClI'IIrIbutIng floW by Iho totsl eslmaled System flaw, tirMS !he proposed amwl amwl bUdget raqulr8menl AI mJd-V8ar, actuBl melanld now data has become avai\abIG n&eeaaII&Ung an evaluation and IIdjualrnenlof 88th oonlradirlg paily'e flows and monthly payment obUgatiol'l8. Based 􀁾II rnlew of Iha year-lo-dal8 metored IIow8 this II&caI year lIIIcIactlEl nOWlllMlrlh8 pasl twelY8 months, the monthly blUlnpl1eVG been m-dIIIermlned for IhB lasllour mooths 01 FY 2005 to ",n!let changes In the predlclod obDgatlon for all contracting par1.l8l. ThD odjuslmontfor!he TCIVITl of Addison" attached, rvfIecUng thallhe ITIOflIhIy billing will chango from $70,040 ID $76,515. Tho aboVa revised amount will bo blUed to yourdty monthly beginning with the August bllDng to bo mailed dloring JuI)'. At the end althe fiscal 􀁾􀁲􀀮the diNer&nee belw80n the reallocatad obilgaUlIOeod lM IIcwel obllgallon wla bo delermlnod eod!he Authorlly will submit the varlllnee 88 a credit or dabiL II you hirve 1111)' queBtlDl15 coneemlng Ihe mld..yaar realloca\lcn, pl88Be con!od U1is olra. 􀁾􀁾􀁾􀀠Menager, Operallonl Northern R89'on PM",", 􀁅􀁟􀁾􀀠c: DaM), F. Vance. General Manager Warnm N. 8t1lW8r, Regional Mzmager. Northem Region John M, Nelson, Menager, OpatBtlona SarvJc;e.s BII TsII.m, Projed.M6nager, Cantra1 􀁒􀁥􀁧􀁾WaaiewatorSyalllrn FrankS, GardII, Jr., ctHI AI:cou"1\ant P.o.ecaaon Mackay,lntemaI Audllor Mrogm.Ta. 7aIJ04..(I24O • (817)49)6100 0- Trinity River Authority of Texas Northern Region Office 3826.102/3828.800 April 14,2005 ,... .". .􀁾􀀠Ulrector, Public \/\Iorks Town of Addison P.O. Box 9010 Addison, Texas 75001-9010 RE: Central Regional Wastewater System -SECOND REQUEST FY 2006 Budget Preparation Projected Contracting Party Flows The projection of annual wastewater flows is an important part of the determination of expenditures and revenue obligations in the annual budgets. These projections are based on historical flows. general population projections, and/or projected flows provided by the contracting parties. We are currentiy collecting data for the preparation of the Central Regional Wastewater System FY 2006 Budget. It would be very helpful if you could have the attached form covering your flow projections for the time period December 1, 2005, through November 30, 2006, completed and returned to me as soon as possible. I have enclosed a summary of the FY 2004 flows and percentages, and the budgeted flows and percentages for FY 2005. In the interest of time, please feel free to contact me by e-mail at nelsonj@trinitvra.orq to forward your projected flows. If further information is needed, please call me at (817) 493-5100. Manager, Operations Services Northern Region JMNlrrr Attachments c: Patricia M. Cleveland, Manager, Operations, Northern Region Bill Tatum, Project Manager, Central Regional Wastewater System P.O. Box 240 Arlington, Texas 76004-0240 (817) 4S3·5100 0- CENTRAL REGIONAL WASTEWATER SYSTEM ACTUAL AND PROJECTED FLOWS 2/15/2005 CONTRACTING PARTY 2004 ACTUAL MGD 2004 ACTUAL % SHARE 2005 BUDGETED MGD 2005 BUDGETED % SHARE ADDISON 2.263 1.570% 2.280 1.508% CENTRAL REGIONAL WASTEWATER SYSTEM PROJECTED FLOW FOR FY 2006 BUDGET PRESENTATION FISCAL YEAR 2006 DECEMBER 1, 2005 -NOVEMBER 30, 2006 CONTRACTING PARTY: ESTIMATED AVERAGE DAILY FLOW IN MILLION GALLONS PER DAY (MGD) FOR FY 2006: INFORMATION SUBMITTED BY: PLEASE RETURN TO: John M. Nelson Manager, Operations Services Trinity River Authority of Texas P.O. Box 240 Arlington, Texas 76004·0240 (817) 493·5100 (817) 417·0367 (Fax) PLEASE RETURN AS SOON AS POSSIBLE ·􀀿􀁾􀀭􀁴􀀢􀀠y--u: 􀀮􀁾􀁾􀀠----------. 􀁾􀀠Trinity RiverAuthority of Texas /. I Northern Office 3826.102/3828.800 February 2. 2005 Mr. Michael E. Murphy. P.E. Director. Public Works Town of Addison P.O. Box 9010 Addison, Texas 75001-9010 RE: Central Regional Wastewater System FY 2006 Budget Preparation Projected Contracting Party Flows Dear Mr. Murphy: The projection of annual wastewater flows is an important part of the determination of expenditures and revenue obligations in the annual budgets. These projections are based on historical flows. general population projections, and/or projected flows provided by the contracting parties. We are currently collecting data for the preparation of the Central Regional Wastewater System FY 2006 Budget. It would bevery helpful if you could have the at!eched form completed and returned to me bJApril 15. 2005. I have enclosed a summary of the FY 2004 flows and percentages, an the budgeted flows and percentages for FY 2005. Timely receipt of your flow projections for the time period December 1. 2005. through November 30. 2006. would be benefiCial and greatly appreCiated. If further information is needed. please call me at (817) 493-5100. Manager. Operations Services Northern Region JMN\rrr At!echments c: Patricia M. Cleveland, Manager. Operations. Northern Region Bill Tatum. Project Manager. Central Regional Wastewater System P.O, Box 240 Arlington, Texas 76004-0240 oRecyclod Paper(817) 493-5100 CENTRAL REGIONAL WASTEWATER SYSTEM PROJECTED FLOW FOR FY 2006 BUDGET PRESENTATION FISCAL YEAR 2006 DECEMBER 1,2005 -NOVEMBER 30, 2006 CONTRACTING PARTY: ESTIMATED AVERAGE DAILY FLOW IN MILLION GALLONS PER DAY (MGD) FOR FY 2006: INFORMATION SUBMITTED BY: PLEASE RETURN TO: John M. Nelson Manager, Operations Services Trinity River Authority of Texas P.O. Box 240 Arlington, Texas 76004·0240 (817) 493·5100 (817) 417·0367 (Fax) PLEASE RETURN BY APRIL 14. 2005 CENTRAL REGIONAL WASTEWATER SYSTEM ACTUAL AND PROJECTED FLOWS 2/15/2005 CONTRACTING PARTY 2004 ACTUAL MGD 2004 ACTUAL % SHARE 2005 BUDGETED MGD 2005 BUDGETED % SHARE IADDISON I 2.263 I 1.570% I 2.280 I 1.508% I HP LaserJet 3200se inventHP LASERJET 3200 FEB-17-2005 11:09AM Fax Call Report Job Date Time Type Identification Duration Pages Result 750 211712005 11:08:33AM Send 7065 1:04 3 ,.." .. Febnl.a!y2,2005 Mr, Mlt:fIlUIIl't Mutpf1y, P.e. , . 􀁄􀁩􀁾􀀮PUblic Works Town ofAddllcn P.O.B(it90fO 􀁁􀁤􀁾􀁬􀁳􀁯􀁮􀀬􀀠1'exD415001..Q010 RE: 􀁃􀁥􀁮􀁬􀁦􀁡􀁬􀁾􀁗􀁬􀁬􀁬􀁬􀁬􀁬􀀸􀁷􀁡􀁴􀀮􀁲􀀤􀁹􀁥􀀨􀀶􀁭􀀠FY 20013 Budge! Pnlpalllllon 􀁐􀁮􀀺􀀻􀁾Contracq Party Frows OMrMr.MLl"PhY: The projMtlon 01 I'Il'Inuai wulliWNr:llcrn Is: Il!I tm{.l(ll'lBnt pelt of 1M! dstlmnlnatlotl of expendltut'ti .and I9WIIWe obligations In tnslinnuai budgm. Tt\a$9projfK.1!ons lYe bau.d on I'IIalolfcall'low's. geMIlli 􀁾pro}l!e\IcIns, ar.dl« 􀁾flows pn»tded by the eootnld.Ing partla1l. We &t8t.tit!'eA1fyCtlil e¢fug daIS forlM 􀁾􀁴􀁉􀁯􀁦􀁴􀁑􀁦􀁬􀁨􀁏Central RI!QiOM:! 􀁗􀁾$ye\ilm FY 2008 Budgat. ItwoU'd be 'IlIlYhaJpfullfyou 􀁾􀁨􀁡􀁶􀀦lhe II.ltaehed kInn completed Ind returned 1:) me byAprl/15, 2005. I haw 8J'IeIoud. summalY 0( the FY 2004 nows anti pareentagl!l$, and !he blllige1ad fkwts sM p.IIOlinfagsa forFY 2005. Tlmoly receipt ofyourflowprojlctlons forth" limo period D$¢$m1Htr 1, 2005, 􀁾NcYember30, 2006. WOiUI be tw;Mflcl!llend great!)' 􀁡􀁾􀁲􀁥􀁣􀁬􀁡􀁬􀁥􀁣􀁬􀀮􀀠􀁉􀁦􀁦􀁵􀁲􀁴􀁨􀁾􀁬􀁮􀁦􀁯􀁲􀁭􀀸􀁴􀀱􀁯􀁮􀀠I. nellded.J)IeOIIS ce.'1 me at (817) 4930$100• . 􀁾􀀠tMlM'IgM, ()penltSoos Service. Northern Rapn JMN'IJrr , """""""'" c: Patrlcls M. CkweIDnd. M$nager, 􀁏􀁰􀁥􀁲􀁡􀁾􀁏􀁎􀀬􀀠NnMam Rtgtxl Oil TalUm, project MIlns;er, CenIIaI Regional W8ShIWlIIar $yelem 0-􀀧􀁾􀁾􀀭􀀢􀀭􀀬􀀬􀀭382&,102f3826.800 --HP LaserJet 3200se HP LASERJET 3200 invent FEB-17-2005 11:06AM Fax Call Report Job Date Time Type Identification Duration Pages Result 749 2117/2005 11:05:16AM Send 99727160834 0:46 3 OK 38211.102:tJe2B.800 Mr. MldwMII E.. Murphy, P,E. [)Irector, P!.IbI.kl Works TOWI'H>I AddltlOn P.O. !ll$ed by Ihe eontladlng penial!. wame ct/I"nlntty eoIlecUng dab'! fot!he prepo!llUan of the Cimini! ReglQl'lafWa8lewa!m"Sye1em FY 200a audgot, II would MVflY htdpM Ifyfll.l CO<.Ild haw!tteatla(.h$d rorm almp\e1Dd aM RlbJmed 10 rna by Apn115, 200$, InaWl andoslid iii t!.llM!'l8lYot Ib8 FY 2()0411owa 800 perconlBIIM, end dis 􀁾I'low'o and perc:enteges ftlrFY 1OOS. 111l'1&ty naeelpt cf yolK flow projectiQm tor the lime pelfod Docember '. 2005, lhrough November 30, 2(100, 'M!Uh1 be OO!'ll!lOdal 􀁡􀁮􀁤􀁴􀁬􀁾􀁴􀁴􀁹􀁾􀂷􀀠􀁾􀀢􀀢􀀧􀁭􀀧􀀢􀀨􀀧􀀧􀀷􀀩􀀧􀀧􀀧􀀧􀀧􀀧􀀧􀀧􀀧􀀠Manager. OpetatlOrul Serv\a!. J"",," Atlavhtm'lb c: PaIrlI:ia M. CioWIiatKI, Man3Qer. 0pete1l'OM. NOl'Ihem Ritglclrl n Tawm. PrqaCl Manager, Cet'It!$l Rlllionai WalleWatef 􀁓􀁾􀀠 0- Trinity River Authority of Texas Central Regional Wastewater System CITY MANAGER 3110.500.040.100 August 30, 2004 Mr. Ron Whitehead City Manager City of Addison P.O. Box 9010 Addison, Texas 75001·9010 Dear Mr. Whitehead: Subject: Contract for Services· Fiscal Year 2005 Revised Technical Services Fee Schedule Central Regional Wastewater System Enclosed are copies of our Board Approved Fiscal Year 2005 Services Fee Schedule for your use and files. The service fees are effective December 1, 2004 through November 30, 2005. Historically the fee schedule for these services is derived annually from the direct costs of performing each test, including manpower, materials, supplies, and equipment costs. Additionally, the cost associated with maintaining quality assurance is included in the cost of the test. Your current Contract expires September 30,2005. You will receive a new contract with applicable price list approximately four months before the expiration date. Should you have any questions concerning this contract or changes in fee schedule, please contact this office at your convenience. Sincerely, 􀁾􀀷􀁢􀀮􀁾􀀠WM. B.CYRUS Manager, Technical Services Enclosures -3 6500 W. Singleton Blvd. Dallas, Texas 75212 Metro (972) 263-2251 Admin Fax (972) 331·4412 Tech Services Fax (972) 331·4414 TECHNICAL SERVICES FEE SCHEDULE FOR LABORATORY ANALYSES INDUSTRIAL INSPECTIONS AND INDUSTRIAL SAMPLING FISCAL YEAR 2005 December 1, 2004 through November 30, 2005 CHEMICAL ANALYSES Alldeity Leachate Mercury Nickel Selenium Silver Thallium Zinc s $ 19.50 126.50 GFAA S21 ,00 EACH Arsenic SeJenuim Lead· Low Level Copper -low Level Cadmium -Low level Thalluim 􀁾􀀠LoW Level $17.55 EACH Mel"ClJl)' Bose Neulrals(EPA 625iSW 8270) $ 231.00 Chlorinated OrganIcs Preparation, $ 140.75 Acid ExtraClables(EPA 6251SW 8270) $ 231.00 Chlorinated Pestioci'des. Volollles(EPA 6241SW8260) $ 125.00 Organophosphate Pesticides. and Polychlorinated Biphenyls (Sample HERBICIDES pneparation,exttaction.and clean-up per sample) Chlorinated Phenoxy Acid $ 115.00 Homicides (Confirmed and ADD: quantified) Pesticlldes 608 $ 71.70 (ConfirmatIon and quantification per sample) 0lllanophosphate Po.Heide $ 73.85 (Confirmation and quantification per sample) Polychlorinated Biphenyls (PCB) $ 78.28 -water (Confinnation and quantification per sample) 􀁾􀀠all (Confirmation and $ 47.25 DRINKING/NATURAL WATER ORGANICS fGCIMS) quantification per sample) VoJafile Olllanics (EPA 524.2) $ 125.00 NOfrVolalile Olllanics (EPA 525) $ 220.00 SAMPLE PREPARATION ADO for Special Treatment/Per $ 24.00 Sample (Sediment, Oil) ADD for Special TreatmentiPer Sample $ 127.00 [TCLP Toxicity Leachate) SPECIAL ANALYSES TCLP/EP TOXICfTY PRlORUY POLLUTANTS Leachate Extraction Procedure $ 127.00 Cyanides $ 44.00 Metals: Arsenic, Barium, Cadmium Metals $ 181.00 Chromfum, Lead, Mercury, Selenium Sliver $ 108.55 Organics: Call for Information MICROBIOLOGICAL ANALYSES Coliform. Fecal (MFJ $ 12.10 Coliform, Fecals (MPN) $ 77.20 􀁃􀁯􀁬􀁾􀁯􀁲􀁭􀀮􀀠Tot.1 (MF) $ 11.55 ColifOrms, TotallEC (MPN) $ 26.50 Collforms. Tolal (MMOIMUG) $ 11.25 Micmscoplc General examination $ 14,50 Streptococcus. Fecal (MF) $ 12.60 Heterotrophic Plate Count $ 12,50 TOXICITY TESTING Chronic.l<. dubla (3 Brood) $700.00 Chronic. e. prometas (Fathead Minnow -7 Day) 24hr. Acute. Q.lMl!i!.. $700.00 $225.00 24hr. Acute. Q.l!!l!