't f ./j I ; _________________________________ _ " 􀁾􀀮􀀠TERRA-MAR, INC. 􀁾􀀠GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT id CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 9/14/99 DC98-050-138 REPORT DISTRIBUTION: Ed Bell Construction Doug Teter Huitt-Zollars, Inc. Kenneth Roberts, P.E. Town of Addison -James Pierce, P.E. Town of Addison Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): __􀁮􀀺􀀮􀀺􀀺􀁡􀁾_____ Placement Dale: 6/28/99 Slump (in.): _-;.:n.:::;a;--_____ Sampled By: Contractor Air Content (%): __4'-::::-60.-_____ Weather: Sunny Concrete Temp ("F): 95 Supplier/Mix: na FIELD DATASET #1 Ticket #: Time Betched: _____ Time Sampled: ________ Slump (in.): Air Content: _____ Unit Weight (pel): ________ Cone. Temp. ('F): AmbientTemp. ('F):-:--::-_-:-:-_ Yardage (c.y.): ________ Placement Location: Cylinders made by contractor, no other information given Remarks: FIELD DATASET #2 Ticket #: Time Batched: Time Sampled: Slump (in.): Air Content: ----Unit Weight (pcf): -------Cone. Temp. ("F): Ambient Temp. ('F):----Yardage (e.y.): ________ Placement Loeation: Remarks: Set# CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PERASTM C3i. TESTED PERASTM C39, CAPPED PER ASTM ca17 Cylinder # Test Date AQe (Days) Max. Load (Ibs Area (sq. in.) Strength (psi FC Notes I 1 AR062801 AR062802 AR062803 8/19/99 8/19/99 8/19/99 52 52 52 145660 138340 133930 28.27 28.27 28.27 5150 4890 4740 U U U (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C13S. C143. C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOU$TON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 id CONCRETE INSPECTION AND COMPRESSION TEST REPORT .NT: ,(OJECT: iEPORT DATE: TMI REPORT #: Ed Beli Construction Arapaho Road Improvements 08/25/99 DC98-050-137 REPORT DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt-Zollars, Inc. Kenneth Roberts, P.E. Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _.::::.3""0;-00=---_____ Placement Date: 07/27/99 Slump (in.): _......;5=---______ Sampled By: Pete W. Air Content (%): Weather: Clear Concrete Temp eF) Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 3088739 Time Batched: 1:53 Time Sampled: ___..:3:.:.:1.:..:5=---___ Slump (in.): 4 1/4 Air Content: 3.4 Unit Weight (pet): _____--'-'na=,---Cone. Temp. ('F): 97 Ambient Temp. (OF): _--:=-::-:::-Yardage (c. y.): __􀀱􀀮􀀮􀀺􀀰􀀺􀀮􀀮􀀺􀀰􀁾􀁦􀀮􀀮􀀺􀀱􀁾􀀰􀀺􀀮􀀮􀀮􀀺􀁣􀁣􀀺􀀺􀀺􀀮􀀮􀀮Y!.:..__ Placement Location: Sidewalk-S. bound on Spectrum, in front of building Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (In.): Air Content: Unit Weight (pet): ----------Cone. Temp. (OF): Ambient Temp. (OF):----Yardage (c.y.): ____________ Placement Location: 􀁒􀁥􀁭􀁡􀁾􀁳􀀺􀀠-------------------------------------------------------------------CONCRETE COMPRESSION TEST RESULTS 􀁃􀁙􀁾􀁉􀁎􀁄􀁅􀁒􀁓􀀠􀁍􀁏􀁾􀁄􀁅􀁄􀀠AND CURED PER ASTM Cl1, TESTED PER ASTM C39. CAPPED PER ASTM C617 Set # Cylinder # Test Date Age (Days) Max. Load (Ibs) Area (sq. in.) Strength (psi) FC Notes 1 AR072701 08/03/99 7 91340 28.27 3230 U A R072702 08/24/99 28 115870 28.27 4100 U AR072703 08/24/99 28 107500 28.27 3800 U AR072704 08/24/99 discard (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, Cln. C231 Note: This report IS for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TM!. Results apply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-88DD Fax: 972·488·8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: id CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 8/20/99 Huitt-Zollars, Inc. Kenneth Roberts, P.E. DC98-050-136 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _-=3.:::00::-0:::....._____ Placement Date: 7121/99 Slump (in.): _.....:5:,,-_____ Sampled By: T Risen Air Content (%): 3-6 Weather: Clear Concrete Temp ("F) 100 Supplier/Mix: TXI FIELD DATA SET #1 Ticket#: 1367789 Time Batched: 12:15 Time Sampled: 1:10 ---...:.;...;.;;;...--Slump (in.): 5 Air Content: 4.7 Unit Weight (pcl): ___-:-'"n::::a;::-::-___ Cone. Temp. (OF): 93 Ambient Temp. ('F): 95 Yardage (c.y.): __.....:J:..:a;;;..n;...-O;;.;O'--__ Placement Location: Sidewalks on corner of Arapaho Rd & Arapaho & Spectrum Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pel): -------Cone. Temp. ('F): Ambient Temp. ('F):----Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set# Cylinder # Test Date Age (Days) Max. Load (Ibs) Area (sq. in.) Strength (psi) FC Notes 1 AR072101 7/28/99 7 93600 28.27 3310 U AR072102 8/18/99 28 131775 28.27 4660 U AR072103 8/18/99 28 128471 28.27 4540 U AR072104 Discard (1) NORMAL CYLINDER SIZE 6" X 12", AREA 26.27 sq. In., UNLESS NOTED ABOVE. (2) TIPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATION$ UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C136, C143, C172, C231 _ /􀁾􀀠Note: This report is for the exclusive use of the Client 􀁡􀁤􀁤􀁲􀁥􀁳􀁳􀁥􀁤􀀮􀁾􀁨􀀧􀀭􀀢􀀢􀀺 􀁩􀀯􀁾􀁨􀀻􀁾􀀬􀁌􀀭􀀼􀀧􀁟􀀮􀀭􀀽􀀽􀀽􀀽􀀽􀁟􀀽􀁟􀁟􀀺􀀺􀀺􀁟􀀺􀀺􀁟􀀽􀁟􀁟􀀺􀁟􀀭􀀭􀀭This report may nol be reproduced except In Its entirety, without 􀁾􀁔􀁅􀁒􀁒􀁁􀀮􀁍􀁁􀁒􀀮Inc, the written consent of TMI. Results apply only 10 above lests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488-8800 Fax: 972-488·8080 id CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT; REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 8/6/99 DC98-050-137 REPORT DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt-Zollars, Inc. Kenneth Roberts, P.E. Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _..::.3=:00::-'0"--_____ Placement Date: 7/27/99 Slump (in.): Sampled By: Pete W. Air Content (%): Weather: Clear Concrete Temp ('F) Supplier/Mix: Lattimore FIELD DATA SET #1 TIcket #: 3088739 Time Batched: 1 :53 Time Sampled: ___...!3:.;.:1.:.;5:::.-___ Slump (in.): 4 1/4 Air Content: 3.4 Unit Weight (pef): __:-=--;.;n:::a::--___ Cone. Temp. (OF): 97 Ambient Temp. ('F): 95 Yardage (c.y.): __􀀱􀀡􀀮􀀺􀀺􀀰􀀧􀀭􀁯􀁾􀁦􀀺􀀮􀀮􀀮􀀱􀀮􀀮􀀺􀀮􀀺􀀰􀀺􀀺􀀮􀀮􀀮􀀺􀀺􀀺􀁣􀁣􀀮􀀢􀀮􀁌􀁹􀀺􀀮􀀮􀀮􀀮__ Placement Location: Sidewalk-S. bound on Spectrum, in front of building Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content Unit Weight (pcf): -------Cone. Temp, ('F): Ambient Temp, ('F):----Yardage (c.y.): ________ Placement Loeation: Remarks: CONCRETE COMPRESSION TEST RESULTS Set# Cylinder # CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Test Date Age (Days) Max. Load (lbs Area (sq. in.) StrenQth (psi) FC Notes 1 AR072701 8/3/99 7 91340 28,27 3230 U AR072702 8/24199 28 AR072703 8/24/99 28 AR072704 8/24/99 hold (1) NORMAL CYLINDER SIZE 0' X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl38, C143, Cl72, C231 Note: This report is for the 􀁥􀁾􀁣􀁬􀁵􀁳􀁩􀁶􀁥􀀠use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TML Results apply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488-8800 cb CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 7/30/99 Huitt-Zollars, Inc. -Kenneth Roberts, P. E. TMI REPORT #: DC98-050-133 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): --'6:.;:5:.:0:-=/2:..:8=--___ Placement Date: 6/24/99 Slump (in.): _---==5:-____ Sampled By: Air Content ('Yo): Weather: Concrete Temp C"F) 90 Supplier/Mix: Lattimore/42 FIELD DATA SET #1 Ticket #: 6100633 Time Batched: 11:50 Time Sampled: ___...!.::::..::::::....-___ Slump (in.): 5 Air Content _---,:-=-__ Unit Weight (pcf): ___-;:;:-:-:-:::-::-___ Cone. Temp. ('F): 90 Ambient Temp. (OF): 95 Yardage (c.y.): __________􀀽􀁾􀀺􀀺􀀮􀀮􀀮􀀮􀀮􀁟__ Sample Location: (Arapaho Road) Right side 16+98 concrete pavement Remarks: FIELD DATA SET #2 Ticket #: Time Batched:____ Time Sampled: _________ Slump (in.): AirContent____ Unit Weight (pcf): _________ Conc. Temp. ("F): Ambient Temp. CF):____ Yardage (c.y.): _________ Placement Location: Sample Location: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM 031, TESTED PER ASTM ora AgeSet # Beam # Test Date Max. Load Average Average Modulus of Notes i(Days) (lbs) Rupture (psi) Depth, D Width, B 7/1/99 7 7680 6.30 6401 AR062401 6.00 7/22/99 28 8280 690AR062402 6.00 6.10 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMgNS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TgSTING. (3) TgST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43. Cl72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. ' _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT cb CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 7/26/99 DC98-050-132 REPORT DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt-Zollars, Inc. Kenneth Roberts, P.E. Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _..:3..:07-0..:0______ Placement Date: 6/24/99 Slump (in.): __4.:..-______ Sampled By: Moe II Air Content ("!o): Weather: SunnylWarm Concrete Temp ("F) 90 Supplier/Mix: TXJ/9601 FIELD DATASET #1 Ticket #: 1346688 Time Satched: 12:40 Time Sampled: ___..;;12::;:..:5,.:;0___ Slump (in.): 4 Air Content: __-==__ Unit Weight (pcf): ___=--.,.___ Conc. Temp. (oF): 90 Ambient Temp. (oF): 95 Yardage (c.y.): ___1:..:0:....y"'d::,:s'--__ Placement Location: (Arapaho Road) left sidewalk station 63+50 Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pcf): --------Conc. Temp. (oF): Ambient Temp. (0F}:----Yardage (c.y.}: ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM cal, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set# Cylinder # Test Date AR062401 7/1/99 1 AR062402 7122/99 AR062403 7/22/99 AR062404 Discard Age (Days) 7 28 28 Max. Load (Ibs) 121410 152120 151330 Area (sq. in.) 28.27 28.27 28.27 (1) NORMAL CYLINDER SIZE 6" x 12:'. AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. Strength (psi) 4290 5380 5350 (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C13B, Cl43. CI72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. FC Notes U U U ,; .. ;-. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488·8800 Fax: 972-488-8080 id CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 07/29/99 DC98-050-136 REPORT DISTRIBUTION: Ed Bell Construction· Doug Teter Huitt-Zollars, Inc. Kenneth Roberts, P. E. Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _-=3"'00"'0"--_____ Placement Date: 07/21/99 Slump (in.): _....,.:5'::-_____ Sampled By: T Risen Air Content (%): _...:3:::-:=:6:--_____ Weather: Clear Concrete Temp CF) 100 Supplier/Mix: TXI FIELD DATA SET #1 Ticket #: 1367789 Time Batched: 1 Time Sampled: ___--'1"':1..:..0=--___ Slump (in.): 5 Air Content: Unit Weight (pcf): ___:-'-'n::a::-::-___ Conc. Temp. ('F): 93 Ambient Temp. ('F): 95 Yardage (c.y.): __--=Jc;:a::.;n""-O:..;O=--__ Placement Location: Sidewalks on comer of Arapaho Rd & Arapaho & Spectrum Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pcf):--------Conc. Temp. ("F): Ambient Temp. CF): ----Yardage (c.y.): ________ 􀁐􀁬􀁡􀁣􀁥􀁭􀁥􀁾􀁮􀁴􀀠Location: Remarks: Set# 1 CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Cylinder# Test Date Age (Days) Max. Load (Ibs) Area (sq. in.) AR072101 07/28/99 7 93600 28.27 AR072102 08/18/99 28 AR072103 28 AR072104 hold Strength (psi) 3310 FC Notes U I (1) NORMAL CYLINDER SIZE 6" X 12". AREA 28.27 sq. in.. UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN 􀁎􀁏􀁔􀁅􀁓􀁾􀀠(4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS. C138, Cl43. C172. C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMJ. Results apply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: 'cb CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 7/21/99 Huitt-Zollars, Inc, Kenneth Roberts, P,E. DC98-050-130 Town of Addison· James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _:::;36=:0::::0'--____ Placement Date: 6/23/99 Slump (in,): __4'--_____ Sampled By: R, Shaheed Air Content ('Yo): Weather: Partly Cloudy Concrete Temp (oF) Supplier/Mix: TXII9601 FIELD DATA SET #1 Ticket #: 1183575 Time Batched: 2:32 Time Sampled: 4:05----=.!.::.:::..-Slump (in,): 5,25 Air Content: 4,3 Unit Weight (pc!): ---.-:::--:---Cone, Temp. ("F): 95 Ambient Temp. (OF): 95 Yardage (C,y,): ___􀀱􀁾􀀰􀀺􀀮􀀮􀀮􀁹􀁲􀀮􀀮􀀺􀀺􀁤􀀺􀀮􀀺􀀺􀁳􀁾__ Placement Location: Sidewalk 1/2 W. on Arapaho 50ft from fire department hydrant E, block FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in,): Air Content: Unit Weight (pcf): -------Cone, Temp. (OF): ,Ambient Temp. ("F):----Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31. TESTED PER ASTM C3S, CAPPED PER ASTM C617 Set# Cylinder # Test Date Age (Days) Max. Load (Ibs) Area (sq, in.) Strength (psi) FC Notes AR062301 6/30/99 7 108050 28.27 3820 U 1 AR062302 6/30/99 7 113060 28.27 4000 U AR062303 7/21/99 28 131660 28.27 4660 U AR062304 7/21/99 28 132480 28.27 4690 U AR062305 Discard (1) NORMAL CYLINDER SIZE 6" X 12", AREA 26.27 sq. in., UNLESS NOTED ABOVE, (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES, (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C136. Cl43. C172, C231 Note: This report is for the the exclusive use of the Client addressed, This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488·8800 cb CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 07102/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050·133 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _..;6:..;5:,.:0:........____ Placement Date: 06/24199 Slump (in.): _-..:::5_____ Sampled By: Moe II Air Content ("!o): Weather: CW Concrete Temp (OF) 90 Supplier/Mix: Lattimore/42 FIELD DATA SET #1 Ticket #: 6100633 Time Balched: 11:50 Time Sampled: ____1:..:2:::.:0;:;5"-___ Slump (in.): 5 Air Content: ---::--::-Unit Weight (pel): ___-::-::--:-:-::-::-___ Cone. Temp. ("F): 90 Ambient Temp. ("F): 95 Yardage (c. y.): __......;6;:;0::./.:.10"'0"--__ Sample Location: (Arapaho Road) Right side 16+98 concrete pavement Remarks: FIELD DATASET #2 Ticket #: Time Batched:_____ Time Sampled: _________ Slump (in.): Air Content: _____ Unit Weight (pel): _________ Cone. Temp. ("F): Ambient Temp. ("F):_____ Yardage (e.y.): _________ PlaeementLocatlon: Sample Location: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM cal, TESTED PER ASTM C78 Set # Beam # Test Date Age (Days) Max. Load (100) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 1 AR062401 AR062402 07/01/99 07/22/99 7 28 7680 6.00 6.30 640 , (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS; C138, Cl43, C172, C231 Note: This report Is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488·8800 Fax: 972·488·8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT cb CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 07/02/99 DC98·050·132 REPORT DISTRIBUTION: Ed Bell Construction· Doug Teter Huitt-Zollars, Inc. Kenneth Roberts, P.E. Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _..::3.::.00.::.0=--_____ Placement Date: 06/24/99 Slump (in.): __4'--_____ Sampled By: Moe II Air Content (%): Weather: SunnylWanm Concrete Temp ("F) 90 Supplier/Mix: TXI/9601 FIELD DATA SET #1 Ticket #: 1346688 Time Batched: 12:40 Time Sampled: ___...:.12::.;.;::5..:;0___ Slump (in.): 4 Air Content: __..,-,,__ Unit Weight (pct): ___::-::---:-___ Conc. Temp. (OF): 90 Ambient Temp. (OF): 95 Yardage (c.y .): __---'1...:.0-'y..:;d""s___ Placement Location: (Arapaho Road) left sidewalk station 63+50 Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: ----Unit Weight (pct): --------Conc. Temp. (OF): Ambient Temp. (0F):_____ Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C3l, TESTED PER ASTM C39, CAPPED PER ASTM C6l7 Set# Cylinder # Test Date AR062401 07/01/99 1 AR062402 07/22/99 AR062403 07/22/99 AR062404 Age (Days) Max. Load (Ibs) Area (sq. in.) Strength (psi) FC Notes 7 121410 28.27 4290 U 28 28 Hold i. • 􀁾􀀠.. (1) NORMAL CYLINDER SIZE 6" x 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, C172, C231 Note: This report is for the exclusive use ofthe Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. > TERRA-MAR, Inc. _________________________________ _ 1 TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUSSOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 7/16/99 Huitt-Zollars, Inc. Kenneth Roberts, P.E. DC98-050-128 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICAnONS PROJECT DATA strength (psi): _::::.3.:::.50:::;0"-_____ Placement Date: 6/18/99 Slump (in.): _-;-;-4'--:=-_____ Sampled By: J. Tipton Air Content (%): 􀁟􀀴􀁾􀁴􀁯􀀽􀀭􀀶􀀽􀀭_____ Weather: Partly Cloudy Concrete Temp ('F) 95 Supplier/Mix: FIELD DATA SET #1 Ticket #: 1342402 Time Batched: 11 :38 Time Sampled: 12:25 Slump 0n.): 3 3/4 Air Content: Unit Weight (pcf): ___-;-::--:-___ Conc. Temp. ('F): 85 Ambient Temp. ('F): 81 Yardage (c.y.): 10 yds Placement Location: NW corner of intersection of Arapaho & Tollway, sampl,ed at 5' N. of Arapaho north curb and 200' W. of Dallas Parkway FIELD DATA SET #2 Ticket #: Time Balched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pcf): --------Conc. Temp. ('F): Ambient Temp. eF):----Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYUNDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Test Date Age (Days) Max. Load (Ibs) Area (sq. in.) Strength (psi) Set# Cylinder # FC Notes 7AR061801 6/25/99 104350 28.27 3690 U 7 90360 3200AR061802 6/25/99 28.27 U 7/16/99 28 138020 28.27 4880 UAR061803 7/16/99 134770 4770AR061804 28 28.27 U (1) NORMAL CYLINDER SIZE 6" X 12". AREA 28.27 sq. in.• UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, CI43, C112, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL, ENVIRONMENTAL, AND CONSTRUCTION MATERIALS TESTING Dallas Fort Worth Houston Lubbock Longview Austin 11050 Ables Lane, Dallas, Texas 75229 Phone; 971-488-8800 Fax: 971-488-8080 DAn.y ACTIVITY OBSERVATION REPORT CLIENT: Ed Bell Construction DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter PROJECT NO.: DC98-050-135 Huitt Zollars, Inc. -Kenneth Roberts, P.E. REPORT DATE: 6/29/99 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde On June 28, 1999, Terra-Mar, Inc. representative, Billy Robinson, was at the above referenced project to perform concrete inspection and testing on one set of cylinders. TMI representative arrived at project site at 11 :35. The truck was already empty and the technician waited for another truck for a sample. Left the site at 12:46 and returned to the office. Note: This report is for the exclusive use of the Client addressed. This report may no! be reproduced e.xcep! in its entirety, without the written consent ofTMI. Results to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488·8800 Fax: 972·488·8080 CLIENT; PROJECT; REPORT DATE: TMI REPORT #: cb CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 07/01/99 Huitt-Zollars, Inc. Kenneth Roberts, P. E. DC98·050·130 Town of Addison -James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _.:::3.::.60=-0"--_____ Placement Date: 06/23/99 Slump (in.); __4:......_____ Sampled By: R. Shaheed Air Content (%); Weather: Partly Cloudy Concrele Temp ("F) Supplier/Mix: TXII9601 FIELD DATA SET #1 Ticket #: 1183575 Time Balched: 2:32 Time Sampled: 4:05--......:..:.=-=--Slump (in.): 5.25 Air Content: 4.3 Unit Weight (pef): ___-:-::----:-___ Cone. Temp. ("F): 95 Ambient Temp. (OF): 95 Yardage (c.y.): ___1:.;:0,-,yc:d:,::d:,::s___ Placement Location: SidewalK 1/2 W. on Arapaho 50ft from fire department hydrant E. blocK FIELD DATA SET #2 Ticket #: Time Batched: Time Sampled: Slump (in.): AirContent:----Unit Weight (pcf):-------Cone. Temp. (OF): Ambient Temp. (oF): _____ Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AlIID CURED PER ASTM 031. TESTED PER ASTM C39. CAPPED PER ASTM C611 Sel# Cvlinder# Test Date Age (Days) Max. Load (Ibs) Area (Sq. in.) Strength (psi) FC Notes AR062301 06/30/99 7 108050 28.27 3820 U 1 AR062302 06/30/99 7 113060 28.27 4000 U AR062303 07/21/99 28 AR062304 07/21/99 28 AR062305 Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 2Il.21 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES" (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl38, Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed" This report may not be reproduced except in its entirety, without the written consent of TML Results apply only to above tests" _________________________________ _ 1 TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lene, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed 8ell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed 8ell Construction -Doug Teter 06/16/99 Huitt-Zollars, Inc. Kenneth Roberts, P.E. DC98-050-126 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): Placement Date: 05/19/99 Slump (in.): Sampled By: Moe II Air Content (%): na Weather: Windy! Sunny Concrete Temp CF) 95 Supplier/Mix: Lattimore/42 FIELD DATA SET #1 Ticket #: 6098024 Time Batched: 11 :40 Time Sampled: ___...:.1...:.1:..::5:..:0'--__ Slump (in.): 2 Air Content: na Unit Weight (pc!): ___-:-':'n::::a=-___ Conc. Temp. (oF): Ambient Temp. (oF): 85 Yardage (c.y.): ___1.:..;0:....:...70=---__ Placement Location: Driveway left 60+32.18 Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ lime Sampled: Slump (in.): Air Content: Unit Weight (pc!): -------Cone. Temp. ("F): Ambient Temp. (0F}:----Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Age (Days) Max. Load (Ibs) Area (sq. in.) Strength (psi) NotesCylinder # Test Date FeSet# 05/26/99 7 110820 28.27 3920AR051901 U 06/16/99 28 125940 28.27 4450AR051902 U 28 131170 28.27 464006/16/99 UAR051903 DiscardAR051904 . (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLYWITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, 0231 Note: This report is for the exclUsive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TM!. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW WBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction Doug Teter REPORT DATE: 06117199 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-127 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA strength (psi): _...;6:..:5:-:0'--____ Placement Date: 05119/99 slump (in.): _--=2=--____ sampled By: Moe II Air Content (%): na Weather: Sunny Concrete Temp CF) 80 Supplier/Mix: Lattimorel42 FIELD DATA SET #1 Ticket #: 6098045 Time Batched: 2:00 Time Sampled: ____2::.·:...;.1..::5'--___ Slump (in.): 2 Air Content: na Unit Weight (pct): ___-=-::n;::,a=-=-___ Conc. Temp. ("F): Ambient Temp. ('F): 90 Yardage (c.y.): ___..::3..::0/-=3..::0___ Placement Location: Midway lot 70-6 and 60+00.6 Sample Location: FIELD DATASET #2 Ticket #: Time Batched:_____ Time Sampled: _________ Slump (in.): Air Content: _____ Unit Weight (pct): _________ Conc. Temp. ('F): Ambient Temp. ("F): _____ Yardage (c.y.): _________ Placement Location: __________________________________ Sample Location: Set# Beam # CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C3i, TESTED PER ASTM C7a Test Date Age 􀁍􀁡􀁸􀁾􀁥􀁲􀁡􀁧􀁥􀀠Average (Days) (Ibsl epth, 0 Width, B Modulus of Rupture (psi) Notes 1 AR051901 AR051902 OS/26/99 7 7500 6.00 6.25 06/16/99 28 7800 6.00 6.25 625 650 2 (1) SPAN LENGTH OF IS INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONs UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Ci38, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, withoul the written consenl of TMI. Results apply only to above lesls. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488-8800 Fax: 972-488·8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 06/28/99 Huitt-Zollars, Inc. Kenneth Roberts, P.E. DC98-050-128 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _..=3..=5,;:,00=--_____ Placement Date: 06/18/99 Slump (in.): _-,-4'---:-_____ Sampled By: J. Tipton Air Content (%): 4 to 6 Weather: Partly Cloudy Concrete Temp ("F) 95 Supplier/Mix: FIELD DATA SET #1 Ticket #: 1342402 Time Batched: 11 :38 Time Sampled: 12:25 Slump (in.): 3 3/4 Air Content: Unit Weight (pel): ___-:-:::--:-___ Cone. Temp. (oF): 85 Ambient Temp. ("F): 81 Yardage (c.y.): 10 yds Placement Location: NW corner of intersection of Arapaho & Tollway, sampl,ed at 5' N. of Arapaho north curb and 200' W. of Dallas Parkway FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: ----Unit Weight (pel): -------Cone. Temp. CF): Ambient Temp. ("F):_____ Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set# Cylinder # Test Date Age (Days) Max. Load (lbs) Area (sq. in.) Strength (psi FC Notes 1 AR061801 06/25/99 7 104350 28.27 3690 U AR061802 06/25/99 7 90360 28.27 3200 U AR061803 07/16/99 28 AR061804 07/16/99 28 I iF11r1(P1[[rrJ[f[(.." , ,..11;... ..},.II .,I " JUt ,6 19991· Ii. 􀀬􀁾􀁪􀁩􀁊􀁾􀀧􀀺􀀺􀀷􀀧􀁛􀁾􀁕􀀠U L:5[i.: ) .......-.... 􀁾􀀠...... ..-..􀁾.......(1) NORMAL CYLINDER SIZE 6" X 12". AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE -A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl38, Cl43, Cl72, C231 Nate: This repart is far the exclusive use of the Client addressed. This report may not be reproduced except in 􀁾􀁳􀀠entirety, without the written consent of TML Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW LUBBOCK 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: (972)488-8080 STABILIZED SOIL GRADATION REPORT CLIENT: Ed Bell Construction DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 06/28/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT#: DC98-050-134 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde Test Method: Tex 101-E Part III Technician: Mike Young Minimum % Passing 1 3/4" Sieve: 100 Date Tested: __0;;..6;;;;.1..;.16;;;;./.;:;9..:.9_________ Minimum % Passing No.4 Sieve: __-=6.::.0___Stabilizing Agent __.::.L:::.im:.:;e:....._________ 1 2 3 Remarks: Note: This report is for the excfusive use of the Client addressed. This report may not be reproduced except in its entirety. without the written consent of TM!. Results apply only to above tests. 􀁟􀁾􀁲􀁫􀀮􀁴􀀮 TERRA-, INC. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 cb CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 06/10/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-125 Town of Addison -James Pierce, P.E, Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _..,;:6:::;5:::0____ Placement Date: 05/12199 Slump (in.): __4-'-____ Sampled By: J. Tipton Air Content (%): _.....:.;n::;a'--____ Weather: Partly Cloudy Concrete Temp (oF) na Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 7070645 Time Batched: 10:47 Time Sampled: ____1'-=2:.:.:1.:.:5::......,___ Slump (in,): 3 1/2 Air Content: 4,3 Unit Weight (pcl): ___;-;::-;n-3a=-:-___ Conc, Temp, ('F): 86 Ambient Temp, (oF): 82 Yardage (c. y.): __---'1c;::1c;::5,;::0..J.yc;::d.::.s___ Placement Location: South bound lane @Spectrum St. Sample Location: 200 S of Arapaho Rd on Spectrum St. FIELD DATA SET #2 Ticket #: 7070657 Time Batched: 12:03 Time Sampled: ___-=:1::;=2;;:0____ Slump (in,): 3 3/4 Air Content: 4.7 Unit Weight (pcl): __--::-::':N"'a=-:-___ Cone. Temp. rf): 88 Ambient Temp. eF): 86 Yardage (c.Y.): __--'2=.9::.;6:....<..yd;::.s=-__ Placement Location: 10'x10' leave out and radius E. of Addison Rd, on Arapaho Rd, Sample Location: at 10'x10' leave out and radius on E. bound lane on Arapaho Rd. CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C7B Set# Beam# Test Date Age (Days) Max. Load (Ibs) Average Depth,D Average Width, B Modulus of Rupture (psi) Notes 1 AR051201 AR051202 05/19/99 06/09/99 7 28 7260 8220 6.05 6.00 6,15 6.10 605 685 2 AR051203 AR051204 05/19/99 06/09/99 7 28 7380 8700 6.05 5.80 6.20 6.10 615 725 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE, (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: CI38, CI43, Cln, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety. without • the written consent of TMI. Results apply onlv to above tests. TERRA-MAR, INC. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone;972-488-8800 Fax; 972-488-8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 06/07/99 Huitt-Zollars, Inc. Kenneth Roberts, P.E. DC98-050-123 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _.:::3::,00;:0::..-__ ___ Placement Date: 05/03/99 Slump (in.): _-=.5_"______ Sampled By: JS Air Content ('!o): Weather: ClearfWarm Concrete Temp ('F): SupplierfMix: TXI FIELD DATA SET #1 Ticket#: 1304293 Time Batched: _---'-'-='-'-_ Time Sampled: ___...:.:::...:.::.___ Slump (in.): 5" Air Content: __.:.::::.__ Unit Weight (pct): ___...:..::::...___ Cone. Temp. ('F): Ambient Temp. c-F): __..:.::.__ Yardage (c.y.): ___...:..::::...___ Placement Location: Sidewalk Sidewalk on Arapaho & Quorum Sample Location: FIELD DATA SET #2 Ticket #: Time Batched:_____ Time Sampled: ________ Slump (in.): Air Content: Unit Weight (pct): ________ 􀁣􀁯􀁮􀁣􀀮􀁔􀁥􀁭􀁰􀁾􀁾􀀧􀁾􀀨􀀧􀀺􀁾􀁆􀁴􀁩􀀩􀀬􀀺􀁾􀁮􀀺􀀽􀀽􀀽􀀽􀀽􀀽􀀽􀀽􀁾􀁟􀁾􀁁􀁾􀁭􀁾􀁢􀀽􀁩􀁾􀁥􀁮􀁾􀁴􀁟􀁔􀁾􀁥􀁾􀁭􀁾􀁰􀁾􀀮􀁾􀁣􀀭􀁾􀁆􀁾􀀩􀀺􀁾 􀀽􀀽􀀽􀀽􀀽􀀽􀀽􀀽􀀽􀁾__􀁹􀁾􀁡􀀽􀁲􀁯􀁾􀁡􀀽􀁧􀁾􀁥􀁾􀀨􀁾􀁣􀀮􀀺􀁹􀁾􀀮􀀩􀀮􀁾􀀮􀁾􀀭􀀽􀀭􀀽􀀭􀀽􀀭􀀽􀀭􀀽􀀭􀀽􀀭􀀽􀀭􀀽􀀭􀀽􀀭􀀽􀀭􀀽􀀭􀀽􀀭􀀽􀁾􀁟Placement .. , Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39. CAPPED PER ASTM C617 Set# Cylinder # Test Date Age (Days) Max. Load (Ibs) I Area (sq. in.) Strength (psi) Fe Notes I 1 AR050301 A R050302 AR050303 AR050304 05/10/99 05131/99 05/31/99 Discard 7 28 28 86110 121560 120220 28.27 28.27 28.27 3050 4300 4250 U U U (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent ofTMI. Results apply only to above tests. ___________________________________ _ 1 TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements OS/27/99 DC98-050-124 REPORT DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt-Zollars, Inc. Kenneth Roberts, P.E. Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _.::.3.::.00::,;0:........_____ Placement Date: 04/28/99 Slump (in.): Sampled By: Contractor Air Content (%): Weather: ClearlWarm Concrete Temp CF): Supplier/Mix: TXI FIELD DATASET #1 Ticket #: Time Batched: _____ Time Sampled: ________ Slump (in.): Air Content: _____ Unit Weight (pct): ________ Conc. Temp. CF): Ambient Temp. (OF): _____ Yardage (c.y.): ________ Placement 􀁌􀁯􀁣􀁡􀁴􀁩􀁯􀁮􀀺􀀮􀀮􀀮􀀮􀀻􀀺􀀮􀁌􀁾􀁩􀀹􀀺􀀺􀀺􀁨􀁣􀀺􀀮􀁴;"p..::o:..:;le:.:s'---:-:--_-:--:-:--_--:-:--:--::-_-::-_-:-________________ Remarks: Cylinders made by contractor no other infonnation given FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pct): --------Conc. Temp. (OF): Ambient Temp. CF): ----Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C3l, TESTED PER ASTM C39, CAPPED PER ASTM C6l7 Age (Days) Max. Load (Ibs) Area (sq. in.) Strength (psi) Set# Cylinder # Test Date FC Notes 87270 309005/05/99 7 28.27 UAR042801 OS/26/99 28 117220 28.27 4150 UAR042802 AR042803 OS/26/99 28 116480 28.27 4120 U discardAR042804 (1) NORMAL CYLINDER SIZE 6" x 12", AREA 2B.27 sq. In., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C13B, Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA·MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488·8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 05/28/99 Huitt·Zoliars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98·050·127 Town of Addison· James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _--"6:.::5""0____ Placement Date: 05/19/99 Slump (in.): Sampled By: Moe II Air Content (%): Weather: Sunny Concrete Temp ("F) Supplier/Mix: Lattimore/42 FIELD DATA SET #1 Ticket #: 6098045 Time Batched: 2:00 Time Sampled: ___-=2"":1:.;:5'--___ Slump (in.): 2 Air Content: na Unit Weight (pcl): ___􀁾􀁮􀀬􀀮􀀢􀁡􀀽􀀭􀀽􀀭___ Conc. Temp. (oF): Ambient Temp. (OF): 90 Yardage (c.y.): ___-=3"'0/:..;:3:.;:0'-__ Placement Location: Midway lot 70-6 and 60+00.6 Sample Location: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: _________ Slump (in.): Air Content: _____ Unit Weight (pel): _________ Conc. Temp. (OF): Ambient Temp. (OF):_____ Yardage (c.y.): _________ Placement Location: ___________________________________ Sample Location: . CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PE;R ASTM C31, TESTED PE;R ASTM CTB Set # Beam # Test Date Age Max. Load Average Average Modulus of Notes (Days) (Ibs) Depth,D Width, B Rupture (psi) 1 AR051901 AR051902 05/26/99 06/16/99 7 28 7500 6.00 6.25 625 2 (1) SPAN LENGTH OF 18 INCHES. UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3);rEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TEsTS ARE PER APPLICABLE ASTM STANDARDS; C138. Cl43. Cl72. C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety. without the written consent of TMI. Results apply only to to above tests. _________________________________ _ TERRA-MAR. INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488·8800 Fax: 972·488·8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed 8ell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed 8ell Construction· Doug Teter 05/28/99 Huitt·Zoliars, Inc, Kenneth Roberts, p, E, DC98·050·126 Town of Addison· James Pierce, P,E, Town of Addison· Dave Wilde SPECIFICATIONS Strength (psi): 3000 psi Slump (in,): 2 Air Content (%): na Concrete Temp (OF) 75 PROJECT DATA Placement Date: 05/19/99 Sampled By: Moe II Weather: Windyl Sunny Supplier/Mix: Lattimore/42 FIELD DATASET #1 Ticket #: 6098024 Time Batched: _....:...:.:;.:,:::..-_ Time Sampled: ___..,;1.;.1;,,;;:S.,;;0___ Slump (in,): 2 AirContent: __.:.:.:;.__ Unit Weight (pcf): ___....,...::n:::a:::-___ Cone, Temp, (OF): 75 Ambient Temp, (OF): __..::.;;;,__ Yardage (c,y,): ___..,;1,,:,0...:,7.,;;0___ Placement Location: Driveway left 60+32,18 Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in,): Air Content: Unit Weight (pet): -------Cone, Temp, (oF): Ambient Temp, (OF):----Yardage (c,y,): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER AsTM C39, CAPPED PER ASTM C617 Set# Cylinder # Test Date Age (Days) Max, Load (Ibs) Area (sq, in,) Strength (psi) FC Notes 1 AR051901 AR051902 AR051903 AR051904 05/26/99 06/16/99 06/16/99 7 28 28 Hold 110820 28,27 3920 U (1) NORMAL CYLINDER SIZE 6" x 12", AREA 28,27 sq, in" UNLESS NOTED ABOVE, (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES, (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES, (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, Cln, C231 Note: This report is for the E;Xclusive use of the Client addressed, This report may no! be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests, _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 05/20/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-121 Town of Addison -James Pierce, P.E Town of Addison -Dave Wilde S PECIFICA TlONS Strength (psi): _..:;6:.:::5.0:.0____ Slump (in.): _--=-:n.::;a_____ Air Content ('Yo): __􀀳􀁾􀀭􀀮􀀮􀀺􀀺􀀺􀀵􀁾____ Concrete Temp eF) na PROJECT DATA Placement Date: 04/21/99 Sampled By: EE Weather: Partly CloudyfWindy Supplier/Mix: Ed Bell FIELD DATA SET #1 Ticket #: 25982 Time Batched: 􀁟􀀭􀀧􀀭􀀺􀁾__ Time Sampled: ___-=.8;..::3;..:3____ Slump (in.): 3 112 Air Content: _---..:::..:::-__ Unit Weight (pc!): ___-::-'=,."..-___ Cone. Temp. ('F): 82 Ambient Temp. ('F): 71 Yardage (c.y.): ___..:::3::;0/c.,:1..:::8___ Placement Location: Paving-Arapaho Road Station 58+50 (?) FIELD DATA SET #2 Ticket#: Time Batched:_____ Time Sampled: Slump (in.): Air Content: Unit Weight (pel); --------Cone. Temp. ('F): Ambient Temp. ('F):----Yardage (c.y.): _________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Set# Beam # Test Date Age Max. Load Average Average (Days) (lbs) Depth,D Width, B 1 EBC042101 04/28/99 7 7800 6.05 6.30 EBC042102 05/19/99 28 8760 5.95 6.10 Modulus of Rupture (psi) 650 730 Notes (1) SPAN LENGTH OF 18INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138. Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without TERA-MAR,TNC. the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 05/25/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-125 Town of Addison James Pierce, P.E. Town of Addison Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): Placement Date: 05/12/99 Slump (in.): Sampled By: J. Tipton Air Content ('Yo): Weather: Partly Cloudy Concrete Temp ("F) Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 7070645 Time Batched: 10:47 Time Sampled: ____1'-'2:;.:.!.15"---___ Slump (in.): 3 1/2 Air Content: 4.3 Unit Weight (pcf): ___-,;nc.::a=--:-___ Conc. Temp. ("F): 86 Ambient Temp. ('F): 82 Yardage (c.y.): ___􀀱􀀺􀀮􀀺􀀺􀀵􀀺􀀮􀀺􀀺􀀰􀁾􀁙􀁣􀀮􀀺􀀺􀁤􀀺􀀺􀀺􀀺􀀺􀁳___ Placement Location: South bound lane @Spectrum SI. Sample Location: 200 S of Arapaho Rd on Spectrum SI. FIELD DATA SET #2 Ticket #: 7070657 Time Batched: 12:03 Time Sampled: ___--':1'7:2:.:0'--___ Slump (in.): 3 3/4 Air Content: Unit Weight (pcf): ___=-=-'N,:..a=--:-___ Cone. Temp. ('F): 88 Ambient Temp. ("F): Yardage (c.y.): __--'2:::9::.:6:...Lyd:::s=--:-__ Placement Location: 10'x10' leave out and radius E. of Addison Rd. on Arapaho Rd. Sample Location: at 1 O'x1 0' leave out and radius on E. bound lane on Arapaho Rd. CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED P(;R ASTM C78 Age Max. Load AverageAverage Modulus of NotesSet# Beam # I Test Date (Days) (Ibs) Depth, D Width, B Ru ptu ra (psi) 7 7260 6.05 6.15 6051 AR051201 05/19/99 28AR051202 06/09/99 7 7380 6.05 6.20 6152 AR051203 05/19/99 28AR051204 06/09/99 (1) SPAN lENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING. LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138. C143. C172. C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 05/25199 Huitt-Zollars, Inc. -Kenneth Roberts, P. E. TMI REPORT #: DC98-050-122 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): _...::6;:::5:.;;:.0____ Slump (in.): _---:4_____ Air Content (%): Weather: CloudylWindy Concrete Temp ('F) 80 Supplier/Mix: Ed Bell FIELD DATA SET #1 Ticket #: 26011 Time Batched: _-=:::..:.:-_ Time Sampled: ___...:9:.:.:=.30"--___ Slump (in.): 4 Air Content: 5.0 Unit Weight (pet): ___􀀭􀀬􀀬􀀭􀀺􀀬􀁮􀀺􀀻􀀻􀀻􀁡􀁾􀀭􀀭􀀭Conc. Temp. ("F): 80 Ambient Temp. ('F): 80 Yardage (c. y.): ___..::3:.;;:.01:..:1..::8'--__ Placement Location: L.8 Edwin Lewis St. before stop sign FIELD DATA SET #2 Ticket #: 169750 Time Batched: 11 :50 Time Sampled: ___-'1=2:....::1..=0___ Slump (in.): 2 Air Content: 5.0 Unit Weight (pcf):----=c-:;:----Conc. Temp. (OF): 80 Ambient Temp. (OF): 85 Yardage (c.y.): ___...:3;;;:2:;../8=--___ Placement Location: Exit to Spectrum and Edwin Lewis Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C7a Test Date Age Max. Load Average Average Modulus of NotesSet# Beam # (Days) (Ibs) Rupture (psi)Depth, D Width, B 04/29/99AR042201 7 7500 5.95 6.15 625 7A R042202 04/29/99 6960 6.05 6.30 5801 05/20/99 28 6.35A R042203 9120 6.05 760 05/20/99AR042204 28 8880 5.95 6.35 740 04/23/99 1 6.30AR042205 7320 6.00 610 04/29/99 11220 935AR042206 7 5.95 6.25 05/20/99 28 6.10 980AR042207 11760 6.002 05/20/99 11520 960A R042208 28 6.00 6.00 04122199 2 hrs 1200 6.10 100AR042209 6.00 4 hrs 6.20 230AR042210 04/22/99 2760 6.00 (ll SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, CI43, CI72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488-8800 Fax: 972-488-8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 05/12/99 Huitt-Zollars, Inc. Kenneth Roberts, P. E. DC98-050-123 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): 􀁟􀀮􀀺􀀺􀀮􀀮􀀳􀀰􀁾􀀰􀁾􀀰􀀬􀀭􀀭____ Slump (in.): _---"5'-"______ Air Content (%): Weather: ClearlWarm Concrete Temp CF): Supplier/Mix: TXI FIELD DATA SET #1 Ticket #: 1304293 Time Batched:_-,-11c:::2::.:4,--_ Time Sampled: ___....:1.::2:..::4.::..5___ Slump (in.): 5" Air Content: __.:..;n;::.2__ Unit Weight (pcf): ___--"n:;::a____ Cone. Temp. rF): Ambient Temp. (·F): __..:.7.::..5__ Yardage (c.y.): ___......::n::::a____ Placement Location: Sidewalk on Arapaho & Quorum Sample Location: Sidewalk Arapaho FIELD DATASET #2 Tieket#: Time Batched:_____ Time Sampled: Slump (in.): Air Content: Unit Weight (pcf):-------Cone. Temp. ("F): Ambient Temp. CF):----Yardage (c.y.): ________ Placement Location: Remarks: Set# CONCRETE COMPRESSION TEST RESULTS CYUNDE;RS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 CyJinder# Test Date Age (Days) Max. Load (Ibs) Area (sq. in.) Strength (psi) FC Notes 1 AR050301 A R050302 AR050303 AR050304 05/10199 05/31/99 05/31/99 7 28 28 Hold 86110 28.27 3050 U (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. In., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, CI43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety. without the written consent of of TM!. Results apply only to above tests. _________________________________ _ TERRA·MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488-8800 Fax: 972-488-8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 05/10199 Huitt-Zollars, Inc. Kenneth Roberts, P.E. DC98-050-124 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _.:::.30=.;0:.:0'--____ Placement Date: 04/26/99 Slump (in.): Sampled By: Contractcr Air Content ('¥o): Weather: ClearlWarm Concrete Temp (OF): Supplier/Mix: TXI FIELD DATASET#1 Ticket #: Time Batched:_____ Time Sampled: ________ Slump (in.): Air Content:_____ Unit Weight (pcf): ________ Cone. Temp. (OF): Ambient Temp. (OF):_____ Yardage (c.y.): ________ Placement 􀁌􀁯􀁣􀁡􀁴􀁩􀁯􀁮􀀺􀀭􀀺􀁌􀁾􀁩􀁾􀁧􀀺􀀮􀀮􀀺􀁨􀁴􀀢􀀺􀀬􀁰􀀢􀀬􀀬􀁯􀀺􀀺􀀺􀁬􀀺􀀺􀀺􀀮􀁥􀁳􀀽􀀭􀀭􀀺􀀭􀀺􀀭􀀭􀁟􀀭􀀺􀀭􀀭􀀭􀀺__--:_-:-;_--::----:_______________ Remarks: Cylinders made by contractor no other information given FIELD DATA SET #2 Ticket #: Time Batched:_____ Time Sampled: ________ Slump (in.): Air Content: Unit Weight (pcf): ________ Cone. Temp. (OF): Ambient Temp. (OF): ----Yardage (c.y.): ________ Placement Location: Remarks: Set# Cylinder # CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Test Date Age (Days) Max. Load IIbs Area (sq. in.) Strength (psi) FC Notes 1 AR042601 AR042802 AR042603 AR042804 05/05/99 05/05/99 05/26/99 7 7 26 Ho!d 67270 26.27 3090 U (1) NORMAL CYLINDER SIZE 6" X 12". AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138. C143. C1n. C231 Note: This report is for the exClusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TM!. Results apply only to above tests. 􀁔􀁅􀁒􀁾􀁁􀁒􀀬Inc. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 04/20/99 Huitt·Zoliars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-106 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): _...:6::::5::::0:...-____ Slump (in.): __4.;..•..;:6_____ Air Content (%): __4..:.;.:.::5_____ Concrete Temp ('F): PROJECT DATA Placement Date: 03/17/99 Sampled By: J. Perez Weather: CloudylWarm Supplier/Mix: Lattimore FIELD DATA SET #1 TIcket #: 7067464 Time Batched: na Time Sampled: ___...;:;.9::.;;:3;.::0____ Slump (In.): 6 1/2 Air Content: 4.0 Unit Weight (pcf): ___--...:.n.:;:a::......___ Cone. Temp. (oF): 68 Ambient Temp. Temp. ('F): 70 Yardage (c.y.): ________ Placement Location: Intersection Addison & Arapho, right lane Remarks: FIELD DATA SET #2 Ticket #: TIme Batched: Time Sampled: Slump (in.): Air Content:----Unit Weight (pcf):--------Cone. Temp. (OF): Ambient Temp. ('F):----Yardage (c.y.): _________ Placement Location: Remarks' CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Set# Beam # Test Date Age (Days) Max. Load (Ibs) Average Average Depth,O Width, B Modulus of Rupture (psi) Notes 1 AR031701 AR031702 03/24/99 04/14/99 7 28 8580 5.90 6.05 715 -'Damaged in field (1) SPAN LENGTH OF 16 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, Cl72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 05/03/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC9S-050-122 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICA􀁔􀁉􀁏􀁾􀀠f'I .. Strength (psi): 4pOOpsi' '50-M4 Slump (in.): 7 4---.:...---Air Content (%): Weather: CloudylWindy Concrete Temp rF) 80 Supplier/Mix: Ed Bell FIELD DATA SET #1 Ticket #: 26011 Time Batched: 9:10 TIme Sampled: ___-'9:.:.:3:::0"--___ Slump (in.): 4 Air Content: 5.0 Unit Weight (pcl): ___..,..:.;n"'a..,.-___ Cone. Temp. (OF): 80 Ambient Temp. ('F): SO Yardage (c.y.): ___3:::0:::./..:.:18:: :....__ Placement Location: L.S Edwin Lewis SI. before stop sign FIELD DATA SET #.2 Ticket#: 169750 Time Batched: 11:50 Time Sampled: ___..:.12::.::...:1..:;0___ Slump On.): 2 Air Content: 5.0 Unit Weight (pcl): ___􀀭􀀽􀁾􀀭􀀭Cone. Temp. ('F): 80 Ambient Temp. (OF): S5 Yardage (c.y.): ___...;3:.:2:::./S"--___ Placement Location: Exit to Spectrum and Edwin Lewis Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM 078 Set# Beam# Test Date Age (Days) Max. Load (100) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 1 AR042201 AR042202 AR042203 AR042204 AR042205 04/29/99 04/29/99 05120199 05/20/99 04/23/99 7 7 28 28 1 7500 6960 7320 5.95 6.05 6.00 6.15 6.30 6.30 625 580 610 2 AR042206 AR042207 AR042208 AR042209 AR042210 04/29/99 05/20/99 05/20/99 04/22/99 04/22/99 7 28 28 2 hrs 4 hrs 11220 1200 2760 5.95 6.00 6.00 6.25 6.10 6.20 935 100 230 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl38, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUaaOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488.8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 04126199 Huitt-Zollars, Inc. -Kenneth Roberts, P .E. TMI REPORT #: DC98-050-115 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICAnONS Strength (psi): __6::::5"'0'-____ Slump (in.): 3-5 Air Content (%): --:;;.5-""'7,----Concrete Temp ('F) 95 PROJECT DATA Placement Date: 03126/99 Sampled By: B. Jones Weather: Sunny Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #; 068268 Time Batched: 9:13 Time Sampled: 9:56 Unit Weight (pc!): ----=-n"'ac:....--Slump (in.): 41/2 Air Content: 5.19 Conc. Temp. ('F): 64 Ambient Temp, ('F): 55 Yardage (c.y.): ___::.;90::./3::.;0:.;:6:......__ Placement Location: 330 ft from intersection Arapaho Rd @Tollway station 63 + 00 FIELD DATA SET #2 Ticket #: Slump (in.): 068285 4 Time Batched: Air Content: 11 :15 6.3 Time Sampled: 12:00 Unit Weight (pc!): ----===--Cone. Temp. ('F): 66 Ambient Temp. ('F): 70 Yardage (c.y.): ___--'1.:.44"-___ Placement Locetion: Arapaho Road at station 62 + 00 Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Set# Beam # Test Date Age (Days) Max. Load (lbs) Average Depth,D Average Width, B Modulus of Rupture (psi) Notes 1 AR032601 AR032602 04/02199 04/23199 7 28 7680 8820 5.90 5.95 6.35 6.30 640 735 2 AR032603 AR033004 04/02199 04/23199 7 28 7620 9780 5.80 6.05 6,15 6,10 635 815 --(1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE, (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C136, Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 04/28/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-121 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): 650 Flex Slump (in.): Air Content ('Yo): 3-5 Weather: P. CloudylWindy Concrete Temp ("F) Supplier/Mix: Ed Bell FIELD DATA SET #1 Ticket #: 25982 Time Batched: 7:45 Time Sampled: ___-=:.8::..::3c.::3____ Slump (in.): 3 1/2 Air Content: 4.0 Unit Weight (pct): ___--..:n.:o8:......___ Conc. Temp. eF): 82 Ambient Temp. eF): 71 Yardage (c.y.): ___-:9:.-___ Placement Location: Paving -Arapaho Road St8 58+50 FIELD DATA SET #2 Ticket #: #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pet): --------Cone. Temp. ("F): Ambient Temp. eF): ----Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C7B Set# Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 1 AR042101 AR042102 04128/99 05/19/99 7 28 7800 6.05 6.30 650 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USEO DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES, (4) FIELD TESTS ARE PER APPLICA8LE ASTM STANOARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addrassed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488·8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction Doug Teter REPORT DATE: 04/28/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E TMI REPORT #: DC98-050-121 Town of Addison -James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS strength (psi): _...:6:;::5.::.0____ Slump 􀁾􀁮􀀮􀀩􀀺􀀠Air Content (%): _....:3::..·5=--____ Concrete Temp ("F) PROJECT DATA Placement Date: 04121/99 Sampled By: EE Weather: P. CloudylWindy Supplier/Mix: Ed Bell FIELD DATA SET #1 TIcket#: 7068521 Time Batchecl: 7:45 Time Sampled: ___.....:::8.:..;:3:::3:...-___ Slump (in.): 2 Air Content: 4.0 Unit Weight (pcf): ___......:nc;:a=-___ Conc. Temp. ('F): 78 Ambient Temp. ('F): 71 Yarclage (c.y.): ___--'9=--___ Placement Location: Median of Arapaho Road FIELD DATA SET #2 Ticket #: 6094472 TIme Batchecl: 12:51 Time Sampled: ___.....::::2:..::0:..:0'--___ Slump (in.): 1 1/2 Air Content: 4.0 Unit Weight (pet): __--::=-:::::=__ Cone. Temp. ("F): 76 Ambient Temp. CF): 88 Yardage (c.y.): __􀀭􀀭􀀮􀀺􀀱􀁾􀀰􀀰􀀮􀀺􀀺􀀮􀀭􀀮􀀺􀀲􀀺� �􀀺􀁯􀁯􀀺􀀮􀀺􀀺􀀮􀀮__ Placement Location: Median of Arapaho Road Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDEDANO CURED PER ASTM C31, TESTED PER ASTM C18 Set# Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 1 AR040501 AR040S02 04/28/99 OS/19/99 7 28 7260 7740 6.05 S.95 6.20 6.0S' 605 645 • ., Does not meet specification 2 AR040S03 AR040S04 04/28/99 OS/19/99 7 28 7200 8640 S.9S 6.00 6.30 6.35 600 720 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproducecl except in its entirety. without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS OCK AUSTIN 11050 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction· Doug Teter REPORT DATE: 04/28/99 Huitt·Zoliars, Inc .. Kenneth Roberts. P.E. TMI REPORT #: DC98·050·116 Town of Addison· James Pierce. P.E. Town of Addison· Dave Wilde SPECIFICATIONS Strength (psi): 􀁟􀁾􀀶􀀺􀀮􀀻􀀺􀀵􀀢􀀬􀀰____ Slump (in.): Air Content (%): Concrete Temp ("F) 95 PROJECT DATA Placement Date: 03/30/99 Sampled By: John Sullivan Weather: Cloudy Supplier/Mix: Ed Bell FIELD DATA SET #1 Ticket #: 25656 Time Batched: na Time Sampled: ____1:..1:.:;:3::;0::...___ Slump (in.): 2 Air Content: 3.5 Unit Weight (pcl): ___...:.;n:.:;a____ Yardage (c.y.): _________Conc. Temp. ("F): 65 Ambient Temp. ("F):-::--::-::-::-::-_ Placement Location: East side of Arapaho Road, station 59+00 Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pcl): --------􀁃􀁯􀁮􀁣􀀮􀁔􀁥􀁭􀁰􀀻􀁾􀀮􀀩􀀨􀀢􀁾􀀺􀁾􀁆􀁵􀀩􀀬 􀀺􀁾􀁮􀀺􀀽􀀽􀀽􀀽􀀽􀀽􀀽􀀽􀁾􀁁􀁾􀁭􀁾􀁢􀁾􀁩􀁥􀁾􀁮􀁾􀁴􀁾􀁔􀁾􀁥􀁭􀁾􀁰􀀮􀁾􀁻􀁾􀂷􀁆􀀩􀁾􀀺􀀽􀀽􀀽􀀽􀀽􀀽􀀽􀀽􀁾_____􀁙􀁾􀁡􀀽􀁲􀁯􀀽􀁡􀀽􀁧􀀽􀁥􀁾􀀨􀀽􀁣􀁾􀀮􀁹􀁾􀀮􀀩􀁾􀀺􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀁾Placement .., Remarks' CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PERASTM C31, TESTED PER ASTM C1a Set# Beam # Test Date 1 AR033001 AR033002 AR033003 AR033004 04/06/99 04/06/99 04/27/99 04/27/99 Age (Days) 7 7 28 28 Max. Load (Ibs) 7680 7980 8400 8760 (1) SPAN LENGTH OF 16 INCHES. UNLESS NOTED ABOVE, Average Depth, D 6.00 6.05 6.05 6.05 Average Width, B 6.00 6.05 6,20 6,25 (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES, (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, Cl12. C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests, Modulus of Notes Rupture (psi) 640 665 700 730 ; -. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 04/26/99 Huitt-Zollars, Inc. -Kenneth Roberts, P .E. TMI REPORT #: DC98-050-114 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): 650 Slump (in.): 􀀭􀀢􀀧􀀺􀀳􀁾􀀭􀀺􀀻􀀻􀀧􀀵􀀭􀀭􀀭Air Content ('Yo): _....:;,5-"'7_____ Concrete Temp ("F) 95 PROJECT DATA Placement Date: 03/25/99 Sampled By: 8. Jones Weather. Sunny Supplier/Mix: lattimore FIELD DATA SET #1 Ticket #: 068166 Time 8atched: 8:40 Time Sampled: 7 Slump (in.): 4 1/2 Air Content: 3.0 Unit Weight (pcf): ---....::n='a:"---Cone. Temp. ("F): 65 Ambient Temp. eF): 91 Yardage (c.y .): ___.::.;63""/:=,;30:.,:0'--__ Placement Location: 100 ft from Intersection Tollway & Arapaho Rd Second air test @99 yards was 5.1 % FIELD DATA SET #2 Ticket #: Slump (in.): 068230 5.00 Time Batched: Air Content: 2:31 4.1 Time Sampled: 3:00 Unit Weight (pet): ----:.n:.:a-=----Conc. Temp. (oF): Ambient Temp. ('F): 90 Yardage (c.y.): ____n:.:;a=--___ Placement Location: 225 feet from intersection of Tollway and Arapaho Rd. Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Set# Beam # Test Date Age (Days) 7 28 Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) 690 685 Notes 1 AR032501 AR032502 04/01/99 04122199 8280 8220 6.00 6.05 6.20 6.00 2 AR032503 AR032504 04/01/99 04/22199 7 28 8760 9480 6.10 5.95 6.00 6.15 730 790 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, Cl72, =1 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the wrillen consent of TMI. Results apply only to above tests. East TERRA-MAR. INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW LUBBOCK 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: (972)488-8080 STABILIZED SOIL GRADATION REPORT CLIENT: Ed 8ell Construction DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed 8ell Construction -Doug Teter REPORT DATE: 04/21/99 Huitt-Zollars, Inc. Kenneth Roberts, P.E. TMI REPORT#: DC98-050-118 Town of'Addison -James Pierce, P.E. Town of Addison -Dave Wilde Test Method: Technician: M. Kashem 􀀭􀀭􀁾􀁾􀁾􀁾􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭􀀭Minim um % Passing 13/4" Sieve: 100 Date Tested: __-=-04..::/.'-1=9/'-"9"'9_________________ Minimum % Passing No.4 Sieve: ____-=6"'0___Stabilizing Agent ___..::L:::.im"'e==-_______________ Rd station 159 + 00 100 69.5 South 18 + 00 100 60.32 16+75 100 68.73 Remarks: Nate: This report is for the exclusive use of the Client addressed, This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS Dallas Fort Worth Houston Austin Longview Lubbock 11050 Ables Lane, Dallas, Texas 75229 Phone: 972-488-8080 Fax: 972-488-8080 UME TREATED SOIL THICKNESS DETERMINATIONS Client: Ed Bell Construction Distribution: Project: Arapaho Road Improvements Ed Bell Construction -Doug Teter Report No.: DC98-050-120 Report Date: 02126/99 \ Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Result apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-4BB-BBOO SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS CLIENT: Ed Bell Construction DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 04/21/99 Huitt Zollar, Inc. -Kenneth Roberts, p, E. TMI REPORT NO.: DC98-050-119 Town of Addison -James Pierce, P,E. Town of Addison -Dave Wilde, P.E. SPECIFICATIONS TEST DATA Percent Compaction: 95+ Date Tested: --:,.;0::..4::;/2:::0""1""99"_____ Moisture Content (%J: Opt. + Technician: M. Kashem MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE (%) MAX. DRY DENSITY (pel) 5 ASTMD698 Lime Treated Brown Clay w/Gravel 25.7 93,6 7 ASTMD Treated Brown Clav 36.6 80,6 IN·PLACE TeST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017, RESPECTIVELY TEST NO. ELEVATION OR LIFT LOCATION REF, CURVE % MOISTURE DRY DENSITY % DENSITY 1 2 3 Grade Grade Grade S. Bound Spectrum Rd @18 + 00 S. Bound Spectrum Rd @17 + 00 E, Bound Arapaho Rd @159 + 00 5 5 7 26.0 26.6 35.8 90.8 89.9 79.1 ,i 97.0 96.0 98.1 GAUGE 1.0,: 10746 STD, DENSITY COUNT: 2537 STD, MOISTURE COUNT: _--"5,,,0=-9__ "R-AFTER TEST NUMBER INDICATES RETEST, "INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS REMARKS: _______________________________________ Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests, TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lene, Dallas, Texas 75229 Phone:972·488·8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 04114/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050·117 Town of Addison· James Pierce, P .E. Town of Addison· Dave Wilde SPECIFICATIONS Strength (psi): _...:6:..:5c:;0____ Slump (in.): 2 Air Content (%): --;4.""6:-----Concrete Temp (oF) 55 PROJECT DATA Placement Date: 04/05/99 Sampled By: BR Weather: Sunny/Cloudy Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 7068521 TIme Batched: 􀁟􀀭􀀬􀀱􀀽􀀺􀀲􀀺􀁾􀀰􀀸􀀽􀀭􀀭􀁟􀀠Slump (in.): 2 Air Content: 4.0 Conc. Temp. (oF): 78 Ambient Temp. CF): --:8;:;8::-Placement Location: Median of Arapaho Road Time Sampled: ___.....:.1;:..::1..:;5____ Unit Weight (pct): ___-;:-'n.;:a;,.,,-___ Yardage (c.y.): ___...:0:;.,.•.:..10;:,:0'--___ FIELD DATA SET #2 Ticket #: 6094472 Time Batched: 12:51 Time Sampled: 2:00 Slump (in.): 1 1/2 Air Content: 4.Q Unit Weight (pct):---....:.:.=----Conc. Temp. (oF): 76 Ambient Temp. CF): 88 Yardage (c.y .): __.....:.1:,.:0.::,0·. ::2.::,00"--__ Placement Location: Median of Arapaho Road Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Max. Load Average Modulus ofTest Date Age Average NotesSet # Beam # (Days) (lbs) Depth, D Width, B Rupture (psi) 7260AR040501 04112199 7 6.05 6.20 6051 i 28AR040502 05/03/99 . i , !: ! AR040503 04112199 7 7200 5.95 6.30 600 AR040504 2 05/03199 28 i . ! II (1) SPAN LENGTH OF 16 INcHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C136, Cl43, C112, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results applv only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488-8800 Fax: 972·488·8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 04/13/99 DC98·050·105 REPORT DISTRIBUTION: Ed Bell Construction· Doug Teter Huttt·Zollars, Inc. Kenneth Roberts, P.E. Town of Addison· James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS Strength (psi): 􀁟􀁾􀀴􀀰􀀢􀀬􀀰􀀻􀀺􀀺􀀮􀀰_____ Slump (in.): 3·5 Air Content (,,10): --47..;:;6-----Concrete Temp ('F) 95 PROJECT DATA Placement Date: 03/15/99 Sampled By: B. Jones Weather: Sunny SupplierlMix: Lattimore FIELD DATA SET #1 Ticket #: 67572 Time Batched: 2:59 Time Sampled: 3:40 Slump (in.): 3 Air Content: 4.5 Unit Weight (pcf): Conc. Temp. rF}: 65 Ambient Temp. ('F): 69 Yardage (c.y.):----:::8/"'8---Placement Location: Piers for traffic lights, NW & SW comer of Arapaho @Addison + 1 pier approx. 150 yds from intersection Remarks: Concrete was 1.5 hours late FIELDDATASET# Ticket #: Time Batched: Time Sampled: Slump (in.): Air Content: ----Unit Weight (pet): -------Cone. Temp. ('F): . Ambient Temp. ("F):_____ Yardage (c.y.): ________ Pla<;ement Location::-.,-,_-,-__________________________-'- ______ Remarks: Set# Cylinder # CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM 031, TESTEO PER ASTM 039, CAPPEO PER ASTM C617 Test Date Age (Days) Max. Load (Ibs) Area (sq. in.) Strength (pSi) FC Notes 1 AR031501 AR031502 AR031503 03/22199 04/12199 Discard 7 28 148320 155560 28.27 28.27 5250 5500 U U , (ll NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq, in., UNLESS NOTED ABOVE. (Z)"TYPE -A" CONE fRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST'RESULTS COMPLY WrFH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl38, Cl43, Cl72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not not be reproduced except in its entirety, without the written consent of TMI. Resulls apply only to above lesls. TERRA': R;lnc. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW WBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone;972-488-8800 Fax; 972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 04119/99 DC98-050-107 REPORT DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt-Zollars, Inc. Kenneth Roberts, P.E. Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _...::3-;:.0=;00"--_____ Placement Date: 03/19199 Slump (in.): __3;;;.-...:.4______ Sampled By: B. Pink Air Content (%): Weather: Overcast Concrete Temp COF) 95 Supplier/Mix: TXI FIELD DATA SET #1 Ticket#: 1265633 Time Batched: 8:20 Time Sampled: ___.:..1=-0::;::3;;;.0___ Slump (in.): 3 Air Content: Unit Weight (pet): Conc. Temp. (OF): 70 Ambient Temp, (OF): 56 Yardage (c,y,): ----=2"'"0@=3"'"0--Placement Location: 1 000 It E. E. of Addison Rd, on Arapaho W,B, sidewalk in front of Dart Remarks: 1800 ft, E, of Addison Rd, on Arapaho W,B. sidewalk in front on Dart FIELD DATA SET # Ticket #: Time Batched: _____ Time 􀁓􀁡􀁭􀁰􀁬􀁥􀁤􀁾􀀧􀀠Slump (in.): Air Content: Unit Weight (pcf):' .......-------Conc, Temp, ("F): Ambient Temp. (0F):----Yardage (c.y.):_;: _______ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set# : Cylinder # Test Date Age (Days) Max. Load (100) Area (sq. in.) Strength (psi) FC Notes 1 AR031901 AR031902 AR031903 03/26199 03126199 04/16/99 7 7 28 93400 90240 122820 28.27 28.27 28.27 3300 3190 4340 U U U AR031904 04116/99 28 120540 28.27 4260 U (1) NORMAL CYLINDER SIZE S" X 12", AREA 28,27 sq. in" UNLESS NOTED ABOVE, (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATIED IN NOTES, (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, CI43. CI72. C231 Note: This report is for the exclusive use of the Client addressed, This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 04/20/99 Huitt-Zollars, Inc. Kenneth Roberts, P.E. De9S-0S0-108 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS strength (psi): _.:::30::;,;0::'0'--____ Slump On.): __3::---:;5______ Air Content (%): 􀁟􀁾􀀴􀀭􀀶􀀮􀀮􀀺􀀺􀀭______ Concrete Temp (OF) 98 PROJECT DATA Placement Date: 03/22199 Sampled By: D. Bell Weather: Sunny/82 Supplier/Mix: TXI FIELD DATA SET #1 Tieket#: 1267092 Time Batehed: 1:10 Time Sampled: ___....;1"":3=.;0"--___ Slump (in.): 2 1/2 Air Content: 5.5 Unit Weight (pef): ___...:.:.n;a____ Cone. Temp. ("F): 76 Ambient Temp. (oF): 80 Yardage (e.y.): ____1.:.,:0'--___ Placement Location: Station 49 + 90 Eastbound Arapaho Rd. sidewalk Remarks: 􀁾FIELD DATA SET# ,. Ticket #: Time Batched: Time 'Sampled:" ., Slump (in.): Air Content:-----Unit Weight (pef):·.,..·.-------Cone. Temp. ("F): Ambient Temp. ("F):-----Yardage (c.y.): ________ Placement Loeation:__________________________________ Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set# Cylinder # Test Date Age (Days) Max. Load (Ibs) Area (sq. in.) Strength (psi) FC Notes 1 A R03220 1 03/29/99 7 103170 28.27 AR032202 04/19/99 28 129000 28.27 AR032203 04/19/99 28 122930 28.27 AR032204 discard 3650 4560 4350 U U U (I) NORMAL CYLINDER SIZE 6" X IT, AREA 28.21 sq.•n., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138. CI43, CI72, C231 Note: This report ;s for the exclusive use of the Client addressed. This report may not be reproduced except in its enUrety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 04101/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-114 Town of Addison -James Pierce, PE Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): Placement Date: 03/25199 Slump (in.): Sampled By: B. Jones Air Content (%): Weather: Sunny Concrete Temp (OF) SupplierlMix: Lattimore FIELD DATASET#1 Ticket #: 068166 Time Batched: 8:40 Time Sampled: 9:17 Slump (in.): 4 1/2 Air Content: 3.0 Unit Weight (pc!): ----=-n':-'a-"----Conc. Temp. ("F): 65 Ambient Temp. CF): 91 Yardage (c.y.): ___::;631=30::.;:0'--__ Placement Location: 100 ft from intersection Tollway & Arapaho Rd Second air test @99 yards was was 5.1 % FIELD DATA SET #2 Ticket #: 068230 Time Batched: 2:31 Slump (in.): 5.00 Air Content: 4.1 Conc. Temp. (OF): 67 Ambient Temp. ("F): 90 Placement Location: 225 feet from intersection of Tollway and Arapaho Rd. Remarks: Time Sampled: 3:00 Unit Weight (pcf): ----=::;:.;:---Yardag e (c.y.): ____n:.:;a=--___ CONCRETE COMPRESSION TEST RESUL TS BEAMS MOLDED AND CURED PER ASTM C3l, TESTED PER ASTM C78 Set# Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 1 AR032501 AR032502 04101/99 04122199 7 28 8280 6.00 6.20 690 2 AR032503 AR032504 04/01199 04122199 7 28 8760 6.10 6.00 730 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138. Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without ERRA-MARJ 􀁾􀀮􀀠the written consent of TMI. Results apply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 04/07/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC9S-0S0-116 Town of Addison -James Pierce. P.E. Town of Addison -Dave Wilde SPECIFICATIONS strength (psi): _...:6"'5"'-0____ slump (in.): Air Content (%): Concrete Temp ("F) PROJECT DATA Placement Date: 03/30/99 Sampled By: John Sullivan Weather: Cloudy Supplier/Mix: Ed Bell FIELD DATASET #1 Ticket #: Slump (in.): 25656 2 Time Batched: Air Content: na 3.5 Time Sampled: 11:30 Unit Weight 􀀨􀁰􀁣􀁦􀀩􀀺􀀭􀀭􀀭􀀭􀀧􀀭􀁮􀀧􀀺􀀧􀀺􀁡􀁾􀀭􀀭Cone. Temp. ("F): 65 Ambient Temp. ("F): -::-::-::c;::--Yardage (c.y.): ________ Placement Location: East side of Arapaho Road, station 59+00 FIELD DATA SET #2 Ticket #: Time Batched: _____ Time sampled: Slump (in.): Air Content: Unit Weight (pef): --------Cone. Temp. ("F): Ambient Temp. (CF):----Yardage (e.y.): _________ Placement Loeation: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31. TESTED PER ASTM C78 Set# Beam # Test Date Age (Days) Max. Load Average (Ibs) Depth. D Average Width, B Modulus of Rupture (psi) Notes 1 AR033001 AR033002 AR033003 AR033004 04/06/99 04/08/99 04/27/99 04127/99 7 7 28 28 7680 6.00 7980 6.05 8.00 6.05 640 665 (1) SPAN LENGTH OF 18 INCHES. UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAFf,iN. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CUENT: Ed Sell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Sell Construction -Doug Teter REPORT DATE: 04/07/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-115 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): __6;:5::,:0:--____ Slump (in.): 􀁟􀁾􀀳􀀭􀀭􀀽􀀵􀀧􀀭􀀭􀀭􀀭Air Content (%): _--';;5--::7_____ Concrete Temp ("F) 95 PROJECT DATA Placement Date: 03126/99 Sampled Sy: S. Jones Weather: Sunny Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 068268 Time Satched: 9:13 Time Sampled: 9:56 Slump (in.): 41/2 Air Content: 5.19 Unit Weight (pcf):----"n"'a'-=----Conc. Temp. ('F): 64 Ambient Temp. ('F): 55 Yardage (c.y.): ___.;;;.90:;:./.:;;30=.;6'---__ Placement Location: 330 ft from intersection Arapaho Rd @Tollway station 63 + 00 FIELD DATA SET #2 Ticket #: 068285 Time Satched: 11 :15 Time Sampled: 12:00 Slump (in.): 4 Air Content: 6.3 Unit Weight (pcf): -----=-==---Conc. Temp. ('F): 66 Ambient Temp. ('F): 70 Yardage (c.y.): ___-'-14.:.c4'---___ Placement Location: Arapaho Road at station 62 + 00 Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOI.DED AND CURED PER ASTM C3l, TESTED PER ASTM C78 Set# Beam # Test Dale Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture 􀀨􀁰􀁳􀁾􀀠Notes 1 AR032601 AR032602 04/02199 04/23/99 7 28 7680 5.90 6.35 640 2 AR032603 AR033004 04/02199 04123199 7 28 7620 5.80 6.15 635 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C136, CI43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This This report may not be reproduced except in its entirety, without ERRA-MAR, I C. the written consent of TML Results apply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane. Dallas, Texas 75229 Phone:972-488·8800 Fax: 972·488·8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction· Doug Teter 04/08/99 Huitt·Zoliars, Inc. Kenneth Roberts, P.E. DC98·05Q-104 Town of Addison· James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS Strength (psi): 􀁟􀀮􀀮􀀮􀀺􀀳􀁾􀀰􀀰􀁾􀀰􀁾_____ Slump (in.): __3"".,;:.5______ Air Content (%): __􀀴􀀮􀀻􀀬􀀮􀁾􀀶􀀭􀀭􀀭􀀭􀀭Concrete Temp (oF) 95 PROJECT DATA Placement Date: 03/10/99 Sampled By: Contractor Weather: Partly Sunny Supplier/Mix: TXI FIELD DATA SET #1 Ticket #: Time Batched: _.....:.1=.'2,;::0.;;.0__ Time Sampled: 12:32 Slump (in.): 3 Air Content: __-=4.",5__ Unit Weight (pet): ---.:.:::=---Cone. Temp. ("F): 65 Ambient Temp. ("F): __..:.7.::,3__ 3__ Yardage (c.y.): ___-'.:10::.:;/2"'0'--__ Placement Location: Station 65 + 00, right 25 Remarks: FIELD DATA SET #.2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pet):--------Conc. Temp. CF): Ambient Temp. ('F): ----Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS I CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C611 'Sel# Cylinder # Test Date Age (Days) Max. Load (lbs) Area (sq. in.) IStrength (psi) I 1 AR031 002 03/17/99 7 101930 28.27 3610 AR031003 04/07/99 28 135010 28.27 4780 FC Notes U, U I , , ! i ! , , , ! i i I I , I (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28,27 sq. In.. UNLESS NOTED ASOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES, (3) TEST RESULTS COMPLY WITH PROJECT SPEciFICATIONS UNLESS INDICATED IN NOTES, (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl38. Cl43, Cl72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TM!. Results apply only to above lests. fERRA.:MA ,Inc. ___________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488·8800 Fax: 972-488-8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 03129/99 Huitt-Zollars, Inc. Kenneth Roberts, P.E. DC98-050-107 Town of Addison· James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): 􀁟􀀮􀀺􀀺􀀺􀀺􀀳􀀰􀀺􀀺􀀺􀀰􀀺􀀻􀀮􀀰􀁾____ Placement Date: 03/19/99 Slump (in.): 3-4 Sampled By: B. Pink Air Content (%): --=...:...------Weather: Overcast Concrete Temp ('F) 95 Supplier/Mix: TXI FIELD DATA SET #1 Ticket #: 1265633 Time Batched: 8:20 Time Sampled: ___..:.1",0:",,3.:;.0___ Slump (in.): 3 Air Content: Unit Weight (pct): Conc. Temp. ('F); 70 Ambient Temp. ('F): 56 Yardage (c.y.): ----:2""0"'@""3""O,.--Placement Location: 1 000 ft. E. of Addison Rd. on Arapaho W.B. sidewalk in front of Dart Remarks: 1800 ft. E. of Addison Rd. on Arapaho W.B. sidewalk in front on Dart FIELD DATA SET # Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pet): -------Cone. Temp. ('F): Ambient Temp. ('F):----Yardage (c.y.): ________ Placement Location: Remarks: Set# Cylinder # CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Test Date Age (Days) Max. Load (Ibs) Area (sq. in.) Strength (pSi FC Notes 1 AR031901 AR031902 AR031903 AR031904 03/26/99 03/26/99 04/16/99 04/16/99 7 7 28 28 93400 90240 28.27 28.27 3300 3190 U U (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, Cl72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in rts entirety, without the written consent of TM!. Results apply only to above tests. . TERRA-M , fhe. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 03/25/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-106 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): __6'7'5:=:0'-____ Slump (in.): _--7-4--:;6_____ Air Content (%): _....::.;4.:;:;5_____ Concrete Temp ('F): PROJECT DATA Placement Date: 03/17/99 Sampled By: J. Perez Weather: CloudylWarm Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: Slump (in.): 7067464 6 1/2 Time Satched: Air Content: na 4.0 Time Sampled: 9:30 Unit Weight (pet): ----=.n:::a:=----Conc. Temp. ('F): 68 Ambient Temp. (,F): 70 Yardage (c.y.): _________ Placement Location: Intersection Addison & Arapho, right lane FIELD DATA SET #2 Ticket #: Time Satched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pct): ---------Conc. Temp. ('F): Ambient Temp. ('F):----Yardage (c.y.): _________ PlacementLocation: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C7B Set # Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth,D Average Width, B 1 AR031701 AR031702 03/24199 04114199 7 28 8580 : i 5.90 6.05 Modulus of Notes Rupture (psi) 715 : I i ! i (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138. Cl43. Cl72, C231 Note: This report is forthe exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results a I onl to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW LUBBOCK 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: (972)488-8080 STABILIZED SOIL GRADATION REPORT CLIENT: Ed Sell Construction DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Sell Construction -Doug Teter REPORT DATE: 03/30/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-111 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde Test Method: Technician: Sob Pink Minimum % Passing 1 3/4" Sieve: 100 Date Tested: 03/22199 Minimum % Passing No.4 Sieve: __---"S.;:..O___Stabilizing Agent __...:L:;::imo=e__________ Remarks: Note: This report is for the exdusive use of the Client addressed. This report may not be reproduced except In its entiretyI without the written consent of TM!. Results apply 􀁯􀁮􀁾􀁹􀀠to above tests. -----___________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 04/01/99 Huitt-Zollars, Inc. Kenneth Roberts, P.E. DC98-050-102 Town of Addison -James Pierce. P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _.;;;.30:..;0"'0_____ Placement Date: 03/03199 Slump (in.): 4 Sampled By: Air Content (%): --'------Weather: Sunny/Clear Concrete Temp eF): Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: Time Batched: Time Sampled: 4:05 Slump 􀁾􀁮􀀮􀀩􀀺􀀠4 1/2 Air Content: Unit Weight (pcf): ----"=----Conc. Temp. ('F): 68 Ambient Temp. ('F): ---::;74-,-----Yardage (c.Y.): ___-'=-5____ Placement Location: From Arapho to Quorum light Remarks: FIELD DATA SET #2 Ticket #: Time Batched: Time Sampled: Slump (in.): Air Content: ----Unit Weight (pcf): --------Conc. Temp. ('F): Ambient Temp. ('F):_____ Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESUL TS 􀁃􀁙􀁾􀁉􀁎􀁏􀁅􀁒􀁓􀀠MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set# Cylinder # Test Date 1 AR030301 AR300302 AR030303 AR300304 03/10/99 03/10/99 03/31/99 03/31/99 L Age (Days) Max. Load (100) Area (sq. in.) Strength (psi) 118610 42007 28.27 ,113410 28.27 40107 , 28 138070 28.27 4880i ,28 137330 28.27 4860 Fe Notes U U U ! U : (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, Without the written consent of TML Results apply only to above tests. ___________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dal/as, Texas 75229 Phone:972-488·8800 Fax: 972-488·8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction· Doug Teter 04/07/99 Huitt-Zollars, Inc. Kenneth Roberts, P .E. DC98·050-103 Town of Addison· James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS Strength (psi): _-=3=-00'='0'--_____ Slump (in.): 3·5 Air Content (%): --..;:;4-..;6;-----Concrete Temp ('F) 95 PROJECT DATA Placement Date: 03109/99 Sampled By: Contractor Weather: Partly Sunny Supplier/Mix: TXI FIELD DATASET #1 Ticket #: Time Batched: _--=-1"=,0:",0.::.0__ Time Sampled: 10:45 Unit Weight 􀀨􀁰􀁃􀁦􀀩􀀺􀀭􀀭􀀭􀀧􀀺􀀢􀀺􀀺􀀧􀀺􀀢􀁾􀀭􀀭Slump (in.): 3 Air Content: 5.0 Cone. Temp. ('F): 65 Ambient Temp. ("F): --;;7:;:'0--Yardage (c.y.): ___􀀮􀀮􀀮􀀮􀀺􀀸􀀺􀀺􀁣􀀯􀀸􀁾___ Placement Location: Station 4600 • left sidewalk 10' Remarks: FIELD DATA SET #2 TIcket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pef): -------Cone. Temp. ('F): Ambient Temp. ("F):----Yardage (e.y.): ________ Placement Localion: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM CB17 Set# Cylinder # Age (Days) Strength (psi) Test Date Max. Load (Ibsli Area (sq. in.) FC Notes I . 1 7 89010 28.27 3150 UAR030901 03/16/99 : 124500 UAR030902 04/06/99 28 28.27 4400 I i I 􀁾􀀠I . ! !I I (1) NORMAL CYLINDER SIZE 6" X IT, AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl38, C143, CI72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only In above tests. TRRA.MAR. Inc. TERRA-MAR, INC. GEOTECHNICAL, ENVIRONMENTAL, AND CONSTRUCTION MATERIALS TESTING Dallas Fort Worth Houston Lubbock Longview Austin 11050 Ables Lane, Dallas, Texas 75229 Phone: 972·488·8800 Fax: 972488·8080 DAILY ACTIVITY OBSERVATION REPORT CLIENT: Ed Bell Construction DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter PROJECT NO.: DC98-050·109 Huitt Zollars, Inc. -Kenneth Roberts. P.E. REPORT DATE: 3/25/99 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde On 3122199, Terra-Mar, Inc. representative Donald Bell was present at the above referenced project to perform lime depth testing. The following results are as noted. Station 59+75 Lime at 6" depth -Approved Station 64+00 Lime at 6" depth -Approved Station 58+10 Lime at 6" depth -Approved Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in ns entirety. without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS CLIENT: PROJECT: REPORT DATE: Ed Bell Construction Arapaho Road Improvements 3/24/99 DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt Zollar, Inc. -Kenneth Roberts, P. E. TMI REPORT NO.: DC98-050-110 Town ofAddison -James Pierce, P.E. Town of Addison -Dave Wilde, P.E. SPECIFICATIONS Percent Compactlon: Moisture Content ('Yo): 95+ opt -1 to +4 TEST DATA Date Tes!ed:-;:;=3/::;:2j=2I:;:9.;;;9=;--____ Technician: Donald E. Bell MATERIAL REFERENCE CURVE DATA CURVE TEST OPTIMUM MAX. DRY NO. METHOD MATERIAL DESCRIPTION MOISTURE ('Yo) DENSITY (pcl) 1 ASTM 0698 Dark Gray and Gray Clay with Gravel 16.3 106.2 7 ASTMD699 Lime Treated Brown Clay 36.6 80.6 IN-PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM 02922, 03017, RESPECTIVELY TEST ELEVATION REF. % DRY % , NO. ORUFT LOCATION CURVE MOISTURE DENSITY DENSITY 1 Grade Sta. 64 + 00 East Bound Arapaho Rd. 7 37.7 80.7 100.1 2 Grade Sta. 59+75 East Bound Arapaho Rd. 7 36.4 80.0 99.3 3 Grade Sta. 58+1000 East Bound Arapaho Rd. 7 39.5 80.3 99.6 , i i i GAUGE 1.0.: __...:,54.:.:2::9--;--:-; STD. OENSITY COUNT: 2617 STD. MOISTURE COUNT: __---=6:..,:4.::.8___ "R" AFTER TEST NUMBER INOICATES RETEST. "INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS REMARKS: _________________________ _____________________________ Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent ofTM!. Results apply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 03/30/99 Huitt-Zollars, Inc, Kenneth Roberts, PE DC98-050-108 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): _...:3;:,00"'0"--_____ Slump (in.): __3=--"'5______ Air Content (%): __4::,-::6______ Concrete Temp ('F) 98 PROJECT DATA Placement Date: 03/22199 Sampled By: D. Bell Weather: Sunny/82 Supplier/Mix: TXI FIELD DATA SET #1 Ticket#: Slump (in.): 1267092 2 1/2 Time Batched: Air Content: 1:10 5.5 Time Sampled: 1 :30 Unit Weight (pef): ----'-'n:::a=-----Conc. Temp. ('F): 76 Ambient Temp. (oF): 80 Yardage (e.y.): ___-=.:10"--___ Placement Location: Location: Station 49 + 90 Eastbound Arapaho Rd. sidewalk Remarks: FIELD DATA SET # Ticket #: Time Batched: Time Sampled: Slump (in.): Air Content: ----Unit Weight (pcf): -------Cone. Temp. ('F): Ambient Temp. ('F):----Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLD!;D AND CURE:D PI:R ASTM C3l, T!;STSD PER ASTM C39, CAPP!;D P!;R ASTM C617 Set# Cvlinder# Test Date Age (Days) Max. Load (lbs) Area (sq. in.) Strength (psi) FC Notes 1 AR032201 03/29/99 7 103170 28.27 AR032202 04/19/99 28 AR032203 04/19/99 28 AR032204 hold 3650 U (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in.• UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIDNS UNLESS INDICAT!;D IN NOTES. (4) FIELO TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, CI43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written written consent of TMI. Results apply only to above tests. ___________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALlAS FORT WORTH HOUSTON LONGVIEW LUSSOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 03/23/99 Huitt-Zollars. Inc. Kenneth Roberts, P.E. DC98-050-105 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): _...:4.;:;.00.::0'--_____ Slump (in.): 3-5 Air Content (%): 􀀭􀀭􀀴􀀻􀀮􀀭􀁾􀀶􀀭􀀭􀀭􀀭􀀭Concrete Temp ('F) 95 PROJECT DATA Placement Date: 03/15/99 Sampled By: B. Jones Weather: Sunny Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 67572 Time Batched: 2:59 Time Sampled: 3:40 Slump (in.): 3 Air Content: 4.5 Unit Weight (pct): Conc. Temp. ('F): 65 Ambient Temp. ("F): 69 Yardage (c.y.): -----=8''''8---Placement Location: Piers for traffic lights, NW & SW corner of Arapaho @Addison + 1 pier approx. 150 yds from intersection Remarks: Concrete was 1.5 hours late FIELD DATA SET # Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pct):--------Conc. Temp. ('F): Ambient Temp. ('F):----Yardage (c.y.): ________ Placement Location: Remarks: i I I Set # 1 Cylinder # AR031501 AR031502 AR031503 CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CUReD PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Test Date 03/22199 04/12199 Age (Days) Max. Load (Ibs) Area (sq. in.) 7 148320 28.27 28 : hold i Strength (psi) FC I 5250 U i Notes : : i ! : I ! i I (1) NORMAL CYLINDER SIZE 6" X 12"'. AREA 26.27 sq. In., UNLESS NOTED ABOVE. (2) TYPE "A' CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, CI43, C172, C231 Note: This report is lor the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent 01 TMI. Results 􀁡􀁾􀁰􀁬􀁹􀀠only to above tests. ADDIsoN TOWN OF To:. From: James C. Pierce,Jr.,P.E.,DEE • INC. Assistant City Engineer o Phone: 972/450-2879 FAX: 972/450-2834 FAX#: q7{6-'ttt-wcro 16801 Westgrove􀁄􀁡􀁴􀁥􀀺􀀬􀁟􀀮􀀮􀀻􀀻􀀻􀀮􀀳􀁟􀁾􀁟􀀲 􀀮􀁟􀀳􀁟􀀴􀀭􀀭􀀮􀀮􀀺􀀮􀀮􀀮􀀮􀁲􀁬􀀮􀀮􀀮􀀮􀀭___ P.O. Box 9010 Addison, TX 75001-9010 # of pages (including cover): -.3 􀁒􀁥􀀺􀀬􀀭􀀭􀀡􀁾􀀺􀀮􀀮􀁌􀀮􀀺􀁟􀀮􀀺􀀻􀀬􀀮􀀺􀀮􀀺􀀻􀀮􀁴􀀿􀁴􀀮􀀺􀀺􀀮􀀺􀀮􀀮􀀺􀀴􀀭􀁾􀁾􀀿 􀁉􀁾􀀴􀀭􀀮􀀠_____'rfJ:,.....;.(-=-ecl-=, <..J o CaUme __________________________________ _ 1 SPECIFICATION PROJECT DATA Strength (psi): Placement Date: 02105/99 Slump (in.): Sampled By: J. Perez Weather: Ticket #: Slump (in.): 65479 5.00 Time Batched: __􀀱􀀺􀁣􀀱􀀻􀀭􀀺􀀻􀀺􀀲􀁾􀀰􀀬􀀭􀀭􀁟􀀠Air Content: 4.5 Time Sampled: 11 :45 Unit Weight (pcl): ------=-::-::-:=-----Conc. Temp. ('F); 70 Ambient Temp. ('F):---:6""4?-Yardage (c.y.): ___---'n:.:.:a=--___ DC98·050·98 􀁟􀀮􀀮􀀻􀀻􀀶􀁾􀀵􀁴􀀭􀀭􀀧􀀺􀀺􀀺􀀭􀀧􀀺􀀢􀀧􀀺􀀺􀀧􀀺􀀻􀀢􀀢􀁟􀀠Air Content (%): Cloudy Concrete Temp CF): SupplierlMix; Lattimore FIELD DATA SET #1 TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:!l72·488·8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction· Doug Teter REPORT DATE: 03110/99 Huitt-Zollars, Inc. -Kenneth Roberts, P .E. TMI REPORT #: Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde Placement Location: Median at Quorum Road FIELD DATA SET #2 Ticket#: Time Batched:_____ Time Sampled: Slump (in.): Air Content: Unit Weight (pel): ---------Conc. Temp. ('F): Ambient Temp. ('F):----Yardage (c.y.): _________ Placement Location: Remarks: Set# Beam # Average Average Modulus of NotesTest Date Max. Load Rupture (psi) Depth, D Width, B Obsl ! ;AR020501 74502112199 8940 6.00 6.20 755AR020502 6.0002112199 9060 6.10 AR020503 6.10 82003/05/99 9840 5.90 ! AR020504 6.20 78003/05/99 9360 6.05 ; ! ; , CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PERASTM C78 Age (Days) 7 7 28 28 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WlTH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, C172, C231 􀁾􀀠Note: This report is for the exclusive use of the Client addressed. This report may nat be reproduced except in its entirety, without y INC. the written consent of TMI. Results apply only to above tests. _________________________________ _ TERRA·MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 03/11/99 Huitt-Zollars, Inc. Kenneth Roberts, P.E. TMI REPORT #: DC98-0S0-102 Town of Addison -James Pierce, P.E. 1 Town of Addison -Dave Wilde 􀁾􀀠SPECIFICA TlONS 􀁾􀀠PROJECT DATA Placement Date: 03103/99 Slump (in.): •....< I ':3 -.5 l Sampled By: Air Content (%): h -tr Strength (psi): 3000 ! L Weather: SunnylClear Concrete Temp ('F): .1 /"'-/SupplierlMix: Lattimore FJELD DATA SET #1 Ticket #: Slump (in.): Conc. Temp. (OF): 4 112 68 Time Batched: Air Content: ----Ambient Temp. ('F): __..;.7..;.4__ Time Sampled: 4:0S Unit Weight (pcf): ---..:;:;:.::.:::..--Yardage (e.y.): ___-"-S____ Placement Location: From Arapho to Quorum light Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: 'Slump (in.): Air Content:_____ Unit Weight (pcf):-------Cone. Temp. (OF): Placement Location: Ambient Temp. (OF): _____ Yardage (c.y.): ________ Remarks: Set # Cylinder # CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Test Date Age (Days) Max. Load (lbs) Area (sq. in.) Strength (psi) FC Notes 1 AR030301 AR300302 AR030303 AR300304 03110/99 03/10199 03/31199 03/31/99 7 7 28 28 118610 113410 28.27 28.27 4200 4010 U U (1) NORMAL CYLINDER SIZE 6" X 12", AREA 26.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C136, C143, C172. C231 Note: This report is for the exclusive use of the Client addressed. This report may 110t be reproduced except in its entirety, without the written written consent of TMI. Results apply only to above tests. ___________________________________ _ TERRA-MAR. INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lana, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 03f18f99 DC98-050-103 REPORT DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt-Zollars, Inc. Kenneth Roberts, P.E. Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): 􀁟􀀮􀀮􀀻􀀻􀀳􀁩􀀭􀀰􀀰􀁾􀀰􀀬􀀭_____ Placement Date: 03f09f99 Slump (in.): Air Content (%): 3-5 --;4-.:;6c------Sampled By: Weather: Contractor Partly Sunny Concrete Temp ('F) 95 SupplierfMix; TXI FIELD DATA SET #1 Ticket #: Time Batched: 10:00 Time Sampled: 10:45--..:.::.:.;:.::-Unit Weight (pcl):---...:..;:c:.:..::.--Slump (in.): 3 Air Content: 5.0 Cone. Temp. ('F): 65 Ambient Temp. ('F};----':;,70::--Yardage (c.y.}: ___..:::.:8/.::;,8____ Placement Location: Station 4600 -left sidewalk 10' Remarks: FIELD DATA SET #2 Ticket #: Time Batched: -'-____ Time Sampled: Slump On.): Air Content: Unit Weight (pcl): -------Cone. Temp. ("F): Placement Location: Ambient Temp. ('F}:----Yardage (c.y.}: ________ Remarks: CONCRETE COMPRESSION TEST RESULTS Set# Cylinder # CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM 0617 Test Date Age (Days) Max. Load Obs) Area (sq. in.) Strength (psi) IFC I Notes 1 AR030901 AR030902 03/16/99 04/06/99 7 28 : 89010 28.27 3150 U' I i i ! ! i I I (1) NORMAL CYLINDER SIZE 6" X 12", AREA 26.27 sq. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS; C138, Cl43, Cl72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR. Inc, ___________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 03/18/99 DC98-050-104 REPORT DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt-Zollars, Inc. Kenneth Roberts, P .E. Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _.;;;3;:.0"'00=-_____ Placement Date: 03/10/99 Slump (in.): 3-5 Sampled By: Contractor Air Content (%): 􀀭􀀭􀀭􀀷􀀴􀀭􀁾􀀶􀀺􀀭􀀭􀀭􀀭􀀭Weather: Partly Sunny Concrete Temp ('F) 95 Supplier/Mix: TXI FIELD DATA SET #1 Ticket #: Time 8atched: 12:00 Time Sampled: 12:32 Slump (in.): 3 Air Content: ---'-74.O;:5=-Unit Weight (Pcf):---.:.==---Cone. Temp. (oF): 65 Ambient Temp. eF): __.;.7.;:.3__ Yardage (c'Y'): ___..:.1:;:.0/.;:2.;:.0___ Placement Location: Station 65 + 00, right 25 Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pet): -------Cone. Temp. (OF): AmbienlTemp. ("F):----Yardage (c.y.}: ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM 039, CAPPED PER ASTM C617 Set # Cylinder # Test Dale Age (Days) Max. Load (Ibs) Area (sq. in.) 1 AR031 002 03/17/99 7 101930 28.27 AR031 003 04/07/99 28 Strength (psi) 3610 FC Noles U (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in •• UNLESS NOTED A80VE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, Cl72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, Without the written consent of TMI. Results apply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 03/10/99 Huitt-Zollars, Inc. -Kenneth Roberts, P .E. TMI REPORT #: DC98-050-98 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS ..,. PROJECT DATA Strength (psi): 650 r(e"t. Placement Date: 02105/99 Slump (in.): ...e--'3 -i Sampled By: J. Perez Air Content (%): 5'''' Weather: Cloudy Concrete Temp CF): Supplier/Mix: Lattimore FIELD DATA SET #1 Tickel #: 65479 Time Balched: __1.:..1;.:::2;;.:0,--_ Time Sampled: 11 :45 Slump (in.): 5.00 Air Conlent: _---,4;c:.5;:-_ Unit Weight (pc!): ----'-'n='=a'-"---Cone. Temp. CF): 70 Ambient Temp. ("F): 64 Yardage (c.y.): ___---'n.:.;;a:......___ Placement Location: Median at Quorum Road --::..;...-FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pc!): --------Cone. Temp. CF): Ambient Temp, ('F): ----Yardage (c,y,): _________ Placement Loealion: Remarks: : ! Sel# !1 : Beam # AR020501 AR020S02 AR020S03 AR020504 Test Date 02112199 02112199 03/0S199 03/05/99 CONCRETE COMPRESSION TEST RESUL T8 BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Age Max, Load Average Average Modulus of (Days) (Ibs) Depth, D Width, B Rupture (psi) I 7 i 8940 6.00 6.20 745 7 9060 6.10 6.00 755 28 9840 5.90 6.10 820 28 9360 6.05 6.20 : 780 Notes i I ! ! : ! (l) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING. LEATHER SHIMS USED DURING TESTING (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICA TEO IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl38, Cl43, C172, C231 􀁾􀀯􀁾Nole: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirely, without Y7,INC.the written consent of TMI. Results apply only to above tests. ___________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 CONCRETE INSPECrlON AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 03/11199 DC98-050-102 REPORT DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt-Zollars, Inc, Kenneth Roberts, P,E. Town of Addison -James Pierce, P,E, Town of Addison" Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _..;3;":0.,:,0,,.0􀀭􀀭􀀺􀀺􀀺􀀺􀀭􀀭􀀺􀀻􀁾􀁟􀀠Slump (in,): .,...t" '3 5 Air Content (%): -""-'----'''::S:---''{[:.';::--Concrete Temp (OF): Placement Date: Sampled By: Weather: Supplier/Mix: 03/03/99 Sunny/Clear Lattimore FIELD DATASET#1 Ticket #: Slump (in,): Cone. Temp, (OF): 4 112 68 Time Batched: _____ Air Content: Ambient Temp, (OF):--""7c;'4-Time Sampled: 4:05 Unit Weight (pet): ----"';:.;;;..--Yardage (c,y,): ___--'5'--___ Placement Location: From Arapho to Quorum light Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: _____ Unit Weight (pet): -------Cone, Temp, (OF): Ambient Temp, ("F): _____ Yardage (c,y,): ________ Placement Location: Remarks: Set # Cylinder # CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Test Date Age (Days) Max, Load (Ibs Area (sq. in,) Strength (psi) FC Notes 1 AR030301 AR300302 AR030303 AR300304 03/10199 03/10199 03/31/99 03/31/99 7 7 28 28 118610 113410 28,27 28,27 4200 4010 U U , (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq, In" UNLESS NOTED ABOVE, (2) TYPE "A-CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES, (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES, (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS; C138, Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed, This report may not be reproduced except in its entirety, without the written consent of TM!. Results apply only to above tests, TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW LUBBOCK 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: (972)488-8080 STABILIZED SOIL GRADATION REPORT CLIENT: Ed Bell Construction DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 03/10/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-99 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde Test Method: Technician: M. Kashem Minimum % Passing 1 3/4" Sieve: 100 Date Tested: 02126/99 Minimum % Passing No.4 Sieve: __-=6=..0___stabilizing Agent __...:L""im"""e__________ Remarks: Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, wilhout the written consent of TML Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS Dallas Fort Worth Houston Austin Longview Lubbock 11050 Ables Lane, Dallas, Texas 75229 Phone: 972-488.8080 Fax: 972-488-8080 LIME TREATED SOIL THICKNESS DETERMINATIONS Client: Ed Bell Construction Distribution: Project: Arapaho Road Improvements Ed Bell Construction -Doug Teter Report No.: DC98-050-101 Report Date: 02126199 Note: This report is for the exclusive use of the client report may not be reproduced except in its entirety, v.II!t,,,,,t written consent of to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 02/24/99 Huitt-Zollars, Inc, -Kenneth Roberts, P,E, TMI REPORT #: DC98-050-98 Town of Addison -James Pierce, P ,E, Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): _.;;6C;;5.:,0';""'""___ Slump (in.): _--:5:-,'-\;--___ 'Air Content (%): (!:oncrete Temp CF): PROJECT DATA Placement Date: 02105199 Sampled By: J, Perez Weather: Cloudy Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 65479 Time Batehed: __1:.;1c:;:2:;.:0,--_ Time Sampled: Slump (in.): 5,00 Air Content: _---:4:,::.5;:-_ Unit Weight (pet): 􀀭􀀭􀀭􀀭􀀧􀀭􀁮􀀺􀀽􀀺􀁡􀁾􀀭􀀭􀀭Conc, Temp, ("F): 70 Ambient Temp, ('F): 64 Yardage (c,y,): ___-"'-=-___ Placement Location: Median at Quorum Road ---':":"'-FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in,): Air Content: Unit Weight (pef): ---------Conc, Temp, ('F): Ambient Temp, ('F):----Yardage (e,y,): _________ Placement Location: Remarks: Set# Beam # CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Test Date Age Max. Load Average Average (Days) (Ibs) Depth, D Width, B Modulus of Rupture (psi) Notes 1 AR020501 AR020502 AR020503 AR020504 02112199 02112199 03/05/99 03/05/99 7 7 28 28 8940 9060 6.00 ,6.10 '6,20 6,00 \ ,'745 755 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE, (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES, (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, Cl72. C231 Note: This report is for the exclusive use of the Client addressed, This report may not be reproduced except in its entirety, without without ERR-.rIiAR. INC. the written consent of TMI. ResuRs apply only to above tests. IEHHA-MAR Consulting Engineers· GeotechnIcal· Environmental· Construction Materials Testing AUSTIN • DAI.W • fORT WORTH • HOUSTON • LONGVIEW Certified Mail # P 572 663 477 Registered, Return Receipt Requested January 29, 1999 Mr. Robert Weber Mr. Pat Rivera Ed Ben Construction Company 10605 Harry Hines Boulevard Dallas, Texas 75220 RE: Demand for Payment Project DC98-050 Invoice # DC8050923 -9130198 Invoice # DC80501015-10/31198 Invoice # DC8050 1115 -11130/98 Dear Mr. Weber and Mr. Rivera: Terra-Mar, Inc. has provided Construction Materials Services on Project #DC98-050 as shown on the following invoices: Invoice # DC8050923 -09130198 in the amount of$6,260.00 Invoice # DC80501015 -10131198 in the amount 0[$1,770.00 Invoice # DC80501115 -11130198 in the amount 0[$1,645.00 As oftoday, the total amount due on these invoices is $9,675.00. This amount does not include additional additional payments due for any work that may have been completed in 1998 or January 1999. As of this date, our records reflect no payment or partial payment having been received from Ed Ben Construction Company. Therefore, demand is hereby made upon you for payment of$9,675.00 This amount is to be paid directiy to Terra-Mar within ten (10) days of your receipt of this letter. ShOUld such payment not be forthcoming or other arrangements made for the satisfaction of this obligation, we may have no other option than to seek whatever legal remedies are available. Should such a step become necessary, Terra-Mar will seek recovery of the principal amount owed, interest, attorney's fees, and court costs. Ifpayment has already been sent, please disregard this letter. Sincerely, 􀁔􀁅􀁒􀁒􀁁􀁾􀁍􀁁C.&.fr-Brit Je, gs Contro er Attachments: Invoice Copies ., ,,;:'C: James C. Pierce, Jr., P.E. Assistant City Engineer Town ofAddison 11050 Ables Lane, OCIllao, Texas 75229, Phone, (972)488-8800, Fax, (972)488-8080 _ TERRA-MAR, INC. 􀁾-CONSULllNG ENGINEERS • GEOTEt.••rlICAL • ENVIRONMENTAL • CONSTRu':;110N MATERIALS ENGINEERS 11050 Ables Lane, Dallas, Texas 75229 Phone: (972) 488-8800 Fax: (972) 488-8080 DALLAS FORT WORTH HOUSTON AUSTIN L.ONGVlEW L.UBBOCK INVOICE TO: Ed Bell Construction INVOICE INVOICE P.O. Box 540787 DATE NUMBER Dallas, Texas 75354-0787 9/30/98 I OC8050923I ATTN: Mr. Troy Childers PHONE NO.: 214-358-6581 FAX NO.: 214-352-3201 Total Amount I I PROJECT #: DC98-050 Due . $ 6.260.00 PROJECT: Arapaho Road Improvements Period of Service: September 1,1998 to September 30,1998 57 MK 9/1 In·Place Densities 5.00 each 10.00 50.00 58 MK 9/1 Field Gradations 2.00 each 10.00 20.00 • " " Technician Time (am) 4.00 hours 28.00 112.00 • " Transportation Charge 1.00 trip 15.00 15.00 59 MK 9/1 Lime Depth Checks 8.00 each 10.00 80.00 60 MK 911 Field Gradations 2.00 each 10.00 20.00 « " Technician Time (pm) 4.00 hours 28.00 112.00 " Transportation Charge 1.00 trip 15.00 15.00 61 MK 912 Proctor #7 1.00 each 120.00 120.00 " " Alterberg Limits 1.00 each 40.00 40.00 62 BG 912 Flexural Beams 8.00 each 20.00 160.00 " TeChnician Time 6.00 hours 28.00 168.00 " Transportation Charge 1.00 trip 15.00 15.00 63 MK 912 In·Place Densities 7.00 each 10.00 70.00 64 MK 9/2 Field Gradations 7.00 each 10.00 70.00 " " " Technician Time 6.00 hours 28.00 168.00 « " " Transportation Charge 1.00 trip 15.00 15.00 65 MK 9/3 Field Gradations 8.00 each 10.00 80.00 66 MK 9/3 In·Place Densities 4.00 each 10.00 40.00 " Technician Time 4.00 hours 28.00 112.00 • " Transportation Charge 1.00 trip 15.00 15.00 67 JS 913 Flexural Beams 4.00 each 20.00 80.00 « Technician Time (1st trip) 4.00 hours 28.00 112.00 " Transportation Charge 1.00 trip 15.00 15.00 68 MK 9/2 Field Gradations 4.00 each 10.00 40.00 • Technician Time (pm) 4.00 hours 28.00 112.00 • " Transportation Charge 1.00 trip 15.00 15.00 69 JS 9/3 Flexural Beams 4.00 each 20.00 80.00 • " " Technician Time (2nd trip) 3.00 hours 28,00 84.00 .. Transportation Charge 1.00 trip 15.00 15.00 70 EE 9/4 Flexural Flexural Beams 12.00 each 20.00 240.00 Technician Time 8.00 hours 28.00 224.00 .. .. Transportation Charge 1.00 trip 15.00 15.00 --.,, 􀀮􀀬􀁟􀁾􀁾􀁾􀁾􀁔􀀠__"'._ .. --􀀭􀀭􀀭􀀧􀁾􀀠... _ .. 􀀭􀁾􀀮􀀮􀀢􀀮􀀮􀀮􀀮􀀠, , , > 􀁉􀀧􀁾􀀡􀁾􀀠, ,jh:I',{ "'" , "I ,'·V,(, • ., 􀁾􀁩􀀮􀁾• 􀀮􀁩􀀢􀀺􀁾-.. 1\:',,;: I'.' "':' , ; '..-., .,1 'f. ?" ' 1', ---...... 􀁾􀀠..... , .,_ .. 􀁾􀀠-;,,:,,".. --􀀧􀀧􀀧􀀧􀀧􀀧􀀧􀀧􀁾-􀁾􀁾􀀠. -.. -􀁾􀀠􀁾􀀠_. 􀁾􀀠􀀢􀀬􀁾􀀭􀀭.. Flexural Beams9/871 JS •• Technician Time• •• Transportation Charge• Flexural Beams9/972 JS •• Technician Time• •• Transportation Charge• Flexural Beams9110BG73 •• Technician Time• •• Transportation Charge• Beam Pickup Time9111 • Transportation Charge Flexural Beams9/2174 JS •• Technician Time· ••• Transportation Charge Flexural Beams9122JS75 ••• Technician Time •• Transportation Charge• Flexural Beams9123JS76 • • Technician Time• ••• Overtime ..• Transportation Charge• Flexural Beams9124JSn ••• Technician Time ••• Overtime ••• Transportation Charge Flexural Beams9/25JS78 .. •• Technician Time • • • Transportation Charge Project Management9/30JY I 8,00 8,00 1,00 12.00 8.00 1.00 4.00 4,00 1.00 2,00 1,00 8,00 8,00 1,00 8.00 8.00 1.00 12.00 8,00 4,00 1.00 8.00 8.00 2.00 1.00 4.00 4.00 1.00 8.00 each hours trip each hours trip each hours trip hours trip each hours trip each hours trip each hours hours trip each hours hours trip each hours trip hours 20,00 28,00 15,00 20,00 28,00 15.00 20.00 28,00 15.00 28,00 15,00 20,00 28,00 15.00 20,00 28.00 15.00 20.00 28.00 42.00 15.00 20.00 28.00 42.00 15.00 20.00 28.00 15.00 55.00 A 􀁾􀀠/J Note: 1. Due on receipt or by tenns of contract. 2. InClude Invoice copy or number with payment. Thank You, We appreciate your business, TOTAL MANAGER APPROVAL 160,00 224,00 15.00 240,00 224,00 15,00 80,00 112,00 15,00 56,00 15,00 160,00 224,00 15.00 160.00 224,00 15.00 240.00 224.00 168,00 15.00 160.00 224.00 84.00 15.00 80.00 112.00 15.00 440.00 6,260.00 / TERRA-MAR, INC. Consulting Engineers • Geotechnical • Environmental • Construction Materials Engineers 11050 Ables Lane, Dallas, Texa" 75229 Phone: (972) 488-8800 Fax: (972) 488·8080 Dallas Fort Worth TO: Ed Bell Construction P,O, Box 540787 Dallas, Texas 75354-0787 ATTN: Mr, Troy Childers PHONE NO.: 214-358-6581 FAX NO.: 214-352-3201 PROJECT #: DC98-050 PROJECT: Arapaho Road Improvements Period of Austin Houston Longview Lubbock INVOICE INVOICE INVOICE DATE NUMBER 10131/98 IDC80S0101S1 Total Amount I I Due ,$ 1.770,00 79 BWG 10/13 .. .. .. .. .. .. 80 BWG 10/14 .. .. .. .. .. .. BWG 10/15 .. .. 81 MK 10/16 .. .. .. .. .. .. MK 10/17 .. .. 82 JP 10/19 .. .. .. .. .. .. JP 10/20 .. .. 83 MY 10/29.. .. .. .. JS 10/29 .. .. .. JY 10/31 Flexural Beams Time Charge Flexural Beams Time Charge Pickup Time Charge Beams i i Time Charge PiCkup Time Charge Beams Time Charge Pickup Time Charge Cores for Compressive Time 2nd TeChnician Time Charge Project Management 4,00 each 4,00 hour 1,00 trip 4,00 each 4.00 hour 1.00 trip 2.00 hour 1.00 trip 4.00 each 4.00 hour 1.00 trip 2.00 hour 1.00 trip 12.00 each 6.00 hour 1.00 trip 2.00 hour 1.00 trip 4.00 each 3.00 hour 3.00 hour 1.00 trip 2.00 hour 20,00 28,00 15,00 20,00 28.00 15.00 28.00 15.00 20.00 28.00 15.00 28.00 15.00 20.00 28.00 15,00 28.00 15.0Q 55,00 28.00 28.00 15.00 55.00 TOTAL 1. Due on receipt or by terms of contract. 2. Include with Thank You, we appreciate your business. MANAGER APPROVAL 80,00 112,00 15,00 80.00 112.00 15.00 56.00 15.00 80.00 112.00 15.00 56.00 15.00 240.00 168.00 15.00 56.00 15.00 220.00 84.00 84.00 15.00 i 110.00 f· 1,770.00 TERRA-MAR, INC. Consulting engineers • Geotechnical • environmental • Construction Materials engineers 11050 Ables Lane, Dallas, Texas 75229 Phone: 􀀨􀀲􀀹􀀷􀀲􀀭􀀴􀀸􀁾􀀺􀀸􀀸􀁏􀁄􀀠Fax: (972 ) 488-8080 Dallas Forth Worth Austin Houston Longview Lubbock INVOICE TO: Ed Bell Construction INVOICE INVOICE P.O. Box 540787 DATE NUMBER Dallas, Texas 75354-0787 11130198 IDC8oso111s1 ATTN: Mr. Troy Childers PHONE No.: 214-358-6581 FAX NO.: 214-352-3201 Total Amountl I PROJECT #: DC98-050 Due . $ 1,645.00 PROJECT: Arapaho Road Improvements Period of 84 EE 1116 " " Time EE 11/7 Beam Pickup Time 85 MK 11/13 Activity Report 86 MK 11117 Densities (min 4 per trip) 87 MK 11/16 Gradations (min 4 per trip) .. " " Time " " " Charge 88 EE 11/25 Beams " " " i i Time " EE 1211 Pickup Time " " " Charge JY 11130 Management 4.00 hours 112.00 .. " Charge " " Charge .. Charge " .. i i Time " " .. Charge " Charge EE 11127 Pickup Time .. " Charge 89 MK 11130 Beams .. " " Time " " .. Charge 4.00 1.00 3.00 1.00 4.00 1.00 4.00 3.00 1.00 4.00 3.00 1.00 4.00 6.00 1.00 3.00 1.00 8.00 6.00 1.00 3.00 1.00 2.00 each trip hours trip hours trip each hours trip each hours trip each hours trip hours trip each hours trip hours trip hours 80.00 15.00 84.00 15.00 112.00 15.00 40.00 84.00 15.00 60.00 84.00 15.00 80.00 168.00 15.00 84.00 15.00 160.00 168.00 15.00 84.00 15.00 110.00 TOTAL 1,645.00 : :' ... Note: 1. on receipt or by terms of contract. 2. Include invoice or number with Thank You, We appreciate your business. MANAGER APPROVAL _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALlAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, DaUas, Texas 75229 Phone:972-488·8800 Fax: 972·488·8080 CLIENT: PROJECT; REPORT DATE: TMI REPORT #; CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 1/8/99 Huitt·Zoliars, Inc. Kenneth Roberts, P.E. DC98·050.91 Town of Addison· James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _...=:4"'00='0'--____ Placement Date: 1218/98 Slump (in.): 3-5 Sampled By: Chris Theriot Air Content (%): ---".n-"a'-------Weather: Clear Concrete Temp (oF) 95 Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 662157 Time Batched: _---'9:.:.:3=,.4'---_ Time Sampled: 10:30 Slump (in.): 2.00 Air Content: na Unit Weight (pet): ---..:.::.n:.::a-=-----Conc. Temp. ('F): 60 Ambient Temp. ("F):---=5-=2--Yardage (c.Y.): ___'---7'---___ Placement Location:....:F...;o;..:u:;..r.;;;.a:.;;re.;;;.a..;;in"'l.:;;ett;;;;s'--____________________________ Remarks: FIELD DATASET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pct): --------Conc. Temp. (oF): Ambient Temp. ("F):----Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31. TESTED PER ASTM C39. CAPPED PER ASTM C617 Set # Cylinder # Test Date Age (Days) Max. Load (Ibs Area (sq. in.) Strength (psi) 1 AR120801 1/5199 28 174780 28.27 AR120802 1/5199 28 173070 28.27 6180 6120 FC Notes U U (1) NORMAL CYLINDER SIZE et' X 12", AREA 26.27 sq. on.• UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C136, Cl43, Cl72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety. without the written consent of TMI. Results apply onlv to above tests. TERRA-MA ;ilic: _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 1/8/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-92 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): Slump (in.): Air Content (%): Concrete Temp PROJECT DATA Placement Date: 1219198 Sampled By: John Sullivan Weather: Cloudy & cool Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: Slump (in.): 7062751 4.00 Time Batched: Air Content: 12:57 5.0 Time Sampled: Unit Weight (pcl): ---....:.:.;nac::...---Conc. Temp. ("F): 65 Ambient Temp. ("F): 54 Yardage (c.y.): ____n:.:.:a=--___ Placement Location: West intersection of quiram and Aprapaho Rd. left turning lane FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pcl):---------Conc. Temp. ("F): Ambient Temp. ('F):----Yardage (c.y.): _________ Placement Location: Remarks: Set # Beam # CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C7B Test Date Age Max. Load Average Average (Days) (Ibs) Depth, D Width, B Modulus of Rupture (psi) Notes 1 APR120901 APR120902 APR120903 APR120904 12116/98 12116/98 1/6199 1/6/99 7 7 28 28 8160 9300 9660 1008 6.10 6.20 5.95 6.00 6.00 6.10 6.15 6.00 680 775 805 840 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STAN DARDS: C138, C143, C172, CZl1 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488-8800 Fax: 972·488·8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 1/6/99 DC98·050·90 REPORT DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt-Zollars, Inc. Kenneth Roberts, P .E. Town of Addison -James Pierce, P .E. Town of Addison· Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _.::.3.::;:00::;:0'--____ Placement Date: 1218198 Slump (in.): _--'5'--_____ Sampled By: A. Johnson Air Content (%): _-;:n:;;.a______ Weather: Clear Concrete Temp ('F) 95 Supplier/Mix: Lattimore #38 FIELD DATA SET #1 Ticket #: 6085991 Time Batched: 1:57 Time Sampled: 4:00 Unit Weight (pet): ----"'n"'a'----Slump (in.): 3.00 Air Content: na Conc. Temp. ("F): 69 Ambient Temp. ('F): 70 Yardage (c.y.): ___-.:.5____ Placement Location: Arapaho Road light pole piers Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pet): --------Conc. Temp. ("F): Ambient Temp. (*F):----Yardage (c.y.): ________ Placement Locatlon: Remarks: CONCRETE COMPRESSION TEST RESULTS CYUNDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C611 Set # Cylinder# Test Date Age (Days) Max. Load (Ibs) Area (sq. in.) Strength (psi) FC Notes AR120801 12115/98 7 108210 28.27 1 AR120801 1/5/99 28 147370 28.27 AR120801 1/5/99 28 150530 28.27 AR120801 DISCARD 3830 U 5210 U 5320 U (1) NORMAL CYUNDER SIZE 6" X 12", AREA 28.27 sq. In .. UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: CI38, CI43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirely, without without • the written consent of TM!. Results apply only to above tests. TERRA-MAR. Inc. TERRA·MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dal/as, Texas 75229 Phone:972·488·8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction· Doug Teter REPORT DATE: 12129/98 Huitt·Zoliars, Inc .• Kenneth Roberts, P.E. TMI REPORT #: OC98-050·89 Town of Addison· James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): --=6.::.50::....:...FI=ex,,-___ Placement Date: 11/30/98 Slump (in.): Sampled By: M. Kashem Air Content ('Yo): _-:..4-6-=-____ Weather: Clear Concrete Temp (OF): Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 3074204 TIme Batched: 8:11 Time Sampled: 9:35 Slump (in.): 4.00 Air Conlent: 5.1 Unit Weight (pc!): Cone. Temp. (oF): 66 Ambient Temp. ("F): 60 Yardage (c.y.): 􀀭􀀭􀀭􀀭􀀭􀀻􀀻􀀹􀁾􀀭􀀭Placement Location: Paving @E. bound Arapaho Rd. @intersection of Arapaho & Quaroun Rd. station 21 +75 FIELD DATA SET #2 Ticket #: 3074216 Time Balched: 10:18 Time Sampled: 11 :30 Unit Weight (pc!): ---...:..:..;=.::..--Slump (in.): 3.50 Air Content: 4.6 Conc. Temp. (oF): 70 Ambient Temp. C"F): 64 Yardage (c.y.): ___--=5"'4____ Placement Location: Paving @Quaroun Rd. S. bound @station 2+55 Remarks: Sel# Beam # Test Date CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM CIS Age Max. Load Average Average (Days) (Ibs) Depth, D Width, B Modulus of Rupture (psi) Notes 1 2 ARI113001 ARI113002 ARI113003 AR1113004 ARI113005 AR1113006 ARI113007 ARI11300B 12107/98 12107/98 12128/98 12128/98 12107/98 12107/98 12128/98 12128/98 7 7 28 28 7 7 28 28 6840 7080 8160 8340 7980 8880 9120 9060 6.05 6.00 6.00 5.85 5.90 6.00 6.00 6.00 6.15 6.25 6.20 6.25 6.15 6.25 6.10 6.20 570 590 680 695 665 740 760 755 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl38, Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results applv onIv to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MA'rERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed 8ell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed 8ell Construction -Doug Teter REPORT DATE: 12117/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-92 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): _...:5::::;5:!:,0____ Slump On.): 4 Air Content (%): ----;5;:----Concrete Temp (oF): PROJECT DATA Placement Date: 12/09/98 Sampled 8y: John Sullivan Weather: Cloudy Supplie r/Mix: On site FIELD DATA SET #1 TIcket#: 7062751 Time Batched: 12;57 Time Sampled: 1:15 Slump (in.): 4.00 Air Content: 5.0 Unit Weight (pel): na Conc. Temp. (OF): 65 Ambient Temp. (OF): 54 Yardage (c.y.): na Placement Location: West intersection of Quorum Road and Arapaho, left tum lane FIELD DATA SET #2 Ticket #: Time 8atched: ____ Time Sampled: Slump On.): Air Air Content: Unit Weight (pef): ---------Conc. Temp. ('F): Ambient Temp. {'F):----Yardage (c.y.): _________ Placement Locetion: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED ANO CURED PER ASTM C31, TESTED PER ASTM C78 Set # Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (pSi) Notes 1 APR120901 APR120902 APR120903 APR120904 12116/98 12116/98 01/06/99 01/06/99 7 7 28 28 8160 9300 6.10 6.20 6.00 6.10 680 775 2 <1l SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIE\.D TESTS ARE PER APPLICABLE ASTM STANDARDS: 0138. 0143, C172, C231 Note: This report is for the exclusive use of the Client addressed. 4< 􀁾..􀁬􀁾􀁰􀁾WERRA_MAR,IN • the written consent of TMI. Results apply only to above tests, This report may not be reproduced except in its entirety, without TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN lJ050Abies Lane, Dallas, Teras 75229 Phone:972-488-8800 Far: 972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 12116/98 DC98-050-90 REPORT DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt-Zollars, Inc. Kenneth Roberts, P.E. Town of Addison -James Pierce, P.E. Town ofAddison -Dave Wilde SPECIFICAnONS PROJECT DATA Strength (psi): _.::.3;::=00:.;:;0___ __ Placement Date: 12/08/98 Slump (ia): _-=-5______ Sampled By: A Jolmson Air Content (%): 􀁟􀁾􀁮􀁡􀀺􀀺􀀻􀀭______ Weather: Clear Concrete Temp (oF): 95 SupplierlMix: Lattimore #38 FIELD DATA SET #1 Ticket #: Slump (in.): 6085991 3.00 Time Batched: __1"":5,,,7:..-_ Air Content: __-.::na:::.-__ Time Sampled: 4:00 Unit Weight (pcf): -----'-'na:::=:..---Conc. Temp. eF): 69 Ambient Temp. ("F): __...:.7",0__ Yardage (c.y.): ___.......;5;;.......___ Placement Location: Arapaho Road light pole piers Remarks: FIELD DATA SET #2 Ticket #: Time Batched: Time Sampled: ________ Slump (in.): Air Content: ----Unit Weight (pcf): ________ Conc. Temp. (OF): Ambient Temp. (oF): _____ Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PERASTM ClI, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # Cylinder If Test Date Age (Days) Max. Load (Ibs) Area (sq. in.) Strength (psi) FC Notes 1 ARI20801 ARI20801 AR120801 AR120801 12115/98 01/05199 01105/99 7 28 28 hold 108210 28.27 3830 U (l) NOR.\1AL CYllNDER SIZE 6" X 12', AREA 28.27 "l. in., UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRAC11JR.E UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPEClFlCA nONS UNLESS INDICATED IN NOTES. (4) FlELD TESTS ARE PERAPPUCABLE ASTM STANDARDS: CIlS,CI43. Cl72. C231 Note: This report is for the eKclusive use of the Client addressed. This report Inay not be reproduced except in its entirety, without the written consent of"I'ML Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT OATE: 12114/98 Huitt-Zollars, Inc. -Kenneth Roberts, P .E. TMI REPORT #: DC98-050-89 Town of Addison -James Pierce, P .E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): --=6=.50::..:....F:..:le.:.:x____ Slump (in.): Air Content (%): _-'-4-.;:6_____ Concrete Temp ('F): PROJECT DATA Placement Date: 11/30/98 Sampled By: M. Kashem Weather: Clear Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 3074204 Time Batched: 8:11 Time Sampled: 9:35 Slump (in.): 4.00 Air Content: 5.1 Unit Weight (pc!): Conc. Temp. ('F): 66 Ambient Temp. ("F): 60 Yardage (c.y.): -----:::9---Placement Location: Paving @E. bound Arapaho Rd. @intersection of Arapaho & Quaroun Rd. station 21+75 FIELD DATASET #2 Ticket #: Slump (in.): 3074216 3.50 Time Batched: Air Content: 10:18 4.6 Time Sampled: 11 :30Unit Weight (pet): ___--'-'c:=-:'--___ Conc. Temp. ('F): 70 Ambient Temp. ('F): 64 Yardage (c.y.): ___-::;S:.;.4____ Placement Location: Paving @Quaroun Rd. S. bound @station 2+55 Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C3l, TESTED PER ASTM CT8 Set # Beam # Test Date 1 ARI113001 ARI113002 ARI113003 ARI113004 1217/98 1217/98 12128/98 12128/98 2 ARI113005 ARI113006 ARI113007 ARI113008 1217/98 1217/98 12128/98 12128/98 Age (Days) 7 7 28 28 7 7 28 28 Max. Load (Ibs) 6840 7080 7980 8880 Average Average Depth, D Width, B , 6.05 6.00 5.90 6.00 6.15 6.25 6.15 6.25 (1) SPAN LENGTH OF 18INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING,lEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. Modulus of Rupture (psi) 570 590 665 740 Notes , . ." 1 TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction· Doug Teter REPORT DATE: 12107198 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-84 Town of Addison-James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS strength (psi): _....;6"'5:-=-0____ Slump (in.): 4 Air Content ("AI): --4-6.,-';;----Concrete Temp CF): PROJECT DATA Placement Date: 11/06198 Sampled By: E.E. Weather: Cloudy & cool SupplierlMix: Ed Bell FIELD DATASET #1 Ticket #: 13263 Time Batehed: 11:10 Slump (in.): 4.25 Air Content: 4.3 Cone. Temp. ('F): 62 Ambient Temp. ('F): Placement Location: East bound left tum lane station 6+-=0-=-0---Time Sampled: 11 :50 Unit Weight (pel): ---....:..:.=--Yardage (e.y.): ___---'1.;:.0____ Remarks: FIELD DATA SET #2 Ticket #: Time Batched: Time Sampled: Slump (in.): Air Content: ----Unit Weight (pel): ---------Conc. Temp. (oF): Ambient Temp. ("F):____ Yardage (c.y.): ________ Placement Location: __________________________________ Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM 031, TESTED PER ASTM C18 Test Date Age Max. Load Average Average Modulus of NotesSet # Beam # (Ibs)(Days) Depth,D Width, B Rupture (psi) 7 7500 5.95 6.10 625ARl110601 11113198 6.25'11/13/98 7 6960 5.95 580ARll10602 600 • • Does not meet specification28 7200 6.00 6.00AR1110603 12104/98 28 7980 665AR1110604 12104198 6.00 6.00 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USEO OURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: CI38, CI43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without -TERRA-MAR, INC. the written consent of TMI. Results a pply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CUENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 1213198 Huitt-Zollars, Inc. -Kenneth Roberts. P.E. TMI REPORT #: DC98-050-88 Town of Addison -James Pierce. P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): 􀀮􀀮􀀮􀀮􀀺􀀺􀀺􀀮􀁡􀀵􀀺􀀺􀀺􀀺􀀰􀁾􀁆􀀧􀀮􀀮􀀡􀁬􀁥􀀺􀁯􀀺􀁸􀀧􀀭􀀭___ Slump (in.): 4 Air Content (%): ---:4-'::a:-----Concrete Temp (oF) 95 PROJECT DATA Placement Date: 11125198 Sampled By: E.E. Weather: Clear & warm SupplierlMix: Ed Bell/Lattimore FIELD DATA SET #1 Ticket#: 62653 Time 􀁂􀁡􀁴􀁣􀁨􀁥􀁤􀀺􀁟􀁾􀀱􀀺􀁾􀀳􀀺􀀺􀀬􀀭􀀴__ Slump (In.): 3.25 Air Content: 􀁟􀁾􀀴􀁾􀀮􀀹􀀺􀀺􀀮􀀮􀀭􀁟􀀠Cone. Temp. (oF): 77 Ambient Temp. (oF): Placement Location: Quirum. South bound lane ----Time Sampled: 2:18 Unit Weight (pel): ----=.:..::..--Yardage (c.y.): ___--=2"'0____ Remarks: FIELD DATA SET #2 Ticket #: Time Batehed: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pel): --------Cone. Temp. (oF): Ambient Temp. (0F):---Yardage (c.y.): ________ Placement Locatlon: Remarks: Set # 8eam# CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C7R Test Date Age Max. Load Average Average (Days) (Ibs) Depth. D Width. B Modulus of Rupture (psi) Notes ARI112501 1 ARI112502 ARI112503 ARI112504 1212198 7 6540 6.10 6.15 1212198 7 6180 6.05 6.10. 12123198 28 12123198 28 545 515 No aggregate fracture (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, CI43, CI72, C231 Note: This report is for the exclusive use of the Client addressed, This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. ERRA-MAR,I C:' _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction· Doug Teter REPORT DATE: 11/19/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050·81 Town of Addison· James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS Strength (psi): __6===5::,:0'---____ Slump (in.): 3-5 Air Content (",.): --;5;--8;;----Concrete Temp ef): PROJECT DATA Placement Date: 10/16/98 Sampled By: M. Kashem Weather: Clear Supplier/Mix; Ed Bell FIELD DATA SET #1 Ticket #: 13124 Time Batched: 7:30 Time Sampled: 9:15 Slump (In.): 5.00 Air Content: 4.5 Unit Weight (pet): na Conc. Temp. ("f): 82 Ambient Temp, (of): 73 Yardage (c.y.): 9 Placement Location: Paving at westbound Arapaho Rd @right tum lane from Arapaho to tollway service road Remarks: FIELD DATA SET #2 TIcket #: Time Batched: _____ Time Sampled: Slump (In.): Air Content: Unit Weight (pct): ---------Conc. Temp. ef): Ambient Temp. ("f): ---Yardage (c,y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Set # Beam # Test Date Age (Days) Max. Load (lbs) Average Depth,O Average Width, B Modulus of Rupture (psi) Notes 1 ARI101601 ARI101602 ARI101603 ARl101604 10/23/98 11/13/98 11/13/98 DISCARD 7 28 28 7200 8220 7980 5.85 6.00 6.05 6.20 6.05 6.05 600 685 665 2 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE, (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES, (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dal/as, Texas 75229 Phone:972-488·8800 SOIL MOISTURE ·DENSITY TEST REPORT IN·PLACE TESTS BY NUCLEAR METHODS CUENT: Ed Bell Construction DISTRIBUTION: PROJECT: Arapaho Road Improvements REPORT DATE: 11/17198 TMI REPORT NO.: DC98·050-86 Ed Bell Construction· Doug Teter Huitt Zollar, Inc .• Kenneth Roberts, P .E. Town of Addison· James Pierce, P.E. Town of Addison • Dave Wilde, P.E. SPECIFICATIONS Percent Compaction: __...;9:.:5:,;+,.-__ Moisture Content (%): opt+ TEST DATA Date Tested:_:-:1;.-1;:,/,:.;17:.:,/::;98=_____ Technician: M. Kashem MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAl. DESCRIPTION OPTIMUM MOISTURIE (%) MAX. DRY DENSITY (pel) 8 ASTM 0698 Lime Treated Brown Clay with Gravel 36.6 80.6 IN-PLACE TEST RESULTS DENSITY AND MeISTURIE TESTS ARE PER ASTM D2922, 03017, RESPECTIVELY TEST NO. ELEVATION OR LIFT LOCATION REF. CURVE % MOISTURE DRY DENSITY % DENSITY 1 2 Grade Grade Quorum Road, southbound, sta 3+00 Quorum Road, southbound, sta 5+25 8 8 36.7 38.7 85.9 83.6 100.6 103.7 GAUGE 1.0.: 10746 STD. DENSITY COUNT. 2591 STD. MOISTURE COUNT. _--=5;,:;02=-_ "R" AFTER TEST NUMBER INDICATES RETEST. • INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS REMARKS: __________________________________________ Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. __________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 11/17/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-84 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS strength (psi); 􀀮􀀮􀀮􀀮􀀺􀀺􀀺􀀶􀀺􀀺􀀺􀀵􀀰􀀺􀀺􀀮􀀮􀀬􀁆􀀻􀀮􀀮􀀻􀁉􀀺􀀻􀀻􀀺􀀻􀁥􀁸􀁾___ Slump Qn.): 4 Air Content ("10); 􀀭􀀭􀀴􀀭􀀶􀁾􀀭􀀭􀀭􀀭Concrete Temp (oF): PROJECT DATA Placement Date: 11/6/98 Sampled By: E.E. Weather: Cloudy & cool Supplier/Mix: Ed Bell FIELD DATA SET #1 Ticket#: Slump (in.): 13263 4.25 Time Batched: Air Content: 11:10 4.3 Time Sampled: 11:50 Unit Weight (pet): ---...:...:.=---Conc. Temp. (oF): 62 Ambient Temp. (oF): Yardage Yardage (c.y.): ___--:.1.=.O____ Placement Location: East bound left tum lane station 6+-=-00=----Remarks: FIELD DATA SET #2 Ticket #: Time Betched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pct): ---------Conc. Temp. ("F): Ambient Temp. ("F):----Yardage (c.y.): _________ Placement Location: Remarks: Set # Beam # CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTEO PER ASTM 07B Test Date Age Max. Load Average Average Modulus of (Days) (lbs) Depth,O Width, B Rupture (psi) Notes 1 ARI110601 ARI110602 ARI110603 ARI110604 11/13/98 11/13/98 1214198 1214198 7 7 28 28 7500 6960 5.95 5.95 6.10 6.25 625 580 (1) SPAN LENGTH OF 1BINCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPUCABLE ASTM STANDARDS: Cl38, Cl43, C172, C231 -'" Note: This report is for the exclusive use of the Client addressed. 􀁾􀁾􀀭􀀮􀀻􀀺􀁾􀀠"'" This report may not be reproduced except in ils entirety, 􀁗􀁩􀁴􀁨􀁏􀁵􀁴􀁾􀁅􀁒􀁁􀀭􀁍􀁁􀁒􀀻􀁗􀁴􀀺􀀺􀀠the written consent of TMI. Results aDPly only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 11/17/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC 98-050-82 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde FIELD DATA SET #3 Ticket#: 1163114 Time Batched: 10:45 Time Sampled: 11 :25 Slump (in.): 5.00 Air Content: 5.7 Unit Weight (pct): ---....:...:n':"a=----Conc. Temp. (oF): 73 Ambient Temp. (oF): 67 Yardage (c.y.): ___--'1..:.0.=.0____ Placement Location: Off Quorum driveway Remarks: FIELD DATA SET #4 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pct): ------------Conc. Temp. ("F): Ambient Temp. ("F): _____ Yardage (c.y.): _________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C7B Age Max. Load Average Modulus of NotesSet # Beam # Test Date Average (Days) (Ibs) Depth, D Rupture (psi) Width, B 6240 6.00 6.10 520ARI101909 10/26/98 7 10/26/98 6240 5.90 6.10 5203 ARI101910 7 .... .... Does not meet specification 28 7620 5.85 635ARI101911 11/16/98 6.20 28 7800 5.90 6.20 650ARI101912 11/16/98 4 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply_only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 11/17/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-82 Town of Addison -.James Pierce, p .E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): 􀁟􀀭􀀬􀀶􀀺􀀻􀀺􀀵􀁾􀀰􀀬􀀭􀀭􀀭____ Slump (in.): _----=3-....::5=-____ Air Content (%): _---"5-...::8=-____ Concrete Temp (oF): PROJECT DATA Placement Date: 10/19/98 Sampled By: J. Perez Weather: Cloudy Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 7060213 Time Batched: 􀁟􀀭􀀭􀀭􀀺􀀻􀀸􀀺􀀻􀀺􀀺􀀰􀁾􀀹􀀭􀀭Time Sampled: 9:20 Unit Weight (pct): ------"n::=a"'---Slump (in.): na Air Content: _--=5",.7=-_ Conc. Temp. (OF): 70 Ambient Temp. (oF): _--=6::8=-_ Yardage (c.c.y.): ___--=1..::0.::.0____ Placement Location: East side of Arapaho Rd Remarks: FIELD DATA SET #2 Ticket #: 7060234 Time Batched: 11 :00 Time Sampled: ____1;..:2:.:.:4.:..:5=-___ Slump (in.): na Air Content: 5.7 Unit Weight (pct): ___......,n'=a:,-___ Conc. Temp. (OF): 70 Ambient Temp. ("F): 68 Yardage (c.y.): ___--=1..::;0.::.0____ Placement Location: West side of Arapaho Rd Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C7a Set # Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 1 ARI101901 ARI101902 ARI101903 ARI101904 10126/98 10126/98 11/16/98 11/16/98 7 7 28 28 9540 8640 9840 8640 6.00 6.00 6.00 6.05 6.20 6.20 6.05 6.10 795 720 820 720 2 ARI101905 ARI101906 ARI101907 ARI101908 10126/98 10126/98 11/16/98 11/16/98 7 7 28 28 9840 8400 10620 10860 6.00 5.85 5.90 6.00 6.00 6.20 6.35 6.35 820 700 885 905 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C13B, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without ERRA-MAR, INC, the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL, ENVIRONh-d,NTAL, AND CONSTRUCTION MA Tht.u£NTAL, AND CONSTRUCTION MATI!.KlALS TESTING Dallas Fort Worth HOU$I;on Lubbock Longview Austin 11050 Ables Lone, Dallas, Texas 75229 Phone: 972488-8800 Fax: 972·488-8080 DAlLY ACTIVITY OBSERVA nON REPORT CLIENT: Ed Bell Construction DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter PROJECT NO.: DC98"()50·85 Huitt Zollars, Inc. -Kenneth Roberts, P.E. REPORT DATE: Ilfl6/98 Town of Addison -James Pierce, P .E. Town of Addison -Dave Wilde On 11l13/98, TM1 representative Mohammed Kashem was present at the above referenced project to perform in·place density and field gradations. Upon arrival, TM1 was notified by.the contractor that the tests were cancelled for the day due to inclement weather conditions. .. 􀁾􀁲􀁾􀀮􀀬􀀮􀁲 Terra-M ,Inc. Note: This report is for the exclusive use ofthe Client addressed. This report may not be reprodllCed· except in its entirety, without the written consent of"IMI. Results apply only to 􀁡􀁢􀁯􀁾􀀢􀀢􀁴􀁥􀁳􀁴􀁳􀁾􀁾􀀮􀁾􀁾􀀭􀀭􀀭􀀭􀁣􀁾􀁾􀁾􀁾􀁟􀁾􀁾􀁾____--' • INC. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW LUBBOCK 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: (972)488-8080 STABILIZED SOIL GRADATION REPORT CLIENT: Ed Bell Construction DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 11/16198 Huitt-Zollars. Inc. -Kenneth RQberts, P.E, TMI REPORT #: DC98-050-87 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde Test Method: Technician: M. Kashem Minimum % Passing 1 3/4" Sieve: ___1.:.;O:;.:O'--__ Date Tested: 11/16198 Minimum % Passing No.4 Sieve: 60 Stabilizing Agent __..:L:::;.im:..::e=--_________ southbound at station 5+25 100 66.71 Road southbound at station 5+25 100 71.6 ,Remarks: Note: This report Is for Ine exclusive use of the Client addressed. this report may not be reproduced except In Its entirety. wilhout the written consent of 1M!. Results apply only to abov.lests. l'ER __________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/25198 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-80 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): 􀁟􀀭􀀺􀀶􀀢􀀬􀀵􀁾􀀰____ Slump (in.): _....:3=--5==--____ Air Content (%): _--"-5-"'8_____ Concrete Temp (OF): PROJECT DATA Placement Date: 10/14198 Sampled By: J. Perez & B. Eberts Weather: Sunny & warm Supplier/Mix: TXI FIELD DATASET#1 Ticket #: 1159413 Time Batched: __1:..;1c:.:1;.;1,--_ Time Sampled: ____1.:.:2:::.:4.:.;0'---___ Slump (in.): 5.50 Air Content: _---;;4"'.1;.-_ Conc. Temp. (oF): 88 Ambient Temp. (oF): 88 Placement Location: Driveway exit off Arapaho Road ---'=-=---Unit Weight (pef): -----::c:::----Yardage (c.y.): ___--=2:;:0____ Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pef): ---------Conc. Temp. (oF): Ambient Temp. ("F): ---Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM cn AgeSet # Beam # Test Date Max. Load Average Average Modulus of Notes (Days) (Ibs) RUPture (psi)Depth, D Width. B 7 6540 5.65 545 1 10/21/98 6.20ARI101401 7 6480 5.90 540 AR1101403 10/21/98 6.25ARI101402 780028 6.00 650 ARI101404 11/11198 6.00 67528 8100 6.00 6.0011/11/98 2 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVe. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed, This report may nol be reproduced except in its entirety. without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488·8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/30/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-82 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): __􀀶􀁾􀀵􀁾􀀰􀀬􀀭􀀭____ Slump (in.): 􀁟􀀭􀀽􀀭􀀳􀀭􀁾􀀵_____ Air Content (%): _-=-5-..::8_____ Concrete Temp (oF): PROJECT DATA Placement Date: 10/19/98 Sampled By: J. Perez Weather: Cloudy Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: Slump (in.): Conc. Temp. (oF): 7060213 na 70 Time Batched: _....:8:;:;:0::;:9:......_ Air Content: 5.7 Ambient Temp. (oF): -""';6=-8-Time Sampled: 9:20 Unit Weight (pel): -----=,n==a=---Yardage (c.y.): ___.....:.;10:.:0'--___ Placement Location: East side of Arapaho Rd Remarks: FIELD DATA SET #2 Ticket #: 7060234 Time Batched: 11 :00 Time Sampled: ____1:..:2:.:.:4.:.:5=---___ Slump (in.): na Air Content: 5.7 Unit Weight (pcl): ___----.;n;a:-___ Conc. Temp. (oF): 70 Ambient Temp. (OF): 68 Yardage (c.y.): ___.....:.;10:.:0'--___ Placement Location: West side of Arapaho Rd Remarks: Set# Beam # Test Date CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Age Max. Load Average Average (Days) (Ibs) Depth, D Width, B Modulus of Rupture (psi) Notes 1 ARI101901 ARI101902 ARI101903 ARI101904 10/26/98 10/26/98 11/16/98 11/16/98 7 7 28 28 9540 8640 6.00 6.00 6.00 6.00 795 720 2 ARI101905 ARI101906 ARi101907 ARI101908 10/26/98 10/26/98 11/16/98 11/16/98 7 7 28 28 9840 8400 6.00 6.00 6.00 6.00 820 700 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. __________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/30/98 Huitt-Zollars, Inc. -Kenneth Roberts, P .E. TMI REPORT #: DC98-050-82 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS FIELD DATA SET #3 PROJECT DATA Ticket#: 1163114 Time Batched: 10:45 Time Sampled: 11:25 Slump (in.): 5.00 Air Content: 5.7 Unit Weight (pct): na Conc. Temp. ("F): 73 Ambient Temp. (oF): 67 Yardage (c.y.): 100 Placement Location: Off Quorum driveway Remarks: FIELD DATA SET #4 Ticket #: Time Batched: _____ Time Sampled: _________ Slump (in.): Air Content: Unit Weight (pct): _________ Conc. Temp. ("F): Ambient Temp. ("F): ----Yardage (c.y.): _________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Set # Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 3 ARI101909 ARI101910 ARI101911 ARI101912 10/26/98 10/26/98 11/16/98 11/16/98 7 7 28 28 6240 6240 6.00 6.00 6.00 6.00 520 520 4 (1) SPAN LENGTH OF 16 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C136, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/25/98 Huitt-Zollars, Inc .• Kenneth Roberts, P .E. TMI REPORT #: DC98-05D-74 Town of Addison -James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS Sirength (psi): 650 Slump (In.): --;;3:0:+7.:'-1/---Air Content ('Yo): _...:5:...-...:8::.-____ Concrete Temp (oF) na PROJECT DATA Placement Date: 9/21/98 Sampled By: John Sullivan Weather: Clear Supplier/Mix: Ed Bell FIELD DATASET #1 , Ticket #: Slump (in.): 14212 2.50 Time Batched: Air Content: na 5.1 Time Sampled: 10:30 Unit Weight (pct): -----=-:n:.::a::.::...---Conc. Temp. (oF): 85 Ambient Temp. (oF): na Yardage (c.y.): ___􀁾􀁮􀁾􀁡􀀽􀀭􀀭___ Placement Location: Station 45+50, north side of paving at Arapaho Remarks: FIELD DATA SET #2 Ticket #: Slump (in.): 7058711 2.00 TIme Batched: Air Content: na 5.0 Time Sampled: 1:45 Una Weight 􀀨􀁰􀁣􀁴􀀩􀀺􀀭􀀭􀀭􀁾􀁮􀀺􀀭􀀺􀁡􀀢􀀭􀀭􀀭􀀭􀀭Conc. Temp. (oF): 87 Ambient Temp. ('F): 98 Yardage (c.y.): ___--'n:.;:a'--___ Placement Location: Station 30+07.33, left tum lane, south side Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM c7a NotesTest Date Age Max. Load Average Average Modulus of Sel# Beam # (Days) (Ibs) Rupture (psi)Depth, D Width, B 9/28/98 5760 6.00 6.00 480ARI092101 7 67209/28/98 7 6.00 6.00 5601 ARI092102 786010119198 28 5.90 6.30 655ARI092103 9300 6.15 775ARI092104 10/19/98 28 6.00 , 9/28198 7800 6.00 6.00 650ARI092105 7 9128198 8160ARI092106 7 6.00 6.00 6802 10/19/98 28 9540 6.00 6.10 795ARI092107 10119198 28 9300 775ARI092108 6.00 6.00 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the wrHten consent of TMI. Results apply only to above tests, TeRRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/23/98 Huitt-Zollars, Inc .• Kenneth Roberts, P.E. TMI REPORT #: DC98-050-77 Town of Addison -James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS Strength (pSi): _-:6:,:::5;::,0,..--___ Slump (in.): 3+1-1 Air Content ('\'oj: 􀀭􀀮􀀮􀀺􀀺􀀻􀀵􀀻􀀮􀀻􀀮􀀭􀁾􀀸􀁾􀀭􀀭􀀭Concrete Temp eF): PROJECT DATA Placement Date: 9/24198 Sampled By: John Sullivan Weather: Clear & wamn Supplier/Mix: Lattimore FIELD DATA SET #1 TIcket #: Slump (in.): 6080933 2.50 Time Batched: _--:;:-;-__ Air Content: 5.1 TIme Sampled: 11 :00 Unit Weight (pcf): ---..:..:.=--Cone. Temp. eF): 82 Ambient Temp. eF): 87 Yardage (c.y.): ________ Placement Location: Station 6+00 South paving Arapaho Rd. Remarks: FIELD DATA SET #2 TIcket #: Slump Qn.): 13064 3.00 Time Batched: _--:;:-;-__ Air Content: 5.1 Time Sampled: 3:45 Unit Weight (pef): ___....:::;C=___ Cone. Temp. eF): 85 Ambient Temp. eF): ""'-""-':';"-;:__. Yardage (c.y.): ________ Placement Location: Westside of Southwestern Bell next to building, Arapaho exit. Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOI.DI;D AND CURED PER ASTM C31, TESTED PER ASTM C78 Set # AgeBeam # Test Date Max. Load Average Average Modulus of Notes (Days) (Ibs) Depth,D Rupture (psi) Width, B ARI092401 10/1/98 7 8340 6.00 6.00 695 1 10/1/98 7 7920 5.95 660 ARI092403 ARI092402 6.10 858010/22198 28 5.95 6.10 715 ARl092404 10/22198 28 8820 6.00 7356.00 ARI092405 10/1/98 7 7440 6.00 620 ARI092406 2 6.05 10/1/98 7680 6.007 6.10 640 ARI092407 10/22198 28 9420 6.00 785 ARI092408 6.15 10122198 28 8940 5.85 6.10 745 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TI;STING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl38, Cl43, C172, C231 Nole: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in ila entirety, without the written consent of TMI. Results apply only to above tests. __________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/25/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-80 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): 􀁟􀀭􀀮􀀬􀀻􀀶􀀺􀀺􀀺􀀵􀁾􀀰􀀺􀀮􀀮􀀮􀀮􀀭____ Slump (in.): 􀁟􀁾􀀳􀀭􀁾􀀵_____ Air Content (%): _--".5-"'8_____ Concrete Temp ("F): PROJECT DATA Placement Date: 10/14/98 Sampled By: J. Perez & B. Eberts Weather: Sunny & warm Supplier/Mix: TXI FIELD DATA SET #1 Ticket#: 1159413 Time Batched: 11:11 Time Sampled: 12:40---=-;.:..:....:...Unit Weight (pcf): -----'-'::...:..:'----Slump (in.): 5.50 Air Content: 􀁟􀀭􀀭􀀭􀀺􀀴􀁾􀀮􀀱􀀺􀀭􀀭 Conc. Temp. (oF): 88 Ambient Temp. ("F): 88 Yardage (c.y .): ___---=2::.:0'--___ Placement Location: Driveway exit off Arapaho Road ----'=--Remarlls: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: _________ Slump (in.): Air Content: Unit Weight (pcf): _________ Conc. Temp. ("F): Ambient Temp. (oF): ---Yardage (c.y.): _________ Placement Location: Remarks: Set# Beam # CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C7a Test Date Age Max. Load Average Average (Days) (Ibs) Depth, D Width, B Modulus of Rupture (!lsi) Notes 1 ARI101401 ARI101402 ARI101403 ARI101404 10/21/98 10/21/98 11/11/98 11/11/98 7 7 28 28 6540 6480 5.65 5.90 6.20 6.25 545 540 2 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/25/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98·050·76 Town of Addison· James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICAnONS Strength (psi): _-::6::;:5:;;0:,..-____ Slump (in.): 3+1-1 Air Content (%): -..::5;..:..'"'8=----Concrete Temp (oF): PROJECT DATA Placement Date: 9/23198 Sampled By: John Sullivan Weather: Clear SupplierlMix: Lattimore FIELD DATA SET #1 Ticket #: 6080783 Time Batched: _-::--::-_ Time Sampled: 8:45 Slump (in.): 3.00 Air Content: 5.5 Unit Weight (pef): ----=.:.:..::..---Conc. Temp. ('F): 80 Ambient Temp. (oF): 80 Yardage (c.y.): ________ Placement Location: South end of Arapaho, west of Tollway, station 66+50 Remarks: FIELD DATA SET #2 Ticket #: 13024 Time Batched: ---::-0---Time Sampled: 12:00 Unit Weight (pel): ---.!!::::::.:::..--Slump (in.): 2.50 Air Content: 5.4 Conc. Temp. (oF): 84 Ambient Temp. (oF): 88 Yardage (c.y.): ________ Placement Location: South end of Arapaho, west of Tollway, station 64+50 Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTEO PER ASTM C78 Set # Beam # Test Date 1 2 ARI092301 ARI092302 ARI092303 ARI092304 ARI092305 AR1092306 ARI092307 ARI092308 9/30/98 9/30/98 10/21/98 10/21/98 9130/98 9/30/98 10/21198 10121/98 Age (Days) 7 7 28 28 7 7 28 28 Max. Load (lbs) Average Depth, D Average Width, B 9480 8760 10500 10200 6.00 6.00 6.00 5.95 6.00 6.00 6.25 6.25 8820 7500 10680 9540 6.00 6.00 5.95 5.90 6.00 6.00 6.15 6.10 '(1) SPAN LENGTH OF 18 INCHES. UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES• (4) FIELD FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, CI43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. Modulus of Ru plure (psi) Notes 790 730 875 850 735 625 890 795 :." ; ." .Ji, 􀀺􀁴􀀺􀁦􀁾􀀠 -lJfRRA-MAR. INC. __________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10125/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-76 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde FIELD DATA SET #3 Ticket #: na Time Batched: 􀁟􀀭􀀭􀀺􀁮􀁾􀁡􀀺􀀭􀁟􀀠Time Sampled: 4:40 Slump (in.): 2.50 Air Content: 5.0 Unit Weight (pct): ------'n'-'a"'----Conc. Temp. ("F): na Ambient Temp. ("F):---:9::;0;:"-Yardage (c.y.): ___􀀭􀀭􀀭􀀢􀁮􀁾􀁡􀀽􀁟􀁟􀁟___ Placement Location: South end of Arapaho, station 6+00 Remarks: FIELD DATA SET #4 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pct): ---------Conc. Temp. (OF): Ambient Temp. (oF): ----Yardage (c.y.): _________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C7a Set # Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 3 ARI092309 ARI092310 ARI092311 ARI092312 9/30/98 9/30/98 10/21/98 10/21/98 7 7 28 28 8580 7440 9300 9360 6.00 6.00 6.00 6.10 6.00 6.00 6.10 6.15 715 620 775 780 (1) SPAN LENGTH OF 1SINCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. :;.-.L": . (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C13S, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. ERRA-MAR, Nc. __________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/27/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-78 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): _-::6:,:5,:,0,--___ Slump (in.): _..:3:-+:..../-:-1____ Air Content (%): _..:5:..,-:....8=--____ Concrete Temp ("F) na PROJECT DATA Placement Date: 09/25/98 Sampled By: John Sullivan Weather: Clear Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 13073 Time Batched: na Time Sampled: 11 :00 Unit Weight (pcl): ----'-n:..:.a.:..::...--Slump (in.): 2.50 Air Content: 5.0 Conc. Temp. ("F): 81 Ambient Temp. ("F): 90 Yardage (c.y.): ____n:.::a=--___ Placement Location: Arapaho Road exit next to SWB building Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pcl): ---------Conc. Temp. ("F): Ambient Temp. ("F): ----Yardage (c.y.): _________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C3l, TESTED PER ASTM C78 Set# Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 1 ARI092501 ARI092502 ARI092503 ARI092504 10/02/98 10/02198 10/23/98 10/23/98 7 7 28 28 7440 7560 9600 9060 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 620 630 800 755 2 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES . (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. . 4 􀀺􀁥􀀮􀁾􀁥􀁾This report may not be reproduced except in its entirety, without RRA-MAR, IN . the written consent of TMI. Results apply only to above tests. __________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction· Doug Teter REPORT DATE: 10/25/98 Huitt-Zollars, Inc .• Kenneth Roberts, P.E. TMI REPORT #: DC98·050·81 Town of Addison· James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): Slump (in.): __675::,:0=--____ 3-5 Placement Date: Sampled By: 10/16/98 M. Kashem Air Content (%): -...;5--=8;----Weather: Clear Concrete Temp ("F): Supplier/Mix: Ed Bell FIELD DATA SET #1 Ticket #: 13124 Time Batched: 7:30 Time Sampled: Slump (in.): 5.00 Air Content: 4.5 Unit Weight (pct): Conc. Temp. ("F): 82 Ambient Temp. ("F): 73 Yardage (c.y.): Placement Location: Paving at westbound Arapaho Rd @right tum lane from Arapaho to tollway service road Remarks: 9:15 na 9 FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pct): ---------Conc. Temp. ("F): Ambient Temp. ("F): ----Yardage (c.y.): _________ Placement Location: Remarks: Set # Beam # Test Date CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C7B Age Max. Load Average Average (Days) (Ibs) Depth, D Width, B Modulus of Rupture (psi) Notes 1 ARI101601 ARI101602 ARI101603 ARI101604 10/23/98 11/13/98 11/13/98 7 28 28 hold 7200 6.00 6.00 600 2 (1) SPAN LENGTH OF 18INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488·8800 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS ·Revised Copy -Report No CLIENT: Ed Bell Construction PROJECT: Arapaho Road Improvements REPORT DATE: 09/10/98 TMI REPORT NO.: DC98-050-SS* DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt Zollar, Inc. -Kenneth Roberts, P.E. Town of Addison -James Pierce, P .E. Town of Addison -Dave Wilde, P .E. SPECIFICATIONS Percent Compaction: Moisture Content (%): 95+ opt+ Date Tested: Technician: TEST DATA 09/03/98 M. Kashem MATERIAL REFERENCE CURVE DATA OPTIMUM MAX. DRY NO. TESTCURVE MATERIAL DESCRIPTION MOISTURE (%) DENSITY (pel)METHOD 25.7 93.6Lime Treated Brown Clay with Gravel 5 0698 IN-PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017, RESPECTIVELY TEST DRYELEVATION REF. % % NO. LOCATION MOISTURE DENSITY DENSITYCURVEOR LIFT 92.6 98.9East bound Arapaho Rd. station 60+75 5 27.7Grade1 97.329.0 91.1Grade East bound Arapaho Rd. station 62+25 52 East bound Arapaho Rd. station 64+00 27.8 90.0 96.2Grade 53 90.9 97.1Grade East bound Arapaho Rd. station 65+50 5 26.54 GAUGE 1.0.: 10903 STD. DENSITY COUNT: 2356 STD. MOISTURE COUNT:_......:6:::0::.::8:. ....._ "R'O AFTER TEST NUMBER INDICATES RETEST. "INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS REMARKS: ______________________________________ Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without 4<:c -Zw. ruthe written consent of TMI. Results apply only to above tests. TERRA.MAR, INC. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/21/98 'Huitt·Zollars, Inc .• Kenneth Roberts, P .E. TMI REPORT #: DC98·050·79 " Town of Addison -James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS Strength (psi): _-:6::.;5;,;:0.,.-____ Slump (in.): 3+1·1 Air Content (%): -'"'5"" • .:..8;;----Concrete Temp (oF) na PROJECT DATA Placement Date: 10/13/98 Sampled By: Brent Gilbert Weather: Sunny Supplier/Mix: Ed Bell FIELD DATASET #1 Ticket #: Slump (in.): na 3.00 Time Batched: Air Content: na 5.0 Time Sampled: 10:50 Unit Weight (pcf): ---"':'::n:::a:'::"--Cone. Temp. ("F): 89 Ambient Temp. ("F): 78 Yardage (c.y.): ___--=6.:::.0____ Placement Location: Centerline paving at Arapaho, 100 yds east of Quorum Remarks: FIELD DATA SET #2 Tlcket#: TIme Batched: Time Sampled: Slump (in.): Air Content: ----Unit Weight (pcf): ---------Conc. Temp. (oF): Ambient Temp. ('F): ____ Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Set# Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 1 ARll01301 ARll01302 ARll01303 ARll01304 10/20/98 10/20/98 11/10/98 11/10/98 7 7 28 28 9240 8400 6.00 6.00 6.00 6.00 770 700 2 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143. C172. C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reprcduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/21198 Huitt·Zoliars, Inc .• Kenneth Roberts, P.E. TMI REPORT #: DC9!l·050·75 Town of Addison· James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): 650 Slump (in.): 􀀭􀀭􀀻􀀺􀀳􀀺􀀺􀀺􀀧􀀫􀀱􀀺􀀻􀀺􀀧􀀭􀀱􀁾􀀭􀀭􀀭Air Content (%): _....:5:,.·....:8:....-____ Concrete Temp CF) na PROJECT DATA Placement Date: 09122198 Sampled By: John Sullivan Weather: Clear Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 705877 Time Batched: 09:00 Time Sampled: 10:00 Slump (in.): 3.50 Air Content: 5.0 Unit Weight (pct): ----'-'n:.:.a::.::..---Conc. Temp. ('F): 81 Ambient Temp. ('F): 90 Yardage (c.y.): ___....:..n"'a____ Placement Location: Main paving east side of Quorum Rd, station 3+50 Remarks: FIELD DATA SET #2 Ticket #: Slump (in.): 7058818 Time Batched: Air Content: na 5.0 Time Sampled: 4:20 Unit Weight (pct}:----'::n=a=-----Conc. Temp. (oF): 88 Ambient Temp. CF): 99 Yardage (c.y.): ___....:..n:;:a____ Placement Location: Main paving east side of Quorum Rd Remarks: Set # Beam # CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Test Date Age Max. Load Average Average (Days) (Ibs) Depth, D Width, B Modulus of Rupture (psi) Notes 1 2 ARI092201 ARI092202 ARI092203 ARI092204 ARI092205 ARI092206 AR1092207 AR1092208 09129/98 09129198 10/20/98 10/20/98 09/29/96 09129/98 10/20/98 10120/96 7 7 28 28 7 7 28 28 7440 8040 10380 10620 7980 7800 9420 9000 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 620 670 865 885 665 650 785 750 (1) SPAN LENGTH OF 18 INCHES. UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING. LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPliCABLE ASTM STANDARDS: Cl38. Cl43, Cl72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety. without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10115198 􀁾Huitt-Zollars, Inc. -Kenneth Roberts, P .E. TMI REPORT #: DC98-050-71 Town of Addison -James Pierce, P .E. Town of Addison· Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _....,6"'50:;0:-____ Placement Date: 09/08198 Slump (in.): _...:3;..--...:5:-____ Sampled By: John Sullivan Air Content (%): 􀁟􀀮􀀮􀀮􀀡􀀵􀀺􀀮􀀮􀀮􀀮􀀭􀀮􀀮􀀮􀀡􀀸􀁾____ Weather: Clear Concrete Temp ("F) na Supplier/Mix: Ed Bell/Lattimore FIELD DATA SET #1 Ticket #: 14360 Time Batched: _.....:n",a::-_ Slump (in.): 3.00 Air Content: 􀁟􀁾􀁮􀀻􀁡􀀺􀀺􀀭􀁟􀀠Cone. Temp. ('F): 91 Ambient Temp. ("F):_.....:;10",,4,--_ Time Sampled: 12:45 Unit Weight (pcf): ---"':':n":a:'::"--Yardage (c.y.): ___-=.;n=.a____ Placement Location: Paving at Arapaho Road Remarks: FIELD DATA SET #2 Ticket #: 6079754 Time Batched: 􀁟􀁾􀀺􀀺􀀺􀀺􀀻􀀭__ Slump (in.): 3.00 Air Content:_---o:::7 __ Cone. Temp. ("F): 91 Ambient Temp. ('F): Placement Location: Paving at Arapaho Road -.....:..:;..:.-Time Sampled: 1:20 Unit Weight (pel): ------':n"'a"'---Yardage (c.y.): ____n;.::a=-___ Remarks: Set # Beam # CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C18 Test Date Age Max. Load Average Average (Days) (Ibs) Depth, D Width, B Modulus of Rupture (psi) Notes ARI090B01 1 ARI090B02 ARI090B03 ARI090B04 09/15198 7 6960 6.05 6.20 09/15198 7 6720 6.00 6.05 10/06198 28 7980 5.95 6.10 10/06198 28 8460 6.05 6.15 580 560 665 705 ARI09QB05 2 ARI090806 ARI090807 ARI090808 09/15198 7 6180 6.00 6.15 09/15198 7 6000 6.00 6.10 10106198 2B 8640 10/06/98 28 9000 6.00 6.15 515 500 720 750 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIM"NS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOT"S. (4) FIELD T"STS ARE PER APPLICABLE ASTM STANDARDS: Cl38, Cl43, Cl72. C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without ERRA-MAR, IN. the written consent of TMI. Results apply only to above tests. __________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/15/98 Huitt-Zollars, inc. -Kenneth Roberts, P .E. TMI REPORT #: DC98-050-71 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS FIELD DATA SET #3 PROJECT DATA Ticket #: 6079798 Time Batched: 03:14 Time Sampled: 4:00 Slump (In.): 3.00 Air Content: 5.0 Unit Weight (pcf): na Conc. Temp. ("F): 92 AmbientTemp. ('F): 107 Yardage (c.y.): na Placement Location: Paving at Ara paho Road Remarks: FIELD DATA SET #4 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pcf): ---------Conc. Temp. ("F): Ambient Temp. ('F): ---Yardage (c.y.): ________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER PER ASTM C78 Set # Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 3 ARI090809 ARI090810 ARI090811 ARJ090812 09/15/98 09/15/98 10/06/98 10/06/98 7 7 28 28 7320 6840 10560 8580 6.00 6.10 6.00 6.00 6.15 6.25 6.20 6.20 610 570 880 715 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESUL TS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl38. Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in 􀁾􀁳􀀠entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972·488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction· Doug Teter REPORT DATE: 10109/98 Huitt-Zollars, Inc .• Kenneth Roberts, P.E. TMI REPORT #: DC98·050·72 Town of Addison -James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS Strength (psi): _-;;6::;;5:;0,--___ Slump On.): 3 -5 Air Content (%): 􀀭􀀭􀁩􀀵􀁾􀀮􀁾􀀸􀁾􀀭􀀭􀀭Concrete Temp IF) 95 PROJECT DATA Placement Date: 09/09198 Sampled By: John Sullivan Weather: Clear Supplier/Mix: Ed Bell/Lattimore FIELD DATA SET #1 Ticket #: 14379 Time Batched: _-;n",a::.-_ Time Sampled: 8:30 Slump (in.): 3.00 Air Content: _----::5"'.0;;-_ Unit Weight (pcl): -----="'na""----Conc. Temp. (OF): 85 Ambient Temp. ('F): 79 Yardage (c.y.): ___---!n::;a'--___ Placement Location: Paving at Arapaho Road south side----':..::--Remarks: FIELD DATA SET #2 Ticket #: 607900 Time 􀁂􀁡􀁴􀁣􀁨􀁥􀁤􀀺􀁟􀁾􀁮􀀻􀀬􀀺􀀺􀁡􀁾Time Sampled: 11:00 Slump (in.): 3.00 Air Content: _--=5:::, ..:..1__ Unit Weight (pel):----'-n:.:a=-=---Cone. Temp. (oF): 87 Ambient Temp. ('F); na Yardage (e.y.): ___--'-n::;a____ Placement Location: Paving at Arapaho Road south Side:----'=--Remarks: CONCRETE COMPRESSION TEST RESULTS 13EAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Set # Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (pSi) Notes 1 ARI090901 ARI090902 ARI090903 ARI090904 09/16198 09/16/98 10/07/98 10/07/98 7 7 28 28 8400 6840 9000 8640 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 700 570 750 720 2 ARI090905 ARI090906 ARI090907 ARI090908 09/16198 09/16198 10/07198 10/07198 7 7 28 28 6780 7560 8580 10800 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 565 630 715 900 (I) SPAN LENGTH OF 1 B INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING. LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLYWITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138. CI43. CI72, C231 Nole: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without TERRA-MAR.IN. the written consent of TMI. Results apply only to above tests. __________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING, CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10109198 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-72 Town of Addison· James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS FIELD DATA SET #3 PROJECT DATA Ticket #: 7058176 Time Batched: na Time Sampled: 12:45 Slump (in.): 3.00 Air Content: 5.0 Unit Weight (pcf): na Conc. Temp. ("F): 87 Ambient Temp. CF): na Yardage (c.y.): na Placement Location: Paving at Arapaho Road south side RemarkS: FIELD DATA SET #4 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content:_____ Unit Weight (pet): ---------Conc. Temp. ("F): Placement Loeation: Ambient Temp. CF):_____ Yardage (c.y.): _________ Remarks: Set # Beam # CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM e31, TESTED PER ASTM e78 Test Date Age Max. Load Average Average (Days) (lbs) Depth, D Width, B Modulus of Rupture (psi) Notes 3 ARI090909 ARI090910 ARI090911 ARI090912 09116198 09/16198 10107198 10/07198 7 7 28 28 9240 8280 9800 12060 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 770 690 800 1005 4 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, Cl72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. ERRA.MAR, iN. TERRA·MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORTWORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488·8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: PROJECT: Ed Bell Construction Arapaho Road Improvements REPORT DISTRIBUTION: Ed Bell Construction· Doug Teter REPORT DATE: TMI REPORT #: 09/17/98 DC98·050·72 \ HUm-zollars, Inc .• Kenneth Roberts, P.E. Town of Addison· James Pierce, P.E. Town of Addison· Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): _-:6;::5::;0:-____ Placement Date: 09/09198 Slump (in.): Air Content (%): 3 • 5 --;5:-.-;8;----Sampled By: Weather: John Sullivan Clear Concrete Temp ("F) 95 Supplier/Mix: Ed Beli/Lattimore FIELD DATA SET #1 Ticket #: Slump (in.): 14379 3.00 Time Balched: 􀁟􀀭􀀻􀁮􀁾􀁡􀀺􀀭􀁟􀀠Air Content: _-;;;5.;:i;'0__ Time Sampled: 8:30 Unil Weight (pcf): ----=n""a:::..--Cone. Temp. CF): 85 Ambienl Temp. (cF): _-.:.7=.9__ Yardage (c.y.): __-.....:.n:::a---Placement Location: Paving at Arapaho Road south side Remarks: FIELD DATA SET #2 Ticket #: Slump (in.): 607900 3.00 Time Balched: _-;n;:a;.-_ Air Content: 5.1 Time Sampled: Unit Weight (pcf): ----'-';.;;::.---Conc. Temp. ("F): 87 Ambient Temp. (cF):--"n:':'a'--Yardage (c.y.): ___.....:.n:::a____ Placement Location: Paving at Arapaho Road south side Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C7lI Age Average Average Modulus ofSet # Beam # Test Date Max. Load Notes (Days) (Ibs) Width, B Rupture (psi) Depth,D 6.00 6.00ARI090901 09/16/98 7 8400 700 ARI090902 09/16198 6840 6.00 6.00 5701 7 10/07198ARI090903 28 ARI090904 10/07198 28 6.00 565ARI090905 09/16/98 6780 6.007 6.00 6.00 6302 ARI090906 09/16/98 75607 ARI090907 10107198 28 ARI090908 10/07/98 28 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: CI38. CI43, Cl72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, Without the written consent of TMI. Results apply only to above tests. __________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 09/17198 Huitt-Zollars, Inc. -Kenneth Roberts, P .E. TMI REPORT #: DC98-050-72 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS FIELD DATA SET #3 PROJECT DATA Ticket #: 7058176 Time Batched: na Time Sampled: 12:45 Slump (in.): 3.00 Air Content: 5.0 Unit Weight (pcf): na Conc. Temp. (oF): 87 Ambient Temp. (oF): na Yardage (c.y.): na Placement Location: Paving at Arapaho Road south side Remarks: FIELD DATA SET #4 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pef): ---------Conc. Temp. ("F): Ambient Temp. ("F):----Yardage (c.y.): _________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Set # Max. Load Beam # Age Average Average Modulus of Notes (Days) Test Date (Ibs) Depth, D Rupture (psi) Width, B 9240ARI090909 09/16/98 7 6.00 6.00 770 3 8280ARI090910 09/16198 7 6.00 6.00 690 ARI090911 10/07198 28 ARI090912 10/07198 28 4 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the excluslve use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. ResultS aDDly only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 09/29/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-75 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): _-::6;:.;5"'0':-____ Slump (in.): 3+1-1 Air Content (%): --';5:-:-_:...,8:i----Concrete Temp (oF) na PROJECT DATA Placement Date: 09/22198 Sampled By: John Sullivan Weather: Clear Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: Slump (in.): 705877 3.50 Time Batched: Air Content: 09:00 5.0 Time Sampled: 10:00 Un it Weight (pcl): -----'-'n:.:.a::.::...---Conc. Temp. (oF): 81 Ambient Temp. (oF): 90 Yardage (c.y.): ___---'n"'a'---___ Placement Location: Main paving east side of Quorum Rd, station 3+50 Remarks: FIELD DATA SET #2 Ticket #: 7058818 Time Batched: na Time Sampled: 4:20 Slump (in.): Air Content: 5.0 Unit Weight (pcl): ------'cn==a'-=----Conc. Temp. (oF): 88 Ambient Temp. (oF): 99 Yardage (c.y.): ___---'n"'a'---___ Placement Location: Main paving east side of Quorum Rd Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31. TESTED PER ASTM C78 Set# Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 1 ARI092201 ARI092202 ARI092203 ARI092204 09/29/98 09/29/98 10/20/98 10/20/98 7 7 28 28 7440 8040 6.00 6.00 6.00 6.00 620 670 2 ARI092205 ARI092206 ARI092207 ARI092208 09/29/98 09/29/98 10/20/98 10/20/98 7 7 28 28 7980 7800 6.00 6.00 6.00 6.00 665 650 (1) SPAN LENGTH OF lSINCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl3B, Cl43, Cl72, C23l Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 09/29/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-74 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): _-::6::.;5::,:0':-____ Slump (in.): 3+1-1 Air Content (%): --':5:-:.-"'8::-----Concrete Temp ("F) na PROJECT DATA Placement Date: 09/21/98 Sampled By: John Sullivan Weather: Clear Supplier/Mix: Ed Bell FIELD DATA SET #1 Ticket #: Slump (in.): 14212 2.50 Time Batched: Air Content: na 5.1 Time Sampled: 10:30 Unit Weight (pct): -----'-'n:..:.a::..::...---Conc. Temp. ("F): 85 Ambient Temp. (oF): na Yardage (c.y.): ___---'n"'a=--___ Placement Location: Station 45+50, north side of paving at Arapaho Remarks: FIELD DATA SET #2 Ticket #: Slump (in.): 7058711 2.00 Time Batched: Air Content: na 5.0 Time Sampled: 1 :45 Unit Weight (pct): -------'n':..:a"'-----Conc. Temp. ("F): 87 Ambient Temp. ("F): 98 Yardage (c.y.): ___􀀭􀀭􀀭􀀮􀀺􀁮􀁾􀁡􀀽􀀭􀀭􀀭___ Placement Location: Station 30+07.33, left tum lane, south side Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Set # Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 1 ARI092101 ARI092102 ARI092103 ARI092104 09/28/98 09/28/98 10/19/98 10/19/98 7 7 28 28 5760 6720 6.00 6.00 6.00 6.00 480 560 2 ARI092105 ARI092106 ARI092107 ARI092108 09/28/98 09/28/98 10/19/98 10/19/98 7 7 28 28 7800 8160 6.00 6.00 6.00 6.00 650 680 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING. LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl3B. Cl43. Cl72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR,' INC. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-4BB-BBOO CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION; PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/8/98 Huitt-Zollars, Inc. -Kenneth Roberts, P .E. TMI REPORT #: DC98-0S0-77 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): 650 Slump (in.): -""3:0:'+7':----/_1Air Content ('Yo): _-'5'---'8'--____ Concrete Temp ("F): PROJECT DATA Placement Date: 9/24198 Sampled By: John Sullivan Weather: Clear & warm SupplierlMix: Lattimore FIELD DATA SET #1 TIcket #: 6080933 Time Batched: _--:::-.-__ Time Sampled: ____1.:..1:.;.:0:..;0'--___ Slump (in.): 2.50 Air Content: 5.1 Unit Weight (pcl): ________ Conc. Temp. CF): 82 Ambient Temp. ("F): 87 Yardage (c.y.): ________ Placement Location: Station 6+00 South paving Arapaho Rd. Remarks: FIELD DATA SET #2 Ticket#: 13064 Time Batched:_--:::-.-__ Time Sampled: Unit Weight (pel): ---..:::.:.;:.::..--Slump On.): 3.00 Air Content: 5.1 Cone. Temp. (OF): 85 Ambient Temp. ("F): Yardage (c.y.): ________ Placement Location: Westside of Southwestem Bell next-:-t"'o""b-u""ild"'i'-ng-,-A'rapaho exit. Remarks: Set # Beam # CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Test Date Age Max. Load Average Average (Days) (lbs) Depth, D Width, B Modulus of Rupture (pSi) Notes 1 AR1092401 ARI092402 ARI092403 ARI092404 10/1/98 1011198 10/22198 10/22198 7 7 28 28 8340 7920 6.00 5.95 6.00 6.10 695 660 2 ARI092405 AR1092406 ARI092407 ARI092408 10/1/98 10/1/98 10122198 10122198 7 7 28 28 7440 7680 6.00 6.00 6.05 6.10 620 640 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNUESS INDICA TED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, wHhout the written consent of TMI. Results apply only to above tests. __________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/8198 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-69 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS PROJECT DATA Strength (psi): Placement Date: 9/3/98 Slump (in.): Sampled By: John Sullivan Air Content (%): Weather: Clear Concrete Temp ("F) Supplier/Mix: Ed Bell FIELD DATASET#1 Ticket#: 14285 Time Betched: na Time Sampled: 12:30 Slump (in.): 3.00 Air Content: 5.0 Unit Weight (pcl): ---....:.:n"'"a=-=---Cone. Temp. ("F): 90 Ambient Temp. C"F): 98 Yardage (c.y.}: ___---'n:.::a::.-___ Placement Location: PaVing at Arapaho Road, station 50+20 Remarks: FIELD DATA SET #2 TIcket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight ((pel): ---------Conc. Temp, ("F): Ambient Temp. ("F): ----Yardage (c.y.): _________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM cal, TESTED PER ASTM C78 Set # Beam # Tes! Date Age (Days) Max, Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 1 ARI090305 ARI090306 ARI090307 ARI090308 9/10/98 9110/98 10/1/98 1011/98 7 7 28 28 7380 7740 9120 8580 6.05 6.00 6.00 6.00 6.25 6.25 6.25 6.10 615 645 760 715 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING, (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES, (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, CI43, CI72, C231 Note: This report is for the exclusive use of the Client addressed, 􀁾􀁙􀀢􀁫􀀮􀁰􀀬This report may not be reproduced except in its entirety, without RRA-MAR. INC. the written consent of TMI. Results apply only to above tests. __________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488·8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/8/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-67 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): _-;6:;::5:..:0;-____ Slump (in.): _-;3:--_5=-____ Air Content (%): _...:5"'-"'8=--____ Concrete Temp (oF) 95 PROJECT DATA Placement Date: 9/3/98 Sampled By: John Sullivan Weather: Clear Supplier/Mix: Ed Bell FIELD DATA SET #1 Ticket #: na Time Batched: _--;n",a;...-_ Slump (in.): 2.50 Air Content: 5.1 Conc. Temp. (oF): 89 Ambient Temp. (oF): -"""::9"'0:--Placement Location: Paving at Arapaho Road Time Sampled: 10:15 Unit Weight ((pct): -----"n""a'-=---Yardage (c.y.): ___---'n"'a:......___ Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: _________ Slump (in.): Air Content: Unit Weight (pct): _________ Conc. Temp. (OF): Ambient Temp. (OF): ----Yardage (c.y.): _________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C3l, TESTED PER ASTM C78 Set # Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 1 ARI090301 ARI090302 ARI090303 ARI090304 9/10/98 9/10/98 10/1/98 10/1/98 7 7 28 28 7140 6960 9120 8640 6.00 6.00 6.00 6.10 6.20 6.15 6.20 6.10 595 580 740 720 2 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING. LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138. Cl43. C172. C231 Note: This report is for the exclusive use of the Client addressed. This report may may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. ___________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 9/21/98 Huitt-Zollars, Inc. -Kenneth Roberts, P .E. TMI REPORT #: DC98-050-73 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): _.....::.65::.;0=---____ Slump (in.): Air Content (%): Concrete Temp ("F): PROJECT DATA Placement Date: 9/10/98 Sampled By: Bryan Glennon Weather: Cloudy Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: Slump (in.): Conc. Temp. (OF): 14406 2.00 85 Time Batched: Air Content: Ambient Temp. (oF): 08:20 3.0 70 Time Sampled: 9:00 Unit Weight (pct): -----=.:.:na:.::....--Yardage (c.y.): ____6"'3=---___ Placement Location: Paving at station F1.26, 10' westbound Remarks: FIELD DATA SET #2 Ticket #: Time Batched: Time Sampled: _________ Slump (in.): Air Content: ----Unit Weight (pct): _________ Conc. Temp. (OF): Ambient Temp. (0F):_____ Yardage (c.y.): _________ Placement Location: Remarks: Set# Beam # CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Test Date Age Max. Load Average Average (Days) (Ibs) Depth, D Width, B Modulus of Rupture (psi) Notes 1 ARI091001 ARI091 002 ARI091003 ARI091004 9/17/98 9/17/98 10/8/98 10/8/98 7 7 28 28 8700 6840 10080 10020 5.85 5.80 5.90 6.00 6.20 6.25 6.10 6.25 725 570 840 835 2 (1) SPAN LENGTH OF 18 INCHES. UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING. LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, Cl43, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. __________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/05/98 ljuitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-78 vTown of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): _-:6::.:5:,:0':-____ Slump (in.): _..::3;:.+:....,/-1;.-____ Air Content (%): _-=5'-:c--=8=--____ Concrete Temp (oF) na PROJECT DATA Placement Date: 09/25/98 Sampled By: John Sullivan Weather: Clear Supplier/Mix: Lattimore FIELD DATA SET #1 Ticket #: 13073 Time Batched: na Time Sampled: 11 :00 Unit Weight (pct): 􀀭􀀭􀀭􀁾􀁮􀀺􀀽􀀺􀁡􀁾􀀭􀀭Slump (in.): 2.50 Air Content: 5.0 Conc. Temp. ("F): 81 Ambient Temp. ("F): 90 Yardage (c.y.): ___---'n"'a=--___ Placement Location: Arapaho Road exit next to SWB building Remarks: FIELD DATA SET #2 2 Ticket #: Time Batched: _____ Time Sampled: Slump (in.): Air Content: Unit Weight (pct): ---------Conc. Temp. (oF): Ambient Temp. ("F): ----Yardage (c.y.): _________ Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Set# Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes 1 ARI092501 ARI092502 ARI092503 ARI092504 10/02198 10/02198 10/23/98 10/23/98 7 7 28 28 7440 7560 6.00 6.00 6.00 6.00 620 630 2 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. GEOTI£CHNlCAL ENVIRONMENTAL AND MATElUALS ENGINEERS DALlA.S FORT WORTlf HOUSTON AUSTIN LONGVIEW 1l0'OAhiesLn., Dallas, Teras 7'229 phane;(972)488-88(}1) fa:c:(972)488-8080 Report of Moisture-Density Relationship Client Ed Bell Construction Project Arapaho Road Improvements Report Distribution Ed Bell Construction -Doug Teter Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde TMI Project No. DC98-050 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI Report No. DC98-050-61 Report Dale 09103198 Material Origin: Sampled By: M. Kashem Sample Location: Eastbound Arapaho Road, station 62+00 Sample Date: 09102198 Material Description: Ume Treated Brown Clay Tested By: Jason Allen Material Use: Roadway .... ._-............ ,... "." " ...-.. 'T_ •••• __.,,'_ ._•••"., .... " ...." ..-._--."..." ''''"."r-'. ..... . ... .... 􀁾􀀠.................................... au 􀁾􀁾􀀠! .... '" ''''''"'T';'-􀁾􀁲􀀭􀀮􀀧􀀠.........􀁾􀀠.. .... .. f 􀂷􀁾􀂷􀂷􀂷•• 􀁾􀁾􀁾􀁉􀀭􀁦􀁩􀀺􀀧􀁾􀁾􀁾􀀿􀁾􀁾􀀿􀁾􀁾t:.·.. n.o 􀁾••􀀬􀀺􀀺􀁾:0:it it ••••••••.•••.... 􀀧􀁾􀂷􀁬􀁾􀀠􀁮􀁾􀁾􀁾􀁾􀁾􀁾􀁾􀀭􀀫􀁾􀁾􀁾􀀭􀀫􀁾􀁾􀁾􀀭􀀫􀁾􀁾􀁾􀁾􀀭􀀫􀁾􀀠• M 07.' .... .... Maximum Dry Density: 80.6 pet Uquid Umit: 48 39 9 Optimum Moisture Percent: 36.6 % Plastic Limit: Test Method(s): ASTM D698-A. D4318-B, D1140 Rammer Description: Mechanical Remarks: Plasticity Index: Preparation Procedure: Passing No. 200: USCS: Moist 43.8 % TERRA-MAR,INC. 4 :t: :/'.:J1:? PfAL CYLINDER SIZE 6"X 12". AREA 28.27 sq. in.. UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTURE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4)FlELD TESTS TESTS ARE PER APPLICABLE ASTM STANDARDS: C138. C143. CI72. C231 Note: This report is for the exclusive nse ofthe Client addressed. This report may not be reproduced except in its entirety, without the written consent ofTMI. Results apply only to above tests. TERRA-MAR, Inc. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 1l050Abies Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax: 972-488-8080 SPECIFICATIONS PROJECT DATA Strength (Psi): _-'4"':00"'0'--_____ Placement Date: 8/5/98 Slump (in.): _---'4'--_____ Sampled By: E.M. Air Content (%): 􀁟􀀭􀀭􀀭􀀻􀁮􀁡􀁾􀀭􀀭􀀭􀀭􀀭􀀭Weather: Cloudy & warm Concrete Temp eF): 95 SupplierlMix: Lattimore #42 FIELD DATA SET #1 Ticket #: Slump (in.): Conc. Temp. eF): Placement Location: 7056035 Time Batched: 01:34_---'-:..:.::..c__ 3.50 Air Content: na 94 Ambient Temp. eF):---;;9:::-1--Retaiuing wall -East end Time Sampled: ___-'2::.;;:2:::5'--___ Unit Weight (pcf): ___􀁾􀁮􀁡􀁾___ Yardage (c.y.): ___􀁾􀀱􀀮􀀺􀀺􀀮􀀰____ Remarks: FIELD DATA SET #2 Ticket #: Time Batched: _____ Time Sampled: _________ Slump (in.): Air Content: _____ Unit Weight (pcf): ________ Conc. Temp. (oF): Ambient Temp. eF): _____ Yardage (c.y.): ________ Placement Location: Remarks: Set # Cvlinder# CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Test Date Age (Days) Max. Load (lbs) Area (SQ. in.) Strength (psi) FC Notes 1 ARJ080501 ARJ080502 ARJ080503 ARJ080504 8/12/98 9/2/98 9/2/98 HOLD 7 28 28 115150 28.27 4070 U (I) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. m, UNLESS NOTED ABOVE. (2) TYPE "A" CONE FRACTIJRE UNLESS INDICATED OTHERWISE IN NOTES. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, CI72, C231 CLIENT: PROJECT: REPORT DATE: TMI REPORT #: CONCRETE INSPECTION AND COMPRESSION TEST REPORT Ed Bell Construction REPORT DISTRIBUTION: Arapaho Road Improvements Ed Bell Construction -Doug Teter 8/17/98 Huitt-Zollars, Inc. Kenneth Roberts, P.E. DC98-050-39 Town ofAddison -James Pierce, P.E. Town ofAddison -Dave Wilde Note: This report is for the exclusive use ofthe Client addressed. This report may not be reproduced except in its entirety, without the written consent ofTMI. Results apply only to above tests. TERRA-MAR, • ' TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUSSOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone;972-488-8800 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS CLIENT: E. L. Dallon & Company, Inc. DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 08/05/98 Huitt Zollars. Inc. -Kenneth Roberts. P .E. TMI REPORT NO.: DC98-050-37 Town of Addison -James Pierce. P.E. Town of Addison -Dave Wilde E.L. Dalton & Company -Mike Claxton SPECIFICATIONS TEST DATA Percent Compaction: 95% Date Tested: 08/03198 MoistureConlent(%): -1 to +3 Technician: E. Mulate MATERIAl REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE (%) MAX. DRY DENSrrY (pel) 1 0698 Dark & Gray Clay with Gravel 16.3 106.2 4 D698 Dark Brown and Light Brown Clay w/LSF 25.0 92.6 IN-PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM 02922, D3017. RESPECTIVELY TEST NO. ELEVATION OR LIFT LOCATION REF. CURVE % MOISTURE DRY DENSrrY % DENSITY 1 2 Grade Grade Backfill at Retaining Wall. al 90 degrees bend of vertical wall 25' Soulh of Bend 4 1 25.5 18.5 90.3 104.7 97.5 98.6 STD. DENSITY COUNT: 2644 STD. MOISTURE COUNT: __7:-1:..;:6,--_GAUGE 1.0.: :=:-:::-=5:.:42::-:9==c: "R" AFTER TEST NUMBER INDICATES RETEST• • INDICATES FAILURE TO COMPLY WITH PROJECT sPECIFICATIONS REMARKS: ________________________________________________________________________ Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results a I onl to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 PhOne:972-488-8800 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS CLIENT: E. L. Dalton & Company, Inc. DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 08/05/98 Huitt Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT NO.: DC98-050-38 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde E.L. Dalton & Company -Mike Claxton SPECIFICATIONS TEST DATA Percent compactlon: 95+ Date Tested: -::-'="0;,:81"'0:...;4:..;/9;.,;;8______ MoistureContent(%): op++ Toch.nielan: M. Kasheem MATERIAL REFERENCE CURVE DATA OPTIMUM MAX. DRY 􀁣􀁵􀁾NO. MATERIAL DESCRIPTION MOISTURE (II) DENSITY (pcl) 2 D698 Light Gray Clay w/LSF 20.7 102.8 IN-PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM 02922, 03017, RESPECTIVELY TEST ELEVATION REF. II DRY II NO. OR LIFT LOCATION CURVE MOISTURE DENSITY DENSITY 1 Grade 39" Storm Sewer, Line C-3 et SIn. 13+ 2 21.7 99.7 97.0 2 Grade 39" Storm Sewer, Line C-3 at Sin. 12+ 2 20.8 100.2 97.5 GAUGE 1.0.: 10903 STD. DENSITY COUNT: 2375 STD. MOISTURE COUNT: __5::;:8::=3'---_ "R" AFTER TEST NUMBER INDICATES RETEST . • INDICATES FAILURE TO COMPLY WITH PROJECT SPECII'ICATIONS REMARKS: __________________________________________ Note: This report is for the exclusive use oflhe Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results a I onl to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 SOIL MOISTURE ·DENSITY TEST REPORT IN·PLACE TESTS BY NUCLEAR METHODS CLIENT: E. L Dalton & Company, Inc. DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 08/03/98 Huitt Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT NO.: DC98-050-35 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde E.L Dalton & Company -Mike Claxton SPECIFICATIONS TEST DATA Percent Compaction: 95+ Date Tested: 08/03/98 Moisture Content (%): opt ++ Technician: M. Kashem MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION OPTIMUM MOISTURE (%) MAlt-DRY DENSITY (pel) 2 0698 Light Gray Calcareous Clay w/LSF 20.7 102.8 4 0698 Dark Brown and Light Brown Clay w/LSF 25.0 92.6 IN-PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM 02922, 03017, RESPECTIVELY TEST NO. ELEVATION OR LIFT LOCATION LOCATION REF. CURVE % MOISTURE DRY DENSITY % DENSITY 1 2 3 Grade Grade Grade 39" Storm Sewer Line C-2 and C-3 at Station 12 + 05 39" Storm Sewer Line C-2 and C-3 at Station 12 + 90 39" Storm Sewer Line C-3 at Station 12 + 98 2 4 4 21.0 25.6 25.8 100.9 90.6 90.1 98.2 97.8 97.3 GAUGE 1.0.: 10903 STD. DENSITY COUNT: 2374 STD. MOISTURE COUNT: _--=5",8:::.9__ "R" AFTER TEST NUMBER INDICATES RETEST. "INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS REMARKS: _________________________ _____________ Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without 4