-􀁾􀀠... , ; ( ,: , l lJ -'" 4i.. •0J:, 1ft -.IO.J. ff 􀁾􀀻􀁉􀁏􀀨􀁩􀀠􀁌􀁊􀀭􀁡􀀮􀀯􀁤􀁾􀀨􀀠If.'w It! !:rd. II 51 ... ".>...!9' .. 􀀺􀁾-,,'. -' 􀀻􀁾􀀠"j, lent By: EBCC; 2143523201; Jan-24-g0 2:36PM; Page 1 " 􀁲􀀻􀀭􀀺􀁾􀁉􀁚􀀺􀁉􀁉􀁉􀁉􀁉􀁉􀁉􀁉􀁉􀁉􀀡􀀡􀁛􀁉􀁉􀁉􀁉􀁉􀀡􀁉􀁉􀁉􀁉􀀢ED DELi.:.. CONSTRUCTION COMPANY P.O. BOX 540711 DALLAS, TX 75354.0787 FACSIMlLE TRANSMlTTAL SHEET-,&batD.Weber o UllGENT 0 FOR UVlI'W 0 PLI!ASl! COIoI'MIil'IT 0 PLI!ASE IUjJlL'( , 0 PLEASE llECYct.1! :ERRA-MAR,TC.This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUSSOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:g72-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 04128/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-121 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi):. _....:6""5::.::0'--____ Slump (in.): Air Content ('Yo): Concrete Temp CF) PROJECT DATA Placement Date: 04121/99 Sampled By: EE Weather: P. CloudylWindy Supplier/Mix: Ed Bell , FIELD DATA SET #1 Ticket #: 7068521 Time Batched: 7:45 Time Sampled: 8:33 Unit Weight (pcf): ----=::..;;.;;'----Slump (in.): 2 Air Content: 4.0 Conc. Temp. CF): 78 Ambient Temp. CF): 71 Yardage (c.y.): ____9=--___ Placement Location: Median of Arapaho Road FIELD DATA SET #2 Ticket#: 6094472 Time Batched: 12:51 Time Sampled: ___-=2:...;:00""-___ Slump (in.): 1 1/2 Air Content: 4.0 Unit Weight (pcf): ----,=-=:c=---Conc. Temp. (OF): Ambient Temp. CF): 88 Yardage (c.y.): __--=1..::.0.::0-..::.2:.:0;.:;0___ Placement Location: Median of Arapaho Road Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31 TESTED PER ASTM C78 , Average Modulus of NotesSet # Beam # Test Date Age Max. Load Average (Ibs) Rupture (psi) (Days) Depth, D Width, B 6.20 605AR040501 04128199 7260 6.051 7 .. • Ooes not meet specification6.05' 645AR040502 05/19/99 28 7740 5.95 6.30 6002 AR040503 04/28/99 7200 5.957 6.35AR040504 05/19/99 28 8640 6.00 720 :1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. :2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. 􀁾􀀩􀀠TEST RESUlTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. :4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: CI38, Cl43. Cln. C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results a I ani to above tests. TERRA-MAR,C. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) "Revised Copy -Specifications CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 02101/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-93 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): 650" Slump (in.): --=.4=----Air Content ("!o): _--.:5::.-.____ Concrete Temp CF): PROJECT DATA Placement Date: 12131/98 Sampled By: J. Perez Weather: Sunny Supplier/Mix: TXI FIELD DATASET #1 Ticket #: Slump (in.): na 5.00 Time Batched: Air Content: 8:14 5.0 Time Sampled: 9:00 Unit Weight (pc!): -----=-n:.:a"'----Conc. Temp. CF): 50 Ambient Temp. CF): 40 Yardage (c.y.): ___---::5"'0____ Placement Location: Quorum and Arapaho Road -northwest FIELD DATA SET #2 Ticket #: Slump (in.): Conc. Temp. (oF): 5.00 50 Time Balched: Air Content: Ambient Temp. ('F): 9:03 5.0 40 Time Sampled: 9:55 Unit Weight (pc!): -----=-n:.:a"'---Yardage (c.Y.): ___---'5:::0____ Placement Location: Quorum and Arapaho Road -south center Remarks' Set# 1 2 Beam # APR123101 APR123102 APR123103 APR123104 Test Date 01/07/99 01/28/99 01/07/99 01/28/99 CONCRETE COMPRESSION TEST RESULTS BeAMS MOLDED AWD CURED peR ASTM C3l, TESTeD PER ASTM C7a Age Max. load Average Average (Days) (Ibs) Depth, D Width, B 7 6300 5.90 6.10 28 7320 5.90 6.10 ti. d-LH(,.,lenTJ '1( 􀁾􀀥􀀠if7 6060 5.90 6.10 28 7260 5.90 6.00 􀀷􀁾􀀠de.kc 􀁾􀁮􀁦􀁪􀀠qe. ;0 of-Modulus of Noles Rupture (psi) 525 610 * .. Does not meet specifICation c.rvr/ri(¢ fj./(.-l 􀁴􀁦􀀭􀁉􀁉􀁾􀀠􀁾􀁕􀀨􀀠505 605 * .. Does not meet specification 􀁕􀁬􀀧􀁴􀀭􀁦􀁲􀁾􀁆􀀭􀁡􀁬􀁬􀁾􀀠,(1) SPAW LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESl1NG, LEATHER SHIMS USED DURING TESTING. (3) TeST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLEASTM STANDARDS: Cl38, C143. C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety. without the wrttten consent of TMI. Results _., nly to above tests, TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, DaUas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed 8ell Construction -Doug Teter REPORT DATE: 04/28/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMJ REPORT #: DC98-050·121 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): 􀁟􀀮􀀮􀀮􀀺􀀶􀁾􀀵􀁾􀀰____ Slump (in.): Air Content (%): __3:;;..-.;;;.5____ Weather: P. CloudylWindy Concrete Temp ("F) Supplier/Mix: Ed Bell FIELD DATA SET #1 Ticket #: Slump (in.): Conc. Temp. ("F): 7068521 2 78 Time Batched: Air Content: Amoient Temp. ('F): 7:45 4.0 71 Time Sampled: 8:33 Unit Weight (pef): ----=n"'a"---Yardage (c.y.): ___--=9____ Placement Location: Median of Arapaho Road FIELD DATA SET #2 Ticket #: 6094472 Time Batched: 12:51 Time Sampled: ___􀀮􀀮􀀺􀀮􀀲􀀺􀀺􀀮􀀺􀀮􀀺􀀰􀁾􀀰􀀺􀀺􀀺􀀮􀀮􀀮􀀮􀀮___ Slump (in.): 1 1/2 Air Content: 4.0 Unit Weight (pef): __--:-::-=-::-::-;:-__ Conc. Temp. (OF): 76 Amoient Temp. (,F): 88 Yardage (c.y .j: __---'1..::,00-.::....=2.;:..00"--__ Placement Location: Median of Arapaho Road Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM 031, TESTED PER ASTM 07B Max. Load Average Average Modulus of NotesAgeSet# 8eam# Test Date Rupture (psi) (los) Depth, D Width, B (Days) 6.05 6.207 7260 605 AR040502 04/28/991 AR040501 • • Does not meet specification5.95 64528 7740 6.0505/19/99 600 AR040504 6.307 5.9504/28/99 72002 AR040503 6.00 7206.3528 864005/19/99 (1) SPAN LENGTH OF 18 INCHES. UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: CI38, CI43, CI72, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results applv onlv to above tests. TERRA-MAR; C. TERRA.MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW LUBBOCK 11050 Ables Lane, Dallas, Texas 75229 Phone:972488·8800 CONCRETE CORE COMPRESSION TEST REPORT CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction· Doug Teter REPORT DATE: 03/31/99 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-050-112 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde PROJECT DATA Placement Date: na Drilled By: Ron Pleasant Date Drilled: 03/24/99 Moisture Condition at Time of Test: Dry Date Tested: 03/26/99 Nominal Max. Size of Aggregate: Age at Test: na Design Strength (psi): CONCRETE COMPRESSION TEST RESULTS CONCRETE CORED IN ACCORDANCE WITH ASTM C42, CURED (IF APPLICABLE) PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C6l7 COREI.D. CORE CAPPED DIAMETER DIAMETER AVERAGE AREA MAXIMUM UD CORRECTION CORRECTED LENGTH LENGTH, L 1 2 DIAMETER,D LOAD FACTOR STRENGTH (in.) (in.) (in.) (in.) (in.) (in') (lb •• ) (psi) 3A 9.6 6.88 3.68 3.68 3.68 10.64 57700 1.87 0.99 5370 2B 9.7 7.31 3.68 3.68 3.68 10.64 78520 1.99 1.00 7380 2A 10.1 7.42 3.68 3.68 3.68 10.64 63130 2.02 1.00 5730 LOCATION OF DRILLED CORES COREI.D. LOCATION 3A Westbound Arapaho inside lane, station 45+71 2B Westbound Arapaho inside lane, station 46+37 2A Westbound Arapaho inside lane, station 46+08 Note: This report is for the exclusive use of the Client addressed. }1......p This report may not be reproduced except in its entirety, without TERRA-MAR, INC. my" 􀁾􀀮􀀢􀁩􀁾MODULUS OF RUPTURE 300 2,000 2,SOO 3,000 3,500 4,000 4,500 5,000 5,500 6,000 Compressive strength, fc (psi) 1-.,. 2.5-Flawttllt> 􀁣􀁾-,.,m relatiotullip U-'l'blcbc.. d.sip .2.6.1 BaN [tit' dtsi&n-Thldm<:>s deIigns for conacle ""vcmenlS are basod IIpOII studie«, mad tcsIS, and wrveis of pavcmcolll pcrfOrmAl1CC. n .. 11>051 t:I;IIIII2lODIy IU4ICI JDe1hods arc the AASHTO Dc:sIgn Eqllilioa, 'Nbidl was developed from dBIa (fbtaiaed al the 􀁁􀁁􀁾􀁏Road TCIit, and lite Portland ("..,_t iUMldalion'. DuigR l'rocedlUe, whkh is ha.'led 010 the rav_III', resistllllCC 10 faUpe and deO",io1I. Other methods h""" been _II, c-s., Ibe Brokaw Me1bcd,' which is bOllll:d 00 5lIf1/q1 of tbe perfOJm&DCe of plUI co=ete pa_ menls in lISe lllrouplil Ihe mull)'. Who Ih_ desi&o _bods wore """eloped ro. analyzing and deroJipiIIg deroJipiIIg pave. mt:n1S for IIreelS Ind biCbwa)'$, IIIe resean:ll bchiad them h.. iDcIudcd Ibin va_en!$, and lIIey COD toe IdCd for parki1lglot desigu. lbe diIl"creIIl ckIsi&n 􀁰􀁾give very similar 1IIlckJIc:s:sca. Mo... complete aplallalions of Ih_design procedula call toe fOWld ill Appcadix A. 0:mc:eIe pavCll1ll1lls are _Illy ..if,... as pJaia Or reinfon:ed, dcpeDdlng 011 whelhl:l' or 1101 Ihe CORQ'Clc COli· lalm! disltibuled IIlm nillfOR>Old4I. Plain prvcmelIlS may toe dMdcd illto IlIole willi Or wilhoIIlload II'lnUfcr devices lIthe joinlS. lhotc willi dwices are usvally nfemd 10 as plaindoweled pawmenlt. The desIp _Iboib Qled above c:u be U>Cd for plain or nillfomd pa_ols since Ih. prese_ or lack of clilttibaled IIeeI reiofon:emerIl Iw 110 apifkallt effect 00 the Joad.can)'iDg c:apKi17 or lbil:ta.... The pre. iICIIce or absem:e of diIIn"buled Sled 􀁾􀁴does a1Cea joipI deti,gn. Load trnsfer devic:u lIave a "air...."1 effect 011 pavClllellllhicbesl. but Ill.,. ate eoIIly and lIot tlOnnaUy U$Od ill light dUly ""vemen,",. The difl'er""" .. be_n these types of pavculeDII are disalsscd ia $e(lionl2.7 _2.8. Thblcs 􀀲􀀮􀀶􀁜􀁾􀀩􀀠aad 2.6(b) bave 􀁾􀁡prepared 10 fadlitat" IIIe w",ion of II' appropriate pavemenl thiclm_ for Ihe types of tralli<: and son mnditiollS most frequenlly eatoulllered ill parking loIS. 􀁔􀁾􀁢􀁬􀁣􀀠2.6(a) list. five dif{erent trall"lC ca\Cgories raaging from enWely passenger con; DDd lighl tram, to bWIY lr1II:ks. Table 2.6(b) pesrcwlllmc:nded (:OOCtade soiIlypeS. n" Ibiclu!.....,. show.. ate \la$ed onll1Odull of I1IpflUe raaglng CrUIQ SOO 10 6!JO psi, wIJkb gD be COfrel.led 10 2lkIny comprasivc 􀀢􀀧􀁲􀁾􀁮􀁧􀁬􀁢􀁳􀀠"slug Eq. (2-1). Ai'I'"""",,IC ..... wlJcre hcu·III.... .CJimDec Is 1101 importanL 11 P(JU14 be hOted 􀁾lbal eha",..1n IIIOdlllus of rllplllrc do dI•• IIIe required eoncrele thicbAl or lbe t:apacily. A desIs-ohollld delCnl\me whellter il il IlIOre ..... ellGliYo 10 iII"_ strenglh or 1It1e1"",", "'king inrn actOlIPI the other ben.1i15 of IIigh _,Ih. Table 2.6(b) can be used to assist the 􀁤􀁥􀀳􀁩􀀮􀁾􀀮􀁲􀀠ill 11115 dclcrmill,lIion. • .. I i I ., %.7in& Q)III ""'" Tof,l TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT 􀁶􀁾􀀠j (THIRD POINT LOADING) (; 􀁾􀀮􀁴􀀧􀀠CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 12103198 DC98-050-88 REPORT DISTRIBUTION: Ed Bell Construction -Doug Teter HuiH-ZoUars, Inc. -Kenneth Roberts, P.E. Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): 􀁟􀀭􀀬􀀶􀁾􀀵􀀻􀀮􀀺􀀰􀀬􀀭􀀭____ Slump (in.): 4 Air Content (%): --47 _"'6----Concrete Temp (oF) 95 Tlcket#: 62653 Slump (In.): 􀁾􀀠,...' Cone. Temp. ('F): Placement Location:-, Remarks: Ticket#: Slump (in.): Cone. Temp. (OF): Placement Location: Remarks: --...:. Set # Beam # Test Date 1 ARI112501 ARI112502 ARI112503 ARI112504 12/02198 12102/98 12123/98 12123/98 l (. 7 7 28 28 .us) 6540 6180 6900 6660 PROJECT DATA Placement Date: 11/25/98 Sampled By: Ed Emanual Weather: Clear Supplier/Mix: LaHimore 'T#1 Time Sampled: ___.-::2,;.::1""8____ Unit Weight (pet): ___---,"""____ Yardage (c.y.): ___--'2;;.:0'--___ Time Sampled: Unit Weight (pet): -------Yardage (c.y.): ________ . """T RESULTS • "STM C31, TESTED PER ASTM C78 Average Depth, D 6.10 6.05 6.10 6.10 􀁾􀀢􀀢􀀠Average Width, B 6.15 6.10 6.15 6.15 5&.>5 y" 81% 'b Modulus of Notes Rupture (psi) 545 515 * • Does not meet specification f575 555 * .. Does not meet specIfication K; . • J .,u. A-,., oIJ. [)"""" 􀁾􀁲􀀠(1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Clsa, Cl43, C172, C231 Note: This report is for the exclusive use of the Clienl addressed. 􀁾. ;t: :E4'2?< N' ; RRA-MAR, INC.This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tesls. TOWN OF 􀁾􀁹􀁾􀀠, ADDIsoN r' PUBLIC WORKS To: 􀀨􀀲􀁨􀁲􀁴􀁴􀁊􀁾􀀠From: James C. Pierce,Jr.,P.E.,DEE Assistant City Engineer Company: €J. K1Jg 􀁾􀀠Phone: 972/450-2879 FAX: 972/450-2837 FAX#: 1-1'{ -'35"2..-"3 2£J I 16801 Westgrove Date: /1-/7-1r P.O. Box 9010 Addison, TX 75001-9010 # of pages (including cover): .3 Re: Ampa.k tel 􀁾􀁔􀁩􀁤􀀭􀁾􀀠o Original in mail o Per your request o FYI o Call me TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN WNGVlEW LUBBOCK 11050 Ables Lane. Dallas. Texas 75229 Phone:972-488-8800 CONCRETE CORE COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: TMI REPORT #: Ed Bell Construction Arapaho Road Improvements 11104/98 DC98-050-83 REPORT DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt-Zollars, Inc. -Kenneth Robens, P.E. Town of Addison -James PielCe, P.E. Town of Addison -Dave Wilde PROJECT DATA Placement Date: na Drilled By: Mike Young/John Sullivan Date Drilled: 10/29198 Moisture Condition at Time orTest: Dry Date Tested: 11102/98 Nominal Max. Size of Aggregate: Age at Test: na Design Strength (psi): CONCRETE COMPRESSION TEST RESULTS CONCRETE CORED rN ACCORDANCE WITH ASTM C42, CURED (IF APPLICABLE) PER ASTM 01, TESTED PER ASTM 09, CAPPED PER ASTM C617 CORELD. CORE LENGTH (!D.) CAPPED LENGTB.L (!D.) DIAMETER I CUL) DIAMETER 2 (!D.) AVERAGE DIAMETEJl.D (tn.) AREA (In') MAXIMUM LOAD (I"".) LED CORRECTION FACTOR CORRECTED STRENGTH (psi) 1 11.0 7.80 3.89 3.90 3.90 11.92 44020 2.00 1.00 3680 2 9.8 7.70 3.90 3.90 3.90 11.95 51180 1.97 1.00 4280 3 9.5 7.80 3.90 3.90 3.90 11.95 61160 2.00 1.00 5030 4 9.8 7.80 3.90 3.90 3.90 11.95 56380 2.00 l.00 4720 LOCATION OF DRILLED CORES CORELD. LOCATION Easlend of A .hO, station 55+50 (core contains rebar) 1 West end ofArapaho, station 46+252 West end ofArapaho, station 4S+453 4 West end ofArapaho, station 44+50 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced e"cept in its entirety, without the written consent ofTMI. Results apply only to above tests. TERRA-MAR, INC. <-4 L :E'j22 􀀨􀁾􀀠 ARAPAHO ROAD CORE TEST RESULTS I R&R = Remove and Re lace Pavement Thickness = 10.0 inches. Pavement Compressive strength = 4,750 psi. Combined Percent , Percent Core Contract Contract Strength Price Deficient Allowed Percent Price Allowed􀁾􀁩􀀡􀀠R&R 4280 3660 22.5% R&R 90 5030 9.9% 90 -5.9% 100 60 4720 1000.6% 100 *************** -CDMM.JOURNAL-****************_ DATE 11-17-1998 ****** TIME 03:54PM ** P.1 MODE = TRANSMISSION START=11-17 03:53PM END=11-17 03:54PM NO. COM SPEED NO STATION NAME/PAGES TELEPHDNE NO. 001 OK .. 92143523201 003 -Add ison Svc Ctr -Upstatl's***************************************C FAX-200 V2.17)*-972 450 2834-************ , 1'OWNOF ADDIsoN PUBLIC WORKS To: Rdu r-t-Wrt 6 rFrom: James C. Pierce,Jr.,P.E.,DEE Company: to( 1& 11 Qm:::d--. Assistant City Engineer Phone: 972/450-2879 FAX#: 1..14 -􀀳􀀻􀀭􀁾􀀭.3:;2£0/FAX: 972/450-2837 Date: II􀁾􀀠􀁉􀁄􀀭􀁪􀁾􀀠16801 Westgrove P.O. Box 9010 Addison, TX 75001-9010 # of pages (including cover): __ Re: A-vzt.pOlh 0 􀁾􀁾-9tA.V.fWlf(l,+ IhlcLYIe 5'5 􀁾􀀵􀀫􀁴􀁾􀀱􀀠D Original in mail D Per your request D FYI D Call me Comments: 'FOr 􀁾r1vUfClSQS o-P--'1{lck)'lf'SS 1-:eS+t h7 T 􀁾􀀱􀁉􀁥􀀮􀀮􀀠dill 􀁊􀁾􀁊􀀠􀁴􀁬􀁵􀀭􀁊􀀶􀁾􀀠\n{, b I\LtYl l t<:, 1/crs 􀁾110<05 ! ' Li-St7:2. @EclwWl L.a.v,"" 'Dr/ve., Qk..chiP1..))n'"e. }J $5) Spe.c:fh,m Dr. , OYlt-' i}11c...k.ness ±e5+skIJ m h,k-t(\) f-n-ICtJ1e; , \􀀩􀀧􀁜􀁣􀁬􀁾􀀬(\'( 􀁾rn IGl (Ie '5) ',n t''l t.-k /;\ Y1 ,to. Tk lbC«.icM skll 􀁾􀀠Mled--eot oJ-flP1.ciom 􀁾P6tVl? 􀁌􀁊􀁬􀀧􀁬􀁯􀁬􀁾􀀴􀀠1"kL r-tt'I'lC{l'Ylc1.e r of-tf..z p(2)c.e--eoiu r e 5 hA. 􀁾􀀠1 be. t{ 'S 􀁾􀁲􀀠CDC-?yuc. 􀁾􀀧􀀶􀀮􀁾􀀬􀀠Cdres 􀁳􀁾􀀯􀀱􀀠6. H-L ---------------------------------------------------------------------------------------------------------------------------------------------------------------------_._---------------------------_. --------------------------_.------------_.__•.. _._------------------------------------------------------------------------_._---------------------------------------f ; .". -------------------------- ----------------------------------..-. __.. ---------------------_.. _---------..--------------------------------------------.... -- -." ' ********--aJMM.JOURNAL-******************** DATE 11-1121-1998 _ TIME 03:33PM ** P.1 MODE TRANSMISSION 􀁓􀁔􀁁􀁒􀁔􀁾􀀱􀀱􀀭􀀱􀀱􀀲􀀱􀀠03:29PM 􀁾􀀱􀀱􀀭􀀱􀀱􀀲􀀱􀀠03:33PM m. STATION NA!'E/TELEPHONE NO. 001 OK iii 92143523201 -Addison Svc Ctr -upstairs"Y72 450 2834_ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DAILAS FORTWORTH HOUSTON AUSTIN LONGVIEW LUBBOCK JI050Abies Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE CORE COMPRESSION TEST REPORT CLIENT: PROJECT: REPORT DATE: TMI REPORT II: Ed Bell Construction Arapaho Road Improvements 1lI04/98 DC98"()50-83 REPORT DISTRIBUTION: Ed Bell Construction -Doug Teter Huitt-Zollars, Inc. -Kenneth Roberts, P.E. Town ofAddison -James Pierce, P.E. Town ofAddison -Dave Wilde PROJECT DATA Placement Date: na Drilled By: Mike YounglJohn Sullivan Date Drilled: 10129/98 Moisture Condition at Time of Test: Dry Date Tested: 11102198 Nominal MaL Size of Aggregate: Age at Test: na Design Strength (psi): CONCRETE COMPRESSION TEST RESULTS CONCRETE CORED IN ACCORDANCE WITH ASTM C42, CURED (IF APPLICABLE) PER ASTM CJl, TESTED PER ASTM 09, CAPPED PERASTM C617 CORELl). CORE LENGTH (In.) CAPPED LENGTH,L (In.) I)IAMETER 1 (In.) DIAMETER 2 (In.) AVERAGE DIAMETER, I) (In.) AREA (ln1 MAXIMUM LOAD (lbo.) I.JI) CORRECTION FACTOR CORRECTED STRENGTH (""I) 1 11.0 7.80 3.89 3.90 3.90 11.92 44020 2.00 1.00 3680 2 9.8 7.70 3.90 3.90 3.90 11.95 51180 1.97 1.00 4280 3 9.5 7.80 3.90 3.90 3.90 11.95 61160 2.00 1.00 5030 4 9.8 7.80 3.90 3.90 3.90 11.95 56380 2.00 l.00 4720 LOCATION OF DRILLED CORES COREW. LOCATION 1 East end ofArapaho, station 55+50 (core contains n:bar) 2 West end of Aranaho station 46+25 3 West end of A '''0 station 45+45 4 West end ofArapaho, station 44+.50 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, ",ithout the written consent ofTMI. Results apply only to above tests. TERRA-MAR, INC. 4< L ;[¢!. 1'9 ARAPAHO ROAD CORE TEST RESULTS L I I Pavement Thickness =10.0 inches. Pavement Compressive Strength = 4,750 psi. R&R =Remove and Replace Combined Percent Percent Percent Core Contract Core Contract Contract Length Deficiency Price Strength Percent Price Price Core I (inches) (Inches) Allowed (psi) Deficient Allowed Allowed 1 11 0 100 3680 22.5% R&R R&R 2 9.8 0.2 100 4280 9.9% 90 90 3 9.5 0.5 60 5030 -5.9% 100 60 4 9.8 0.2 100 4720 0.6% 100 100 ARAPAHO ROAD CORE TEST RESULTS Pavement Thickness = 􀀱􀁣􀀻􀀻􀀰􀁣􀀧􀀻􀀮􀀰􀀻􀀿􀀧􀀻􀀢􀁩􀁮􀁃􀀺􀁣􀁩􀁨􀁥􀀺􀀢􀁳􀀺􀀽􀀧􀀮􀀢􀀧􀀻􀁐􀁾􀁡􀁾􀁶􀀭􀀭􀀺􀁥􀀢􀀧􀁭􀁣􀀭􀁥􀀧􀀺􀀭􀀺􀁮􀀺􀀭􀀡􀁣􀁴􀀭􀀻􀀻􀀺􀁣􀀺􀀭􀀺􀀺􀁯􀀭􀀽􀁭􀀺􀁃� �􀁰􀀺􀁃􀀺􀁲􀁥􀀢􀀢􀁓􀁓􀀺􀀺􀀭􀀺􀂱􀁩􀁶􀁃􀁃􀁥􀁃􀁃􀁓􀁴􀀽􀁲􀁥􀀺􀁃􀀺􀁮􀀺􀁃􀀺􀁧􀀧􀀢􀁴􀁨􀁬􀀺􀀭􀀽􀀽􀀭􀀻􀀴􀀢􀀬7:;;S=;0;cps=i.t----I R&R = Remove and Replace Combined Percent Percent Percenl Core Contract Contract Siren h Percent Price Price (psi) Deficient Allowed Allowed 3680 22.5% R&R R&R 4280 9.9% 90 90 S030 -5.9% 100 60 4720 0.6% 100 100 Contract , . JJ-{JU--:; f' 􀁾􀀭􀁾􀀷􀁾􀀠/.::5 I 􀁾􀁩#-'L 􀁾􀀠􀀧􀁦􀀮􀁾􀁦􀀭􀀧􀀲􀀮􀀮􀀧􀁓􀀠t/b 1-10 if&,. f-e-fo 􀁾􀁾􀀠 TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW LUBBOCK AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/0S/98 Huitt-Zollars, Inc. -Kenneth Roberts, P.E. TMI REPORT #: DC98-0S0-70 Town of Addison -James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS Strength (psi): 􀁟􀁾􀀶􀀺􀀺􀀺􀀺􀁓􀀻􀀮􀀰􀀺􀀭___ Slump (in.): 3 +/-1 Air Content (%): -.::;S=-'--'-:8,;----Concrete Temp ("F) na PROJECT DATA Placement Date: . 09/04/98 Sampled By: Ed Emanuel Weather: Sunny Supplier/Mix: Ed Bell Construction FIELD DATASET #1 Ticket #: 14318 Time Batched:_-,0:;9",:4",5=--_ Time Sampled: 9:55 Unit Weight (pct): -----"n:..:a..::....--Slump (in.): 2.00 Air Content: 3.8-......:::::--Conc. Temp. ("F): 91 Ambient Temp. 􀀨􀀢􀁆􀀩􀀺􀀻􀀬􀀭􀀺􀀭􀀻􀁾􀀹􀀺􀀮􀀮􀀺􀀷__ Yardage (c.y.): ___--'1.::26=---___ Placement Location: Paving at Arapaho Road, station 46+25 Remarks: FIELD DATASET #2 Ticket #: 14323 Time Batched: 11 :00 Time Sampled: 11 :22 Slump (in.): Air Content: 3.8 Unit Weight (pct): ---....:...:n::'a=----Conc. Temp. ("F): 98 Ambient Temp. ("F): 98 Yardage (c.y.): ___--'1.:..7.:..1____ Placement Location: Paving at Arapaho Road, station 45+4S Remarks: CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Set# Beam # Test Date Age (Days) Max. Load (Ibs) Average Depth, D Average Width, B Modulus of Rupture (psi) Notes. 1 ARI090401 ARI090402 ARI090403 ARI090404 09/11/98 09/11/98 10/02198 10/02198 7 7 28 28 6120 5820 7560 7440 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 510 485 630 620 * * Does not meet specification •• Does not meet specification 2 . ARI09040S ARI090406 ARI090407 ARI090408 09/11/98 09/11/98 10/02198 10/02198 7 7 28 28 4680 5640 7020 6780 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 390 470 S8S 565 * * Does not meet specification * * Does not meet specification (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138. C143, C172, C231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entirety, without > TERRA-MAR, INC. the written consent of TMI. Results apply only to above tests. _________________________________ _ TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS CONCRETE INSPECTION AND FLEXURAL STRENGTH TEST REPORT (THIRD POINT LOADING) CLIENT: Ed Bell Construction REPORT DISTRIBUTION: PROJECT: Arapaho Road Improvements Ed Bell Construction -Doug Teter REPORT DATE: 10/05/98 Huitt-Zollars, Inc. -Kenneth Roberts. P.E. TMI REPORT #: DC98-050·70 Town of Addison· James Pierce, P.E. Town of Addison -Dave Wilde SPECIFICATIONS FIELD DATA SET #3 PROJECT DATA Ticket #: 14333 Time Batehed: 13:40 Time Sampled: 14:08 Slump (in.): 3.50 Air Content: 4.0 Unit Weight (pcf): na Cone. Temp. ("F): 94 Ambient Temp. (oF): 103 Yardage (c.y.): 261 Placement Location: Paving at Arapaho Road, station 44+50 Remarks: FIELD DATASET #4 TIcket #: TIme Batched: Time Sampled: Slump (in.): Air Content: ----Unit Weight (pet): ---------Conc. Temp. CF): Ambient Temp. (0F):____ Yardage (c.y.): ________ Placement Location: Remarks: Set # Beam # CONCRETE COMPRESSION TEST RESULTS BEAMS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C78 Test Date Age Max. Load Average Average Modulus of (Days) (lbs) Depth, D Width, B Rupture (psi) Notes 3 ARI090409 ARI090410 ARI090411 ARI090412 09/11/98 09/11/98 10/02198 10/02198 7 7 28 28 6540 5100 7380 6960 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 545 425 615 580 • • Does not meet specification • • Does not meet specification 4 (1) SPAN LENGTH OF 18 INCHES, UNLESS NOTED ABOVE. (2) SPECIMENS GROUND PRIOR TO TESTING, LEATHER SHIMS USED DURING TESTING. (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICA TlONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: Cl38, Cl43, C172, 0231 Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its entiraty, without the written consent of TMI. Results apply onlv to above tests.