,. 􀁾􀀠 I (972) 450-2871 16201 Westgmve MEMORANDUM May 28,1998 To: Randy Moravec Finance Director From: Jolm R. Baumgartner, P. Director ofPublic Works "'/t..().:'VI--Re: Addison Circle Phase I -Funding Reconciliation During construction ofthe street infrastructure for Addison Circle Phase I offsite utilities (sanitary sewer) and Bosque Park improvements were included in the project. An adjusting journal entry should be made for the amount of$45,01 0 for the offsite sanitary sewer and $32,106.34 for the Bosque Park (project number 420005815065801) improvements. Both ofthese charges were anticipated at the time of bid award. Please call me if you have any questions or need additional information. Attachments: Addison Circle Reimbursement Request #22 Offsite Utility Summary cc: Slade Strickland \ /Addison Circle Phase I Offsite Utility Summary May 28, 1998 20 L.F. 8" Wastewater Line at $21.60/I.f. $432 867 L.F. 12" Wastewater Line at $30.24 I.f. $26218 5 Ea. 5' Manholes at $3672 ea. $18360 Total offsite wastewater $45,010 Offsite wastewater is the section of line between proposed Spectrum Road and Dallas North Tollway. Gibson & A.swciatos inc. .>b Description: ADDISON CIRCLE -PHASE I Estimat& No. 23 Clien!: TOWN OF AODISON Contrad Amoont: $3.517.664.44 Estimated Period: February 26,1998 To April 25.19988 Payable To: Gibson & Associates,lnc, 11210 Ryfiecrest Drive Balch Springs.Texas 75'380 ftem II II Description II II' II Unft II Contract Quantity II II Monthly Quantity III III Quantity To Date II II 􀁕􀁮􀁾􀀠Prico III III rotal ----JI 11---11 II III II II: SCHEDULE I PAVING IMPROVEMENTS 101 102 103 104 105 106 107 lOS 109 110 III 112 113 114 115 116 117 118 II MOBILIZATION II UNCLASS ST EXCAVA INC HAUUDISPOSE II REM & DISP OF EXiST CONC PAVE II REM & DISP OF EXIST CONC SW 116" LIME STAB or subgrade prep II HYDRATED LIME 313111", liS" 650 PSI FLEX RC PVMT liS" 650 PSI FLEX RC DRCP SALS 114" 3000 PSI RC SDWLK II 4" 3000 PSI RC SDWLK SUB-BASE 116" 3000 PSI RC SDWLK SUB-BASE 11 ttem doleted Addenda 4 116" 650 PSI FLEX RC DRIVE 116" 650 PSI FLEX INTEGRAL CURB 11 REINF CONC ST HEADER II FULL DEPTH SAWCUT EX CONC II • Furnish vehicle brick paver del. II ST BOLLARD (STEEL) ilLS II IICY II IISY II IISY II IISY II II TON II IISY II IISY II IISF II IISF II IISF II II II IISY II IILF II IILF II IILF II IISF II ilEA II 1 II 214311 560411 129211 II 11 571211 144911 7231 11 5S7S611 122511 II 21811 516211 300 II 129911 II 7111 iii III III III III III III III III III III III III III III III 111 III 111 214311 569411 126211 II II 5S3511 139211 882211 5722811 297411 II 29911 529211 41111 153711 II 71 II $94.135.00 III $2.16111 88.40 III $5.40111 54.03111 887.29111 $31.00 Iii $35.90 III 62.00111 $2.90111 $3.20111 III $30.00 III $1.60 III $5.00 III $2.75111 $3.37111 $3SO.00 III $94.135.00 54.625.88 $53.523.60 $6.97S.00 $174.685.00 $49.972.00 624.141.60 $165.961.20 $9.196.60 88.070.00 $7,938.00 $2,055.00 54.226.75 $24,650.00 119 120 114" WIDE THERMOPLASTIC LANE STRIP 114" NON REFLECT BUTTON TV W IILF ilEA II II 5411 112 II 88111 88111 10411 2BS II $2.16 111 54.32111 $224.64 $1.149.12 121 122 II 4" REFLECT BUTTON TV I·W-C 114" REFLECT BUTTON TV n-Y-Y ilEA ilEA II II 19511 4011 92 111 6111 21511 4811 SS.48111 SS.10 III $1.393.20 $3n.60 123 124 125 126 1124' WIDE THERMO STOP LINE 1112" WIDE THERMO YIELD liNE 115TD & TRAFF CTRl SIGNS fumllnstall Ii" fumlinstaU st. sign post,found. IILF IILF ilEA ilEA II II II II 7111 15211 9611 5211 III III III 3111 71 II 15211 98 11 8811 $10.80 III $6.48111 $164.16111 $166·:12111 $788.80 $964.96 $16.007.66 $9,313.92 127 128 129 130 131 132 133 134 135 II ST BARRICADES (GUARD RAIL) II BARRICADES, SIGNS & TRAFF CTRL II ff TALL BLACK VINYL COAT CHAIN LINK FENCE II item deleted per addenda 4 II nom deleted per oddend. 4 II item dol<6' REFL DIAGRAMMATIC SIGN ADV-D3 ilEA 115')(2' REFL STREET SIGN ST 1,2.3 ilEA II REMOVE EXISTING STREET LIGHT FOUNDATION II EA II FIINSTALL ST. LIGHT FOUNDATION QUORUM ilEA II 6"x6" CL A TV I-C JIGGLE BAR ilEA II CONSTRUCT LONGITUDINAL BUTT JOINT IILF II II II II II II II 211 1 II 311 511 11 II 5411 80211 III III III III III JIJ III 211 1 II 311 711 1311 5911 88111 $3,888.00 III $3.884.00 III $1,296.00 III 5426.60 III 5499.00 III $13.60 III $7.50 III $7.776.00 $3,564.00 $9.888.00 $2.588.20 $5,967.00 $796.50 $6.607.60 143 144 149 146 147 148 149 150 151 152 153 154 155 188 11 item deleted per addenda 4 11"4 fumlinstall bedding matrt & pavers 11"4 fumllnstall 6" 650psi RC pavmnt 11"4 fumllnstl6" SSOpsi RC drop slab /1"4 fumJinstl6.7Sx1.5'rotl.diag signU"4 romlreplc cone. unit pavor'S 11'"4 􀁦􀁵􀁲􀁮􀁬􀁩􀁮􀁳􀁴􀁾􀀠6'" compacted flex base 11·4 remldispose conc. fiumo 11"4 􀁲􀁥􀁾􀁬􀁣􀀮􀀠exst b1kvynl cl funco II "4 fumlplant buffalo grass soodIfert 11 "4 temp lnig. wort< area wahu to"M!lr II --4 construction progress report CPM II Furnish Vechicular Pawr 1I10"x 12"Cu,b II IISF IISY IISY ilEA IISF IISY IISY IILF IISY ilLS ilLS IISF IILF II II II II II II II II IIII II II II II II 18631 II 499711 1211 II 311 2670 II 29711 4111 240 II 88411 1 II 1 II 11m II 421 II III III III III III III III III 8111 III III III III III II 18631 II 516511 1000 II 311 295211 32811 4111 22811 88411 1 II II 1100011 3$411 III $2.53111 $34.00 III $33.70 III $1.404.00 III $2.50111 $6.30 III $10.00 III $19.98111 $0.66111 $2.16(1.00 III $2,100.00 III $2.89111 $10.00 III 547.135.43 $175,610.00 $33.700.00 54,212.00 $7,350.00 $2,066.40 5410.00 $4,555.44 $927.12 $2,160.00 $31.790.00 $9.940.00 157 158 II Signal Int",..,n""'" Wiring II Fum Vech Paver Typ A & B Glen Gory IIlF IISF II II 1200 II S58811 III III II 821611 $3.74111 $9.12111 $25.633.92 159 160 114" Singlo R_Iv. Bilton Tjl-YII Sign Revision Mv, 0-1 ilEA ilLS II II 4811 1 II III III 4811 1 II $6.S7IR $$673.75111 $329.76 $673.75 􀁩􀀮􀁘􀁬􀁾􀁩􀁮􀁧􀀠Light Base ropair ilEA II 311 III 311 $181.50 III $544,50 Ii Revis<> Adv·l ,A: STORM WATER IMPROVEMENTS 301 II CL 3 RCP 18' IILF II 84811 III 843 11 $28.08111 iR3.671.44 302 303 304 305 306 307 30S 309 IICL 3 RCP 21' IICL 3 RCP 24' IICL 3 RCP 27" IICL3 RCP30' IICL 3 RCP 33' II CL 3 RCP 36" IICL3 RCP39' IICL3 RCP42' IILF ULF IILF IILF IILF IILF IILF IILF II II II II II II II II 551 11 188 II 108 II 32911 6411 43411 19111 35711 III III III III III III III III 55111 18411 lOS II 32911 6411 42711 191 II 35711 $31.32111 $34.55111 $38.88 111 $42.12 111 $47.52111 $52.92111 $63.72111 iI6S.04 III $17.251.32 $8,355.04 $4,199.04 $13,657.48 $3,041.28 $22,596.84 $12,170.52 $24.290.28 310 IICL3 RCP45' IILF II 35111 III 35111 $75.60 III $26.5$,60 311 II CL 3 RCP 60" IILF II 26711 III 29711 $127.44111 $34.026.45 312 313 313 314 315 316 317 318 319 320 321 322 323 IICL3 RCP 66' IILF IICL 3 RCP 72' IILF II REM & DISP OF EX CURB INLET ilEA 116' RECESS CURB INLET W/RECESS TOP FOR BRill EA 118' RECESS CURB INLET WIRECESS TOP FOR BRill EA 118' RECESS CURB INLET (EXT DEPTH) WIRECESSII EA 1110' RECESS CURB INLET WIRECESS TOP FOR Bill EA 1110' RECESS CURB INLET ilEA 1110' RECESS CURB tNLET (EXT DEPTH) IlEA 1112' RECESS CURB INLET W/RECESS TOP FOR Bill EA 1114' STD CURB INLET ilEA 114' GRATE INLET ilEA II II II II II II II II II II II II 248 11 11611 10 II 411 311 1 II 211 1 II 1 II 1 II 1 II 1 II III III III III III III III 111 111 III III III 24811 11611 10 II 411 311 1 II 211 1 II 1 II 1 II 1 II 1 II $149.04111 $ln.80 UI $756.00 III $1.944.00 III $2.052.00 III $2.268.00 III $2.28a.60 III $2.28a.60 III $2,430,00 III iR,538,OO III $2.754.00 III $2,862.00 III $38.961.92 iRO.044.80 $7,560.00 $7,776.00 $8,156.00 iR,208.00 $4,579.20 iR,289.60 iR,43O'oo iR.538.00 $2.754,00 $2,862.00 324 325 326 327 328 II DELETED ITEM PER ADDENDA 2 113 GRATE COMBO CURB INLET II5'X5' STD Y INLET II REM EX REINF CONC PIPE IITY ASTRMWTRMH II ilEA ilEA IILF IlEA II II II II II II 411 411 89011 111 III III 111 III III II 411 411 890 II 1 II III $2.970.00 III $2.862.00 III $14.04111 $2.376.00 III $11,880.00 $11.445.00 $12,495.60 iR,376.00 329 330 331 332 333 334 II TY A STRM WTR MH IITYB STRM WTR MH II RCP 60 DEGREE WYE CONNECT IIRCP45 • , II RCP 60 DEGRE E BEND CONNECT II RCP 45 DEGREE BEND CONNECT ilEA ilEA ilEA ilEA ilEA ilEA II II II II II II 1 II 411 3711 111 211 211 III III III III III III 1 II 411 37 11 1 II 1 II 411 $3.156,00 III $4,698.00 III $216.00 III $216,00 III $216.00 III $216.00 III $3.156.00 $18,792.00 $7,992.00 $216.00 $216.00 $864.00 335 338 II RCP 30 DEGREE BEND CONNECT II PIPE TO PIPE CONNECT ilEA ilEA II II 411 1411 III III 411 1411 iR16,00 III $216.00 III $864.00 $3,024.00 337 336 339 340 II INLET CONNECT II PRECAST CONC PLUG FOR RCP II UNCLASS CHANNEL EXCAVA II ROCK CHANNEL EXCAVA ilEA IlEA IICY IICY II II II II 211 1811 949511 451111 III III III III III 1 II 21 II 85SS11 451111 $486,00 III $81.00 III $5.37111 $8.48 111 $496.00 $1.701.00 $45,832.95 $29.231.28 341 342 343 II REM & DISP OF EXIST HEADWALLS & CONC RIP !I LS II 'J: STONE RIP RAP IICY II HYDROMULCH TOP GUN BUFFALO (FERTIWTR) II SY II II II 1 II 23811 168611 III 1\1 593111 211 100 II 83311 $2.160.00 III $37.80111 $1.12111 $4,320.00 $3.780.00 $932.98 344 II FIBER NETTING NA GREEN SI60BN IISY II 168611 111 240 II $1,43111 $343.20 345 346 347 348 349 350 351 352 II FURN, INSTL, MAIN, REM INLET PROTECT FOR 􀁅􀁾􀁉􀀠EA II FURN, INSTL. MAIN 80 REM SILT FENCE FOR EROlII LF II FURN. INSTl, MAIN & REM STRAW BALE DICK CI1I LF II ROCK BERM FURNliNSTAUMA1NTNlREMOV II CY II FURN, INSTL, MAINT & REM STAB CONST ENTR II SY II DELETED ITEM PER ADDENDA 2 II II TRENCH SAFETY FOR UTIL ilLS II TRENCH SAFETY FOR CONSTR IILF II II II II II II II II 3011 280011 20011 10 II 33311 II 1 II 405211 III III 1\1 III III III III III 411 2150 II II 3011 II II II 404311 $50.00111 $3.00 III $8.00 III $150.00 III $9,72111 III $810.00 111 $1.08 III $;!OO.OO $8.430.00 $4.500.00 $4.366.44 353 354 355 II REM EXST INLET TOPIRECQNST wlRECESS ilLS 1I10'RECES.CURB INlET(XTRA DEP1l1jRECS TOP II EA 11-4 rem/dispose oxst ReP larger 36'" IILF II II II 1 II 1 II 150 II III III III 1 II 1 II 150 II $3.510.00 III $2,430,00 iii $14.04111 $3,510.00 $2,430.00 $2,106.00 􀀽􀀽􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀀽􀀽􀁾􀀽􀀽􀁾􀀠Total Schedule III $459.7138.27 /, -s'CHEDULE IV VVASTEVVATERIMPRDVEMENTS 401 402 403 404 405-407 403-II SDR 26 PVC WNTR LINE g-IILF II SDR 35 PVC WNTR LINE 8" IILF II SDR 35 PVC WNTR LINE 10" II LF II SDR 26 PVC WNTR LINE 12" II LF II SDR 35 PVC WNTR LINE S' VVI2 WAY CLEANOUTII EA 114'DIAWWTRMH ilEA II 5' DIA VVVVTR MH II EA II TV INSPECT IILF II TRENCH SAFETY FOR CONSTR II LF II II II II II II II II II 4011 163911 35711 156411 1711 311 1111 360011 4010 II III 20 II 111 17:lO II III 35711 III 156411 III 1611 III 311 III 1111 III 3651 11 III 367111 Tota[ Schedulo IV $21.60111 $432.00 $19.44111 $33,631.20 $28.08111 $10,024.56 $30.24111 $47.295.36 $540.00 III $e.S4Il.OO $1,836.00 III $5,508.00 $3,672.00 III $40,392.00 $1.62111 $3.914.62 $0.60111 $2,360.15 􀀻􀀺􀀺􀀺􀀽􀀭􀀭􀀺􀀺􀀺􀀺􀀺􀀺 􀀺􀀺􀀺􀀺􀀺􀁥􀀽􀀭􀁾􀀽􀀻􀀺􀀠$154.223.89 SCHEDULE V WATER IMPROVEMENTS 501 502 503 504 505 506 507 506 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 II CONC BLOCKING IICY II II DI FITTINGS CL 250 II TON II 11'"46" pvc B\WIa c9OOdr1B, ci150 II LF II 11"4 a·pvc awN'lJ c900 dr18 cl150 IILF II 11"412" pvc awwa c9Q0,dr16 e1150 IILF II 11·4 fum.24-awwa c303 bar wrapped cone pipe IILF II II FILL EXT 24' D\A RCCP VVTR LINE IILF II 116" RESILIENT SEAT GATE VALVEIBOX ilEA II liS' RESILIENT SEAT GATE VALVE/BOX ilEA II II ITEM DELETED PER ADDENDA 3 II II 11'4 fumllnstl fire hyd complete ilEA 11 II REM, SALVE & DEL TO TOWN EXIST FIRE HYDRAjI EA II 11"4 connect 10 all EXTVVTR MAIN ilEA II 11"4 WTR SERV LINE l.5'"meter,box.bldlw,dbl cit ilEA II II WTR SERV LINE 2"(MTR BOX,8KFLO PRE\/) ilEA II II WTR SERV LINE 6"(FOR FIRE PROTECT) ilEA II II TAPP SLEEVE VALVE/BOX 20" X8" ilEA II II TAPP SLEEVE VALVE/BOX 20" X 12" ilEA II 112000 PSI CONC ENCASE IILF II II ADJ EXT WTRVALVE STACl(/COVER ilEA II II TRENCH SAFETY IILF II IIWTR TEST ilLS II11 item delated per addanda 4 II II 112' VVATER SERVICE LINE ilEA II 11*4 instl 24--3WM!J c303 bar wrap. pipiZ) IILF IIII Relocate 2* Water Service ilEA II 4511 611 22511 194511 7611 24811 20011 1211 1111 II 911 311 311 211 111 311 111 1 II 6011 611 249411 111 II 1811 24811 211 III 45 11 III 611 III 17211 III 194411 III 7611 III 24811 III 200 II III 1311 III 11 II III II III 9 11 III 311 III 3 11 III 211 III 1 II III 311 III 1 II III 1 II III 6011 III 611 III 217711 III '11 III II III 1911 III 24811 III 211 Total Schedule V $75,60 III $3.402.00 $1,944.00 III $11,664.00 $14.58111 $2,507.76 $18.20 III $31,492.60 $32.40 III $2,462.40 $70.20 III $17,_.60 $23.76111 $4,752.00 $468.00 III $8,318.00 $594.00 III $8,534.00 III $1,512.00 lit $13,608.00 $432.00 III $1,296.00 $540.00 III $1,620.00 $1,944.00 III $3,888.00 $2,268.00 III $2,268.00 $540.00 III $1,620.00 $3,02.4.00 III $3,024.00 $3,240.00 III $3,240.00 $20.52111 $1,641.60 $54.00 III $324.00 $0.22111 $478.94 $610.00 !II $610.00 III $540,00 III $10,260.00 $70.20111 $17,409.60 $610.00 III $1,220JJO *:=====s=-=-=e==== $149,250.70 SCHEDULE VI BOSQUE PARK IMPROVEMENTS 601 602 503 604 605 606 007 608 II it.m deleted per addenda a II tt.m d.leted per eddend. 6 II ttem doleted per addend. 2 II II "4 m£'tro drinkn' foumln & ¥At s.erve 11"4 4" 3000pei '" sdwIk ""bb... 11"4 fum pod. p._ mtrl del 11"4 fumllnstl bedding /I. bricI< pave", II Fum Pad Pavor Glen Gory II II II ilEA II SF II SF II SF II SF II 11 II II II II II II II II II 211 4449 11 II 342611 342611 o,f!, III III III III III III III III II II IIZ. +.i! II 360011 II 342811 342611 III III III $5,900.00 III $2.70 III $1,98111 $1.52111 $1.57111 It/Boo $1',080.00 $9.720.00 $5,207.52 $5,378.82 SCHEDULEVll ELECTRICAL IMPROVEMENTS Total Schedule VI 􀀮􀀽􀀭􀀭􀀽􀀽􀀽􀁾􀀽􀁾􀀽􀁾􀁾􀀠32 t:;386:34 '$Z,I"iP .?4701 702 703 704 705 706 707 708 709 710 711 116ES CONC ENCASE DUCKBANK 8" DIA 1Y DB PVqI LF 114ES CONC ENCASE DUCKBANK 8" DIA 1Y DB PVql LF II TUE STD 4 VVAY MH ilEA II TUE STD 2 WAY MH ilEA II REINF 5' X 5' X 0' CONC PAD AROUND MH ilEA II TUE STD PRECAST DEEP WELL 25KV SWITCH 􀁐􀁾􀁉􀀠EA 116" DIA TY D8 PVC 90 DEGREE SWEEP 36" ilEA IIl0ES CONC ENCASE DUCKSANK 6" DIA 1Y D8 pvl LF 1110ES CONC ENCASE DUCKSANK 6" DIA 1Y DB Plill LF II (BY OTHER THAN OPEN CUT) II 11"46" Iy db pvc 90 dog. """I' fl(J" ilEA 11'42' ""h 40 pvc condu' IILF SCHEDULE VIII STREETSCAFEIMPROVEMENTS II II II II II II II II II II II II 2500 II 3$311 9 11 '11 211 3 11 13 11 135 11 70 II II 1211 760 II III 268311 III 38111 III 911 III 111 III 211 III 211 III 1211 III 12211 III 70 II III II III 1211 III 760 11 Total Schedul<> VII $70.00 III $187,810.00 $60.00 III $19,050.00 $9.100.00 III $61,900.00 $9,000.00 III $9,000.00 $750,00 III $1,500.00 $1,200.00 III . $2,400.00 $55.00 III $600.00 $150.00 III $18,300.00 $300.00 III $21,000.00 III $55.00 III $600.00 34.00111 $3,120.00 􀀽􀁣􀀺􀀽􀀽􀀽􀀭􀁾..= __= $345,400.00 , ! /. dIRRIGATION SYS EAST SIDE OF aUARUM ilLS II II/II REO OAK TREE 200 GAL CONTAINER GROWN ilEA II II .13 114" PVC SCH 40 PERFORATED SUBDRAIN SYS II LF II II 6G4 II FURNISH I PLANT WEEPING LOVE GRASS IISF II II 805 11"4 st light ort.... 􀁾􀀮􀀠puU boxes ilEA II II 800 11'42" sch 40 pvcst 􀁈􀀮􀁮􀁤􀁵􀁾􀀠IILF II II 807 11"4 st light foundation IlEA II II 808 II "4Sq. cap for light bas. ilEA II II 8()9 11'43' sch 40 pvc Ir.. n. 􀀢􀀢􀀢􀁤􀁵􀁾􀀠IILF II II SCHEOULEIX STREETSCAPEIMPROVEMENTS 913 11'44' cement stabarlZed subgrade IISY II 57311 914 1I'41i8"x4' TYer'SO" Idscp edging IILF II 870 11 E:¢ra II Concrete Yield Loss Above 8% IICY II 11 ========= 􀀭􀀽􀀽􀀽􀁾􀀠APPROVED; III III II II $10,260.00 III $1.150.20 III III II $11.00111 III III II II $0.03111 $232,20 III III III III II II II $3,89111 $36S.60 III $97.20 III III II $4,'97111 Total Schedu,," VIII III 647.2211 $5,40 III $3,494,99 $1.48111III II ====--==========-== Total SehedulelX $5,494,99 III 112,2711 $58,00 III $5,511,66 TOTALWORKDONE""/,,Z f)'" f)'-􀀤􀀳􀀬􀀱􀀱􀁾􀁓􀀻􀀼􀀳􀀬􀀹􀀶S, 1-a,.,:s4S QIe $3.025,197.12 't .. I T, '" RETAINED 2,5% 􀀷􀁥􀀢􀀮􀁲􀁯􀀮􀁥􀁢􀁱􀁦􀁊􀁾􀀺� �􀀧􀁾􀀠AMOUNT PAYABLE 'is:S $a'Wee,iS?􀀧􀁾􀁊􀀠.U> $,""""1 ;9.6 PREVIOUS PAYMENTS AMOUNT DUE THIS ESTIMATE $15.569,11 PHASe I A SON ClRCLE· PUBLIC INFRAS1'Rl.ICTURE Phasellmprovemenls j Remaining Bosque Park , j Electrical Vault (park) '/QUOM,lm Rotary Park Remaining AI+_ , Quorum Rotary Park Waterline Relf' (Part of Phase itA Infrastructure Co .' ) Design Engineering COnstruction Inspection j Geotechnical A1Jowance ! Street Ugh! Allowance 1 Tan Street Lights & Power by TlJ AIIjnce Securlty/Ewnt Fencing Allcwanc; • San Ciffllf'lllIi! t!f3 FACSIMILE TRANSMITl'AL Daze:.-!..JI􀀱􀁾􀀳􀀮􀁡􀁄􀁌􀀮􀁊􀀯 􀁦􀀬􀀮􀀮􀀮􀀮􀀻􀀹􀁷􀀷__ Fax No.:.________ XURG:eNT D For Your Review 0 Please Call Upon Receipt 0 Orig. To FoHow By Mail SEST BY, TIME, o...tt,_______:=_ 1/_ 􀁎􀁾􀀠1_ _ ...... _ '-.-... (.!/4, 871·ho4 ""1,-""_...,._Tt" ....tkI. pH.... 􀁾􀀠JJl/. 7100nIr y"". 31)1 .v,Kinn«:>·Avmt.o! • SuiIJ: 6(}1) • DalltJ!t, Tmrs 75204. (214) 1l71·:J:J11 • FAX (IU; 8iI.(}iSi 􀁓􀁾􀁔􀀮􀀬􀁂􀁙􀀺􀁘􀁅􀁒􀁏􀁘􀀠7033 2-10-97 8:38 HUITT-ZOLLARS. 􀁉􀁾􀁃􀀬􀁾􀀠9316643;# 2/16 ADDISON CIRCLE PHASE I pueUCINFRASTRUCTURE HZ! COST RECONC!UAnON 01130197 TOWN OF AOOl5ON COLUMBUS TOTAL PHASE I IMPROVEMENTS $2.ne,673 $85,058 $2,863,731 REMAINING BOSQUE PARK ALLOWANCE 5320,438 5320,438 BOSQUE PARK LANDSCAPE & IllllCTRICAL VAULT S37,5tKl S37,5tKl DESIGN FEE ELECTRICAL VAULT (PARK) $10$.740 ROTARY FEATURE AllOWANCE $1,tKlG.OOO $I,GtKl,OOO DESIGN ENGINEERING EXCluDING 80SQUE PARK $262,8QO 5262,800 CONSTRUCTION INSPECTiON ALlOWANCe $!lO,OtKl $$0,000 GEO'J'ECHNICAL ALlOWANCIl $2l.Q00 523,000 STREST lIGHTS AND POVVER 8Y TUE AllOWANCE $97,149 $97,149 TALL LIGHTS FOR ROTARY AllOWANCE 57,800 57,800 SECURITY/EVENT FENCING S6,000 $8,000 WATER TOWER SITE RESTORATION ALLOWANCE $15,000 S15,000 TREE LIGHTING PHASE I ALlOWANCE S7e.5oo 576.500 I"HASIlI ESCROW·EAST SIDE OF CIRCLE $35,700 IS!J8-TOTAl PHASE I $4,000,000 $445,358 , $4,9015,3581 OTHER Il'EMS OFFSITE UTIUllES (SEWER & DRAINAGE) $76,260 $78,260 PHAse II UTILITIES (WATER, SEWER & DRAINAGE) $83,!l40 $63,1140 PHASE II STREETSGAPI: DELETED $(I (EAST SlOE OF QUORUM DRIVE) PHASE II LIGHTS $0 (EAST SIDE OF QuORuM) , ISUB-TOTAL PHASE IIIOFFSITE $162,100 $0 $102,100 I TOTALS $4.662.100 $445,358 $5.107,458 􀁕􀀢􀀧􀁁􀁕􀁉􀁜􀁉􀀻􀁉􀀧􀁚􀁾􀁉􀀢􀀢􀁉􀁜􀁉􀀤􀀤􀁮� �􀀢􀀧􀀧􀀱􀁾􀁲􀁲􀀮􀀩􀀨􀀧􀀧􀁊􀁏􀀠 I 􀁓􀁾􀁾􀁴􀀠BY:XEROX 7033 ADDISON CIRCLE PHASE; , PUBLIC INFRASTRUCTURE HZ! BID RECONCILlAllON BASED ON KNOWN FIELD ADJUSTMENTS AND CHANGE ORDERS NO.1 THRU NO.6 1/3019T GIBSON AND ASSOCIATES BASE BID $3,425,10898 SELECTED ALTERNATIVES $91.555.46 RECOMMENDED AWARD $3.517.664.44 CHANGE ORDER #1 ($352.843.24) CHANCE ORDER Ir.! '(515.972.011 CHANGE ORDER til 511.317.50 CHANCE ORDER #4 ($00.94;I.WI CHANCE ORDER #5 ($34._.37) CHANGE ORDER t6 ($12,696.441 53.025,830,$2 BID RECONCILIATION TOWN OF ADDISON PHASE I IMPROVEMENTS $2,na,m OFFSITE UnUTIES (SEWER 8. DF!AlNAI3E) $78,250 PHASE II \JTILll1ES (SEWER & DF!AINAGE) $83.840 PHASE II STREETSCAPE DELETED lEAST SIDE OF QUORUM ORIVE) COLUMBUS TOTAL $85.058 $2.883.731 $78.260 $83.840 $0 ITOTAlS $2.94!I.m $85.058 $3,025.831 I PAYMENTS RECEIVED TO OATE FRDM ADDISON CIRCLE I $4(lS,414.00 REBATES PAID TO ADDISON CIRCLE I 5352,84324 NET PAYMEN]' RECEIVED FROM ADDISON CIRCLE I 552,630.76 CURRENT PA'I'MENT DUE FROM ADDISON CIRCLE I 532.427.W 􀁾BY:XEROX 7033 2-10-97 6:36 HUITT-ZOLLARS. li'iC. 􀁾􀀠9316643;# 2/16 ADDISON CIRCLE PHASE' I PUBUCI"FRASTRUCTURE HZ! COST RECONCIUATION 011301111 TOWN OF ADDISON COLUMBUS TOTAl PHASE I IMPROVEMENTS $2.778.673 $65,0!ill $'l,8$3,131 REMAINING BOSQUE PARK AlLOWANCE 5320.433 5320,433 eOSQU(; PARK LANDSCAPE .. SL(;CTRICAI. VAULT DESIGN FEE 􀀤􀀻􀀬􀁜􀀷􀀮􀁾􀀱􀁬􀁑􀀠􀀤􀀳􀀷􀀬􀁾􀀱􀁬􀁑􀀠ELECT RICAL. VAULT (PARK) $109.740 ROTARY FEATUl'tE ALLOWANCE $1,QIlQ.DIlQ $1.IlQO,OIlQ DESIGN 􀁅􀁎􀁇􀁉􀁎􀁅􀁾􀁒􀁉􀁎􀁇􀀠EXCLUDING BOSQUE PARK $282.800 S262,81lQ CONSTf!UCTlON INSPECTION ALLOWANCE! $SD.OIlQ 590,000 GEOTECHNICAL ALlOWANCE $23,000 S23,0IlQ STREET LIGHTS AND POWER BY rue ALLOWANCE S97.149 $97,149 'P\L.L LIGHTS FOR ROTARY ALLOWANCE $7,81lQ S7.81lQ SECURITYIEVENT FENCING SB.OIlQ SS.QIlQ WATER TOWER SITE RESTORATION ALLOWANCE $15,000 S15,000 TREE liGHTING PtIASE I ALlOWANCE 576.500 $78.500 PHASE I ESCROW·EAST SIDE OF CIRCLE $35.700 IS!:iB.TOTAL PHASE I $4,500,000 $445.358 ... $4.945.3581 OTHER ITEMS OFFSITE UTILITIES (SEWER" DRAINAGE) 578,260 $78.280 PHASE" UTILITIES (WATER. SEWER" DRAINAGE') $83,840 $63,840 PHASE II STREETSCAF'I: (EAST SIDe OF QUORUM DRIVE) DELETED 􀁾􀀠PHASE" LIGHTS (EAST SIDE OF QUORUM) SUB-TOTAL PHASe IIIOFF$ITe $II $162.100 $0 $II . $102.1DD 1 TOTALS $4.6&2,100 5445,358 $5.1D7.458 􀁕􀀢􀀢􀁖􀀯􀁗􀁊􀁬􀁺􀁴􀀧􀁬� �􀀧􀁜􀁕􀁓􀁮􀁍􀁁􀀧􀁬􀁾􀁉􀀢􀁲􀀮􀁘􀁦􀁊􀀺􀀠 I SENI IlY: )(tK()X 7U;J;J Z-lU-1l7 tlUIlI-ZUUAK:S. INC." GIBSON AND ASSOClATES BASE BID SELECTED ALTERNATIVES ADDISON CIRCLE PHASE I PUBLIC INFRASTRUCTURE HZlBID RECONCILIATION BASED ON KNOWN FIELD ADJUSTMENTS AND CHANGE ORO!;RS NO.1 THRU NO.6 1130191 $3,426, 􀀱􀀰􀀸􀁾􀀹􀀸􀀠$91.555.4& RECOMMENDED AWARD CHANGE ORDER #1 CHANGE ORDER 112 CHANGE ORDER tI3 CHANGE ORDER #4 CHANGE ORDER #5 CHANGE ORDER t6 $3.517.664.44 (8352,843.24) ($15,972.01) $11,317.&l 􀀨􀀤􀀸􀁓􀀮􀀹􀀴􀁾􀀮􀀰􀁉􀁉􀀩􀀠􀀨􀀤􀁾􀀬􀀶􀀹􀀶􀀳􀀷􀀩􀀠($12,696.44) $3,025,i30,82 BID RECONCILIATION PHl\SE IIMPRO\ll;MENTS OFFSITE UnUTIES (SEWER & DRAINAGE) PHl\SE II UTILITIES (SEWER & DRAINAGE) PHASEIISTREETSCAPE (EAST SIDE OF QUORUM ORIVE) TOWN OF ADDISON $2,778.673 $76,260 $S3,B40 DELETED COLUMBUS $85.058 TOTAL $2,863,731 $78,m $S3.B40 $0 ITOTALS $2,9411,n3 $85.058 $3,025,831 I PAYIIIEN1li RECEIVED TO CATE FROM AOQISON CIRCLE I $405.474.00 REBATES PAID TO AOOISON CIRCLE I $352.114324 NET PAYMENT RECEIVED FROM ADDISON CIRCLE I $52,630.76 CURRENT PAYMENT DUE FROM ADDISON CIRCLE I $32,427.011 ADDISON CIRCLE PHASE I PUBLIC INFRASTRUCTURE PHASE II • OFFSITE COSTS CONSTRUCTED IN PHASE I 01130197 ORIGINIIl. BUDGET IICTUAlCOST SIIVlNGS OFFSITE llTILlT1ES, SEWER & DRAINAGE FROM 588,3119 57$,281) $10.129 Cl OF SPECTRUM OR TO TOU.WAY PHASE II UTllITIES; WATER, SEWER & DRAINAGE 5103,701 $83.831 $19.664 FROM EAST ROW OF RoTARY TO Cl SPECTRUM DR PHASE II ALT. STREETSCAPE IMPROVEMENTS $89,500 $89.500 BOSQUE PARK POTENTiAl SAVINGS $500.000 S354,560 ____...;5...;146=.440.;.;... (ACTUAL ASSUMIiS $175,000 FOR BOSQUE BID PLUS $1 79,S60 ALRI:A1lY SpeNT) $264)9331 ADDmoNlll. OFFSITEIPHASE IIIP000tmAL PARK COSTS OFF$!Tl! ELECTRICAL FRQM ADDISON ROAD TO AFFRQJ\. 305' EAST OF ADVISON RD. PHASE II PAAKINGISTREETSCAPE ON WEST SIDE OF QUORUM OR FROM RR TO SOlfTH ROW OF ROTARY STREETSCAPE ON THE EAST SIDE OF THE ROTARY STREETSCAPE ON THE WEST SlOE OF lJoIE ROTARY SmEETSCAPE ADJACENT TO THE PARK POTENTIAL DRAINAGI: CREDIT FOR OFFSm! 􀁐􀁒􀁏􀁰􀁥􀁒􀁔􀁉􀁾􀁓􀀠POTEHTlAL WASTEWAlER CREOIT FOR OFFSIT!! PROPERTIES ADDITIONAl. OFFSITEII'HASE II/POTENTIAl PAl'll( COSTS TOTAL COST $36.120 $102,200 $94,330 $98,640 􀀤􀀱􀁾􀀬􀀸􀁉􀀩􀁏􀀠$3,270 ::.t.N I HI: xtJ(1I}[ (U;J;:) I1UIT1-:tIll..l..AK:I. I Nt;, 􀁾􀀠ADDISON 􀁬􀁾􀁉􀁒􀁬􀁾􀁌􀁅􀀠I'IIASE I PlfBLlC INFRAStRUCTURE OFI;srn: IfnLfflES, SEWI>R AND DRAINACE IMPROVEMENfS FROM CENTERLlIiE OF SPECTRUM UJUVE ",nOLl.WAY UIIJIII'n mOM 􀁉􀁭􀂷􀀮􀁳􀁣􀁋􀁵􀁾􀁮􀁯􀀺􀀮􀁬􀀠UIIIlT 􀀨􀀩􀁴􀀱􀁊􀁜􀁾􀁮􀁮􀁹􀀠UNlTPiUCE. 􀁓􀁃􀁈􀁂􀁑􀁬􀁕􀁭􀁾6TOftM WATeR IMPRQvr:fldr-NT/iO ,,., 􀁕􀁎􀁴􀁾􀁮􀀺􀁕􀀺􀁬􀁊􀁃􀀱􀁬􀁁􀁎� �􀁡􀀬􀁅􀁘􀁃􀁁􀁖􀁁􀁬􀁬􀁏􀁎􀀠... ROC'K CHANNf1I-P'X(" 4 VAT10N "" l'TlIH.:K !liOfllli RU'·KI\? >lG Sn.TPENCE "" R()tK ItF.NM 􀁾􀁉􀁋􀁄􀁬􀁉􀁬􀀬􀀧􀀻􀀠III_STURM WATEKIMI'ittJVI:MENntSVtJ.'l'OlAL 􀁾􀀨􀀺􀁈􀁅􀁏􀁕􀁌􀁈􀀬􀁉􀁖􀀮􀀠WA:Ht."WAJU .c.'It'KUVNw1I::Nl'S 40' It-"f)R If;PV(: WJI,STr.WATfI,R UN!'!,INCUIDlNCOaml.!.DMl!NT ..... ll-film 26 l've WA;.f{TS,wA'tBR LlNE,INCLUDlNv BM9EDMENT 49' S'DlA, 􀁗􀁉􀁜􀁓􀁔􀁅􀁗􀁉􀁜􀁔􀁅􀁬􀁴􀁍􀀢􀁎􀁬􀁴􀁴􀀮􀁮􀁊􀁾􀀠... 'tV.lmt'E'CTION 4(lII lUNC1l SAfJIT'Y scttEO:Ul.t lV· WASrtWATEI\ IMPRuv.;/MKNTSSlI....TtYt'.\J. 􀁾􀁶􀀠:1.>211 ('V 141., (:y 11 LP ),10 ev '" I.' IS LI' eo; FA 􀁾􀀠LI' at! fF m s''Ol1 .... $;JUt 􀁾􀀬􀁯􀁯􀀠'ISlUIO $l1.60 lJIl.24 SM1Z.00 :SUiZ so.•s AMQUN"f $IUttJ.J6 $'9,641.12 "".SO SSJHlHJl SU{)llJlO U9.t1!.sa $J21-00: S26,218.01 SII)«l.OO SI,41U14 '-5'13.30 $46,'904,U Ol'R'lTlt 􀁬􀁲􀁴􀁬􀁬􀀬􀁭􀁦􀀺􀁾􀁓􀁜􀀱􀁊􀁬􀀮􀁔􀁏􀁔􀁁􀁌􀀠MUtJIUt.A'nO/ll 13"') omt11t ltfll,mM.STQTAL 􀁁􀁮􀁄􀀮􀁾􀁊􀁏􀁎􀀠C1Rn.F. PHARR J ,IIlJUC 􀀧􀁎􀁉􀀧􀁬􀀨􀁁􀁾􀀧􀂷􀁒􀁬􀁩􀀨􀀺􀁲􀁵􀁒􀁅􀀠 PHASE II UTlLl1lES; WATEK. SEWER AND DAAlNAGE IMPROVEMENTS JiRUM EA.>;r RI)W ()"lUrrAMY'm n;NTF.RUNt:Or SPECTRUM DinVE 01128197 I1EM DBSC'JUPTION UNiT QUAlmTY UNIT PJtICC AMOUmSC'llEVt..Ulll 􀁾􀀠StoRM WATER IMPROVBMEN1S "n )6" n,In KI:'P, tNt'lAn}lN<; EMIlIJ)-"';kl U' " $)291 $tMOSl 􀁾􀀱􀁬􀀠(,(1" CL IIIRa, INCLUDlNGEMBI!nMerr Lf " $f4IJ,t\4 J3.m.oo m lr' CLIU KCt·, lr-tCl.tJUiNO£.M8£OM'ENl' 1.1' ,,0 5112.30 SlU,D44,MI :030' rtPS'O'MANIIOLn !lA I S4,691l.OO s.c.'1J8.00 l3? UN("l.ASSmEOCHA'NNEL flXCAVATION C'I .m SSl7 Sb,lUW "" .RQ('K (,HANNHL £Xt'AVA'nON C'i 3<122 $tt,41t $f9.5825(' '" Z' THICK :flUNK K'Nt"'I' n •• SJ'UV lJ,lWIZ. INC.... ADDISON 􀁃􀁉􀁒􀁃􀁉􀀮􀁾􀀠PHAS!,; I 1'1181.1(: INI'RII8TRUcrURE PHASE 11 ALTERNATIi STHEK1"lleIlPl: IMPROVEMENTS F.lllfr sun: OF QIlOR\IM DRIVF, NORTH AND SOUTH IWTUE ROTIIRY OVM7 ITEM DESCIUl'IION ullin Ql.1J\fffiTY 􀁕􀁎􀁉􀁔􀁾􀀠AMOUNT 'St.lIliDUu.: \,111 -Al'lLltHA:l'i:. !)llWl;)T$\::A1'£ JMt'KOYbMtNlS A4, JlUdGATtON SYSTF;M, RA51 51np. OF QliORliMONLY ... 1 $1O.J(,o 0(1 $JO,26O.oo "'" kNit",k 1l!1HlJU.U)N, Cl)N 􀁲􀁁􀁬􀁾OftQWN 􀁬􀀧􀁾􀀠.. 􀀤􀀱􀀮􀁬􀁾􀁕􀁵􀀠"',00800 "'" "" PVCSCHEDULE40 SU'BI)RA1N SYSTEM ,,; '",1 111.00 SII,Z:H 01:1 .... WHiPtNt: 􀁊􀀬􀀨􀀩􀁖􀁪􀁾􀀨lit""'*> Sf 29110 $Oj!] 1413,'"' .., !jTf(mT'UON1 OrTRr.:!'! I.tGtlT1'llf J, n01(; EA 10 $2.12.211 $Z.v,z,OO flOG r I'Ve 􀁾􀁬􀁴􀁗􀁕􀁬􀀮􀀮􀁴􀁩ifO' S'l'IlEETlJGHT CONDUIT I.t: ,... SUO 􀁾.on s rRI:i'.T t J,;Srl' H)(INI)A mIN 􀁷􀁾􀀠'4 $3SIUIa ... ,'QuARbCA!' JIOK 􀁵􀀮􀁃􀁊􀁈􀀢􀁲􀀮􀁵􀁾􀀠'"' 14 $91.20 .... )" P\'C!«.1Il!OtJLI!4tJ 'nu::u .l..Kf1l'l' 􀁬􀀺􀀧􀁏􀁾􀀱􀀩􀁕􀁮􀀠S(:nKIlIiI.K Viti • "1:rKHfr!'A'I'It.!rrKltfC'lSt:MI.IMrKOV KMKI''lI!I !lUu.llrrAI. 1.1' 􀁉􀀨􀀬􀀬􀁾􀀠".Ill .......... : PIL\SIi. UALTf'.R1QT& SlRI&6TSCAPIC SUII-TOTAI, MOI.il1.IU ltoN {J'Y>DC!tlP't1:0N Ut.(;10.00 '04 􀁉􀁎􀁈􀁁􀁦􀀮􀁉􀁾Tl.JC }..WAY MANUf)f.I;; "" I $9,000.00 $0),000.00 "" INSlAU. kElNFORC'&,) CONe, PAt> Ai\OtJND MANItOU! SA I S7!5IlJ'1(l 57W.OO 􀁎􀁃􀁴􀁦􀁾􀁖􀁴􀁬􀁷􀁮􀁅􀁃􀁬􀀱 􀁕􀁃􀁁􀁊􀀮􀀮􀁬􀁍􀁄􀁗􀁖􀂣􀁍􀁅􀁎􀁔􀀵􀀵􀁬􀁩􀁬􀁩􀁊􀀮􀁔􀁏􀁔􀁁􀁌􀀠5l9.GO.OO 2" 􀁫􀁾􀁦􀁑􀁋􀁴􀁩􀁕􀁕􀁴􀁬􀁏􀁁􀁬􀁪􀁕􀁎􀀠UN ",OKuUWt:. 􀁏􀁩􀀧􀁾􀁬􀁕􀀺􀀡􀁎􀁃􀁂􀁃􀁅􀁎􀁔􀀱􀁗􀀠"" I $1,OZtl.1I(J 'f1.'I2c,.lIO 1'1 RhU.& SURIJ\9Rxtf.;T. NELUf It S'!1::'V1!NS IWLUUS SA .. 􀀧􀁬􀁾􀁕􀀴􀀠S2....U.1v '" ftJNNl.tul4. l1...AN'"f W£lLlE R.. S'I'EV'eNSHO!..U'BS £A " 􀀮􀁴􀁮􀁩􀁬􀀬􀁾􀀠'1/.10.00 114 1U!MOva ANDUUS! EXlSi 􀁳􀁔􀁃􀁕􀁴􀀮􀀮􀁉􀀮􀀮􀁁􀁎􀁉􀁾􀂷􀁁􀀮􀀧􀀱􀀺􀀺􀀠FJ)(jIN{l 􀁉􀀮􀀮􀁾􀀠I I S31I." tUK.W 15' BmNli(lItCllnCOllloml1tfol.1iMf: I.' I $710." 1750,00 NA AIlDITlOlY ,. 1'141.'-n "' '"'' .W ,... $}too " " $1.1111 '" ...., ..... IY ... :SUO ... m n." LF "" tUt, .. IlMOtll'lT ,,4')(,1,1 S11OJlO _.. 17,oit>.ilfl 'Jr,I(>O ,J1'.66l SO 􀁗􀁾􀀱􀀺􀁍􀁊􀀠,,'"''",-m,. 􀁳􀀩􀀱􀀮􀀢􀀢􀀧􀁬􀁾􀀱􀀠, '" '" "" '" '" '" "" '" ". 1." 􀀧􀀢􀁾􀀠". ''12 '" '1.¥. "" "'A 2lI ,.. ".".j nlKNISH I'I'.J'1YJOltt),."N "'UCK """'I'.Jt MAr. Ui::l.v lUKII'Y. I" VVC satEDtiLlZoSO'f1II.E1i,uutfI'l;CNDUrr r PVC SC'It1!DUlJ! 40 IITIU!:I!T UCHt CONDl11f SIltBi1'UGfIrORtKeSUGRTfItl lJ Il()X J1W.OAnO'N nSnM INCL I"OWU fOftC'01'fTl.0LLU.3 •• Wi: J;;(':JJt'f)lJlP,.oW 1PF.JtI'ORA'T1!D ."UUOMlN SYSl'CM tntn QAI\. :zaJ vAU.OH 􀀨􀀨􀁴􀁾􀀱􀀧􀁩􀁜􀀱􀁾􀀱􀀧􀀡􀁉􀁩􀁴􀀠{ptOWN OWf', VAUI'ON lDUli 􀀴􀁾􀁬􀁕􀀡􀁄􀁧􀁕􀁍􀁏􀁁􀁙􀁕􀁌􀁖􀀠􀀮􀁾􀀠I>An.lLY MIXW 􀁬􀁗􀀮􀁊􀁜􀁒􀁦􀀩􀁦􀁬􀁦􀁽􀁉􀀧􀁒􀁬􀁾􀁐􀀧􀁦􀁭􀁐􀁊􀀮􀁦􀁬􀀺􀁎􀁏􀀠I 􀁾􀁕􀁕􀁓􀁙􀁾􀁗􀁎􀁏􀀬􀁉􀀠"·3.!'IOMLlLV tlAl'FotJU.. MJ.Xm NQ. l .' 11I.1I'", '" r\JlU"Uj Hf.I\lU ..... 􀁉􀁕􀀮􀁏􀁃􀁁􀁭􀁉􀀧􀁬􀀮􀁒􀀶􀁉􀁉􀁙􀀰􀁊􀁉􀁊􀁜􀁬􀀧􀁦􀁔􀁻􀁾􀁮􀂣􀁶􀁴􀀱􀀱􀁅􀁍􀁓􀁉􀀠PUI\NISU &lNST AU. DCDDlNI;i NAT.• u.;ST UIUCr. rAVE.J.:l ml!t::r t f(JkT H1U1'Il1llt.nUN !:(lUAU! CI\J) POR UGlITBASt 􀁴􀁾􀀠rvc SCffSVULE 4Q nmUI1lfT' 􀁾􀁑􀁎􀁮􀁕􀀱􀁔􀀠t;Utwuu: ... 􀀢􀁊􀁬􀁩􀁬􀀢􀀢􀀧􀁾􀀧􀀢\Ml'IlOV.Qt.I'Kl$SU.1'O'fAL " .... '1.57 L' :\11 11.4Q '.1' :41'1 ".... • .,,""" LS I $J;.uu.w IV 'IT' $IHk') PA 1:􀁳􀁾􀀬􀁡􀁯􀀲􀀮􀀰􀀠... .,. S4JJJ CA ,. :h."ft 'A " S).61.. " 11l,1 fA " $Lvl.. ,. 􀁓􀁾􀀮􀀱􀀲.. '" .$Y.II PA '" fl."" •• " ll.fi.. , Sl.711,OO Sf -$Ul 'A , .,..... "" 5 􀁾􀀧􀁮􀀬􀀺􀁮􀀠r, "" n... , SHI,OlLl,'(' 􀁉􀁬􀀮􀁄􀁬􀀴􀁾􀀠11.44) I' SI,II!4411 n,))".W .",tIJI.1\(l 􀀵􀀡􀀷􀁾􀀧􀁊􀁏􀁏􀀠SI.lI};/(,," "'.'" :SltlSu .ln4!} 91.50 .,," .)!lIizn m ... 14'I,:L\ $l.llUIU SV,14'J It 􀁓􀁉􀁾􀀬􀁗􀀠....,. $1,41120 _ .... 1 I'JIMIEIfWESf'.!III)I: ur(,NtUKllM' ttll"-M'''', MVfj.1UloA1'I{)N 0%) '11.\2jlWDI' SIDE OF (JUGAU ..'VlJ.1VTAL ;)Ll'll OJ -.u::.r\VA IU00 O·':t0 • nu I I 1-LVL.LJU\.J, I J'tL ..... uulUU'tu,ff"11/1V ADDUiON eIRCI.K rlL\S! J PllIJLlf: INt·HAlt;THlll.TVRI rllASE II BUDGET ITEMS SUtll."l'SCAPK ON ....tI:: }:;A.....r It;1O.: OF TirE ROUNDABOUT OI/lOI97 􀁉􀁊􀁬􀀧􀁾􀀠􀁬􀁉􀁾􀁉􀁴􀁊􀁬􀀢􀁮􀁕􀁎􀀠UNIT Qv",..nn UNlTPRJCn >MUlJNT lKl:!WUl,.5.1· rA.VlNG 1MPlWvu.u;JiTS '''' ,'N"'.ASloIlI'IJ'.I) S1'II.IIt'T I"'C{:AVI\TIO'" & HAVI . ..c}J'F C'f '" S!..J6 􀁊􀁍􀀢􀀧􀀮􀁾􀀧􀀠'04II. 110 Rl!MOV(! 􀀢􀁎􀁄􀁭􀀡􀀻􀁐􀁏􀁾or 􀁬􀀧􀁘􀁉􀁾􀁔􀀠r.nNC:. 􀁾􀁭􀁔􀀡􀀮􀁷􀁁􀁕􀁃􀀺􀀠4',lIUJPSIl-'OMr Ill!lNl'.("VM; :S1l}f;WALK "I' J(IOO PSI COMP 1lI!lNI'.mNr. 􀁾􀁊􀁄􀁨􀀮􀁾􀀨􀁭􀀩􀁛􀀡􀁷􀁁􀁊􀀮􀁉􀁩􀀺􀀩􀀠,y '" 13. 􀀱􀁾􀀱􀀴􀀠􀀬􀀬􀁾􀀠r.1O 􀁓􀀱􀁾􀀶􀁬􀀠S4.21"'.11.1 " ,.5O -. n.", JIIU"DS.OO 5(;'1IEP\'U I-PA'\IING IMrROVEM!NTS SUa-TOTAL Sll,4ll.u I o. W 􀁉􀀧􀀱􀁉􀁒􀁎􀀱􀁾􀁕􀁬􀁬􀁭􀁊􀁉􀁓􀁔􀁒􀁉􀁁􀁬􀀧􀁩􀁉􀁭􀁕􀁲􀀮􀁲􀁣􀀠Mvrnl \lAT. Tjl'LV. n)J;tw " U51) SI.'''17 19.11HC ,., ,-I"Vl:l!IC,..MU' 􀀧􀁥􀀧􀁾􀀧􀀭􀀢􀀧􀀧􀀧􀀧􀀧􀀧 􀀠I IIJ"'TCQNIJUIT U' '" S,ULI! oil) oil) S"lRImT LlGlrtOONDUlT ,. ". ".. ".1"1.no Z.. 􀁾􀁉􀀢􀀢􀀠!rrrumr UC;UT OR TJU!I'! urnrr Pill J. DOX IMllGA.TlONSTSIl!M 􀁉􀁴􀁬􀁬􀁾􀀠J'OwIlI\ 􀁽􀁏􀁏􀁊􀁬􀀨􀁾􀁎􀀢􀁉􀁾􀀠.. LS , , 􀀤􀀱􀀱􀁾􀀠Mil :il.OCIOOO _._. ---S1.m.OCI 11,000.00 '" 1-I'Vl.: SCJl.6DUlJi 4D.PmU'0flATt!D SUDDRAIN SYSmM U· ,.. 51100 􀀤􀁬􀁾􀁾􀁋􀁏􀀮􀁏􀁏􀀠m KItlJO.f.K lIMIi".Ao,.Il'N lVIIofI'A'Nhlt l.ill.l)WI\,I "" " 􀀤􀀧􀀮􀀧􀁾􀁻􀁉􀀺􀁮􀀠SZ7.l501..1O "0 OWF. YAUPON nOLl.1I! "' !t71) ".05 U.n:uo :m 4" 􀁾􀁈􀀢􀁓􀀱􀀧􀁁􀀠􀁮􀁁􀁬􀁾􀁙􀀠.. 18 $1:/11 S13I.'" 􀁾􀁊􀀧􀀠4' II"lUL."( STtiLt.A I>M.,IKU .. .., $,).(,1 5161_11 '" BllAP.DBDlRISI"Ull'lJII-lO.1 I!I\ I.m SUo1 s.tII.lU 11'1 HKltX1JI"UJlUjJ "".,tOw 􀁾􀀨􀀩􀀮􀁉􀀠.. II $1.,;7 "t.'''''Wa '" 4"SI'lVtiIlULY "" .. 􀂷􀁾􀀮􀀷􀀲􀀠S21'1.'6 Z.. DA.l'J'ODlL PeD. r.m..DNO. , "-' ". SO." $i1.'Jl '" DAI'I'QT)II. PllI!M«i TOM NO. I "" " SUI $26n :m FtJRNISU &; INSTALl. DUDDING MAT•• INST DlUCIt Ptr.VIJRS '" 􀀮􀀧􀁉􀁉􀁾􀁮􀀠􀀧􀀱􀀮􀁾􀀲􀀠SU9LOO >., 8.MRY.I·UGIi r I'OUNUA".-IQN .. 1 S:lU.RO $l.mzo ,.. SQUARE CAl' fOIl. UUH1· ""Sf "" • $'IIJ.11) sm.•1) ,., z· PVC liOlOOl1IJ! 4O'T'R.I![! LKiTrrroNOUTT .., '.. SUi 􀁓􀀲􀀬􀀲􀀮􀁾􀁦􀁩􀀮􀁚􀁉􀁬􀀠SClIEDUlL U • SlRDTSCAl'E lMrRU'\IEM£N1'! SUD-TO'L\L 􀁓􀁉􀀡􀁏􀀧􀀮􀀢􀁾􀀱􀀹􀀱􀀠􀁾􀁉􀁊􀁉􀀮􀁮IX _ALTI!lNAm 􀁾􀁊􀀡􀁾􀁁􀁬􀁉􀁉􀀡IMPkOV(WJ[!N1' !9 .. 1 􀁐􀁉􀁉􀁁􀁾U E.UT SlDa; 01" 11IE.KOUlillPAUUlr' ....,us MOBIlJZATtON{J"" 􀁐􀁬􀁉􀁁􀁾􀁪􀁩􀀻􀀠1l1lA..... 􀁾􀁬􀁮􀁴􀀻􀀠0)1"'111'; kOUI'IOANOlrr 10 AMISON CIRr'CF. PIlASE J nrBLIC INfiW'iTKl!(.:TtlR£ PHASE II B!}OOET ITElIIS Sl"BE!.TSCAI"f: ON 'rilE Wl:ST SIDIC OFTHF. ROUNPAlC)tll OI/lOm fl... Ub:lCtl!I'nUN ,...... QUA,NrnY W{Ti'IUClI """"'NT SCfWIiI.t! • 􀁾􀀠i>A Vim, 'MI'MIIVI'.MI'.N"I}. "" ,.. t.INCtASSiRGt' STREGf eXCAVATiON#: 1f>\\Jl..-OJ'1' 􀁒􀁃􀁍􀁏􀁜􀀧􀁉􀀡􀁁􀁎􀁄􀁾OP 􀁊􀀡􀁬􀁏􀁾􀀠mHC:. XfOBWAlX 􀀨􀁾􀁹􀀠SY ". "' .. '" 􀁾􀁾􀀺􀂫􀁊􀀠􀁾􀁉􀁏􀀬􀀴􀀰􀀠rn>1A1; , '09 ... JOOO PlOt rnNI'. RPlIfl'I. r.ONC. IIn)lW;1\T.K '" 'm suo S....,f,il Un .." ;M'IIII'SI"i'{)MI'. 1I:1!.lNt'. 􀁜􀀮􀀧􀀮􀁑􀁦􀀧􀁮􀀮􀁾􀀠!lvt!MI:I (S.wJ:SWAUI..) '" ,..., "-'" 111!i,IIfj(o.lIU t«.'tIt:PVU; I 􀁾􀀠,,,"V,tt'V IWI'fKUV&MI:NfllWf.lUTAl. IU.n:UIj! '" 􀁦􀁜􀁔􀁋􀀮􀁎􀁉􀂻􀁴􀁾􀀧􀁬􀁬􀁕􀁁􀁎􀁂􀀦􀁗􀀮􀀺􀁘􀁲􀁁􀀮􀀢􀀱􀀺􀁩􀂫􀀮􀁍􀁁􀀮􀁬􀁉􀂻􀀩􀁬􀀮􀀬􀁖 􀀮W:m6 SF "'" 1J.S7 """'" '" 􀁉􀁾􀀠􀁦􀁉􀁾SC'W!I)Ul.I! (at'Uii LlGU'l' C'ONDU'lT L' 􀀱􀀲􀁾􀀠S))UI $t.46.00 ,.., 1:' i'VC !K'1W.'Illl.b l,QSnU1i;if \.Wtfl WNIXIIT IJ' >I' lHi!) sm.,. "" .'1'U.ErlJGfl.T 0JltunUQtiT 1'IJU. BOX "' v m ... l:e.I"!.ZU "" nUttroAnON S'iID'JlU WC:I.. POWP.R FOR CONT'ROT,f,llRX LS I $l.""''' $2..1JQIJ.OO '" "" PVC: 􀁾􀁃􀁈􀁍􀁕􀁴􀁊􀁴􀀮􀂢lI'El'lFtmlloTEJ) 􀁉􀁩􀁯􀁖􀁒􀁬􀀢􀀩􀁦􀁴􀁁􀁴􀀮􀁎􀁾􀁾􀀠U' ". 11 I ,QI'Io SI.05I>.w W RIiD OAK 200 GI\U.01-I t"Ol"lJ'AU4I:JI. OIOWN M ,.. 􀀧􀁕􀁾􀁏􀀧􀀺􀁷􀀠$17_" DO rNlF. YAUPON HOLLW PA He. "" f:.H:Utl ", ,.$lfhSTA DIU';'\" ... 1Z "'. Ilzu« '" '".• 􀀴􀁾􀀠tJ}\yt"u.'r $1 tILL" 1).l:o;I,"IW 􀁾􀁗􀁓􀁊􀁬􀀧􀁕􀁊􀀮􀁐􀁊􀀮􀀮􀀱􀀡􀁎􀁏􀀮􀁬􀀠... "" ".., ""W $1,1 'A.[It 􀁾􀁕􀁄􀀮􀁾􀁕􀀠􀁾􀀠􀁴􀁬􀀮􀁢􀁁􀁾􀁗􀁓YlIU.(JW NO I .. .. $Ic':' JltOJ2 ... .," .s'JDEll LlL Y "" .. $!>,12 􀀤􀁚􀀱􀀰􀀱􀁾􀀠,... DAl'i'ODU. rrt:ra GOLI) NO. I Ph " .."'" mOl 􀁾􀀬􀀠OArl'VOlLl"ImI'JN(J TUMNO. 1 '" )0 􀀤􀁩􀁉􀀮􀁾􀀠m •• lS' 􀁚􀁾􀀧􀁉􀀠rtJl\NlSU 4.1NSTALL 􀁄􀁾MAl', 􀀴􀀮􀁬􀁾􀀧􀁓􀁔􀀮Data. Ph."'DRS ErfklO(t uGlfrI'Qt!N,,'\'!1 ON '" "" ",. , tDl ,,"..0 14."1,010 $!.'J.C4:nn '" sqUAJUi t'M' fUll UUfU BASli "" , '972\1 ....'" ,., 􀁚􀀧􀁬􀁾􀀨􀀻􀀧􀀠M.1tbOtJt.b4''Jl'l\tiliLUfflf lVNDvrJ' J,f ,.. "" \:l.nOHl' st'HWVll.lI 􀁾􀀠:i'IIt;t;RK:Al't! 􀁉􀁍􀁦􀀧􀁋􀁏􀁙􀀧􀀮􀁍􀁾􀀬􀁯􀁮􀁳􀁳􀁾􀁉􀁉􀀮􀁷􀁲􀁁􀁌􀀠3IW,Jtl.lll OIl MUMIU/...Ylt... 􀁴􀁾􀀾􀀠 PHMIi If IlfllU:tltK"A')$ Of! WI':,-r "nn:OJ1'i't,1U MII)J!;('N C1H(;L); PHASt,; I puauc INFllASl'KU("I'IIKE "fORM WATli:jt ANII WASn:W",TI:R CREDIT FOR QUORUM 􀁉􀀩􀁉􀁕􀁖􀁾􀀠 011J01!17 "'SM 􀁒􀁲􀀺􀁬􀁭􀁧􀁬"" "" ... ='11. ,., nr.oc:!UPl'lON 􀁬􀁊􀀡􀁉􀁉􀁬􀂷􀁓􀀧􀁦􀀱􀀢􀁭􀀺􀁍􀁗􀁁􀀧􀁉􀁊􀀺􀀺􀁉􀁜􀁬􀁍􀁊􀀢􀀺􀁫􀁏􀁖􀁓􀁾􀀤􀁲􀁯􀁕􀁏􀁉􀁕􀁊􀁍􀁄􀁉􀁴􀀮􀁍􀁁􀁊􀁎􀁏􀁎􀁌􀀮􀁬􀁽􀀠JG'CTA.CU;: 11 :Ilr;p -' ' 4r t"LAD U Kt'l' d.s-r.r....ssII KU' 􀁾....."'LASS II&<;P u....tI Lf ,.. ,,' L' wAf'tlnlY ., "., ... "",.. i,lNit l'JUt"t; 􀀤􀁾􀀺􀁚􀀮􀀱􀁉􀀲􀀠..... 171,(;) l121.*1 I\MUUNI n.:m.,,,, : 511,I:tI!.4I: I 11),;711,40 : SH.\Yb)o<4' : GO" CI.J\SS u: ttCF .no TVPtl' -n. STOItM YANUUU; M.'l,t:.DVl.1t II". Cil O.WATQ ml'ROVEMlUftl:t 8VI:J.JOT,l', l.l' $14.>,)f)ol '" , 􀁓􀀴􀀮􀀶􀁾􀁏􀁏􀀠roTALM.eA CONTIU8iJTU'«J (AtlCE:fJ IUfJU. Ol'Wtrrf!AflnIl Nm'r:nNT.(ACRr..-;, 􀀢􀁏􀁴􀁴􀁾􀁉􀀧􀁉􀀧􀀸􀁉􀀱􀀱􀀡􀀮􀁜􀁬􀀨􀁍􀀠romlUlllM'1NG »MAtI'4ACfi CREDIT 􀀱􀀺􀁬􀀢􀀮􀀹􀀶􀀱􀁾􀀠; S4,Il9!IOO i ....,.... ..;tll ." '''' ''','791,93 " SCU,WVUi IV· WASTfIWATl'lR t':R£DlT (QUOJ((Jr.(tliUVPQNf.y) ,-" SI').+4 􀁓􀀨􀀮􀀮􀀧􀁭􀁬􀀮􀁾•" SO.)': ltyt; "."" 1,P10" !!iDA 35 PYC; S10.o:zU64Il' .,."'" ,... tJ,;J.iJ.w$:V":;"w401 ,.. ill". WM"!WATr.a MANUO,t,.f 􀀭􀁾􀀠􀁉􀀤􀁃􀁈􀁉􀁔􀁬􀁕􀁊􀀮􀁾􀀠IV. WNI'I'I:\VAT.t:IUMMtQVJ:Mt'.NTS ,"'B.IUrAL $U.MUl TOTAl, I'l.nw ':oNTltlillJm.U\MOD) 1).2N '((YfAL OFl'SlTI" FI.oWNflTamT. (UC;D) O.UH 􀀥􀁑􀀨􀁴􀁯􀁲􀀺􀁬􀁉􀁓􀁮􀀧􀁮􀁁􀀨􀁜􀁓􀁨􀁾􀀧􀁕􀁎􀁲􀁒􀁕􀁈􀀱􀀱􀀱􀁎􀁑􀀠11"1. ,S 􀀬􀁾.....'WA,STEWATU (ROlT 􀁾􀀭􀀭􀀮􀀠\'3 PHASE I ADDISON CIRCLE -PUBLIC INFRASTRUCTURE Phase I Improvements Remaining Bosque Park Allowance Electrical Vault (park) Rotary Feature Allowance Design Engineering Construction Inspection Allowance Additional construction inspection Geotechnical Allowance Street Ughts & Power by TU Allowance Security/Event Fencing Allowance Water Tower Site Restoration Allowance Tree Lighting Phase I Allowance Phase I Escrow -East side of Circle COST RECONCILIATION DECEMBER 12,1996 TOWN OF ADDISON $2,759,662 $320,260 $109,740 $1,000,000 $90,000 $54,000 $20,000 $104,338 $42,000 COLUMBUS $104,068 $262,800 $6,000 $15,000 $76,500 TOTAL $2,863,730 $320,260 $109,740 $1,000,000 $262,800 $90,000 $54,000 $20,000 $104,338 $6,000 $15,000 $76,500 $42,000 ISubtotal Phase I $4,500,000 $464,368 $4,964,368 I Other Items: Offsite Utilities (Sewer & Drainage) $78,260 $78,260 Phase II Utilities (Sewer & Drainage) $83,840 $83,840 Phase II Streetscape DELETED Phase II Ughts from Rotary to railroad on the eastside of Quorum $25,622 $25,622 ISubtotal Phase 1I/0ffsite $187,722 $0 $187,722 I I TOTALS $4,687,722 $464,368 $5,152,090 I PHASE I ADDISON CIRCLE· PUBLIC INFRASTRUCTURE BID RECONCILIATION DECEMBER 12,1996 Gibson & Assoc. Base Bid $ 3,426,109.00 Selected Alternatives $ 91,555.00 Award $ 3,517,664.00 Change order #1 ($352,843.24) Change order #2 ($15,972.01) Change order #3 $11,317.50 Change order #4 ($86,943.06) Change order #5 ($34,696.37) Change order #6 ($12,696.44) Adjusted contract $ 3,025,830.38 Bid Reconciliation Town of Addison Columbus Total Phase I Improvements $2,759,662.00 $104,068.00 $2,863,730.00 Offsite Utilities (sewer & drainage) $78,260.00 $78,260.00 Phase II Utilities (sewer & drainage) $83,840.00 $83,840.00 Phase II Streetscape (East side of Quorum) DELETED ITotals $2,921,762.00 $104,068.00 $3,025,830.00 I Payments received to date from "Addison Circle I" $ 405,474.00 Rebates paid to "Addison Circle I" $ 352,843.24 Net payment received from "Addison Circle I" $ 52,630.76 Current payment due from "Addison Circle I" $ 51,437.24 PHASE I ADDISON CIRCLE -PUBLIC INFRASTRUCTURE Phase I Improvements Remaining Bosque Park Allowance Rotary Feature Allowance Design Engineering Construction Inspection Allowance Geotechnical Allowance Street Lights & Power by TU Allowance Security/Event Fencing Allowance Water Tower Site Restoration Allowance Tree Lighting Phase I Allowance Phase I Escrow -East side of Circle COST RECONCILIATION DECEMBER 2, 1996 TOWN OF ADDISON $2,810,000 $430,000 $1,000,000 $90,000 $20,000 $108,000 $42,000 COLUMBUS $53,573 $262,800 $6,000 $15,000 $76,500 TOTAL $2,863,573 $430,000 $1,000,000 $262,800 $90,000 $20,000 $108,000 $6,000 $15,000 $76,500 $42,000 ISubtotal Phase I $4,500,000 $413,873 $4,913,873 I Other Items: Offsite Utilities (Sewer & Drainage) $78,260 $78,260 Phase II Utilities (Sewer & Drainage) $83,840 $83,840 Phase II Streetscape DELETED Phase II Lights from Rotary to railroad on the eastside of Quorum $22,000 $22,000 ISubtotal Phase 1I/0ffsite $184,100 $0 $184,100 I ITOTALS $4,684,100 $413,873 $5,097,973 I PHASE I ADDISON CIRCLE· PUBUC INFRASTRUCTURE BID RECONCIUATION AUGUST 20,1996 Gibson & Assoc. Base Bid Selected Alternatives Award Change order #1 Change order #2 Change order #3 Change order #4 Change order #5 Change order #6 Change order #7 Change order #8 Adjusted contract Bid Reconciliation Phase I Improvements Offsite Utilities (sewer & drainage) Phase II Utilities (sewer & drainage) Phase II Streetscape (East side of Quorum) $ 3,426,109.44 $ 91,555.00 $ 3,517.684.44 ($352,843.24) ($15,972.01) $11,317.50 ($86,943.06) ($34.696.37) ($12.696.44) $22.966.41 $18,419.08 $ 3,067,216.31 Town of Addison $2.814,522.00 $78,260.00 $83,840.00 DELETED DRAFT Columbus Total $90.593.87 $2,905,115.87 $78,260.00 $83,840.00 ITotals $2,976,622.00 $90,593.87 $3,067,215.87 I Paymenls received to date from ''Addison Circle I" $ 405,474.00 Rebates paid 10 "Addison Circle '" $ 352,843.24 Net payment received from ''Addison Circle I" $ 52,630.76 Current payment due from "Addison Circle I" $37,963.11 NOTE: Ifa $300,000 transfer from Phase IIA to Phase I we "",e Columbus $262,036.89 for construction costs and partial reimbursement of engineering ADDISON CIRCLE PHASE IIA DRAFTPUBLIC INFRASTRUCTURE COST RECONCILIATION AUGUST 20,1997 DESCRIPTION TOWN OF ADDISON Bid Package "A" $ Bid Package "B" $ Bid Package "C" $ Addison Circle Median Park (Remaining Allowance) $ Design Engineering Construction Inspection Allowance $ Gectechnicar Allowance $ Spectrum Street Ughting Allowance $ Addison Circle Street Ughting Allowance $ TOTAL $ 245,000 365,000 273,240 588,308 75,000 25,000 50,000 50,000 COLUMBUS TOTAL $ 817,359 $ 1,062,359 $ 1,213,971 $ 1,578,971 $ 810,270 $ 1,083,510 0 $ 588,308 $ 398,000 $ 398,000 0 $ 75,000 0 $ 25,000 0--$ 50,000 0 $ 50,000 1,671,548 $ 3,239,600 $ 4,911,148 NOTE: Totar due from Columbus assuming a $300,000 transfer from Phase itA to Phase I is $2,841.600 ADDISON CIRCLE PHASE IIA DRAFTPUBLIC INFRASTRUCTURE BID RECONCILIATION AUGUST 20, 1997 BID PACKAGE "A" Jim Bowman Bid $ 1,062,359 BID PACKAGE "B" Jim Bowman Bid $ 1,578,971 BID PACKAGE "C" North Texas Contracting Bid $ 1,083,540 TOTAL PUBLIC INFRASTRUCTURE $ 3,724,840 BID RECONCILIATION TOWN OF ADDISON COLUMBUS TOTAL Phase IIA Improvements Quorum Rotary Park Waterline Addison Circle Median Park $ 826,990 $ 37,388 $ 18,862 $ 2,841,600 o o $ 3,668,590 $ 37,388 $ 18,862 TOTALS $ 883,240 $ 2,841,600 $ 3,724,840 • Funding from Addison Circle Median Park -Phase I DRAFTADDISON CIRCLE PHASE II FUNDING SUMMARY AUGUST 19,1997 PROJECT MASTER FACILITIES PHASEIIA FUTURE PHASES AGREEMENT Quorum Drive $ 520,000 $ 188,000 $ 332,000 Addison Circle (Mildred) East of Quorum $ 318,000 $ 318,000 0 Spectrum $ 364,000 $ 200,000 $ 164,000 Addison Circle Open Space (East Mildred) $ 610,000 $ 610,000 0 Quorum North Park $ 295,000 0 $ 295,000 Mews Park $ 675,000 a $ 675,000 R-2 $ 270,000 0 $ 270,000 R-3 $ 205,000 0 $ 205,000 R-4 $ 322,000 $ 268,000 $ 64,000 R-5 $ 166,000 0 $ 166,000 M-2 $ 624,000 $ 303,000 $ 321,000 Addison Circle (Mildred) East of Spectrum $ 131,000 $ 131,000 0 TOTAL $ 4,500,000 $ 2,018,000 $ 2,482,000 Phase IIA Utilities Constructed during Phasel $ (83,840) Phase IIA Funds Transferred to Phase I (Subject to Council Approval) Quorum Rotary Park (Watar Line) TOTAL FUNDS AVAILABLE FOR PHASE IIA $ $ $ (300,000) 37,388 1,671,648 PHASE I ADDISON CIRCLE -PUBLIC INFRASTRUCTURE COST RECONCILIATION DRAFT Phase I Improvements Remaining Bosque Park Electrical VauH (park) Quorum Rotary Park Remaining Allowance Quorum Rotary Park Waterline Relocation (Part of Phase ItA Infrastructure Contract) Design Engineering Construction Inspection Geotechnical Allowance Street Ught Allowance Tall Street Lights & Power by TU Allowance Security/Event Fencing Allowance Water Tower Site Restoration Allowance Tree Ughting Phase I Allowance AUGUST 20, 1997 TOWN OF ADDISON $2,814,522 $357,938 $109,740 $962,612 $37,388 $90,000 $23,000 $97,000 $7,800 COLUMBUS $90,593.87 $45,145 $262,800 $6,000 $15,000 $76,500 TOTAL $2,905,116 $403,083 $109,740 $962,612 $37,388 $262,800 $90,000 $23,000 $97,000 $7,800 $6,000 $15,000 $76,500 ISubtotal Phase I $4,500,000 $496,038.87 $4,996,039 I Other Items: Phase I Street Lights $80,000 $80,000 Offsite Utilities (Sewer & Drainage) $78,260 $78,260 Phase II Utilities (Sewer & Drainage) $83,840 $83,840 Phase II Streets cape DELETED Phase II Lights from Rotary to railroad on the eastside of Quorum DELETED $0 Subtotal Phase 1I/0ffsite $242,100 $0 $242,100 ITOTALS $4,742,100 $496,038.87 $5,238,139 I PHASE I ADDISON CIRCLE -PUBLIC INFRASTRUCTURE COST RECONCILIATION MARCH 12, 1996 Town of Addison Columbus Total Phase I Improvements $2,830,400 $405,474 $3,235,874 Remaining Bosque Park Allowance $425,000 $425,000 Rotary Feature Allowance $1,000,000 $1,000,000 Design Engineering $262,800 $262,800 Construction Inspection Allowance $90,000 $90,000 Geotechnical Allowance $20,000 $20,000 Street Lights & Power by TU Allowance $104,400 $104,400 Tall Lights for Rotary Allowance $30,000 $30,000 Security/Event Fencing Allowance $6,000 $6,000 Water Tower Site Restoration Allowance $15,000 $15,000 Tree Lighting Phase I Allowance $76,500 $76,500 ISubtotal Phase I mL$4,499,800 I 􀀤􀀧􀀷􀀶􀀵􀀬􀀷􀀷􀁾􀀱􀀠$5,265,574 i Other Items Offsite Utilities (Sewer & Drainage) $88,389 $88,389 Phase II Utilities (Sewer & Drainage) $103,701 $103,701 Phase II Streetscape $89,500 $89,500 Phase II Lights from Rotary to railroad on the eastside of Quorum $26,600 $26,600 ISubtotal Phase 1I/0ffsite .. $308,190 I $01 $308,190 I Totals $4,807,990 $765,774 $5,573,764