gis.addisontx.gov - /GIS_Documents/Plan-Room/Addison Asbuilts/01 Project Files/2009-05/Notices/
[To Parent Directory]
5/18/2011 8:46 AM 122880 Action List for Punch List for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:21 AM 14744 Action List for Punch List for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
5/18/2011 9:11 AM 73728 Action List for Punch List for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).msg
8/9/2021 11:21 AM 7378 Action List for Punch List for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).txt
5/18/2011 3:36 PM 134656 Action List for Punch List for project _Vitruvian Infrastructure Phase 1D Bridges_ (4).msg
8/9/2021 11:21 AM 19346 Action List for Punch List for project _Vitruvian Infrastructure Phase 1D Bridges_ (4).txt
5/23/2011 12:42 PM 158720 Action List for Punch List for project _Vitruvian Infrastructure Phase 1D Bridges_ (5).msg
8/9/2021 11:21 AM 28100 Action List for Punch List for project _Vitruvian Infrastructure Phase 1D Bridges_ (5).txt
6/1/2011 7:29 AM 173568 Action List for Punch List for project _Vitruvian Infrastructure Phase 1D Bridges_ (6).msg
8/9/2021 11:21 AM 31342 Action List for Punch List for project _Vitruvian Infrastructure Phase 1D Bridges_ (6).txt
5/13/2011 10:23 AM 84480 Action List for Punch List for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:21 AM 8400 Action List for Punch List for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
7/22/2011 10:17 AM 49152 Download Files for project _Vitruvian Infrastructure Phase 1C Park_.msg
8/9/2021 11:21 AM 7488 Download Files for project _Vitruvian Infrastructure Phase 1C Park_.txt
5/10/2010 9:31 AM 89088 File upload notification for Vitruvian Infrastructure Phase 1D Bridges (2).msg
8/9/2021 11:21 AM 44032 File upload notification for Vitruvian Infrastructure Phase 1D Bridges (2).txt
7/30/2010 10:58 AM 46080 File upload notification for Vitruvian Infrastructure Phase 1D Bridges (3).msg
8/9/2021 11:21 AM 4076 File upload notification for Vitruvian Infrastructure Phase 1D Bridges (3).txt
5/10/2010 8:13 AM 36864 File upload notification for Vitruvian Infrastructure Phase 1D Bridges.msg
8/9/2021 11:21 AM 2778 File upload notification for Vitruvian Infrastructure Phase 1D Bridges.txt
8/11/2010 1:56 PM 289280 FW_ Meeting Minutes For _Construction Meetings_ Meeting No. 5 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:21 AM 24518 FW_ Meeting Minutes For _Construction Meetings_ Meeting No. 5 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
7/14/2010 2:58 PM 34816 Meeting Minutes For _Construction Meetings_ Meeting No. 1 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:21 AM 8152 Meeting Minutes For _Construction Meetings_ Meeting No. 1 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
7/22/2010 3:38 PM 69120 Meeting Minutes For _Construction Meetings_ Meeting No. 2 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:21 AM 12794 Meeting Minutes For _Construction Meetings_ Meeting No. 2 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
3/11/2011 3:41 PM 77312 Meeting Minutes For _Construction Meetings_ Meeting No. 28 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:21 AM 12066 Meeting Minutes For _Construction Meetings_ Meeting No. 28 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
7/28/2010 1:24 PM 90112 Meeting Minutes For _Construction Meetings_ Meeting No. 3 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:21 AM 19092 Meeting Minutes For _Construction Meetings_ Meeting No. 3 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
8/4/2010 3:27 PM 87552 Meeting Minutes For _Construction Meetings_ Meeting No. 4 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:21 AM 18382 Meeting Minutes For _Construction Meetings_ Meeting No. 4 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
8/11/2010 1:56 PM 99840 Meeting Minutes For _Construction Meetings_ Meeting No. 5 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:21 AM 23790 Meeting Minutes For _Construction Meetings_ Meeting No. 5 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
7/22/2010 3:44 PM 35840 New RFI No. 25 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:21 AM 3446 New RFI No. 25 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
3/23/2011 8:31 AM 40448 New Construction Submittals No. 36 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:21 AM 4084 New Construction Submittals No. 36 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
3/23/2011 8:12 AM 40448 New Construction Submittals No. 36 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:21 AM 4084 New Construction Submittals No. 36 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
7/27/2011 3:41 PM 40960 New Construction Submittals No. 47 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:21 AM 4682 New Construction Submittals No. 47 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
9/17/2010 7:21 AM 45056 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (10).msg
8/9/2021 11:21 AM 2920 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (10).txt
9/17/2010 7:40 AM 49152 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (11).msg
8/9/2021 11:21 AM 2470 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (11).txt
9/17/2010 8:00 AM 54272 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (12).msg
8/9/2021 11:21 AM 6286 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (12).txt
9/17/2010 8:04 AM 49152 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (13).msg
8/9/2021 11:21 AM 2610 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (13).txt
9/17/2010 8:11 AM 52224 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (14).msg
8/9/2021 11:21 AM 2752 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (14).txt
9/20/2010 7:58 AM 49152 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (15).msg
8/9/2021 11:21 AM 2480 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (15).txt
9/20/2010 8:03 AM 46592 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (16).msg
8/9/2021 11:22 AM 2376 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (16).txt
9/24/2010 10:17 AM 62464 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (17).msg
8/9/2021 11:22 AM 6146 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (17).txt
9/27/2010 7:07 AM 54784 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (18).msg
8/9/2021 11:22 AM 9422 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (18).txt
9/27/2010 7:29 AM 49152 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (19).msg
8/9/2021 11:22 AM 2774 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (19).txt
8/31/2010 10:28 AM 34816 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:22 AM 3178 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
9/27/2010 9:13 AM 50688 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (20).msg
8/9/2021 11:22 AM 3170 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (20).txt
9/27/2010 9:17 AM 48640 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (21).msg
8/9/2021 11:22 AM 2376 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (21).txt
9/27/2010 9:24 AM 46592 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (22).msg
8/9/2021 11:22 AM 2472 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (22).txt
9/27/2010 12:26 PM 48640 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (23).msg
8/9/2021 11:22 AM 2376 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (23).txt
3/8/2011 11:51 AM 52224 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (24).msg
8/9/2021 11:22 AM 2638 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (24).txt
5/12/2011 11:14 AM 55808 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (25).msg
8/9/2021 11:22 AM 3154 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (25).txt
8/26/2011 8:06 AM 39424 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (26).msg
8/9/2021 11:22 AM 2812 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (26).txt
8/31/2010 10:50 AM 48640 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).msg
8/9/2021 11:22 AM 2376 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).txt
9/2/2010 12:13 PM 49152 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (4).msg
8/9/2021 11:22 AM 2474 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (4).txt
9/2/2010 12:20 PM 46592 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (5).msg
8/9/2021 11:22 AM 2752 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (5).txt
9/8/2010 9:59 AM 46592 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (6).msg
8/9/2021 11:22 AM 2570 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (6).txt
9/10/2010 1:23 PM 59904 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (7).msg
8/9/2021 11:22 AM 6134 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (7).txt
9/10/2010 1:25 PM 40448 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (8).msg
8/9/2021 11:22 AM 3248 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (8).txt
9/14/2010 1:07 PM 46592 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (9).msg
8/9/2021 11:22 AM 2376 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_ (9).txt
8/11/2010 7:54 AM 51200 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:21 AM 3248 New files uploaded for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
9/1/2010 2:05 PM 53760 Response to Construction Submittals No. 2 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:22 AM 6880 Response to Construction Submittals No. 2 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
9/1/2010 2:00 PM 53760 Response to Construction Submittals No. 2 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
1/5/2011 5:02 PM 33792 Response to Construction Submittals No. 32 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 6594 Response to Construction Submittals No. 32 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
1/10/2011 8:36 AM 33792 Response to Construction Submittals No. 33 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 4846 Response to Construction Submittals No. 33 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
3/7/2011 2:01 PM 79872 Response to Construction Submittals No. 35 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:22 AM 13216 Response to Construction Submittals No. 35 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
3/7/2011 1:59 PM 79872 Response to Construction Submittals No. 35 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 13216 Response to Construction Submittals No. 35 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
4/1/2011 2:08 PM 45056 Response to Construction Submittals No. 38 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 4926 Response to Construction Submittals No. 38 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
4/13/2011 8:35 AM 45568 Response to Construction Submittals No. 40 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 5734 Response to Construction Submittals No. 40 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
4/19/2011 10:04 AM 45056 Response to Construction Submittals No. 41 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 5110 Response to Construction Submittals No. 41 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
4/19/2011 9:53 AM 53760 Response to Construction Submittals No. 42 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 8920 Response to Construction Submittals No. 42 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
4/20/2011 9:15 AM 69632 Response to Construction Submittals No. 43 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:22 AM 16298 Response to Construction Submittals No. 43 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
4/19/2011 9:47 AM 48128 Response to Construction Submittals No. 43 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 7068 Response to Construction Submittals No. 43 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
5/24/2011 2:31 PM 45568 Response to Construction Submittals No. 45 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 5666 Response to Construction Submittals No. 45 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
6/27/2011 11:01 AM 51200 Response to Construction Submittals No. 46 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:22 AM 6922 Response to Construction Submittals No. 46 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
6/22/2011 2:59 PM 55808 Response to Construction Submittals No. 46 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 7698 Response to Construction Submittals No. 46 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
7/28/2011 1:17 PM 47104 Response to Construction Submittals No. 47 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 6500 Response to Construction Submittals No. 47 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
9/1/2010 10:34 AM 48128 Response to Construction Submittals No. 7 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 7752 Response to Construction Submittals No. 7 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
7/19/2010 10:10 AM 33280 Response to RFI No. 1 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 5210 Response to RFI No. 1 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
7/23/2010 2:39 PM 59904 Response to RFI No. 23 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:22 AM 8544 Response to RFI No. 23 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
7/27/2010 2:42 PM 63488 Response to RFI No. 23 for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).msg
8/9/2021 11:22 AM 9100 Response to RFI No. 23 for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).txt
7/23/2010 9:03 AM 55296 Response to RFI No. 23 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 7806 Response to RFI No. 23 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
7/23/2010 9:11 AM 41472 Response to RFI No. 25 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 4222 Response to RFI No. 25 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
7/27/2010 1:22 PM 59392 Response to RFI No. 26 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:22 AM 8150 Response to RFI No. 26 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
7/23/2010 2:39 PM 45056 Response to RFI No. 26 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 5296 Response to RFI No. 26 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
7/23/2010 12:07 PM 58880 Response to RFI No. 4 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 7680 Response to RFI No. 4 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
1/5/2011 4:40 PM 33280 Response to RFI No. 49 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 6364 Response to RFI No. 49 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
1/5/2011 4:41 PM 43008 Response to RFI No. 50 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 11116 Response to RFI No. 50 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
1/5/2011 5:00 PM 49152 Response to RFI No. 52 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 16412 Response to RFI No. 52 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
1/7/2011 4:40 PM 51200 Response to RFI No. 58 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:22 AM 7078 Response to RFI No. 58 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
1/10/2011 8:34 AM 39936 Response to RFI No. 58 for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).msg
8/9/2021 11:22 AM 8642 Response to RFI No. 58 for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).txt
1/7/2011 4:33 PM 45568 Response to RFI No. 58 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 5568 Response to RFI No. 58 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
1/31/2011 7:05 AM 46592 Response to RFI No. 59 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 5250 Response to RFI No. 59 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
7/27/2010 1:22 PM 69120 Response to RFI No. 6 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:22 AM 9480 Response to RFI No. 6 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
7/28/2010 7:54 AM 74240 Response to RFI No. 6 for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).msg
8/9/2021 11:22 AM 10742 Response to RFI No. 6 for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).txt
7/19/2010 1:12 PM 36352 Response to RFI No. 6 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 6948 Response to RFI No. 6 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
2/8/2011 11:21 AM 56832 Response to RFI No. 60 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:22 AM 7514 Response to RFI No. 60 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
2/8/2011 2:40 PM 62464 Response to RFI No. 60 for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).msg
8/9/2021 11:22 AM 8662 Response to RFI No. 60 for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).txt
2/9/2011 5:23 PM 70656 Response to RFI No. 60 for project _Vitruvian Infrastructure Phase 1D Bridges_ (4).msg
8/9/2021 11:22 AM 11634 Response to RFI No. 60 for project _Vitruvian Infrastructure Phase 1D Bridges_ (4).txt
2/8/2011 10:09 AM 44544 Response to RFI No. 60 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 5210 Response to RFI No. 60 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
4/5/2011 3:34 PM 65024 Response to RFI No. 69 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:22 AM 11460 Response to RFI No. 69 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
4/6/2011 9:00 AM 71680 Response to RFI No. 69 for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).msg
8/9/2021 11:22 AM 12838 Response to RFI No. 69 for project _Vitruvian Infrastructure Phase 1D Bridges_ (3).txt
3/30/2011 3:54 PM 49152 Response to RFI No. 69 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 5876 Response to RFI No. 69 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
3/31/2011 11:58 AM 50176 Response to RFI No. 71 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 6590 Response to RFI No. 71 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
3/31/2011 12:00 PM 48640 Response to RFI No. 72 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 5760 Response to RFI No. 72 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
3/30/2011 10:38 AM 48128 Response to RFI No. 74 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 6160 Response to RFI No. 74 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
4/12/2011 3:11 PM 48640 Response to RFI No. 76 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 5668 Response to RFI No. 76 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
5/18/2011 10:38 AM 62976 Response to RFI No. 77 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).msg
8/9/2021 11:22 AM 9842 Response to RFI No. 77 for project _Vitruvian Infrastructure Phase 1D Bridges_ (2).txt
5/5/2011 12:04 PM 50176 Response to RFI No. 77 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 6450 Response to RFI No. 77 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
5/24/2011 4:30 PM 50688 Response to RFI No. 79 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 7446 Response to RFI No. 79 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt
6/8/2011 7:35 AM 46080 RFI - No. 80 for project _Vitruvian Infrastructure Phase 1D Bridges_.msg
8/9/2021 11:22 AM 6752 RFI - No. 80 for project _Vitruvian Infrastructure Phase 1D Bridges_.txt